joint training and education day (jted) tampa bay post, society of american military engineers...

Download Joint Training and Education Day (JTED) Tampa Bay Post, Society of American Military Engineers Jacksonville District, US Army Corps of Engineers July 23,

If you can't read please download the document

Upload: elizabeth-bishop

Post on 26-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

  • Slide 1
  • Joint Training and Education Day (JTED) Tampa Bay Post, Society of American Military Engineers Jacksonville District, US Army Corps of Engineers July 23, 2015 If you are having technical difficulties, please call WebEx @ 1-866-779-3239
  • Slide 2
  • Moderator David J. O'Brien, PSM, C-FedS, LEED AP President, SurvTech Solutions Immediate Past President, SAME Tampa Bay Post Speakers LTC Mark Himes P.E. Deputy Commander, Jacksonville District US Army Corps of Engineers SAME Tampa Bay Post, Pre-JTED Webinars Mike Rogalski, P.E., PMP Deputy Chief, Programs/Project Management Division, Jacksonville District, US Army Corps of Engineers
  • Slide 3
  • JACKSONVILLE DISTRICT SAME Tampa Bay webinar Jacksonville District Overview Presented by: LTC Mark Himes, P.E. Deputy Commander Mike Rogalski, P.E. Deputy Chief, Programs and Projects Management Division Jacksonville District July 23, 2015
  • Slide 4
  • BUILDING STRONG AGENDA 4 BUILDING STRONG INTRODUCTION TO JACKSONVILLE DISTRICT District Area of Responsibility Mission Areas FY15/16 Program Budgets Major Program Areas Water Resources Ecosystem/Everglades Restoration Military/IIS Herbert Hoover Dike FY2015/2016 contract awards
  • Slide 5
  • BUILDING STRONG GEORGIA FLORIDA Jacksonville Cocoa Melbourne Palm Beach Gardens West Palm Beach Miami Gainesville Tampa Panama City Pensacola Ft. Myers Sebring Clewiston Naples AREA OF RESPONSIBILITY CIVIL WORKS Portions of Florida and Georgia (defined by watersheds) Puerto Rico and the Antilles REGULATORY Florida Puerto Rico and the Antilles DISTRICT HEADQUARTERS DISTRICT AREA OF RESPONSIBILITY Mobile District Jacksonville District CIVIL WORKS AREA OF RESPONSIBILITY (FLORIDA AREA) PUERTO RICO ANTILLES San Juan Ponce Palatka 5 Field Offices
  • Slide 6
  • BUILDING STRONG MILITARY AND IIS EMERGENCY MANAGEMENT FLOOD DAMAGE REDUCTION FY15 $75M FY15 $95M FY15 $675,000 6 NAVIGATION ECOSYSTEM RESTORATION SHORE PROTECTION REGULATORY FY15 $40M FY15 $0M FY15 $16M FY15 $76M BUILDING STRONG FY15 PROGRAM BUDGETS (TOTAL PROGRAM $303M)
  • Slide 7
  • BUILDING STRONG MILITARY AND IIS EMERGENCY MANAGEMENT FLOOD DAMAGE REDUCTION FY16 $28.5M FY16 $81.3M FY16 $0.7M 7 NAVIGATION ECOSYSTEM RESTORATION SHORE PROTECTION REGULATORY FY16 $38.6M FY16 $23M FY16 $16.7M FY16 $132.1M BUILDING STRONG FY16 PROGRAM BUDGETS (TOTAL PROGRAM $320.8M)
  • Slide 8
  • BUILDING STRONG 900 Miles of Inland Waterways Intracoastal Waterway (IWW) from Jacksonville to Miami Okeechobee Waterway (OWW) connecting the Atlantic Ocean to the Gulf of Mexico Part of the Gulf Intracoastal Waterway (GIWW) Harbors 17 Deep Draft Harbors 20 Shallow Draft Harbors WATER RESOURCES Navigation MIAMI HARBOR PORT EVERGLADESTAMPA HARBORJACKSONVILLE HARBOR BUILDING STRONG 8
  • Slide 9
  • Largest Shore Protection Program in the Nation Constructs/maintains over 30% of the nations shore protection projects 17 Counties involved Partnership with sponsors and agencies Protects infrastructure and property from flood damage Beneficial for recreation, habitat, and economy Major projects include Dade County, Pinellas County, and Brevard County BUILDING STRONG 9 WATER RESOURCES Shore Protection
  • Slide 10
  • BUILDING STRONG Life, Health, and Safety Issues Protection of People and Property Includes some of the Districts Major Projects including, Portugues Dam, and Rio Puerto Nuevo 10 WATER RESOURCES Flood Risk Management
  • Slide 11
  • BUILDING STRONG Peanut Island Section 1135 restoration project in Palm Beach Process by which the Corps can respond to a variety of water resource problems without obtaining specific congressional authorization Eight general authorities whereby the Corps is authorized to plan, design and implement certain types of water resources projects Each authority has its own program authority and strict limits on the federal contribution Continuing Authorities Program (CAP) Aguadilla Harbor Section 107 project in Puerto Rico 11
  • Slide 12
  • BUILDING STRONG Planning in an area twice the size of New Jersey Intense stakeholder interest Competing interests Complexity of problems Conflicting agency responsibilities SOUTH FLORIDA ECOSYSTEM AREA: 18,000 square miles POPULATION TODAY: 6.5+ million 12 ECOSYSTEM/ EVERGLADES RESTORATION ECOSYSTEM/ EVERGLADES RESTORATION
  • Slide 13
  • BUILDING STRONG RESTORATION PROGRESS Lake Okeechobee BISCAYNE BAY COASTAL WETLANDS PHASE 1 BROWARD COUNTY WATER PRESERVE AREAS C-43 RESERVOIR C-111 SPREADER CANAL FOUNDATION PROJECTS 1 ST GENERATION CERP 2 ND GENERATION CERP (WRRDA 2014 authorization) CEPP: Central Everglades Planning Project KISSIMMEE RIVER RESTORATION C-51/STA-1E C-111 SOUTH DADE SEMINOLE BIG CYPRESS MODIFIED WATER DELIVERIES IRL-S C-44 RESERVOIR/STA SITE 1 IMPOUNDMENT PICAYUNE STRAND MELALEUCA ERADICATION Current versus Restored Flows WCA 1 WCA 2 WCA 3 ENP CEPP BUILDING STRONG 13
  • Slide 14
  • BUILDING STRONG FLORIDA Mobile District FORMERLY USED DEFENSE SITES & REGULATORY MILITARY INTERAGENCY INTERNATIONAL CIVIL WORKS REAL ESTATE/MOBILIZATION CUBA HAITI PUERTO RICO & U.S. VIRGIN ISLANDS BAHAMAS ST. LUCIA ST. VINCENT & GRENADINES JAMAICA NORTHCOM SOUTHCOM ARUBA CURACAO BONAIRE TRINIDAD & TOBAGO GRENADA DOMINICA U.S. VIRGIN ISLANDS PUERTO RICO Area of Responsibility MILITARY/IIS PROGRAM
  • Slide 15
  • BUILDING STRONG GEORGIA FLORIDA Orlando Range & Chemical Yard Lake Bryant Bomb & Gun Range Mullet Key Bomb & Gun Range Ellyson Field Dale Mabry AAF Lee Field NAS Sanford Airport Lakeland AAF Perry Bombing Range Drew Field Deland Naval Training Center Bushnell AAF Brooksville Turret Gunnery Range Withlacoochee CWS Alachua AAF Camp Blanding Corry Station USN Training Camp Gordon Johnston Brooksville AAF Pinecastle Jeep Range McCoy AFB Vero Beach NAS Hendricks AAF Ft. Pierce Naval Amph Base Avon Park Range Air Force Plant 74 Fort Myers Bomb & Gun Range Opa Locka Airport Richmond NAS Ft. Taylor Camp Murphy Cross City Target Range FORMERLY USED DEFENSE SITES MILITARY INTERAGENCY NSB Kings Bay USMC Blount Island Terminal NS Mayport NAS Jacksonville NOTU Canaveral NS Key West EPA Superfund, JAX Ash & Browns Dump EPA Superfund Florida Petroleum Reprocessors USDA-NRCS Support USCG CEU-Miami Support EPA Superfund Anodyne Site BUILDING STRONG Florida MILITARY/IIS PROGRAM
  • Slide 16
  • BUILDING STRONG Henry Barracks Culebra Ramey AFB Desecheo Island & Ft. Buchanan San Patricio Buck Island UDT TF Ft. Segarra Benedict Field San Juan NAS Arecibo AAF PRNG Camp Santiago DODEA Antilles ES DHS-ICE St. Thomas & St. Croix CDC San Juan Office Complex DHS-CBP Ramey Center Complex FORMERLY USED DEFENSE SITES MILITARY INTERAGENCY INTERNATIONAL BAHAMAS BUILDING STRONG MILITARY/IIS PROGRAM Antilles & Bahamas USNORTHCOM 16
  • Slide 17
  • BUILDING STRONG DOMINICAN REPUBLIC USAID NORTH PORT ST. LUCIA USAID ECAM USAID DUMAY DAM USAID FEEDER RURAL ROADS GRENADA Caribbean Sea INTERNATIONAL TRINIDAD & TOBAGO ST. VINCENT & THE GRENADINES USSOUTHCOM HAITI BUILDING STRONG MILITARY/IIS PRGRAM USSOUTHCOM AOR 17
  • Slide 18
  • BUILDING STRONG 18 Herbert Hoover Dike Culvert Replacement Program Approval from 2011 HHD Culvert Letter Report 32 culverts identified for replacement or removal 1 removal complete 2 replacements complete (ARRA) 16 replacements under contract 10 replacements planned 3 abandonments planned Planned contract awards through FY2018 with completion in FY2021 Reach 1 Water Control Structure (Culvert ) Status Construction Contract Complete Construction Contract Ongoing Construction Contract Planned
  • Slide 19
  • BUILDING STRONG Reach 1 19 Project Area Reach 1 Cutoff Wall Extension Extension of Reach 1 limits to include Inundation Zone A Additional six and a half miles of embankment and foundation fixes to address the internal erosion of the dike. Planned solution is a cutoff wall through the embankment into the foundation Environmental Assessment completed in June 2015 Construction start in 2017 with completion expected by 2020
  • Slide 20
  • BUILDING STRONG SAJ A/E/Professional Svcs Opportunities DistrictProject Title Project Location Projected Advertise Date Type Work Estimated Award Value Set-Aside Category Procurement Method SAJ Topographic/Hydrographic Surveying FL 4 th Quarter FY2015 AE $2,250,000- MAX up to 3 contracts SDVOSB/ SBSA Brooks Act SAJ Remote Sensing FL 4th Quarter FY2015 AE $2,250,000- MAX up to 2 contracts SBSABrooks Act SAJ Topographic/Hydrographic/ Aerial Surveying OCONUSFY2015/2016AE $2,250,000- MAX up to 4 contracts TBD Based on Market Research Brooks Act SAJ REAT Environmental Remediation Services South Atlantic Division July 2015Svcs $188M MATOC Max 5/pool SBSA RFP W912EP- 15-R-0011 SAJ REAT Environmental Remediation Services South Atlantic Division Aug/Sep 2015Svcs $50M MATOC-4 Max 4/pool HUBZone http://www.saj.usace.army.mil/Portals/44/docs/SBO/corrected%20June2015.pdf
  • Slide 21
  • BUILDING STRONG SAJ Construction Opportunities DistrictProject Title Project Location Projected Advertise Date Type WorkMagnitude Set-Aside Category Procurement Method SAJ Canal 38 Reach 3 Backfill Kissimmee River, FL Advertised June 2015 Construction $5-$10MSDVOSB IFB W912EP- 15-B-0007 SAJ C-111 South Dade County, Contract 8 Levees, weirs, berms Dade County, FL July 2015 Construction$25-$35MSBSA IFB W912EP- 15-B-0005 Closes 21 Jul SAJ Water Control Structure Culvert 10a Placement Herbert Hoover Dike Area FL May 2015 Construction $25- $100M UNR RFP W912EP- 15-R-0013 Closes 21 Jul SAJ Water Control Structure Culvert 6 Placement Herbert Hoover Dike Area FL Advertised July 2015 Construction$10-$25MUNR RFP W912EP- 15-R-0007 Closes 04 Aug SAJ Construction of DMMA Martin County, FL October 2015 FY2016 award Construction$5-$10M TBD based on Market Research TBD http://www.saj.usace.army.mil/Portals/44/docs/SBO/corrected%20June2015.pdf
  • Slide 22
  • BUILDING STRONG SAJ Construction Opportunities (cont) DistrictProject Title Project Location Projected Advertise Date Type Work Estimated Award Value Set-Aside Category Procurement Method SAJ Complete HVAC Replacement, Bldg. 101U West, FRC Southeast NAS Jacksonville FL 4 th Qtr 2015 FY2016 award Construction$5-$10M 8(a) Competitive RFP SAJ Design Build Gen SATOC FL 4 th Qtr 2015 FY2016 award Construction$25M 8(a) Competitive RFP SAJ DLA Bldg 109 Renovation, windows, roofing, etc NAS Jacksonville FL 4 th Qtr 2015 FY2016 award Construction$10 -$25M TBD Based on market research RFP SAJ Roof Replacement SATOC FL 4 th Qtr 2015 FY2016 award Construction $20M TBD Based on market research RFP http://www.saj.usace.army.mil/Portals/44/docs/SBO/corrected%20June2015.pdf
  • Slide 23
  • BUILDING STRONG SAJ Construction Opportunities (cont) DistrictProject Title Project Location Projected Advertise Date Type Work Estimated Award Value Set-Aside Category Procurement Method SAJ C-38 Reach 2 Backfill Contract 10 Kissimmee River FL Mar 2016 Construction$10-$25M TBD IFB SAJ Contract 12A S-69 Weir Kissimmee River FL May 2016 Construction$5-$10MTBD SAJ C44 CNT 1 Intake canal bank stabilization Martin County, FL 1 ST QTR 2016 Construction $10 -$25M TBD Based on market research TBD SAJ Jax Harbor Deepening Contract A Duval County, FL 2 nd QTR 2016 Construction Dredging $25-$100MUNRRFP http://www.saj.usace.army.mil/Portals/44/docs/SBO/corrected%20June2015.pdf
  • Slide 24
  • BUILDING STRONG FOR MORE INFORMATION 24 Beth Myers Deputy, Office of Small Business Programs, Jacksonville District (904) 232-1150 [email protected] Jacksonville District FY2015 and FY2016 forecast information http://www.saj.usace.army.mil/Portals/44/docs/SBO/corrected%20June2015.pdf
  • Slide 25
  • Upcoming Events: (Webinar) NAVFAC Southeast CAPT Hamer, Commander & Nelson Smith, Small Business Deputy Thursday, 30 July from 1300 to 1400 hrs (Webinar) USACE Mobile District LTC Raby, Deputy District Engineer Thursday, 6 August from 1300 to 1400 hrs Joint Training and Education Day; Wednesday, 12 August, MacDill AFB, FL Thank you for joining us today!