Page 1: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

www.eera-set.eu

EERA is an official part

of the EU SET-Plan.

http://setis.ec.europa.eu/

Joint Programme Smart Grids

Presentation to JP Energy Storage

Brussels, 6-Nov-2017

Coordinator: Luciano Martini – RSE

Representative: Chris Caerts – VITO

Page 2: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

www.eera-set.eu

JPs launched in 2010 Bioenergy ≈ 327* CCS ≈ 361* Geothermal ≈ 408* Material for Nuclear ≈ 198* PV ≈ 162* Smart Grids ≈ 156* Wind Energy ≈ 162*

JPs launched in 2013

Environmental, economic and social impact “E3S” ≈ 194*

Shale gas ≈ 181*

JPs launched in 2011 AMPEA ≈ 522* CSP ≈ 132* Energy Storage ≈ 430* FC&H2 ≈ 160* Ocean Energy ≈ 45* Smart Cities ≈ 212*

New JPs Energy Efficiency in Industrial

Processes Energy Systems Integration

*FTEs (Full-time equivalent)

JP Smart GridsOne of the first JPs

Page 3: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

Geothermal

Bioenergy

Wind Energy

Smart Cities

Materials for Nuclear

E3S Economic,

environmental and social impacts

Shale GasPV

Photovoltaic Solar Energy

FCHFuel Cells and

Hydrogen

CSPConcentrated Solar Power

Smart Grids

Ocean Energy

MATERIALS SYSTEMS

AMPEAAdvanced

Materials and Processes for

Energy Application

Energy System

Integration

Energy efficiency in

Industrial Processes

CCSCarbon

Capture and Storage

Energy Storage

EERA Joint Programme technology portfolio

- supporting the SET Plan -

TECHNOLOGIES

3EERA JP Smart Grids Overview

Page 4: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA website with a number of tools in support of the work of the Joint Programmes

www.eera-set.eu

The European Energy Research Alliance

www.eera-set.eu

Page 5: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart Grids at glance

20+20 Research Organizations(106 + 50 py/y)

17 European Countries

JP sub-programmes:SP1 Network Operation

SP2 Power System Management

SP3 ICT & Control System Interoperability

SP4 Electrical Storage Integration

SP5 Transmission Networks

EERA JP Smart Grids

Page 6: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

SINTEFDTU

U.

STRATH TNO

VITO

ENEA

VTT

IPE

IEN

AIT

CRES

TUBITAK

CEA

INESC

TECNALIA RSE

LABLEC

JRC

IWES

E ER A

J P

P A R T N E R S

FOSS

Page 7: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

NTNU

MINES

DERLab

OFFIS

CNRUniPA

CENER

CIRCE

ITE

CIEMAT

UGirona

IK4

IREC

UValenciaFUB

UPadova

UAAchen

NTUA

E ER A

J P

A S S

OC I A T E S

PoliTOUPisa

Page 8: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart Grids

2013 2014 2015 2016 2017 2018

DoW 1 DoW 2

… …

Page 9: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart GridsSome examples of effective

collaborations

EERA JP Smart Grids

Page 10: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

Response to ENTSO-E draft RD&I roadmap 2017-2026 document BEFORE the Public Consultation

EERA JP Smart Grids

EERA JP Smart GridsSome examples of effective

collaborations

Page 11: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

Active role in ETIP-SNET, e.g. contributing to ETIP-SNET regional workshops

EERA JP Smart Grids

EERA JP Smart GridsSome examples of effective

collaborations

Page 12: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart Grids

2013

ELECTRA IRP

2014 2015 2016 2017 2018

DoW 1 DoW 2

… …

Page 13: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

13EERA JP SG @ EERA JP ES

6 November 2017, Brussels

Proposal full title: "European Liaison on Electricity grid Committed

Towards long-term Research Activities"

Proposal acronym: ELECTRA

Topic ENERGY.2013.10.1.8 - Integrated Research Programme on Smart Grids

Type of Funding scheme: Combination of Collaborative Project and CSA

Starting Date: 01/12/2013 Ending Date: 30/11/2017 28/02/2018

ELECTRA IRP in figures:

The ELECTRA IRP

www.ElectraIRP.eu

13.1 M€

Total Budget

21

Partners

16

EUCountries

12

Work

Packages48

Months

10.0 M€

EU Funds

1 + 1

AB + ICB

Page 14: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

14EERA JP SG @ EERA JP ES

6 November 2017, Brussels

ELECTRA IRP Participants

no. Participant Organisation name Country

1 Ricerca sul Sistema Energetico (RSE) IT

2 Austrian Institute of Technology (AIT) AT

3 Flemish Institute for Technological Research (VITO) BE

4 LABORELEC (LABLEC) BE

5 Technical University of Denmark (DTU) DK

6 Technical Research Centre of Finland (VTT) FI

7 Commission for Atomic Energy and Alternative Energies (CEA) FR

8 Fraunhofer-Institut für Windenergie und Energiesystemtechnik (IWES) DE

9 Centre for Renewable Energy Sources and Saving (CRES) GR

10 Italian National Agency for New Techn., Energy and Sust. Economic Development (ENEA) IT

11 Institute of Physical Energetics (IPE) LV

12 SINTEF Energi AS (SINTEF) NO

13 Institute of Power Engineering (IEN) PL

14 INESC Porto (INESC_P) PT

15 TECNALIA (TEC) ES

16 Joint Research Centre – Institute of Energy and Transport (JRC) NL/BE

17 The Netherland’s Organisation of Applied Scientific Research (TNO) NL

18 Scientific and Technological Research Council of Turkey (TUBITAK) TR

19 University of Strathclyde (USTRATH) UK

20 European Distributed Energy Resources Laboratories (DERlab) DE

21 Institute for Information Technology at University of Oldenburg (OFFIS) DE

Page 15: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

15EERA JP SG @ EERA JP ES

6 November 2017, Brussels

ELECTRA IRP Participants

no. Participant Organisation name Country

1 Ricerca sul Sistema Energetico (RSE) IT

2 Austrian Institute of Technology (AIT) AT

3 Flemish Institute for Technological Research (VITO) BE

4 LABORELEC (LABLEC) BE

5 Technical University of Denmark (DTU) DK

6 Technical Research Centre of Finland (VTT) FI

7 Commission for Atomic Energy and Alternative Energies (CEA) FR

8 Fraunhofer-Institut für Windenergie und Energiesystemtechnik (IWES) DE

9 Centre for Renewable Energy Sources and Saving (CRES) GR

10 Italian National Agency for New Techn., Energy and Sust. Economic Development (ENEA) IT

11 Institute of Physical Energetics (IPE) LV

12 SINTEF Energi AS (SINTEF) NO

13 Institute of Power Engineering (IEN) PL

14 INESC Porto (INESC_P) PT

15 TECNALIA (TEC) ES

16 Joint Research Centre – Institute of Energy and Transport (JRC) NL/BE

17 The Netherland’s Organisation of Applied Scientific Research (TNO) NL

18 Scientific and Technological Research Council of Turkey (TUBITAK) TR

19 University of Strathclyde (USTRATH) UK

20 European Distributed Energy Resources Laboratories (DERlab) DE

21 Institute for Information Technology at University of Oldenburg (OFFIS) DE

Page 16: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

16EERA JP SG @ EERA JP ES

6 November 2017, Brussels

• Objective 1: To design the information flows and control mechanisms required to synchronise the activities of the different stakeholders for managing voltage and frequency in 2030+ power system

• Objective 2: To develop concepts and methods for increasing network observability as a vital basis for novel controls

• Objective 3: To develop robust coordination functions for multiple controllers across different control boundaries

• Objective 4: To conduct experimental testing of ELECTRA controllable flexibility solutions in a lab environment

• … … …

• Objective 0: To support CSA activities at European and extra-EU level

The ELECTRA IRP overarching goal is to reinforce the EERA Joint

Programme on Smart Grids with the aim to strengthen coordinated

European research towards the European SET Plan targets.

www.eera-set.eu

General IRP Objectives

Page 17: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

17EERA JP SG @ EERA JP ES

6 November 2017, Brussels

The ELECTRA IRPWork Packages

Research

and

Development

ACTIVITY

Coordination

and

Support

ACTIONS

Page 18: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

18EERA JP SG @ EERA JP ES

6 November 2017, Brussels

R&D activitiesin the ELECTRA IRP

1. Decentralized control scheme for future reserves activations

based on local observables:

solving local problems locally

and

separation of concerns /

divide-and-conquer

2. Load Frequency Control Areas smaller cells that are

responsible both detecting the need for reserves activations as

well as for the reserves activation itself

3. Local collaboration between cells based on local observables

instead of global collaboration based on frequency as global

observable

WEB of Cells concept

Page 19: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

19EERA JP SG @ EERA JP ES

6 November 2017, Brussels

Voltage : obvious

System Balance : restore as aggregated effect

of restoring local cell balances

Cell balance setpoint = (aggregated) cell

tie-line powerflow schedule (cfr FCR)

Web-of-Cells Concept

Detect and Solve local problems

locally based on local observables, and

using local resources, acknowledging

that:

causes are highly distributed and

local (the problem)

reserves providing resources are

available locally (the solution)

detailed local grid status information

is needed to activate securely and

effectively

Divide-and-conquer / Separation of

Concerns: large LFCA smaller cell

secure and efficient decision in

computational tractable time

mitigate communication and

aggregation/disaggregation

complexity, delays and risks

Page 20: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

20EERA JP SG @ EERA JP ES

6 November 2017, Brussels

Web-of-Cells Balance Control

Page 21: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

21EERA JP SG @ EERA JP ES

6 November 2017, Brussels

Web-of-Cells Balance Control

Page 22: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

22EERA JP SG @ EERA JP ES

6 November 2017, Brussels

Four WPs dedicated to Coordination & Support Actions

CSA activities:

• WP1 - Coordination and Networking

Coordination with the EERA JP SG, with other IRPs

and JPs, with Advisory Board and EU grid stakeholders

• WP2 – Development of Joint Research Facilities

Database of EU smart grid research infrastructure,

its improvement, collaboration with ISGAN

• WP9 – Researchers Exchange

Training of young researchers, increase cooperation and share

knowledge in smart grid controls

• WP10 – INCO activities

Foster collaboration with extra-EU countries, establishment of

International Coordination Board, share information and knowledge

Coordination activities in the ELECTRA IRP

Page 23: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

24EERA JP SG @ EERA JP ES

6 November 2017, Brussels

“European smart grid research infrastructure database”

In September 2016, a completely re-designed version of the database

was launched, accessible via: http://infrastructure.der-lab.net/.

It contains more than 190 RI from over 45 Institutes.

WP2 - European SG-RI database

Page 24: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

25EERA JP SG @ EERA JP ES

6 November 2017, Brussels

• Standard exchange «products» developed• Cycle of ELECTRA REX Calls – 5 calls issued to date• Supporting dissemination and feedback• EERA JP SG Partners engaged• Global and European engagement facilitated• Early career networking of researchers enhanced• Supporting EERA and DERlab mobility WG efforts

inc. questionnaire• Model being adopted by ECRIA colleagues International Workshops:

• #1 – EDST’15• #2 – ISGT’16• #3 – EERA’16• #4 – ISGT’17

Researcher Exchange ELECTRA REX

Page 25: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

26EERA JP SG @ EERA JP ES

6 November 2017, Brussels

6 Calls have resulted in the following being commissioned:• 39 exchanges: 14 ELECTRA, 13 European, and 12 Global• A total of 210 researcher weeks• A total of 25 exchanges involving an early career researcher

Calls 1-6 include:• INESC P&D Brasil @DTU - Experimental Validation of BDI Agents for

Distributed Control of Electric Power Grids• USTRATH @FSU: Controller HIL Testing of Real-Time Distributed

Frequency Control for Future Power Systems• IWES @CSIRO: Sizing and grid impact of PV battery systems - a

comparative analysis for Australia and Germany• Komi SC @IPE: Optimal PMU Placement for Тopological Observability

of Power System: Robust Measurement Design in the Space of Phasor Variables

• …

Researcher Exchange ELECTRA REX

Page 26: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

27EERA JP SG @ EERA JP ES

6 November 2017, Brussels

ELECTRA IRP

INCO

WP10: International Cooperation

Leveraging

outcomes of EU

research at

international

level

Collaboration

with extra-EU

research

organisations

Inputs and

advices to

disseminate

IRP results

Comparison of

EU approach

with extra-EU

countries

Step-by-step approach:

1. Initial exchange of information

about ongoing smart grids programs

and projects

2. Sharing of national vision, strategy

and priorities

3. Selection of R&D topics of mutual

interest

4. Exchange of publicly available data

and results

5. Selection of areas/topics for potential

joint R&D collaborative projects

6. Definition and launching of joint

R&D tasks

7. Execution of joint R&D activities

involving the use of research

infrastructures and REX

8. Additional INCO activities of mutual

interest

Page 27: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

28

Mission Innovation Challenge #1: Smart Grids

L. Martini - Mission Innovation Challenge #1: Smart Grids - 11/05/2017

Page 28: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

29

Mission Innovation Organizzazione e le 7 IC

Mission Innovation Ministers

Challenge 1: Smart Grids

Challenge

2: Off-Grid Access to Electricity

Challenge

3: Carbon Capture

Challenge 4: Sustainable Bio-Fuels

Challenge

6: Clean Energy Materials

Challenge 5: Converting Sunlight

Challenge 7: Affordable Heating and Cooling of Buildings

Mission Innovation Steering Committee

Mission Innovation

Secretariat

Analysis and Joint Research Sub-Group

Business and Investor Engagement

Sub-Group

Information Sharing Sub-Group

http://mission-innovation.net/

Page 29: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

30

Organization and Objective

Members of MI Smart Grids Innovation Challenge

Page 30: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart Grids

Three on-line newsletters published on

the ELECTRA website issued on June

2016, November 2016, and May 2017

35 presentations delivered at

International Conferences

34 peer-reviewed papers included in

conference proceedings, including 12

open access papers delivered at CIRED

2017.

Joint project proposals

EERA JP Smart Grids / ELECTRARecent dissemination activities

Page 31: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart Grids

2013

ELECTRA IRP

2014 2015 2016 2017 2018

DoW 1 DoW 2

DoW 3

… …

Page 32: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

4yr Strategic Plan 2018-2022 (common for SPs)mission, and vision to speed up the realization of the SET plan goals

Common, coordinated research

Sharing research infrastructure

Mobility of researchers

Involve and partner with stakeholders

Governance & Finance

2yr Implementation Plan (for each SP)Specific (demand driven) instead of broad (overview of …)

Joint publications, Workshops, … instead of documents on website

EERA JP Smart Grids

DoW 2018-2022

Page 33: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

New SP structure inspired by / aligned with ETIP-SNET WGs

SP1 - Technologies and tools for management of future Power Systems

SP2 – Storage integration and services in support of the electricity grid (incl. interaction with other energy systems: P2X)

CA2.1 Integration of storages and ancillary services

CA2.2 Flexibility provided by storages for smart grids

CA2.3 Economic and technical benefits of storage systems in the network integration

CA2.4 Integration of EV into grid

SP3 - Flexible power system operation

SP4 – Prosumer activation and engagement through digitalization and ICT

SP5 – Flexible Transmission network

EERA JP Smart Grids

DoW 2018-2022

Page 34: Joint Programme Smart Grids - European Energy Research ...13 EERA JP SG @ EERA JP ES 6 November 2017, Brussels Proposal full title: "European Liaison on Electricity grid Committed

EERA JP Smart Grids

Contact information:

[email protected]