ACER and ENTSOG Questionnaire II Questionnaire useful for all stakeholders in the gas market: implementation milestones and schedules for the Member States calculation methodologies of daily imbalacing charges and neutrality charges methodologies of information provision, nominations and WDOS The Joint ENTSOG-ACER Report on the early implementation of the BAL NC is now available on ENTSOG and ACER websites: Link 1 Link 2 Information shown in the following slides is based on TSO and NRA responses in July-August 2014TRANSCRIPT
![Page 1: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/1.jpg)
Joint ACER-ENTSOG update on implementation of the Balancing NC
26th Madrid Forum16 October 2014
![Page 2: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/2.jpg)
ACER and ENTSOG Questionnaire I
![Page 3: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/3.jpg)
ACER and ENTSOG Questionnaire II
• Questionnaire useful for all stakeholders in the gas market: • implementation milestones and schedules for the Member States• calculation methodologies of daily imbalacing charges and
neutrality charges• methodologies of information provision, nominations and WDOS
• The Joint ENTSOG-ACER Report on the early implementation of the BAL NC is now available on ENTSOG and ACER websites:
• Link 1
• Link 2
• Information shown in the following slides is based on TSO and NRA responses in July-August 2014
![Page 4: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/4.jpg)
Expected implementation timeline by country
4
By 1 October 2015 => BAL NC implemented in 10 COUNTRIES (AT, BE, DK, FR, GB, HU, IT, LU, NL, SI)
![Page 5: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/5.jpg)
Main challenges as perceived by TSOs and NRAs:
Implementation challenges
Investment in new IT equipment; metering changes
Extensive cooperation with NRAs, DSOs, Network Users needed
Ensuring adequate data quality and formats
Information provision
Determination of relevant Short term Standardised Products
More difficult where:•Liquidity is low;•Countries do not currently have trading platforms.
Redesign of current nomination processes (continuous re-nomination cycle)
Extensive cooperation with adjacent TSOs needed
NominationsOperational balancing
![Page 6: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/6.jpg)
Existence of a trading platform
![Page 7: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/7.jpg)
Nominations
• Strong efforts by the majority of MS to comply by 2015• Cross-border cooperation expected/ongoing
![Page 8: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/8.jpg)
8
Information Provision
• Strong efforts by the majority of MS to comply by 2016• Cross-border cooperation expected/ongoing
![Page 9: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/9.jpg)
Cross Border Cooperation
Cross-border aspects may require further attention in future implementation reviews
![Page 10: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/10.jpg)
BAL NC implementation workshop with the Energy Community in Vienna on 27 November 2014
• Cooperation between ENTSOG and the Energy Community (EnC)
• Objective: To explain the BAL NC and share knowledge regarding balancing practises focusing on CEE countries and members from the EnC
• Participants are TSOs, regulators from EU MS and EnC
• Presentations on balancing practices reflecting various market conditions: NW Europe, CEE countries and contracting parties from the EnC
• Panel discussion on implementation options
• Discussion on way forward
![Page 11: Joint ACER-ENTSOG update on implementation of the Balancing NC 26 th Madrid Forum 16 October 2014](https://reader034.vdocuments.us/reader034/viewer/2022051710/5a4d1acc7f8b9ab05996fd8d/html5/thumbnails/11.jpg)
Conclusions
• Implementation is well underway across Europe
• Many challenges still lie ahead, but…
• …extensive discussion between NRAs, TSOs and market participants
• Limited cross border elements identified, further attention may be required
• Good cooperation seen between NRAs, TSOs, ACER and ENTSOG
• ACER and ENTSOG will build on this experience and continue to coordinate future efforts
• ACER/ENTSOG Report on the early implementation of the BAL NC will be updated in one year