LITERATURE CASE STUDY: JOHNSON & WALES CULINARY ARTS SCHOOL , NORTH CAROLINA
The project is a 156,000 sq ft project whose construction started in September 2002, andwas completed in July 2004.
The effect of the restrictive urban site was that the building would obviously have to bevertical; yet the nature of the culinary arts program is horizontal, where there is a desire foran easy connection and progression between event space and kitchen area to make foodservice manageable. The building unfortunately makes this aspect very difficult, where mostfood preparation occurs on lower floors and service is above.
In addition, the fact the building is vertically split into two wings, with the administrationsection being substantially smaller, results in the absence of a central entry space. Instead,one enters towards either end of the building with long corridors (up to 176 feet) stretchingin between.
Site Area= 12,077.5 sq mt Total footprint area= 4,831 sq mt Total built up area= 14,493 sq mt
40%
60%
Built
Unbuilt
An urban plaza accessible bythe public, makes the campusof this institution lively andacts as an interactive space
between the culinary artistsand general public.
The long corridorsare broken atappropriatedistance, so as totake in natural lightand ventilation.
A R E A S T A T E M E N T
ADMINISTRATION
SPACES AREA (sq mt)Waiting area 100
Reception 20Offices 200
Faculty workstations 200Exam room 100Infirmary 40
Total 660
Circulation 145TOTAL BUILT UP 805
ACADEMIC
Auditorium 500Baking Lab 600
Meat Lab 150PastryTech Lab 200Chocolate Lab 200
Pastry Lab 150Dining Area 400
Total 2200Circulation (40%) 880
TOTAL BUILT UP 3080
KITCHEN
Production Kitchen, Demonstration kitchen 400
Hot, cold kitchen 1000Sauce prep Kitchen 120
Total 1520Circulation (40%) 608
TOTAL BUILT UP 2128
STORAGE
Dry 100Cold 75
General Storage 800
Total 975Circulation (40%) 390
TOTAL BUILT UP 1365
RESTAURANT
Bar 40Dining area 450
Total 490
Circulation (40%) 196
TOTAL BUILT UP 686
SERVICESFire pump station, Mechanical room,
Telecom Room, elevators, Ducts, trashholdings, security, etc.
6420
1
1
1
1
1
1
11
1
1
CASE
STUDY
SHIRLEY DAS
1BQ12AT053
SEM: VIII
B.ARCH,
BMSSA