    LITERATURE CASE STUDY: JOHNSON & WALES CULINARY ARTS SCHOOL , NORTH CAROLINA

    The project is a 156,000 sq ft project whose construction started in September 2002, andwas completed in July 2004.

    The effect of the restrictive urban site was that the building would obviously have to bevertical; yet the nature of the culinary arts program is horizontal, where there is a desire foran easy connection and progression between event space and kitchen area to make foodservice manageable. The building unfortunately makes this aspect very difficult, where mostfood preparation occurs on lower floors and service is above.

    In addition, the fact the building is vertically split into two wings, with the administrationsection being substantially smaller, results in the absence of a central entry space. Instead,one enters towards either end of the building with long corridors (up to 176 feet) stretchingin between.

    Site Area= 12,077.5 sq mt Total footprint area= 4,831 sq mt Total built up area= 14,493 sq mt

    40%

    60%

    Built

    Unbuilt

    An urban plaza accessible bythe public, makes the campusof this institution lively andacts as an interactive space

    between the culinary artistsand general public.

    The long corridorsare broken atappropriatedistance, so as totake in natural lightand ventilation.

    A R E A S T A T E M E N T

    ADMINISTRATION

    SPACES AREA (sq mt)Waiting area 100

    Reception 20Offices 200

    Faculty workstations 200Exam room 100Infirmary 40

    Total 660

    Circulation 145TOTAL BUILT UP 805

    ACADEMIC

    Auditorium 500Baking Lab 600

    Meat Lab 150PastryTech Lab 200Chocolate Lab 200

    Pastry Lab 150Dining Area 400

    Total 2200Circulation (40%) 880

    TOTAL BUILT UP 3080

    KITCHEN

    Production Kitchen, Demonstration kitchen 400

    Hot, cold kitchen 1000Sauce prep Kitchen 120

    Total 1520Circulation (40%) 608

    TOTAL BUILT UP 2128

    STORAGE

    Dry 100Cold 75

    General Storage 800

    Total 975Circulation (40%) 390

    TOTAL BUILT UP 1365

    RESTAURANT

    Bar 40Dining area 450

    Total 490

    Circulation (40%) 196

    TOTAL BUILT UP 686

    SERVICESFire pump station, Mechanical room,

    Telecom Room, elevators, Ducts, trashholdings, security, etc.

    6420

    1

    1

    1

    1

    1

    1

    11

    1

    1

    CASE

    STUDY

    SHIRLEY DAS

    1BQ12AT053

    SEM: VIII

    B.ARCH,

    BMSSA