john project
TRANSCRIPT
-
8/14/2019 John Project
1/20
DiversifiedDiversified
AggressiveAggressive
Well-positioned for a vibrant copper marketWell-positioned for a vibrant copper market
CRV TSX Venture Exchange
-
8/14/2019 John Project
2/20
CAUTIONARYDISCLAIMER
Forward-Looking Statements
Certain statements contained herein regarding the Company and itsoperations constitute forward-looking statements within the meaning ofthe United States Private Securities Litigation Reform Act of 1995. Allstatements that are not historical facts, including without limitationstatements regarding future estimates, plans, objectives, assumptions orexpectations of future performance, are forward-looking statements. We
caution you that such forward looking statements involve known andunknown risks and uncertainties that could cause actual results and futureevents to differ materially from those anticipated in such statements. Suchrisks and uncertainties include fluctuations in metal prices, unpredictableresults of exploration activities, uncertainties inherent in the estimation ofmineral reserves and resources, fluctuations in the costs of goods andservices, problems associated with exploration and mining operations,
changes in legal, social or political conditions in the jurisdictions where theCompany operates, lack of appropriate funding and other risk factors, asdiscussed in the Companys filings with Canadian Securities regulatoryagencies. Resource and production goals and forecasts may be based ondata insufficient to support them. Ms. Jean Pautler, P. Geo. Is the QualifiedPerson for the Company as required by NI 43-101. The Company expresslydisclaims any obligation to update any forward-looking statements
-
8/14/2019 John Project
3/20
RISING COPPER PRICE =DEMAND FOR FRESH SUPPLY
-
8/14/2019 John Project
4/20
Exploring a large-scale copper/moly/goldtarget in southwest British Columbia
-
8/14/2019 John Project
5/20
BRIDGE RIVER PROJECT (COPPER CLAIMS):Location
Located near supplies and infrastructure 235 kilometers byroad from Vancouver
-
8/14/2019 John Project
6/20
BRIDGE RIVER PROJECT:
History
Significant exploration occurred on the claimsbetween 1929 and 1987
Cominco, Noranda, Phelps Dodge.
Underground development, diamond drilling, hand trenching and samplingfocused on the three known showings.
Higher copper prices in 2006 sparked new interest in the project, leading toCresvals acquisition and work.
Evaluation indicated open ended mineralized zones, additional showingsevident, open ended and untested soil anomalies
-
8/14/2019 John Project
7/20
BRIDGE RIVER PROJECT:Mineralization
Sampling, trenching & drilling uncovered threeprimary, open-ended high-grade showings w/widespread coppermineralization
BR Showing:
Open1700m by500m zone
Nichol Showing:Mineralized intrusionbreccia
Russnor Showing:600m by 400m zone
-
8/14/2019 John Project
8/20
BRIDGE RIVER PROJECT:Mineralization
Excellent potential for a bulk- mineable, porphyrycopper molybdenumgold deposit.
BR Showing Highlights: 1.08% Cu and 0.05% Mo across 1m from quartz-sulphide veins, 0.14% Cu over 17m
from trenching and 0.125% Cu over 6.55m and 0.134% Cu over 9m molybdenumfrom the bottom of DDH 71-1.
Gold values up to 1.04 g/t
Russnor Adit Highlights: Average of 1.38% Cu over 30.5m, 1.19% Cu over 12.2m and 1.00% Cu over 16.2m.
An open cut 25m north of the portal graded 0.94% Cu over 12.8m, with minorvalues in gold, silver and molybdenum.
Diamond drilling (790m/11 holes) yielded significant results, including 0.30% Cuover 36.6m in 61-5.
Nichol Showing Highlights: 4.73% Cu, 32.8 g/t Ag, 0.16 g/t Au and 0.015% Mo over 1m from Vein 1 in Trench 5,
with 2.08% Cu over 4.5m from the wallrock, and 8.91% Cu, 33.1 g/t Ag and 0.043%Mo over 0.6m from Vein 2 in Trench 9.
Diamond drilling (412m/10 holes) yielded significant results, including 3.50% Cu,1.00 oz/t Ag, 0.079% Mo over 8.5m in 79-S1.
-
8/14/2019 John Project
9/20
BR SHOWING
Mineralization on cliffs found to extend significantly into plateau area,amenable to open pit mining
Significant gold values and molybdenite encountered on plateau
Previous IP geophysics suggests mineralization extends under basalt capping
Limited previous drilling with vertical holes; preferred orientation is westerlyto SW
Flow
-
8/14/2019 John Project
10/20
BRIDGE RIVER PROJECT:Copper Plateau
In foreground
View looking easterly
Basalt
Granodiorite
Basalt
Granite
Basalt
Showing #3Basalt
Nichol Showingbelow
Mineralization
-
8/14/2019 John Project
11/20
BRIDGE RIVER PROJECT:Russnor Showing
View looking easterly
Basalt
Basalt Basalt
Thunder Creek Canyon
Mineralization in AditRussnor Adit
-
8/14/2019 John Project
12/20
BRIDGE RIVER PROJECT:Nichol Showing
View looking easterly
Basalt
Basalt
View lookingeasterly
NicholsCreekNichol Adit
-
8/14/2019 John Project
13/20
BRIDGE RIVER PROJECT:Recommendations
View looking easterly
Basalt
Basalt
Latest round of explorationinitiated
Airborne geophysical survey(magnetic, electromagnetic,radiometric) - bids tendered
Drilling - holes spotted in field
Upgrade access - engineering survey
-
8/14/2019 John Project
14/20
Basalt
Basalt
NEW RAVEN PROJECT:Location
Exciting, high-grade gold target insouthwest B.C.
-
8/14/2019 John Project
15/20
View looking easterly
Basalt
Basalt
NEW RAVEN CLAIMS:History
Claims staked in 1990 afterroad building uncovered floatassaying 12.2 grams Au/tonne(0.356 oz Au/ton).
Trenching from 1990-1992identified five gold showingswith excellent potential to hosta vein gold deposit.
Diamond drilling of 481m in 10holes in 1991 returned 5.8 g/tAu over 2.8m and 15.64 over1.5m Au.
Acquisition by Cresval in 2008.
-
8/14/2019 John Project
16/20
View looking easterly
Basalt
NEW RAVEN CLAIMS:Mineralization
Six strong goldshowings covering
600m by 150marea.
Similar toBralorne-PioneerMine 45 km toNW, (produced12.6 mt of 9.3 g/tgold).
-
8/14/2019 John Project
17/20
View looking easterly
Basalt
NEW RAVEN CLAIMS:Current Work
Maximum values in 2008 from Discovery Zone of12,109 and 44.41 g/t Au.
Zone is open along strike to the north and south.
Check samples collected in 2008 to verify work completedby previous operators graded 9.36 g/t Au over 1m and;
16.75 g/t Au from the C zone and 12.13 g/t Au over 0.3mand 7.35 g/t Au over 1.2m from the D zone.
-
8/14/2019 John Project
18/20
View looking easterly
Basalt
Basalt
NEW RAVEN CLAIMS:Recommendations
Two-phase exploration programplanned.
Detailed prospecting & mapping (< 1% of property hasbeen mapped and sampled)
VLF-EM geophysical survey (useful in detectingstructures/veins)
Trenching to uncover strike extent of veins
Followed by a 1,500m diamond drill program withadditional trenching
-
8/14/2019 John Project
19/20
View looking easterly
Basalt
Basalt
WHY INVEST IN CRESVAL
CAPITAL?
High-grade copper showings (gold,molybdenum) on the large, 11,700 hectare(28,910-acre) Copper Claims in southwestern BC
Excellent potential for a bulk mineable, porphyrycoppermolybdenum gold deposit
Three primary copper showings with high gradesin sampling, trenching and drilling
The New Raven property in BCs Lillooet districthas produced five strong gold showings
Aggressive exploration planned on bothproperties
-
8/14/2019 John Project
20/20
View looking easterly
Basalt
Basalt
CORPORATE INFORMATION
Head Office:Suite 400, 455 Granville Street
Vancouver, BC V6C 1T1604.682.3701
Investor Relations:Lee Ann Wolfin,President604.682.3701
Shares Traded:TSX.V Symbol CRVHead Office:
www.cresval.co