Oil and Gas Air Quality Authorizations in Texas
Joe Shine
Air Permits Division
Texas Commission on Environmental Quality
Environmental Trade Fair 2013
![Page 2: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/2.jpg)
Terminology
Permitting Options
Application Content
Submission Options
Today’s Topics
![Page 3: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/3.jpg)
Pollutants of Concern
◦VOCs: formaldehyde and benzene
◦H2S
◦CO
◦NO2
◦SO2
◦PM10 and PM2.5
Terminology
![Page 4: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/4.jpg)
Facility –stationary equipment that emits pollutants
◦Engines
◦Tanks
◦Flares
◦Separators
◦Dehydrators
Terminology
![Page 5: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/5.jpg)
Site – a group of oil and gas facilities at a property
◦Common control
◦Equipment that relies on each other
◦Within ¼ mile
Terminology
![Page 6: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/6.jpg)
Produced water tank
Oil tankGunbarrel Separator
Wellhead
Andy’s Site
![Page 7: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/7.jpg)
Terminology
Receptor
◦Residence or other structure which is not used only by the O&G owner/operator
◦Recreational Area
![Page 8: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/8.jpg)
Andy’s Property Nathan’s Property
Nathan’s House
Andy’s House
Mechanic Shop
Andy and Nathan’s Property
![Page 9: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/9.jpg)
Oil and Gas Permitting Options
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
Increasing Levels of Emissions
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
![Page 10: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/10.jpg)
De Minimis
Pipeline isolation valve sites meeting certain criteria
![Page 11: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/11.jpg)
Oil and Gas Permitting Options
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
Increasing Levels of Emissions
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
![Page 12: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/12.jpg)
Permits by Rule
Must meet all conditions exactly
Emission limits in §106.4
◦25 tpy of VOCs
Meet all other applicable federal, state, and local requirements
![Page 13: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/13.jpg)
In Barnett Shale counties
• New - 30 TAC §106.352(a)-(k)
• Existing – 30 TAC §106.352(l)
Not in Barnett Shale counties
• New & Existing – 30 TAC §106.352(l)
• May voluntarily register under §106.352 (a)-(k)
PBR Options – Location
![Page 14: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/14.jpg)
Barnett Shale Counties
![Page 15: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/15.jpg)
No registration required
Meet §106.4 limits
Various facilities included
Flares follow §106.492
Compressors follow §106.512
§106.352(l) – Sweet
![Page 16: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/16.jpg)
TCEQ sour = 24 ppmv
Registration required
¼ mile distance required
4.0 lb/hr limit of sulfur compounds (not including sulfur oxides)
Vent height based on sulfur compound limit
§106.352(l) – Sour
![Page 17: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/17.jpg)
Notification and registration through ePermits system
Notification - Prior to construction or implementation of changes
Registration
◦Level 1 - Within 180 days from start of operation
◦Level 2 - Within 90 days from start of operation
§106.352(a)–(k)
![Page 18: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/18.jpg)
PBR Level 1 Emission Limits
§106.352(a)–(k)
Air Contaminant Steady-state lb/hr
< 30 psig periodic lb/hr up to 150 hr/hr
≥ 30 psig periodic lb/hr up to 300 hr/yr
Total tpy
Total VOC 15
Total crude oil or condensate VOC
100 145 318
Total natural gas VOC
204 750 1,500
Benzene 1.95 7 15.4 2.8
Hydrogen sulfide 4.7 5.1 9.8 20.6
Sulfur dioxide 47 93.2 25
Nitrogen oxides 43.2 100
Carbon monoxide 45 100
PM2.5/PM10 10 5
![Page 19: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/19.jpg)
§106.352(a)–(k)PBR Level 2 Emission Limits
Air Contaminant Steady-state lb/hr
< 30 psig periodic lb/hr up to 150 hr/hr
≥ 30 psig periodic lb/hr up to 300 hr/yr
Total tpy
Total VOC 25
Total crude oil or condensate VOC
100 145 318
Total natural gas VOC
356 750 1,500
Benzene 3.35 7 15.4 4.8
Hydrogen sulfide 6 6 9.8 25
Sulfur dioxide 63 93.2 25
Nitrogen oxides 54.4 250
Carbon monoxide 57 250
PM2.5 12.7 10
PM10 12.7 15
![Page 20: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/20.jpg)
Emission impacts tables
Screening modeling
Dispersion modeling
§106.352(a)–(k)Impacts
Air contaminant lb/hrBenzene 0.039
Hydrogen sulfide 0.025Sulfur dioxide 2
Nitrogen oxides 4
![Page 21: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/21.jpg)
Other Oil and Gas PBRs
Temporary Oil and Gas Facilities (§106.353)
Stationary Engines and Turbines (§106.512)
Flares (§106.492)
![Page 22: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/22.jpg)
90-day operation
◦Must flare sour gas (per §106.492)
◦Reduced sulfur emissions must be < 4 lbs/hr
◦Vent heights must meet §106.352(l)
§106.353Temporary Oil and Gas Facilities
+
![Page 23: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/23.jpg)
Federal Standards Applicability Table
Emissions Calculations Spreadsheet
Representative Gas and Liquid Analysis
Control Device Charts
Permits by Rule Guidance
![Page 24: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/24.jpg)
Oil and Gas Permitting Options
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
Increasing Levels of Emissions
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
![Page 25: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/25.jpg)
Standard Permit Options
Standard permit under §116.620
◦“Old Standard Permit”
Non-rule standard permit
◦Applies to new projects and dependent facilities in the Barnett Shale counties
◦Sites in other counties can use it voluntarily
![Page 26: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/26.jpg)
Sour sites that can’t meet ¼ mile limit in §106.352(l)
VOCs are >25tpy
VOCs must be speciated using E=L/K
Calculation techniques, emissions summary tables, etc. – same as a PBR application
Standard Permit Under §116.620“Old Standard Permit”
![Page 27: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/27.jpg)
Notification & registration online – STEERS (ePermits) system
Notify - Prior to construction or implementation of changes
Register
◦Within 90 days from the start of operation
Impacts – Same as §106.352 (a)-(k)
Non-Rule Standard Permit
![Page 28: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/28.jpg)
Non-Rule Standard PermitEmission Limits
Contaminant Steady-state or < 30 psig(lb/hr) (normal emissions)
> 30 psig Periodic(lb/hr) (MSS, loading, etc)
Total (tpy)
Total VOC 250
Total Crude Oil or condensate VOC
145 318
Total natural gas VOC
750 1,635
Benzene 7 15.4 10.2
Hydrogen sulfide 10.8 9.8 47
Sulfur dioxide 93.2 250
Nitrogen oxides 121 250
Carbon monoxide 104 250
PM10/PM2.5 28 15
![Page 29: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/29.jpg)
Oil and Gas Permitting Options
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
Increasing Levels of Emissions
De Minimis
Permit by Rule
Standard Permit
State Permit
NNSR and PSD
![Page 30: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/30.jpg)
Submitting
the
Application
![Page 31: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/31.jpg)
Cover letter Core Data Form PI-7, PI-7-Cert, or PI-1S Copy of check or ePay voucher
Application Admin. Documents Preferred Order
![Page 32: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/32.jpg)
Emission limitations for Title V applicability
Federal applicability
Control/destruction efficiency claims
Operating hours
When Do I Need to Certify?
![Page 33: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/33.jpg)
Introduction Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables
Application Technical Documents Preferred Order
![Page 34: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/34.jpg)
Summary of Emissions
![Page 35: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/35.jpg)
Introduction Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables
Application Technical Documents Preferred Order
![Page 36: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/36.jpg)
Guidance at www.TexasOilandGasHelp.org
Three criteria
◦Reservoir/formation
◦API gravity
◦Process/treatment
AnalysisSite Specific/Representative
![Page 37: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/37.jpg)
Introduction Process and flow diagram Summary of emissions Emission calculations Impact analysis/ NAAQS Applicability Lab analysis Maps Tables
Application Technical Documents Preferred Order
![Page 38: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/38.jpg)
Timeline extensions
Reviewer deficiency process◦Day 1
Call and follow-up e-mail
◦Day 4 Deadline reminder phone call/e-mail
◦Day 5 Final phone call made
Void letter issued
Deficiency Information
![Page 39: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/39.jpg)
Oil and Gas Registrations Over the Last Four Fiscal Years
198889%
25811%
125486%
20114%
228883%
46817%
329386%
52814%
2009: 2246 2010: 1455
2011: 2756
2012: 3821Standard permits
Permits by rule
![Page 40: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/40.jpg)
New Processes
and
Adapting to Change
![Page 41: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/41.jpg)
Purpose
E-mail notification
Expectations
Reply
Enhanced Application Review E.A.R
![Page 42: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/42.jpg)
High Volume Submittals
![Page 43: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/43.jpg)
Applicant schedules a pre-permit meeting
Before the meeting, applicant submits an example application
At the meeting, TCEQ and the applicant discuss:
◦The process and expectations
◦The process for electronic submittals
◦TCEQ’s feedback on example application
High Volume Submittals
![Page 44: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/44.jpg)
Q2
ualityuick
![Page 45: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/45.jpg)
Historical notification New/existing Level 1, Level 2, and Non-rule
notifications and registrations APD-Cert §106.263 §106.352(l) – New and existing registrations §116.620 – New and existing registrations
STEERS (ePermitting) Current Projects
![Page 47: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/47.jpg)
Oil and Gas Air Quality Authorizations in Texas
Proposed MSS PBR
Tasha Burns
Air Permits Division
Texas Commission on Environmental Quality
Environmental Trade Fair 2013
![Page 48: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/48.jpg)
Applicability
Highlights of the proposed PBR
Timeline
Compliance preparations
Overview
![Page 49: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/49.jpg)
Planned MSS emissions
No registration, no fee
§106.4 emission limits
Use with authorization for day-to-day operations
Proposed MSS PBR
![Page 50: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/50.jpg)
Activities/facilities authorized
◦Listed activities
◦Similar activities as those listed
◦Additional activities
Maintenance program
Proposed MSS PBR
![Page 51: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/51.jpg)
Proposed MSS PBR Timeline
March 15-April 15 Comment Period
August 22Anticipated Effective Date
July 31Anticipated Adoption
January 5, 2014O&G Authorizes Planned
MSS
![Page 52: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/52.jpg)
Compliance
Site-wide calculations
Maintenance program
Guidance in development
Proposed MSS PBR
![Page 53: Joe Shine Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2013](https://reader036.vdocuments.us/reader036/viewer/2022062404/551a3654550346cb358b5225/html5/thumbnails/53.jpg)
Tasha Burns: 512-239-5868
www.TexasOilandGasHelp.org
Sign up for e-mail updates: Oil and Gas Compliance-Resources Updates
Air Permits main line: (512) 239-1250
Where to Find More Information