Smart Buildings Have Promised a Lot. Use Energy Management and Fault Detection and Diagnoses (FDD) to Make them Deliver.
P2Copyright 2013 CopperTree Analytics Inc.
Energy Management is a Crowded Race
P3Copyright 2013 CopperTree Analytics Inc.
FDD for the WinThe forerunners will offer Energy
Management and FDD
P4Copyright 2013 CopperTree Analytics Inc.
The Garden Path…
Energy Management without FDD
P5Copyright 2013 CopperTree Analytics Inc.
The First Step in the Right Direction:
Preserve Your Commissioning
P6Copyright 2013 CopperTree Analytics Inc.
Golden Standards
P7Copyright 2013 CopperTree Analytics Inc.
Fault Detection and
Diagnostics
P8Copyright 2013 CopperTree Analytics Inc.
Demand Limiting: Return on Investment
• $50 for example devices ($1,086 per year for entire
solution)
• >$300 in Savings lost over 3 months when
system was in manual
• Could have saved: $250
ROI = 250/50x100
= 5 times
P9Copyright 2013 CopperTree Analytics Inc.
The Second Step:Automated Fault Detection Diagnostics (FDD)
P10Copyright 2013 CopperTree Analytics Inc.
Pinpoint Wastage
Electrical distribution for VAV zones
P11Copyright 2013 CopperTree Analytics Inc.
Pinpointing Wastage: Return on Investment
• Weekday average electrical energy savings (VAVs): 68%
• Average Daily VAV consumption (Before): 414 kWh
• Average Daily VAV consumption (After): 90 kWh
Savings: 324 kWh per day; 260 workdays per year
Savings per year: $8,542 (at US Av. kWh 10.14 cents)
Cost to implement: One time: $300, Annual: $1,477
3 Yr ROI: 5.42 times
P12Copyright 2013 CopperTree Analytics Inc.
Prioritize Maintenance
P13Copyright 2013 CopperTree Analytics Inc.
Prioritize Maintenance: return on investment
• Traditional maintenance Approach: Service Rotation
• Sample Maintenance Approach using FDD:
• 1,000 Zone Systems
• Continuously monitor and rank performance
• Target maintenance only at worst performing
systems
Savings: $3,050 labor savings, plus associated energy
reductions
Results: 100 Zone systems repaired for the price of 30
P14Copyright 2013 CopperTree Analytics Inc.
For Even Greater Control and Operational/Energy Efficiencies:Integrate with Your Enterprise Facility Manager (enteliWEB)
Make the Changes
Identified by your
FDD Package
Directly to Your
BAS
P15Copyright 2013 CopperTree Analytics Inc.
P16Copyright 2013 CopperTree Analytics Inc.
www.copper t reeana ly t i cs . com
Copyright 2013 CopperTree Analytics Inc.
Thank you.