Defra Research Contract: Reservoir Safety Advice ENGINEERING GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS Volume 3 of 3 : Main Guide Completed examples – A3 Draft for informal consultation Job Number 0022203/ 206 Rev A04 June 2006 Jacobs Babtie Thorncroft Manor, Dorking Road, Leatherhead, Surrey KT22 8JB Tel 01372 863613 Fax +01372 863602

Upload: duongtruc

Post on 18-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Defra Research Contract: Reservoir Safety Advice ENGINEERING GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS Volume 3 of 3 : Main Guide Completed examples – A3 Draft for informal consultation Job Number 0022203/ 206 Rev A04 June 2006 Jacobs Babtie Thorncroft Manor, Dorking Road, Leatherhead, Surrey KT22 8JB Tel 01372 863613 Fax +01372 863602

VOLUME PLAN Volume

1 Main Guide Main Guide Appendix A : Emergency Planning generally Appendix B : Detailed issues regarding hydraulic modelling Appendix C : Scenario Planning in relation to possible emergencies at a dam Appendix D : Possible template for off-site plan

2 Completed examples - A4 Appendix E : Rapid Impact assessment Appendix F.1 : Standard Impact assessment (A4 plan) Appendix G : On-site Plan Example A (owner of single dam) Appendix H : On-site Plan Example B (owner of many dams) Appendix J : External Interface Plan Appendix K : Statement by Qualified Civil Engineer

3 Completed examples- A3 Appendix F.2 : Standard Impact assessment (A3 maps and tables)

The authors of this report are employed by Jacobs Babtie. The work reported herein was carried out under a Contract placed on 6th September 2002 by the Secretary of State for the Environment, Food and Rural Affairs. Any views expressed are not necessarily those of the Secretary of State for the Environment, Food and Rural Affairs. ©Crown Copyright 2006.

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT VOLUME 2 (ATTACHMENT B - A3 ):

RESULTS FOR RIVER ARIES

STANDARD IMPACT ASSESSMENT for reservoirs owned by Xenon plc on

Rivers Anduin, Aries and Kappa

Preface 1. This example Impact assessment, although based on a real cascade, has been edited in respect of key features

of the cascade and downstream valley to preserve the anonymity of the dam, including names.

Volume Plan

Volume Title 1 Main report Standard Impact assessment for reservoirs owned by Xenon plc on Rivers

Anduin, Aries and Kappa 2 Attachment B Results for River Anduin 3 Attachment C Results for River Aries 4 Attachment D Results for River Kappa

Notes. 1. Volumes 2 and 3 not included with Guide to Emergency Planning for brevity

Change log for plan

Rev Date Details of nature of change By Ckd Approved Owner Panel

AR1

Accepted by EA

A01.01 17/06/2005 Issued to Environment Agency for examination and

acceptance

FJBS AJB EHG JDG Na

A01.02 15/08/2005 Accepted by Environment Agency

- - - - ABC

A02.01 2/3/20012 Add new housing estate to consequence tables

RTS SEG EHG JDG GTF

Notes 1. Documented in signed off separate statement by Qualified Civil Engineer

Contents Photographs of key points controlling flow down AnDuin valley Relevant extracts of Environment Agency Zone 2 and 3 maps (from internet) Figures Figures Figure B.1R : Anduin : Flood Hydrographs from Standard Analysis (Rainy day).....................................................1 Figure B.1S : Anduin : Flood Hydrographs from Standard Analysis (Sunny day) ....................................................1 Figure B.2 : Anduin : Peak flows down valley ...........................................................................................................2 Figure B.3 : Anduin : Longitudinal section down valley showing peak flood levels .................................................3 Figure B.4-1 : Anduin: Model Layout – Upstream section ........................................................................................4 Figure B.4-2 : Anduin: Model Layout – Upstream section – Detail...........................................................................5 Figure B.4-3 : Anduin: Model Layout – Middle section ............................................................................................6 Figure B.4-4 : Anduin: Model Layout – Downstream section....................................................................................7 Figure B.4-5 :Anduin: Model Layout – Downstream section – Detail .......................................................................8 Figure B.5-1 : Anduin : Flood Risk Map without OS Mapping – Flood Zones 1, 2, 3, 4 and 5.................................9 Figure B.5-2 : Anduin: Flood Risk Map without OS Mapping – Flood Zones 3, 4 , 5, 6 and 7...............................10 Figure B.5-3 : Anduin: Flood Risk Map without OS Mapping – Flood Zones 7, 8 and 9........................................11 Figure B.6. 1 Inundation plan Sheet 8 ......................................................................................................................12 Tables Table B.1 : Anduin : Transportation embankments across flow path......................................................................13 Table B.2 : Anduin : Summary of likely consequences by zone .............................................................................14 Table B.3R : Anduin Rainy day scenario : Schedule of non-residential property ...................................................15 Table B.3S : Anduin Sunny day scenario :Schedule of non-residential property....................................................16 Table B.4 : Anduin : Data at key points....................................................................................................................17

21/06/2006 iii

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

PHOTOGRAPHS OF KEY POINTS CONTROLLING FLOW DOWN ANDUIN VALLEY

Motorway at CH xxx, from downstream (note car parked in left hand corner)

Railway at Ch 3600, from downstream

Bridge under Canal , from upstream

AX bridge, from downstream

21/06/2006 1

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Hydrographs from Standard Analysis plus Normal Manning's 'n' - Sunny Day

0

100

200

300

400

500

600

700

800

900

1000

6.50 7.50 8.50 9.50 10.50 11.50 12.50 13.50 14.50 15.50Time (hours)

Flow

(m3 /s

)

Beta South OutflowGamma East OutflowDelta South Outflow/ U/s Zone 1U/s Zone 2U/s Zone 3U/s Zone 5U/s Zone 6U/s Zone 7U/s Zones 8 and 9Total Flow at Downstream Boundary

Hydrographs from Standard Analysis plus Normal Manning's 'n' - Rainy day

0

500

1000

1500

2000

2500

3000

3500

5.50 6.50 7.50 8.50 9.50 10.50 11.50 12.50 13.50 14.50Time (hours)

Flow

(m3 /s

)

Beta South OutflowGamma East OutflowDelta South Outflow/ U/s Zone 1U/s Zone 2U/s Zone 3U/s Zone 5U/s Zone 6U/s Zone 7U/s Zones 8 and 910,000 year flood - gross inflowTotal Flow at Downstream Boundary

RELEVANT EXTRACTS OF ENVIRONMENT AGENCY ZONE 2 AND 3 MAPS (FROM INTERNET) Omitted to maintain anonymity of the reservoir

FIGURES

Figure B.1R : Anduin : Flood Hydrographs from Standard Analysis (Rainy day)

Figure B.1S : Anduin : Flood Hydrographs from Standard Analysis (Sunny day)

21/06/2006 1

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

21/06/2006 2

0

0

0

1500

2000

2500

00

3500

0 5,000 10,000 15,000 20,000 25,000Distance from Dam (m)

/s)

Rainy Day Peak FlowSunny Day Peak Flow100 year flood - 6.25 hour storm

Figure B.2 : Anduin : Peak flows down valley

50

100

301000 year flood - 6.25 hour storm

Zon

e 7

Zon

e 8+

9

Zon

e 5

Zon

e 6

Flow

(m3

Zon

e 1

Zon

e 2

Zon

e 3

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Figure B.3 : Anduin : Longitudinal section down valley showing peak flood levels

M xx

Railway, A road

Railway, Canal

Ax

Natural narrowing of valley

Weir A xx

Note: Steps in valley floor on longitudinal sections likely to be due to

a) Infoworks omits lengths of structure when plotting long sections

b) Tree cover leading to incorrect (high) ground levels in places

Base of valley (lowest point on cross sections taken from Ifsar)

Inundation level prior to

embankment breaching of railway

21/06/2006 3

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South East Gamma

Delta South

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

Figure B.4-1 : Anduin: Model Layout – Upstream section

21/06/2006 4

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East

a South Delt

Note: Map background omitted from ensure anonymity. Delivered plans are

example to expected

to incorporate 1:10000 OS maps as a minimum.

Fig tail ure B.4-2 : Anduin: Model Layout – Upstream section – De

21/06/2006 5

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

Figure B.4-3 : Anduin: Model Layout – Middle section

21/06/2006 6

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Figure B.4-4 : Anduin: Model Layout – Downstream section

Reservoirs/Dams Beta South Gamma East Delta South

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

21/06/2006 7

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

Figure B.4-5 :Anduin: Model Layout – Downstream section – Detail

21/06/2006 8

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Figure B.5-1 : Anduin : Flood Risk Map without OS Mapping – Flood Zones 1, 2, 3, 4 and 5

Confluence with River Kappa (inflow from west)

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

21/06/2006 9

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Figure B.5-2 : Anduin: Flood Risk Map without OS Mapping – Flood Zones 3, 4 , 5, 6 and 7

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Extent of inundation area prior to breaching of railway embankment

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Extent of inundation area prior to breaching of railway embankment

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Extent of inundation area prior to breaching of railway embankment

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Extent of inundation area prior to breaching of railway embankment

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

21/06/2006 10

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

This document is part of the following Inundation Analysis and Consequence Assessment: Watercourse River Anduin

Reservoirs/Dams Beta South Gamma East Delta South

Confluence with River Aries (inflow from east)

Note: Map background omitted from example to ensure anonymity. Delivered plans are expected to incorporate 1:10000 OS maps as a minimum.

Figure B.5-3 : Anduin: Flood Risk Map without OS Mapping – Flood Zones 7, 8 and 9

21/06/2006 11

GUIDE TO EMERGENCY PLANNING FOR UK RESERVOIRS DEFRA RESEARCH CONTRACT APPENDIX F.2 : EXAMPLE OF STANDARD IMPACT ASSESSMENT

Figure B.6. 1 Inundation plan Sheet 8

Note: Unrelated map background used in example to ensure anonymity.

This document is pfollowing Inundation AnConsequence Assessment:

art of the alysis and

Watercourse Rive

21/06/2006 12

r Anduin

Reservoi eta South mma East lta South

rs/Dams BGa

eD

Table B.1 Anduin Transportation embankments which could obstruct flow pathPoint definition Embankment Structure through embankment All structures and embankments intact Best estimate Representation Notes

Hydraulic model output - Structure Representation Hydraulic model output

Flood Zone Reference

Name of Transportation embankment

Model Cross Section

Immediately Upstream

Easting Northing Floodplain Elevation

Crest Level

Max height

Crest width

(along flow route)

Notes re vulnerability to breach

Type Bottom Width

Height of crown above flood plain

Open area above flood

plain (unrestricted)

Source of data

% blockage in dam

break event

Effective open area

above flood plain

Maximum discharge

Maximum Average Velocity

Maximum Flood

Elevation

Maximum Floodplain

DepthStatus Notch

Invert

Bottom Width of Notch

Notch Width at

embankment crest

Maximum discharge

Maximum Average Velocity

Maximum Flood

Elevation

Maximum Floodplain

Depth

Text – Up to 40 charactersSection name in model – blank for

rapid method

Seven-digit OS co-ordinates

mAOD, to one

decimal place

mAOD m m mAOD m m m2 % m2 m3/s

m/s, to one

decimal place

mAOD, to one

decimal place

m, to one decimal place

mAOD m m m3/s

m/s, to one

decimal place

mAOD, to one

decimal place

m, to one decimal place

ZoneRef PointName Pt_CS XCoordPt YCoordPt GroundLevel Qmax MaxVel MaxStage MaxDepth Qmax MaxVel MaxStage MaxDepth

Rainy day scenario

Zone 1Mxx motorway bridge SE Pelargir. C road on right bank

OS1k03550 360448 416346 108.5 116.0 7.5 30 Low Vertical RC side walls 20 15.0 300 Site visit 0 300 See Note on front sheet of Volume 1 Breached 108.5 10 70 2509 2.0 120.0 11.4

Ifsar data shows step in flood plain level - this is probably error, due to dense tree covering valley upstream of bridge

Zone 2 Railway 1 - bridge SE Pelargir OS1k05550 359773 415600 86.8 93.2 6.4 6 High Masonry arch

bridge 5 9 40 Site visit 50% 20 Breached 87.2 0 60 2403 1.5 98.5 11.7

Zone 3 Canal bridge over river SW of Railway 1 OS1k05570 359718 415559 87.4 91 3.6 10 Medium Masonry arch

bridge 6 3 15 Site visit 80% 3 Embankment and structure not modelled 2403 1.9 98.2 10.8 Flood will also flow along canal route in both directions

Zone 3 Ax road bridge at Pelargir OS1k06500_int637 359222 416238 75.3 80 4.7 12 Medium Masonry arch bridge 9 5 40 Site visit 50% 20 Embankment and structure not modelled 1119 2.8 84.1 8.8 Flow reduced by shortcut spill route.

Zone 5 Railway 2 - dual bridges near Euxton OS1k17000 355789 417911 28.1 45.5 17.4 6 High RC Culvert 10 4 40

Air photos;

no public access

50% 20 Breached 28.0 20 80 992 2.1 38.8 10.7

High Viaduct - would have no significant incremental effect on flow relative to upstream culvert Embankment and structure not modelled As Above

Zone 6 Axx road - Pxxxxx Bridge OS1k17400 355660 417851 28.3 39 10.7 10 Low Masonry Arch bridge 10 10 100 Site visit 10% 90 Embankment and structure not modelled 992 2.8 33.8 5.5

Zone 6 Byway immediately downstream (original route) Neglect as broadly at flood plain masonry humpback 10 3 30 Site visit 80% 6 Embankment and structure not modelled As Above

Zone 6Ax motorway bridge. Gravel track under one side, access to houses

OS1k18600 354482 417910 18.3 27.7 9.4 30 Medium

3 span bridge, two rows of 1x 1.5m

columns plus bank seats for abutments

20 7 120 Site visit 20% 96 Breached 18.3 0 60 990 1.3 29.2 10.8

Zone 8 Axxx road at Rauros OS1k26500 348531 418539 6.0 Neglect as broadly at flood plain masonry arch bridge 7 2 12 Site visit 80% 2 Embankment and structure not modelled 127 0.5 7.6 1.6 Flow reduced by spill to South

Zone 8 Railway 3 - bridge West (downstream) of Rauros OS1k26500 348531 418539 6.0 6.6 0.6 4 High Horizontal steel

bridge 7 0.5 3 Site visit 80% 1 Embankment and structure not modelled 127 0.5 7.6 1.6 Flow reduced by spill to South

Zone 9 Railway 3 - structures SW of Rauros (storage area) 347270 416770 0 n/a n/a 4.3 n/a Flood draindown routes not

investigated

Note : See Note on front sheet of Volume 1

Sunny day scenarioZone 1 M61 motorway bridge SE

PelargirOS1k03550 360448 416346 108.5 As above As above As above See Note on front sheet of Volume 1 Breached 108.5 10 70 572 2.0 115.9 7.4

Zone 2 Railway 1 - bridge SE Pelargir

OS1k05550 359773 415600 86.8 Breached 87.2 0 60 499 0.9 94.8 8.0

Zone 3 Canal bridge over river SW of Railway 1

OS1k05570 359718 415559 87.4 Embankment and structure not modelled 499 1.9 94.5 7.0 Flood will also flow along canal route in both directions

Zone 3 Ax road bridge at Pelargir OS1k06500_int637 359222 416238 75.3 Embankment and structure not modelled 296 1.9 79.4 4.0Zone 5 Railway 2 - dual bridges

near EuxtonOS1k17000 355789 417911 28.1 Breached 28.0 20.0 80 205 1.3 33.0 4.8

Embankment and structure not modelledZone 6 Axx road - Pxxxxx Bridge OS1k17400 355660 417851 28.3 Embankment and structure not modelled 205 2.0 31.1 2.8

Byway immediately downstream (original route) Embankment and structure not modelled

Zone 6 Ax motorway bridge. Gravel track under one side, access to houses

OS1k18600 354482 417910 18.3Breached

18.3 0 60 205 0.7 24.4 6.1

Zone 8 Axxx road at Rauros OS1k26500 348531 418539 6.0 Embankment and structure not modelled 19 0.5 7.1 1.1 Flow reduced by spill to SouthZone 8 Railway 3 - bridge West

(downstream) of RaurosOS1k26500 348531 418539 6.0 Embankment and structure not modelled 19 0.5 7.1 1.1 Flow reduced by spill to South

Zone 9 Railway 3 - structures SW of Rauros

(storage area) 347270 416770 n/a0.0

n/a n/a 4.3 n/a Flood draindown routes not investigated

21/06/2006 15:22P:\Environment\0022203 Defra research 2002-06\206 Task F Eng Guide to emergancy planning\Guide 04 Draft for Public consultation\2006-06-12 Final\Vol 3 resent 20-6\Appendix F Tables Rev-4.07.xls Table B1

Table B.2 Anduin Summary of likely consequences by zone

Flood Zone Definition Hydrograph details at upstream cross section Number of properties, PAR, 3rd party damage PAR in transportati

on

Fatality rate and likely loss of life in each reach

Residential properties at risk Non-Residential property at risk(see Table B2)

Flood Zone Reference

Flood Zone Name Upstream limit cross section

Upstream limit

Easting

Upstream limit

Northing

Downstream limit cross section

Downstream limit Easting

Downstream limit Northing

Zone Length m, measured

along modelled flow path

Distance from Dam

m from dam along modelled flow path

Time to Onset

Time to Peak

Maximum discharge

Maximum Average Velocity

Maximum Floodplain

Depth

Total number of properties in flood risk

area by damage category

Cost of Damage to Residential

Property

Num of buildings

Number of people in non-residential property

in flood risk area

Cost of Damage to Non-

Residential Property

Average on 24 hour basis

Average velocity from all sections in reach

(m/s)

Average maximum

depth from all sections in reach

(m)

Depth x Velocity

Average Inundated width W

Q/W Fatality ratio

Average population

at risk

Likely loss of

life

Seven-digit OSco-ordinates

Seven-digit OSco-ordinates

hrs:mins, to nearest 5

minutes from commencement of breach event

Inun

datio

n da

mag

e V<

2m/s

Parti

al s

truct

ural

(V

>2m

/s, 3

<DV<

7

Stru

ctur

al V

>2m

/s,

7<D

V Building occupancy

Time averaged

PAR

m3/s m/s, to one

decimal place

m, to one decimal place

m/s m m

Rainy day scenario Time Zero = 05:45

Zone 1 Dam to Mx OS1k01000 362000 414664 OS1k03550 360448 416346 2627 0 06:15 06:55 3026 9.6 4.4 0 0 2 #REF! #REF! 1 904 2 1 #REF! 6 3.2 9.1 29.3 160 18.9 100.0% #REF! #REF!Zone 2 Mx to Railway 1 OS1k04000_int125 360295 416332 OS1k05550 359773 415600 1404 2,627 06:30 07:05 2509 6.8 3.4 0 0 11 #REF! #REF! 1 310 31 5 #REF! 5 3.2 7.3 23.1 200 12.5 50.0% #REF! #REF!Zone 3 Pelargir Centre OS1k05570 359718 415559 OS1k08500 358570 415320 3064 4,031 06:40 07:10 2403 1.9 10.8 73 0 134 #REF! #REF! 19 24,725 538 208 #REF! 5 3.7 7.9 29.0 160 15.0 60.0% #REF! #REF!Zone 4 Brook at Pelargir n/a n/a n/a OS1k06500_int437 359384 416368 n/a 4,956 n/a n/a n/a n/a n/a 8 0 0 #REF! #REF! 2 10,120 169 39 #REF! 1 2.0 2.0 4.0 80 ####### 25.0% #REF! #REF!Zone 5 D/S Pelargir to Railway 2 OS1k09000 358264 415065 OS1k17000 355789 417911 7524 7,095 06:55 07:30 1689 1.9 9.5 0 0 3 #REF! #REF! 2 1,340 14.8 4 #REF! 8 3.8 7.2 27.6 130 13.0 50.0% #REF! #REF!Zone 6 Railway 2 to Axxx OS1k17400 355660 417851 OS1k18600 354482 417910 1486 14,619 07:45 08:45 992 2.8 5.4 3 0 12 #REF! #REF! 1 3,000 50 12 #REF! 2 2.1 7.0 15.1 100 9.9 30.0% #REF! #REF!Zone 7 Axxx to u/s Rauros OS1k18800 354351 417873 Os1k24500 349938 417882 6576 16,105 07:55 08:55 990 3.2 6.6 6 0 1 #REF! #REF! 3 1,550 34 2 #REF! 6 1.6 4.2 6.6 300 3.3 4.0% #REF! #REF!Zone 8 Rauros Centre OS1k25000 349591 418023 OS1k27000 348289 418663 1711 22,681 08:55 10:05 687 0.7 3.6 636 0 0 #REF! #REF! 41 23,791 925 187 #REF! 5 0.6 2.1 1.2 800 0.9 0.5% #REF! #REF!Zone 9 Rauros Moss Os1k24500 349938 417882 n/a n/a n/a n/a 22,157 n/a n/a n/a n/a n/a 13 0 0 #REF! #REF! 3 3,982 8 2 #REF! 0 0.6 2.2 1.2 600 ####### 0.2% #REF! #REF!

Totals (all Zones): 739 0 163 #REF! #REF! 73 69,722 1,771 459 #REF! 38 #REF! #REF!902 #REF!

Totals (Zones 1 to 6): 84 0 162 #REF! #REF! 26 40,399 804 267 #REF! #REF! #REF!246

check as single value for NR £/m2 £1,227 m2/ occup. 16085,548,894 436

Sunny day scenarioTime Zero =

06:35Zone 1 Dam to Mx OS1k01000 362000 414664 OS1k03550 360448 416346 2627 0 06:35 06:55 857 6.9 2.3 1 0 0 #REF! #REF! 1 0 0 0 £0 6 2.5 5.2 12.8 80 10.7 35.0% #REF! #REF!Zone 2 Mx to Railway 1 OS1k04000_int125 360295 416332 OS1k05550 359773 415600 1404 2,627 06:55 07:15 572 4.3 1.4 0 0 4 #REF! #REF! 1 310 31 5 #REF! 5 2.2 3.9 8.8 110 5.2 10.0% #REF! #REF!Zone 3 Pelargir Centre OS1k05570 359718 415559 OS1k08500 358570 415320 3064 4,031 07:00 07:30 499 1.9 7.0 63 0 12 #REF! #REF! 16 15,246 287 88 #REF! 5 2.2 4.3 9.7 100 5.0 10.0% #REF! #REF!Zone 4 Brook at Pelargir n/a n/a n/a OS1k06500_int437 359384 416368 n/a 4,956 n/a n/a n/a n/a n/a 3 0 0 #REF! #REF! 2 718 12 3 #REF! 1 0.5 0.5 0.3 50 ####### 5.0% #REF! #REF!Zone 5 D/S Pelargir to Railway 2 OS1k09000 358264 415065 OS1k17000 355789 417911 7524 7,095 07:20 08:10 306 1.0 4.3 1 0 0 #REF! #REF! 1 780 7.8 2 #REF! 8 2.3 3.3 7.6 110 2.8 4.0% #REF! #REF!Zone 6 Railway 2 to Axxx OS1k17400 355660 417851 OS1k18600 354482 417910 1486 14,619 08:25 09:35 205 2.0 2.8 8 0 2 #REF! #REF! 1 3,000 60 14 #REF! 2 1.6 3.5 5.5 80 2.6 4.0% #REF! #REF!Zone 7 Axxx to u/s Rauros OS1k18800 354351 417873 Os1k24500 349938 417882 6576 16,105 08:40 09:50 205 1.7 4.0 6 0 0 #REF! #REF! 1 580 29 0 #REF! 6 1.0 2.5 2.5 225 0.9 0.5% #REF! #REF!Zone 8 Rauros Centre OS1k25000 349591 418023 OS1k27000 348289 418663 1711 22,681 10:30 12:30 140 0.5 2.4 155 0 0 #REF! #REF! 18 15,942 580 111 #REF! 5 0.4 1.3 0.6 560 0.2 0.2% #REF! #REF!Zone 9 Rauros Moss Os1k24500 349938 417882 n/a n/a n/a n/a 22,157 n/a n/a n/a n/a n/a 1 0 0 #REF! #REF! 1 0 2 1 #REF! 0 0.4 1.8 0.7 480 ####### 0.1% #REF! #REF!

Totals (all Zones): 238 0 18 #REF! #REF! 42 36,576 1,009 223 #REF! 38 #REF! #REF!256 #REF!

Totals (Zones 1 to 6): 76 0 18 #REF! #REF! 22 20,054 398 112 #REF! #REF! #REF!94

Total number of people in

residential property in flood risk

area

Total Area of Non-

residential Buildings in flood risk area (m2

21/06/2006 15:22P:\Environment\0022203 Defra research 2002-06\206 Task F Eng Guide to emergancy planning\Guide 04 Draft for Public consultation\2006-06-12 Final\Vol 3 resent 20-6\Appendix F Tables Rev-4.07.xls Table B.2

Table B.3R Anduin Schedule of Non-residential propertiesPoint definition Property details Model details Calculations with input data

Flood Zone Reference

Point Type Name Postcode Easting Northing Num of bldgs

Plan area Number of floors affected

Occupant area

Building occupancy

Occupancy factor

Remarks Base PAR Model Cross Section Maximum Section Velocity

Maximum depth at

point

Damage parameter

Damage Category (if statement on

DV))

Damage cost£/m2

Total Damage Cost

Type of Property (for occupancy rate)

(Text – Up to 40 characters) Postcode (if address point

in building)

Seven-digit OS co-ordinates Total plan area in flood

risk area (m2)

m2 / person % of hours occupied in

year

Building occupancy

x

As in model – blank for rapid method

m/s, to one decimal place

m, to one decimal place

(all floors affected)

ZoneRef PointType PointName Pcode XCoordPt YCoordPt NonResArea Pt_CS V D DxV DamageCat NonResCost

Zone 1 Farm J Smith & Sons (part) n/a 361849 414904 904 1 904 500 2 30% 1 OS1k01000_int308 3.2 0.9 2.88 Inundation #REF! #REF!Zone 1 Totals 1 904 904 2 1 #REF!Zone 2 Public House BLACK HORSE HOTEL PR6 9EE 360208 416333 310 1 310 10 31 15% 5 OS1k04400 5.5 3.0 16.53 Structural #REF! #REF!Zone 2 Totals 1 310 310 31 4.65 #REF!Zone 3 Factory MARCONI INTERACTIVE SYSTEMS PR7 3JP 359034 416065 10000 1 10000 60 167 23% 38 OS1k07400 0.6 7.0 3.99 Inundation #REF! #REF!Zone 3 Retail DAWN TIL DUSK PR7 3JQ 358948 416157 390 1 390 30 13 23% 3 OS1k07400 0.6 5.5 3.14 Inundation #REF! #REF!Zone 3 Public House HOP POCKET HOTEL PR7 3JQ 358973 416172 390 2 780 50 16 20% 6 OS1k07400 0.6 5.2 2.96 Inundation #REF! #REF!Zone 3 Office ACTION ALARM SYSTEMS PR7 4AD 359329 416038 65 2 130 40 3 23% 1 OS1k06500_int137 7.1 4.0 28.52 Structural #REF! #REF!Zone 3 Motor Trade YARROW BRIDGE GARAGE PR7 4AB 359277 416063 290 1 290 80 4 23% 1 OS1k06500_int137 7.1 5.5 39.22 Structural #REF! #REF!Zone 3 Office MILLERS PR7 4AB 359300 416115 540 2 1080 40 27 23% 12 OS1k06500_int137 7.1 5.6 39.93 Structural #REF! #REF!Zone 3 Recreation DUXBURY PARK GOLF CLUB PR7 4AS 358777 415896 6200 1 6200 300 21 15% 3 OS1k07500_int204 0.7 2.0 1.43 Inundation #REF! #REF!Zone 3 Care Home MARLEY COURT NURSING & RESIDENTIAL HOME PR7 4AZ 359632 415220 910 2 1820 50 36 100% 73 OS1k05570 1.9 2.6 5.05 Inundation #REF! #REF!Zone 3 Hotel PREMIER LODGE PR7 4AB 359268 416103 280 2 560 50 11 50% 11 OS1k06500_int137 7.1 5.5 39.22 Structural #REF! #REF!Zone 3 Office F TAYLOR & SONS LTD PR7 4AB 359268 416103 280 2 560 40 14 23% 6 OS1k06500_int137 7.1 5.5 39.22 Structural #REF! #REF!Zone 3 School St. Georges Primary School n/a 359065 416330 1305 1 1305 7 186 23% 43 OS1k07000 1.7 0.6 1.02 Inundation #REF! #REF!Zone 3 Office assumed Unknown 01 n/a 359379 415536 130 1 130 40 3 23% 1 OS1k06000 2.8 3.2 9.08 Structural #REF! #REF!Zone 3 Office assumed Unknown 02 n/a 359379 415517 170 1 170 40 4 23% 1 OS1k06000 2.8 3.2 9.08 Structural #REF! #REF!Zone 3 Office assumed Unknown 03 n/a 359379 415494 226 1 226 40 6 23% 1 OS1k06000 2.8 2.6 7.38 Structural #REF! #REF!Zone 3 Office assumed Unknown 04 n/a 359416 415513 133 1 133 40 3 23% 1 OS1k06000 2.8 1.6 4.54 Partial Structural #REF! #REF!Zone 3 Office assumed Unknown 05 n/a 359414 415537 180 1 180 40 5 23% 1 OS1k06000 2.8 2.4 6.81 Partial Structural #REF! #REF!Zone 3 Office assumed Unknown 06 n/a 359644 415414 223 1 223 40 6 23% 1 OS1k06000 2.8 3.7 10.50 Structural #REF! #REF!Zone 3 Office assumed Unknown 07 n/a 359655 415392 171 1 171 40 4 23% 1 OS1k06000 2.8 5.4 15.33 Structural #REF! #REF!Zone 3 Office assumed Unknown 08 n/a 359353 416286 377 1 377 40 9 23% 2 OS1k06500_int537 2.3 5.6 12.68 Structural #REF! #REF!Zone 3 Totals 19 22260 24725 538 208 #REF!Zone 4 Factory MARINE MOTOR SERVICES LTD PR6 0QG 359530 416835 8470 1 8470 60 141 23% 32 n/a 0.5 1.6 0.80 Inundation #REF! #REF!Zone 4 Factory D MARTINDALE LTD PR6 0QQ 359613 417079 1650 1 1650 60 28 23% 6 n/a 0.5 2.7 1.35 Inundation #REF! #REF!Zone 4 Totals 2 10120 10120 169 39 #REF!Zone 5 Motor Trade CLAYTON BROOK GARAGE PR7 1NR 356366 417359 560 1 560 80 7 23% 2 OS1k16000 2.4 3.6 8.69 Structural #REF! #REF!Zone 5 Plant Nursery Unknown 780 1 780 100 8 30% 2 OS1k12000_int584 1.3 2.7 3.63 Inundation #REF! #REF!Zone 5 Totals 2 1340 1340 14.8 3.95 #REF!Zone 6 Factory MANCHESTER RUBBER CO PR7 6EB 354859 418085 3000 1 3000 60 50 23% 12 OS1k18000_int173 1.0 1.5 1.55 Inundation #REF! #REF!Zone 6 Totals 1 3000 3000 50 12 #REF!Zone 7 Farm SARSCOW FARM PR268LS 350440 418321 620 1 620 200 3 30% 1 OS1k24000 0.8 0.4 0.33 Inundation #REF! #REF!Zone 7 Farm INGRAVE FARM PR7 6NA 351309 418193 350 1 350 200 2 30% 1 OS1k22500 1.6 0.9 1.47 Inundation #REF! #REF!

Zone 7 Place of Worship Unknown 580 1 580 20 29 1%Reduce PAR as chapel

in graveyard 0 OS1k22500 1.6 2.4 3.84 Inundation#REF! #REF!

Zone 7 Totals 3 1550 1550 34 2 #REF!Zone 8 Retail THE ROYAL BANK OF SCOTLAND PLC PR269RA 348885 418620 200 1 200 30 7 23% 2 OS1k26000 0.5 0.6 0.32 Inundation #REF! #REF!Zone 8 Retail POST OFFICE PR269RN 348831 418906 10 1 10 5 2 23% 0 OS1k26000 0.5 0.1 0.03 Inundation #REF! #REF!Zone 8 Offices NICHOLSONS SOLICITORS PR269RB 348890 418564 485 1 485 40 12 23% 3 OS1k26000 0.5 0.9 0.46 Inundation #REF! #REF!Zone 8 Factory WOOD DESIGN PR269RB 348918 418521 65 1 65 30 2 23% 0 OS1k26000 0.5 2.0 1.07 Inundation #REF! #REF!Zone 8 Retail SHIRLEYS HAIR DESIGN PR269RN 348830 418954 65 1 65 28 2 23% 1 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Farm FINNEY BARRS FARM PR269JE 348261 418295 510 1 510 200 3 30% 1 n/a 0.5 2.3 1.15 Inundation #REF! #REF!Zone 8 Farm HEYHOUSE FARM PR269JE 348322 418287 660 1 660 200 3 30% 1 n/a 0.5 2.1 1.04 Inundation #REF! #REF!Zone 8 Farm FINNEY HALL FARM PR269JQ 347855 417794 820 1 820 200 4 30% 1 n/a 0.5 1.7 0.85 Inundation #REF! #REF!Zone 8 Farm WITHINGTON BARN FARM PR269JQ 348003 417805 600 1 600 200 3 30% 1 n/a 0.5 1.0 0.50 Inundation #REF! #REF!Zone 8 Farm + Offices HOME FARM PR269HB 349767 417988 4830 1 4830 160 30 30% 9 OS1k24500 0.6 2.0 1.26 Inundation #REF! #REF!Zone 8 Offices MCMILLAN & CO PR269RE 348937 418404 210 1 210 40 5 23% 1 OS1k26000 0.5 0.9 0.46 Inundation #REF! #REF!Zone 8 Farm NEW MANOR HOUSE FARM PR269RE 348970 418247 1930 1 1930 300 6 70% 5 OS1k26000 0.5 1.2 0.64 Inundation #REF! #REF!Zone 8 Retail CROSTON VILLAGE SURGERY PR269HJ 349004 418632 150 1 150 20 8 40% 3 OS1k26000 0.5 0.5 0.27 Inundation #REF! #REF!Zone 8 School CROSTON OLD SCHOOL PR269HA 348996 418397 2300 1 2300 7 329 20% 66 OS1k26000 0.5 1.3 0.69 Inundation #REF! #REF!Zone 8 Recreation CROSTON SPORTS CLUB PR269RR 348679 418724 903 1 903 40 23 15% 3 OS1k26500 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Public House LORD NELSON PR269HJ 348957 418616 270 1 270 10 27 15% 4 OS1k26000 0.5 0.7 0.37 Inundation #REF! #REF!Zone 8 Public House GRAPES HOTEL PR269RA 348996 418494 600 1 600 10 60 15% 9 OS1k26000 0.5 1.4 0.75 Inundation #REF! #REF!Zone 8 Public House WHEATSHEAF HOTEL PR269RA 348900 418608 390 1 390 10 39 15% 6 OS1k26000 0.5 0.7 0.35 Inundation #REF! #REF!Zone 8 Public House CROWN HOTEL PR269RN 348832 418882 370 1 370 10 37 15% 6 OS1k26000 0.5 0.2 0.09 Inundation #REF! #REF!Zone 8 School TRINITY & ST. MICHAELS PR269HJ 349166 418676 1220 1 1220 7 174 20% 35 OS1k25500 0.8 0.1 0.07 Inundation #REF! #REF!Zone 8 Retail CROSTON VILLAGE NEWSAGENTS PR269RN 348831 418906 100 1 100 30 3 30% 1 OS1k26000 0.5 0.1 0.03 Inundation #REF! #REF!Zone 8 Retail WESTHEAD STORE PR269RR 348623 418685 85 1 85 30 3 30% 1 OS1k26500 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Offices POLICE STATION PR269RR 348706 418732 190 1 190 40 5 80% 4 OS1k26500 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Retail A BURNET PR269RB 349004 418457 175 1 175 30 6 30% 2 OS1k26000 0.5 1.2 0.63 Inundation #REF! #REF!Zone 8 Retail FAVOURITES PR269RB 348998 418465 80 1 80 30 3 30% 1 OS1k26000 0.5 1.3 0.69 Inundation #REF! #REF!Zone 8 Retail THE VEG PATCH PR269RN 348834 418921 110 1 110 30 4 30% 1 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Office assumed Unknown 10 n/a 349251 418239 133 1 133 30 4 23% 1 OS1k25500 0.8 0.8 0.61 Inundation #REF! #REF!Zone 8 Place of Worship Place of Worship n/a 349263 418051 213 1 213 5 43 5% 2 OS1k25500 0.8 1.7 1.30 Inundation #REF! #REF!Zone 8 Office assumed Unknown 11 n/a 348512 418361 236 1 236 40 6 23% 1 OS1k26500 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Office assumed Unknown 12 n/a 348840 418686 329 1 329 40 8 23% 2 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Office assumed Unknown 13 n/a 348838 418661 134 1 134 40 3 23% 1 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Office assumed Unknown 14 n/a 348825 418606 335 1 335 40 8 23% 2 OS1k26000 0.5 0.5 0.27 Inundation #REF! #REF!Zone 8 Office assumed Unknown 15 n/a 348887 418688 176 1 176 40 4 23% 1 OS1k26000 0.5 0.2 0.11 Inundation #REF! #REF!Zone 8 Office assumed Unknown 16 n/a 348437 418565 241 1 241 40 6 23% 1 OS1k26500 0.5 1.4 0.65 Inundation #REF! #REF!Zone 8 Farm Drinkhouse Farm n/a 348437 418565 3455 1 3455 300 12 30% 3 n/a 0.5 1.8 0.90 Inundation #REF! #REF!Zone 8 Office assumed Unknown 17 n/a 348923 418727 73 1 73 25 3 23% 1 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Office assumed Unknown 18 n/a 348944 418739 271 1 271 40 7 23% 2 OS1k26000 0.5 0.3 0.16 Inundation #REF! #REF!Zone 8 Office assumed Unknown 19 n/a 348964 418719 224 1 224 40 6 23% 1 OS1k26000 0.5 0.3 0.16 Inundation #REF! #REF!Zone 8 Office assumed Unknown 20 n/a 348963 418678 135 1 135 40 3 23% 1 OS1k26000 0.5 0.3 0.16 Inundation #REF! #REF!Zone 8 Office assumed Unknown 21 n/a 348794 419060 132 1 132 40 3 23% 1 OS1k26000 0.5 0.3 0.16 Inundation #REF! #REF!Zone 8 Office assumed Unknown 22 n/a 348762 419015 376 1 376 40 9 23% 2 OS1k26000 0.5 0.3 0.16 Inundation #REF! #REF!Zone 8 Totals 41 23791 23791 925 187 #REF!Zone 9 Farm MIDGE HALL FARM PR269JS 349112 417060 1780 1 1780 500 4 30% 1 n/a 0.5 0.2 0.10 Inundation #REF! #REF!Zone 9 Farm SUMNERS MOSS FARM PR269JS 348600 417378 540 1 540 500 1 30% 0 n/a 0.5 0.2 0.10 Inundation #REF! #REF!Zone 9 Farm MOSS FARM PR269JS 348146 417389 1662 1 1662 500 3 30% 1 n/a 0.5 0.2 0.10 Inundation #REF! #REF!Zone 9 Totals 3 3982 3982 8 2 #REF!

21/06/2006 15:22P:\Environment\0022203 Defra research 2002-06\206 Task F Eng Guide to emergancy planning\Guide 04 Draft for Public consultation\2006-06-12 Final\Vol 3 resent 20-6\Appendix F Tables Rev-4.07.xls Table B.3R

Point definition Property details Model details Calculations with input dataFlood Zone Reference

Point Type Name Postcode Easting Northing Num of bldgs

Plan area Number of floors affected

Occupant area

Building occupancy

Occupancy factor

Remarks Base PAR Model Cross Section Maximum Section Velocity

Maximum depth at

point

Damage parameter

Damage Category (if statement on

DV))

Damage cost£/m2

Total Damage Cost

Type of Property (for occupancy rate)

(Text – Up to 40 characters) Postcode (if address point

in building)

Seven-digit OS co-ordinates Total plan area in flood

risk area (m2)

m2 / person % of hours occupied in

year

Building occupancy

x

As in model – blank for rapid method

m/s, to one decimal place

m, to one decimal place

(all floors affected)

ZoneRef PointType PointName Pcode XCoordPt YCoordPt NonResArea Pt_CS V D DxV DamageCat NonResCostSub total Zones 1-6 26 37934 40399

21/06/2006 15:22P:\Environment\0022203 Defra research 2002-06\206 Task F Eng Guide to emergancy planning\Guide 04 Draft for Public consultation\2006-06-12 Final\Vol 3 resent 20-6\Appendix F Tables Rev-4.07.xls Table B.3R

Table B.3S Anduin Schedule of Non-residential properties - Sunny Day

Point definition Property details Model details Calculations with input dataFlood Zone Reference

Point Type Name Postcode Easting Northing Num of bldgs

Plan area Number of floors affected

Occupant area

Building occupancy

Occupancy factor

Remarks Base PAR Model Cross Section Maximum Section Velocity

Maximum depth at

point

Damage parameter

Damage Category Damage cost£/m2

Total Damage Cost

Type of Property (for occupancy rate)

(Text – Up to 40 characters) Postcode (if address point

in building)

Seven-digit OS co-ordinates Total plan area in flood risk area (m2)

m2 / person % of hours occupied in

year

Building occupancy

x

As in model – blank for rapid method

m/s, to one decimal place

m, to one decimal place

ZoneRef PointType PointName Pcode XCoordPt YCoordPt NonResArea Pt_CS V D DxV DamageCat NonResCost

Zone 1 £0Zone 1 Totals 1 0 0 0 0 £0Zone 2 Public House BLACK HORSE HOTEL PR6 9EE 360208 416333 310 1 310 10 31 15% 5 OS1k04400 3.5 0.7 2.45 Inundation #REF! #REF!Zone 2 Totals 1 310 310 31 4.65 #REF!Zone 3 Factory MARCONI INTERACTIVE SYSTEMS PR7 3JP 359034 416065 10000 1 10000 60 167 23% 38 OS1k07400 0.5 2.2 1.08 Inundation #REF! #REF!Zone 3 Retail DAWN TIL DUSK PR7 3JQ 358948 416157 390 1 390 30 13 23% 3 OS1k07400 0.5 0.8 0.39 Inundation #REF! #REF!Zone 3 Public House HOP POCKET HOTEL PR7 3JQ 358973 416172 390 1 390 50 8 20% 2 OS1k07400 0.5 0.5 0.25 Inundation #REF! #REF!Zone 3 Office ACTION ALARM SYSTEMS PR7 4AD 359329 416038 65 1 65 40 2 23% 0 OS1k06500_int137 3.2 2.0 6.38 Partial Structural #REF! #REF!Zone 3 Motor Trade YARROW BRIDGE GARAGE PR7 4AB 359277 416063 290 1 290 80 4 23% 1 OS1k06500_int137 3.2 2.7 8.62 Structural #REF! #REF!Zone 3 Office MILLERS PR7 4AB 359300 416115 540 1 540 40 14 23% 3 OS1k06500_int137 3.2 2.7 8.62 Structural #REF! #REF!Zone 3 Recreation DUXBURY PARK GOLF CLUB (part) PR7 4AS 358777 415896 750 1 750 300 3 15% 0 OS1k07500_int204 0.3 2.8 0.97 Inundation #REF! #REF!Zone 3 Care Home MARLEY COURT NURSING & RESIDENTIAL HOME PR7 4AZ 359632 415220 910 1 910 50 18 100% 18 OS1k05570 1.9 0.1 0.19 Inundation #REF! #REF!Zone 3 Hotel PREMIER LODGE PR7 4AB 359268 416103 280 2 560 50 11 50% 11 OS1k06500_int137 3.2 2.3 7.36 Structural #REF! #REF!Zone 3 Office F TAYLOR & SONS LTD PR7 4AB 359268 416103 280 1 280 40 7 23% 2 OS1k06500_int137 3.2 2.3 7.36 Structural #REF! #REF!Zone 3 Office assumed Unknown 01 n/a 359379 415536 130 1 130 7 19 23% 4 OS1k06000 2.5 0.2 0.50 Inundation #REF! #REF!Zone 3 Office assumed Unknown 02 n/a 359379 415517 170 1 170 40 4 23% 1 OS1k06000 2.5 0.1 0.25 Inundation #REF! #REF!Zone 3 Office assumed Unknown 06 n/a 359644 415414 223 1 223 40 6 23% 1 OS1k06000 2.5 0.5 1.24 Inundation #REF! #REF!Zone 3 Office assumed Unknown 07 n/a 359655 415392 171 1 171 40 4 23% 1 OS1k06000 2.5 1.6 3.97 Partial Structural #REF! #REF!Zone 3 Office assumed Unknown 08 n/a 359353 416286 377 1 377 40 9 23% 2 OS1k06500_int537 1.5 1.9 2.83 Inundation #REF! #REF!Zone 3 Totals 16 14966 15246 287 88 #REF!Zone 4 Factory MARINE MOTOR SERVICES LTD (part) PR6 0QG 359530 416835 288 1 288 60 5 23% 1 n/a 0.5 0.5 0.25 Inundation #REF! #REF!Zone 4 Factory D MARTINDALE LTD (part) PR6 0QQ 359613 417079 430 1 430 60 7 23% 2 n/a 0.5 0.5 0.25 Inundation #REF! #REF!Zone 4 Totals 2 718 718 12 3 #REF!Zone 5 Plant Nursery Unknown 780 1 780 100 8 30% 2 OS1k12000_int584 1.3 1.0 1.35 Inundation #REF! #REF!Zone 5 Totals 1 780 780 7.8 2.3 #REF!Zone 6 Factory MANCHESTER RUBBER CO PR7 6EB 354859 418085 3000 1 3000 50 60 23% 14 OS1k18000_int173 0.5 1.0 0.54 Inundation #REF! #REF!Zone 6 Totals 1 3000 3000 60 14 #REF!Zone 7 Place of Worship Unknown 580 1 580 20 29 1% 0 OS1k22500 0.9 0.9 0.84 Inundation #REF! #REF!Zone 7 Totals 1 580 580 29 0 #REF!Zone 8 Offices NICHOLSONS SOLICITORS PR269RB 348890 418564 485 1 485 40 12 23% 3 OS1k26000 0.5 0.2 0.11 Inundation #REF! #REF!Zone 8 Factory WOOD DESIGN PR269RB 348918 418521 65 1 65 40 2 23% 0 OS1k26000 0.5 1.3 0.69 Inundation #REF! #REF!Zone 8 Farm FINNEY BARRS FARM PR269JE 348261 418295 510 1 510 200 3 30% 1 n/a 0.5 1.1 0.55 Inundation #REF! #REF!Zone 8 Farm HEYHOUSE FARM PR269JE 348322 418287 660 1 660 200 3 30% 1 n/a 0.5 0.9 0.45 Inundation #REF! #REF!Zone 8 Farm FINNEY HALL FARM PR269JQ 347855 417794 820 1 820 200 4 30% 1 n/a 0.5 0.8 0.40 Inundation #REF! #REF!Zone 8 Farm WITHINGTON BARN FARM PR269JQ 348003 417805 600 1 600 200 3 30% 1 n/a 0.5 0.6 0.30 Inundation #REF! #REF!Zone 8 Farm + Offices HOME FARM PR269HB 349767 417988 4830 1 4830 160 30 30% 9 OS1k24500 0.5 0.8 0.40 Inundation #REF! #REF!Zone 8 Offices MCMILLAN & CO PR269RE 348937 418404 210 1 210 40 5 23% 1 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 School CROSTON OLD SCHOOL PR269HA 348996 418397 2300 1 2300 7 329 20% 66 OS1k26000 0.5 0.5 0.27 Inundation #REF! #REF!Zone 8 Recreation CROSTON SPORTS CLUB (part) PR269RR 348679 418724 118 1 118 40 3 15% 0 OS1k26500 0.5 0.3 0.16 Inundation #REF! #REF!Zone 8 Public House LORD NELSON PR269HJ 348957 418616 190 1 190 10 19 15% 3 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Public House GRAPES HOTEL PR269RA 348996 418494 600 1 600 10 60 15% 9 OS1k26000 0.5 0.6 0.32 Inundation #REF! #REF!Zone 8 Public House WHEATSHEAF HOTEL PR269RA 348900 418608 390 1 390 10 39 15% 6 OS1k26000 0.5 0.1 0.05 Inundation #REF! #REF!Zone 8 Retail A BURNET PR269RB 349004 418457 175 1 175 30 6 30% 2 OS1k26000 0.5 0.4 0.21 Inundation #REF! #REF!Zone 8 Retail FAVOURITES PR269RB 348998 418465 80 1 80 30 3 30% 1 OS1k26000 0.5 0.5 0.27 Inundation #REF! #REF!Zone 8 Place of Worship Place of Worship n/a 349263 418051 213 1 213 5 43 5% 2 OS1k25500 0.8 0.6 0.46 Inundation #REF! #REF!Zone 8 Office assumed Unknown 16 n/a 348437 418565 241 1 241 40 6 23% 1 OS1k26500 0.5 0.8 0.37 Inundation #REF! #REF!Zone 8 Farm Drinkhouse Farm n/a 348437 418565 3455 1 3455 300 12 30% 3 n/a 0.5 1.2 0.60 Inundation #REF! #REF!Zone 8 Totals 18 15942 15942 580 111 #REF!Zone 9 Farm MIDGE HALL FARM (part) PR269JS 349112 417060 958 1 958 500 2 30% 1 n/a 0.5 0.2 0.10 Inundation #REF! #REF!Zone 9 Totals 1 958 958 2 1 #REF!

21/06/2006 15:22P:\Environment\0022203 Defra research 2002-06\206 Task F Eng Guide to emergancy planning\Guide 04 Draft for Public consultation\2006-06-12 Final\Vol 3 resent 20-6\Appendix F Tables Rev-4.07.xls Table B3.S

Point definition Rainy day - Hydraulic model output Notes Sunny day - Hydraulic model output

Flood Zone Reference Name of Risk Location Model Cross Section

Immediately Upstream Easting Northing Maximum discharge

Maximum Average Velocity

Maximum Flood

Elevation

Floodplain Elevation

Maximum Floodplain

Depth

Maximum discharge

Maximum Average Velocity

Maximum Flood

Elevation

Floodplain Elevation

Maximum Floodplain

Depth

Text – Up to 40 characters Section name in model – blank for rapid method

Seven-digit OS co-ordinates m3/s

m/s, to one decimal place

mAOD, to one decimal

place

mAOD, to one decimal

place

m, to one decimal place

m3/sm/s, to one

decimal place

mAOD, to one decimal

place

mAOD, to one decimal

place

m, to one decimal place

ZoneRef PointName Pt_CS XCoordPt YCoordPt Qmax MaxVel MaxStage GroundLevel MaxDepth Qmax MaxVel MaxStage GroundLevel MaxDepth

Zone 1 High pressure gas main near dam OS1k01000_int308 361811 414798 2920 3.2 124.9 118.5 6.4 766 2.5 121.8 118.5 3.3

Zone 3 A-road along flood plain OS1k06500 359420 415768 2021 8.2 93.3 91.0 2.3

Levels quoted for typical point on road on floodplainFlood would flow across road to cut off meander

496 3.8 91.7 91.0 0.7

Zone 6 Axxx road West of Pxxxxx Bridge OS1k18000_int073 354921 418041 990 1.2 31.6 24.5 7.1 205 0.8 28.1 24.5 3.6

Zone 8 A581 road through Rauros OS1k25000 349591 418023 687 0.7 10.5 6.9 3.6 Flow reduced by spill to South 140 0.5 9.3 6.9 2.4