job card --productivity
TRANSCRIPT
-
8/7/2019 job card --productivity
1/18
PLANT
.
JOBCARDS + PRODUCTIVITY
Dec,2010
-
8/7/2019 job card --productivity
2/18
Plant : 13/6
Presented By : Mr. Deepak Mallik
Date : 10/01/2011
Frm /
Plant Productivity Presentation
for the Month of DEC. 10
-
8/7/2019 job card --productivity
3/18
Frm /
Monthly Sales ( In Lacs )
Plant : 13/6
Presented By : Mr. Deepak Malik
Date : 10/01/2011
665
454
541
630
528
702651
578521
0
100
200
300
400
500
600
700
800
Apr'10 May'10 Jun'10 Jul'10 Aug'10 Sep'10 Oct'10 Nov'10 Dec'10
-
8/7/2019 job card --productivity
4/18
Frm /
Sales/Manhours (in Rs/Manhr)
Plant : 13/6
Presented By : Mr. Deepak Malik
Date : 10/01/2011
685627
697 675
583
724 732687 672
0
100
200
300
400
500
600
700
800
Apr'10 May'10 Jun'10 Jul'10 Aug'10 Sep'10 Oct'10 Nov'10 Dec'10
-
8/7/2019 job card --productivity
5/18
Frm /
Sales in Rs. / Rupees Wage
Plant : 13/6
Presented By : Mr. Deepak Malik
Date : 10/01/2011
33
23
29 30
24
3230
2624
0
5
10
15
20
25
30
35
Apr'10 May'10 Jun'10 Jul'10 Aug'10 Sep'10 Oct'10 Nov'10 Dec'10
-
8/7/2019 job card --productivity
6/18
-
8/7/2019 job card --productivity
7/18
JOB CARDS
-
8/7/2019 job card --productivity
8/18
STEP-1
Check Physical Inventory on Shop Floor
( All areas , net off Rejections/Scrap
which must be returned to Stores before
physical inventory or else be considered
part of inventory).
-
8/7/2019 job card --productivity
9/18
STEP2 Balance this Physical Inventory as per Bill of
Materials in Sets.
(Keep only what is fast moving and required
for current month and return excess inventory
or Ask stores to issue components required to
balance your inventory in sets)
-
8/7/2019 job card --productivity
10/18
STEP3
Issue Job Cards week wise ,every
Wednesday for next weeks requirement.
(must consider work in progress WIP).
-
8/7/2019 job card --productivity
11/18
STEP
4 Max. Two Job Cards in WIP
Any Job Cards Qty/Value for that productshould normally be equivalent to max one
weeks requirement during that month.
-
8/7/2019 job card --productivity
12/18
STEP
5
Total Value of WIP at any stage should notbe more than one weeks Sale value.
-
8/7/2019 job card --productivity
13/18
STEP 6 MIS to be sent latest by 7th each month on
status of Job Cards & WIP as on last date of
previous month.
Rejection observed during process be
recorded & returned to stores by RRRN
(Material Rejection Return Replacementnote) for getting replacements.
-
8/7/2019 job card --productivity
14/18
STEP 6 Production HODs must ensure that material
returned as above be recovered through reworking
& if not possible then these materials be Scrapped
by using STN (Scrap Transfer Note) to Stores.
.Stores to ensure that all materials which were rejected dueto inputs from Suppliers be returned to concerned Supplier ,
debit note for such return be obtained from A/Cs andenclosed with such returns (Please follow Excise & Other
formalities as required)
-
8/7/2019 job card --productivity
15/18
STEP 7 Prod Head/Stores to send monthly MIS for :
(i) Material returned to Suppliers giving
item code/description/qty/value/reason for
rejection/Future desired action.(ii) Total Job Cards pending as on last
working day:
(iii) Total STNs (Scrap Transfer notes) Latest by 7th ofEach month for previous
month.
-
8/7/2019 job card --productivity
16/18
Present Status:
1. We are already using job card & no production can take place on linewithout a job card.
2. Process sequence of printing & using a job card is as shown inseparate slide.
Advantages ofusing Job Cards:
a) Lot size is defined & store issues exact Quantity as per bill of materials.
b) Every lot size has a unique batch code & incase of any customer problem, we can trace back the
date, line No., operators on each operations & various dimensional readings taken as per ControlPlan.
c) Job cards are stored for 3 years.
d) There is no ambiguity about process sequence & Quality Plan & are followed strictly includingcritical parameters/ Special Characteristics.
e) MaterialaTracebility/ accountability of issued material to the line.
JOB CARD:
-
8/7/2019 job card --productivity
17/18
Discipline needed inuse of job card:
a) Full material must be available in store & on ERP stock.
b) BOM has to be correct 100%.
c) ERP must run.
d) In no case line be allowed to run without job card.
e) Process sequence followed on line must be same as shown on job cardas per control plan.
f) job cards have to be stored in Record Room for 3 years with properindexing & traceability.
g) Without Job Card CCDC/PDIR will not accept material.
23rd Oct,2009
-