1 Ministry of New and Renewable Energy Jawaharlal Nehru National Solar Mission ( Scheme on Off-grid and Decentralized Solar Applications) Submission of proposal for installation of solar thermal systems/ devices Respective Channel Partners as stated in the scheme may submit consolidated proposals to MNRE for installation of various solar thermal systems in the prescribed format as enclosed. These channel partners other than Govt. bodies coming under Progrmme Administrators need to be accredited if they do not have tie up with scheduled commercial banks/ FIs. The methodology for accreditation will be put on MNRE website by 30 th September, 2010. In case, they have tied up with scheduled banks/ FIs for the purpose of providing loans to the customers, the proposals will come from banks/FIs. These banks/ FIs will be provided funds by IREDA for this purpose as per the re-financing scheme of IREDA placed on their website. The proposal should be completed in all respects without which it may not be considered by MNRE. Minimum number of systems proposed in the proposal will be one or more of as below: i) Solar water heaters : 2500 sq m iii) Box solar cookers : 5000 no. vi) Dish solar cookers : 500 no. v) Solar air heating systems/ Driers : 500 sq.m vi) Concentrating solar systems : 500 sq m vii) Any other solar system based on FPCs : 500 sq.m. For less than these numbers, the Channel Partners will submit their proposals through Programme Administrators (PAs). The proposals received in MNRE will be examined for approval and release of subsidy as per the guidelines of above mentioned scheme. ****** Note: The scheme is applicable from 8 th July, 2010 issued vide Ministry’s Sanction No. 5/23/2009-P&C. The claims for capital/interest subsidy for various solar thermal systems as per old schemes will be considered for settlement by MNRE for period till 7 th July, 2010.

Upload: ketan-chheda

Post on 29-Mar-2015

96 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: jnnsm-proposal format-st

1

Ministry of New and Renewable Energy

Jawaharlal Nehru National Solar Mission( Scheme on Off-grid and Decentralized Solar Applications)

Submission of proposal for installation of solar thermal systems/ devices

Respective Channel Partners as stated in the scheme may submit consolidatedproposals to MNRE for installation of various solar thermal systems in the prescribed formatas enclosed. These channel partners other than Govt. bodies coming under ProgrmmeAdministrators need to be accredited if they do not have tie up with scheduled commercialbanks/ FIs. The methodology for accreditation will be put on MNRE website by 30th

September, 2010. In case, they have tied up with scheduled banks/ FIs for the purpose ofproviding loans to the customers, the proposals will come from banks/FIs. These banks/ FIswill be provided funds by IREDA for this purpose as per the re-financing scheme of IREDAplaced on their website. The proposal should be completed in all respects without which itmay not be considered by MNRE. Minimum number of systems proposed in the proposalwill be one or more of as below:

i) Solar water heaters : 2500 sq m

iii) Box solar cookers : 5000 no.

vi) Dish solar cookers : 500 no.v) Solar air heating systems/ Driers : 500 sq.m

vi) Concentrating solar systems : 500 sq m

vii) Any other solar system based on FPCs : 500 sq.m.

For less than these numbers, the Channel Partners will submit their proposalsthrough Programme Administrators (PAs). The proposals received in MNRE will beexamined for approval and release of subsidy as per the guidelines of above mentionedscheme.

******

Note: The scheme is applicable from 8th July, 2010 issued vide Ministry’s SanctionNo. 5/23/2009-P&C. The claims for capital/interest subsidy for various solar thermalsystems as per old schemes will be considered for settlement by MNRE for period till7th July, 2010.

Page 2: jnnsm-proposal format-st

2

Format for Submitting Project Proposals for Solar Thermal Systems/ Devices

1. Title of the Project :

2. Name of the Project Proponent :

3. Socio- Economic Justification of the Project:

4. Benefits of the proposed project:

PART-A: Details of the Project Proponent

I Name and Category of Project Proponenta) Renewable Energy Service Providing Company (RESCO)b) Financial Institutions (Banks, NBFCs, MFIs)c) Financial Integratord) System Integratore) Program Administrator

Ii Name, Designation and Address of the Authorized Representative forcorrespondence with telephone no, fax & email

Iii In case of Channel Partner other than Programme Administrator, thefollowing information will be provided:

a) Whether commercial or non-commercial.b) Copy of Articles of Association, Registration No. & Datec) Audited Balance Sheet for last three yearsd) Annual Report of previous yeare) Whether MNRE has earlier sanctioned any Solar Thermal

project (s) for implementation to the Project Proponent, if yes,please furnish information.

Iv In case of 1 (e), Please indicate:a) Government Department, Autonomous Institution set up by

Central/ State Government, State renewable Energydevelopment agency, Public Sector Undertaking

b) Others

PART-B: Details of the Project

1. Summary of the Proposal:

2. Details of Project site: (State, District/ City, Block, Panchayat, Village/ Hamlet, Building/Institute and accessibility to site)

- Existing DG set Capacity, if any.- Monthly/ Annual Diesel consumption.

Page 3: jnnsm-proposal format-st

3

3. Details of Project Beneficiaries

4. Details of Proposed System(s) ( To be enclosed as per Annexure )

PART C: Implementation Schedule

- Major Monitorable Milestones

- Project Commissioning Timeline

PART D: Performance Monitoring Mechanism:

Performance Data Monitoring(Daily, Monthly and Annual energy generation ,logging, compilation and sharing with MNRE)Monthly monitoring of reduction in diesel/electricity/ other fuel consumption, if any.Own MechanismThird Party

PART E: Project Cost and Financing Details.

i. Cost of Systems Hardwareii. Cost of transportation and insuranceiii. Cost of civil works and electrical worksiv. Cost of installation and commissioningv. Cost of Annual Maintenance for 5 yearsvi. Any other cost

Total Cost of the Systems/ProjectTotal Capacity & Collector Area

Means of Finance

a) Contribution of Project Proponentb) Contribution of Beneficiaries organizationc) Envisaged CFA from MNREd) Other Source (s) of Funding (capital grant)e) Envisaged Soft Loan assistance, if anyf) Whether funds are in surplus or deficiency

Details of Project Revenue recurring, if anyProject Duration

PART F: Operation and Maintenance Arrangements

- Details of Operation and Maintenance Arrangements.

- Arrangements for energy saving data collection Details of monitoring equipment proposedto be installed and method of supplying data to MNRE/ designated agency.

Page 4: jnnsm-proposal format-st

4

- Method of monitoring of reduction in conventional fuel consumption, if any.

- Training of the O & M Personnel of the Beneficiary Organization

PART G: Declarations

(a) It is certified that I/we have read the guidelines issued by the Ministry vide 5/23/2009/P&Cdated 16th June, 2010 and the related provisions/terms and conditions for availing financialsupport from the Ministry of New and Renewable Energy and I agree to abide by theseguidelines and related terms and conditions.

(b) I understand that failure to comply by these guidelines may result in denial of financialsupport by the Ministry.

(c) I confirm that the present proposal in full or part has not been submitted / has beensubmitted to any other agency for seeking support (In case proposal has been submitted toany other agency or under consideration all details and a copy of the proposal must besubmitted along with the present proposal).

(d) I confirm that I will not submit the same proposal or a part thereof to any other fundingagency, without prior knowledge of the Ministry of New and Renewable Energy.

(e) I confirm that the share of project proponent/beneficiaries shall not be lower than 20% inany circumstances. Projects owned by the Programme Administrators are exempt fromthis condition.

(f) I confirm that the proposed solar thermal system(s) have not been installed/supplied at theproposed sites or to the proposed beneficiaries, prior to the receipt of project sanction letterfrom the Ministry.

(g) There is no duplication in the proposal and the submitted proposal is the only proposal bythe proponent and to the best of my / our knowledge no other organization has submittedany proposal for the systems at these site(s) to MNRE for financial support.

(h) A detailed site survey has been done/or will be undertaken to identify the beneficiariesbefore actual supply and installation takes place.

(i) In case of System Integrators, the beneficiaries will be charged net of MNRE subsidytowards cost of systems installed by them at their respective places.

I confirm that in case of any dispute, the decision of Secretary, Ministry of New and RenewableEnergy, Government of India will be final and binding on all.

Signature _____________Name & Designation of

Authorized Signatory SealPlace:Date:

Page 5: jnnsm-proposal format-st

5

AneexureDETAILS OF SYSTEMS TO BE INSTALLED

Sl.

No

Systems to beinstalled

Type of systems/collector to be used*

Place(s) ofinstallation**

No. ofsystems

No. ofcollectors/

dishes

Totalcollector area

(sq. m)

Application Total cost ofsystems/ units

including AMCfor 5 yrs(Appx.)

Subsidy soughtfrom MNRE @

Rs…./sq. m

State subsidy to beavailed if any @

Rs. ------

Expected dateof completion

1. Solar waterheating systems

Flat plate type

a) Domestic

b) Others

ETC type

a) Domestic

b) Others

Storage cum collectortype

2. Solar airheating system/dryer

Flat plate type

Dryer cum collectortype

3. Solar cookers Box type (Manualtracking)

Dish type Manualtracking)

Scheffler type (Singleaxis automatic tracking

4. Solar steamgenerating/pressurizedliquid system

Non imaging type

Single axis automatictracking

Double axis automatictracking

Page 6: jnnsm-proposal format-st

6

5. Any othersystem

* Only those systems will be eligible for subsidy which have BIS/MNRE standards/ specifications or have approval from test centers of MNRE

** For domestic systems, only area of operation/implementation will be mentioned

This is to certify that the various components of the Solar Thermal System (s) conform to the Relevant Standards, as mentioned in the Guidelines for Off-grid and Decentralized SolarApplications for Solar Collectors and components under JNNSM. Copies of the Relevant BIS/MNRE Certificates/specifications should be enclosed.

Note: It is mandatory to provide technical performance specifications of each component of the system(s) to be installed under the project and for which the performance will bewarranted. All technical parameters and warranty requirements must meet or exceed the requirements mentioned in the guidelines issued by the Ministry.

(Signature & Seal of Channel partner)as Head of Organization