jhf2k neutrino beam line
DESCRIPTION
2002/7/2 NuFact02 @ CERN. JHF2K neutrino beam line. A. K. Ichikawa KEK. Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy Summary. Overview of experiment. Conventional n m beam of ~1GeV. Kamioka. Super-K: 50 kton Water Cherenkov . JAERI - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/1.jpg)
JHF2K neutrino beam line
A. K. IchikawaKEK
2002/7/2 NuFact02@CERN
• Overview
• Primary Proton beamline
• Target
• Decay Volume
• Strategy to change peak energy
•Summary
![Page 2: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/2.jpg)
Overview of experimentOverview of experiment
Conventional beam of ~1GeV
Kamioka
JAERI(Tokai-mura)
→ → xx disappearance
→ → ee appearance NC measurement
0.75MW 50 GeV PS
Super-K: 50 ktonWater Cherenkov
~Mt “Hyper Kamiokande”
4MW 50GeV PS
CPVproton decay
1st Phase2nd Phase
![Page 3: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/3.jpg)
Off Axis Beam(ref.: BNL-E889 Proposal)
Target Horns Decay Pipe
Far Det.
Quasi Monochromatic Beam x2~3 intense than NBB
Exp’ed # of evts(1yr,22.5kt)~4500 tot ~3000 CC e contamination ~0.2% at peak
Expected spectrum(OAB2o)~102 x (K2K)
OA3°OA2°OA1°
Osc. Prob.=sin2(1.27m2L/E)
m2=3x10-3eV2
L=295km
Tuned at oscillation maximum
(OAB 2degree)
osc.
max
.
![Page 4: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/4.jpg)
Overview of FacilityPrimary Proton beamline
Target Station
Decay
Volume
280m Near Detector
SK Beam Axis
50GeV PS
pit
JHF NuMI(FNAL)
K2K
E(GeV) 50 120 12
Int.(1012ppp) 330 40 6
Rate(Hz) 0.275 0.53 0.45
Power(MW) 0.75 0.41 0.0052
![Page 5: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/5.jpg)
Overview -Primary proton beamline-
Preparation section
Arc R=106m
Final Focusing Section
Single turn fast extraction
8 bunches/~5s
3.3x1014proton/pulse
3.94 (3.64) sec cycle
1 yr≡ 1021proton on target(POT)
=6 mm.mr
![Page 6: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/6.jpg)
Beam loss
No way to know absolute beam loss Assumed by HAND Assure hands on maintenance (1W/m) Shielding design based on the assumption Same order as KEK-PS beam line ~102 relative suppression!!Challenging
Fast ext.(kicker, septum)1.125kW (0.15%)
Matching section(ctrl’ed loss by collimator)
0.75kW (0.1%)
50GeV ring0.5W/m
![Page 7: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/7.jpg)
Acceptance : 60 mm.mrad (cf Acc. design = 6 mm.mr)
Waist mode & normal mode.
monitor
V
H
24 Collimator/shieldMatching Point10cm
10cm
Preparation sectionMake the matching with the Arc.
Consists of normal conducting magnets.
![Page 8: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/8.jpg)
2cm
X
Y
Normal Mode
Matching Point beam ellipse is tilted to achieve small size.
2cm
Primary Beamline –Arc-B
B
Bends by 3m long 4 T superconducting magnet. + 1m long Q-superconducting magnet.Bore : ~180mm
To prevent the quenching,
the beam size and halo should be small.
FODO lattice x 10,
about 80o bending
![Page 9: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/9.jpg)
Beam halo study using Geant
60 mm.mr beam 1,000 events
100 mm.mr beam 500 protons
Preparation section
Arc
Magnet geometry and field are set via data file.
applicable to different beamlines.
![Page 10: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/10.jpg)
![Page 11: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/11.jpg)
Beam DirectionFor both SK and possible HK.
Decay pipe
![Page 12: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/12.jpg)
Target Station
Side View
Off Axis Beam
Plan to change the axis by moving horns or w/ dipole after horns.
OAB 2o, 2.5o, 3o
Service pit
ironconcrete
![Page 13: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/13.jpg)
Target
Graphite (or Be) is a unique solution. ← Heat problem
(except for liquid target)
density ~1.8 g/cm3
Interaction length 79g/cm2 (44cm)Melting point >3000 o
Thermal conductivity ~ 115W/m ・ KThermal expansion 4.2×10-6/ o CYang Modulus ~ 1E10 PaSound velocity 7,400 m/s → 3.7 cm/5s
![Page 14: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/14.jpg)
Energy deposit in the target
Graphite( =1.81g/cm3)
/spillJ/cm3/spillJ/cm3
3J/cmMaximum 460 3J/cmMaximum 300
2cm target, beam=0.4cm 3cm target, beam=0.6cm
![Page 15: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/15.jpg)
Temperature in the target (FEM analysis)
C230 C43
1000mmL 30mm,
300mm~z0,rC230~ @
surfaceC70~ @
beam directionr=0mm,z=300mm
r=1.5mm,z=300mmC70
C230
4 8 3212 (Sec.)
Time Evolution
![Page 16: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/16.jpg)
Target -for 4MW-
Not yet considered well.
Radiation cooling, Liquid target………
![Page 17: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/17.jpg)
Decay Volume
Side View
Concrete shield
w/ additional 60cm thick concrete,
it can accept ~4MW beam.
Top view
6.6m
To SK/HK OAB 2 o
OAB3 o
-pit
![Page 18: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/18.jpg)
Decay Volume –Cooling-
Iron
Concrete
~600 o
FEM analysis for
4MW beam
53°
![Page 19: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/19.jpg)
Collimator after Horns
Side View
Service pit
iron
concrete
Important for DV
z(m)
W/m3
For 0.75MW beam
![Page 20: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/20.jpg)
Strategy to change peak energy
Dipole magnet
gap 1m×1m×1m
One method is changing the beam axis.
The other…. OAB+Bending Magnet
![Page 21: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/21.jpg)
OAB vs OAB+Bending
No need to access target and horns.
Easy to change the peak energy
By T.Oyabu
![Page 22: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/22.jpg)
Summary
JHF will produce 0.75 MW 50 GeV proton beam.
Quasi Monochromatic Beam with off-axis method.
Peak Energy can be tuned
by changing axis or w/ bending magnet.
Facility is being designed to accept 0.75 MW beam
while keeping extendibility for 4 MW beam.
![Page 23: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/23.jpg)
Supplement
![Page 24: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/24.jpg)
2cm Y
X
Waist mode
![Page 25: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/25.jpg)
Total Length=37.5m
120mm 200m200m
120mm
4m
3cm@target
Applicable to 6 mm.mr<<24 mm.mr
Vertical bending magnets
Arc section
![Page 26: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/26.jpg)
Size (radius) dependence of neutrino yield
=1cm=2cm=3cm
=1cm=2cm=3cm
![Page 27: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/27.jpg)
Al target
Maximum energy deposit of aluminum target (3cm)
/spill700J/cm~ 3
→ 290°/pulse
![Page 28: JHF2K neutrino beam line](https://reader035.vdocuments.us/reader035/viewer/2022062411/5681675e550346895ddc2edd/html5/thumbnails/28.jpg)
Thermal stress)Tα(T
ν-EP 021
0,TTανEP Pressure
Young modulus
Poisson ratio
Linear expansion rate
Temperature
MPa12~P
2.0C /102.4 6
GPa8.10
CC 25,235
Small enoughSimulation results (by ANSYS) are almost consistent (or smaller).
Dynamic thermal stress can be reduced by splitting the target in a few cm pieces.