jen muir jkmuir, llc 860-367-3570 [email protected] leo h. leboeuf cl&p [email protected]...

17
Jen Muir JKMuir, LLC 860-367-3570 [email protected] om Leo H. LeBoeuf CL&P [email protected] 860-665- 5357

Upload: elisabeth-doyle

Post on 11-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Jen MuirJKMuir, LLC

[email protected]

Leo H. LeBoeufCL&P

[email protected] 860-665-5357

Page 2: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Funding

• Low cost & no cost improvements

• CT Energy Efficiency Fund • Fund up to 75% of project cost

• $1M / customer / year• Funding provided as a rebate after project

completion

• Funding currently available

Page 3: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Incentive Programs

What’s eligiblePrescriptive rebates (lighting/HVAC)Custom projectsPumps, aeration, VFDs,

controls/automation

Baseline dataCalculating savings (kW & $)Correspondence with utility

Page 4: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Public Benefits Charge

Page 5: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

What is the Program?

• Connecticut Energy Efficiency Fund (CEEF)– 3 mill charge on all electric and gas bills– CL&P and UI Administer the Fund Electric

Programs– CL&P Administers the Fund Gas Programs

• Incentives to Do the Right Design– Provides funds to promote use of energy saving

designs and equipment

Page 6: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

The Big Picture

• Gas and Electric Projects Eligible• EO - Energy Opportunities– For existing process equipment that are within

design life

• ECB - Energy Conscious Blueprint– For new designs – For replacement of process equipment beyond

design life

Page 7: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

EO Projects

• Additions to existing equipment that will save energy– VFD on motors– Air Receiver tanks that allow lower pressure– Energy efficient lights– Automated Process controls– Software to shut down unused computers– Will need savings calculations

Page 8: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

EO Project Incentives (CL&P)

Page 9: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

ECB Projects

• New Design/ Equipment or Replacement of Equipment > 75% Useful Life– Compare energy efficient equipment to base non

energy efficient equipment– Will need $ for base and efficient equipment– Will need calculations for savings

Page 10: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

ECB Project Incentives (CL&P)

Page 11: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Additional $ Caps (CL&P)

• EO– $1,000,000 annual cap per Federal Tax ID– http://www.cl-p.com/downloads/Retrofit

%20Incentives.pdf?id=4294986588&dl=t• ECB– $1,000,000 annual cap per Federal Tax ID– Gas Projects require PURA approval > $100,000– http://www.cl-p.com/downloads/ECB

%20Incentives.pdf?id=4294986560&dl=t

Page 12: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Pumping Project Example

Pump System ImprovementsVFDsPLC control systemInstrumentation

WW level, pressure & flow, kW

Discharge flow & pressureOnline pump efficiency monitoring

Optimized pumping controls50% Incentive (total installed cost)

$150,000 (EO)

Page 13: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Aeration SystemProcess modificationDissolved Oxygen controlsNew instrumentation - Air flow meters &

air flow control valvesNew blower VFDsPLC control panel

Expected savings = > 1 million kWh/yr

Incentive funding $270,000 (EO)

Page 14: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Pumping Project Example

Pump System Improvements (oversized pump replacement)

Incentive: $19,950 (ECB)

Estimated Project Cost

Replace existing 25 Hp Pump $17,000

Install 10 Hp Pump with VFD & enhanced controls $38,000

Differential Cost $21,000

Annual Savings $2,574

Payback Period (yrs) 8.2

Page 15: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Aeration System – Blowers & ControlsNew Blowers

High Efficiency units selected instead of standard design/models

Enhanced controls also installedDissolved Oxygen controlAir flow meters & flow control

valvesPLC control panel

Expected savings = > 1 million kWh/yr

Incentive funding $900,000 (EO & ECB)

Page 16: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

Wastewater Plant UpgradeMultiple measures – part of substantial

facility upgrade Pump improvements – VFDs & controlsNew Blowers – aeration system

Expected savings = > 1 million kWh/yr

Incentive funding $480,000 (EO & ECB)

Page 17: Jen Muir JKMuir, LLC 860-367-3570 JenMuir@jkmuir.com Leo H. LeBoeuf CL&P leboelh@nu.com 860-665-5357

• Leo H. LeBoeuf - Energy Engineer – CL&P– [email protected]– 860-665-5357

• Jim Motta Supervisor – CL&P– [email protected]– 860-665-3098

• Roy Haller – UI– [email protected]– 203-499-2025 Jen Muir