Udfordringen

Page 5: Jboye slides-27-02-2013

IT er generelt nød til at lytte til forretningens krav.

GOVERNANCE

Page 6: Jboye slides-27-02-2013

Fysisk arkitektur

Logisk arkitektur

Service

Farm

Web App Service App Zone

Content DB

Site collection

Site

List / Library

[Foldere]

Item / Dokument

Page 7: Jboye slides-27-02-2013

Definere

Designe udvikle

Deploy

vedligehold

måling

rettelser

2 uger

Page 8: Jboye slides-27-02-2013
Page 9: Jboye slides-27-02-2013

Number of 9's Availability Percentage Total Annual Downtime

2 99% 3 days, 15 hours

3 99.9% 8 hours, 45 minutes

4 99.99% 52 minutes, 34 seconds

5 99.999% 5 minutes, 15 seconds

For a given software application or service, high availability is ultimately measured in terms of the end user’s experience and expectations. The tangible and perceived business

impact of downtime may be expressed in terms of information loss, property damage, decreased productivity, opportunity costs, contractual damages, or the loss of goodwill.

The principal goal of a high availability solution is to minimize or mitigate the impact of downtime. A sound strategy for this optimally balances business processes and Service

Level Agreements (SLAs) with technical capabilities and infrastructure costs.

A platform is considered highly available per the agreement and expectations of customers and stakeholders. The availability of a system can be expressed as this calculation:

Actual uptime/Expected uptime X 100%

The resulting value is often expressed by industry in terms of the number of 9’s that the solution provides; meant to convey an annual number of minutes of possible uptime,

or conversely, minutes of downtime.

http://technet.microsoft.com/en-us/library/jj715263.aspx

Page 10: Jboye slides-27-02-2013
Page 11: Jboye slides-27-02-2013
Page 12: Jboye slides-27-02-2013

Aktiv Passiv

Page 13: Jboye slides-27-02-2013

Aktiv Aktiv

Page 14: Jboye slides-27-02-2013

Web frontend

Site

Web frontend

Site

Load balance

Central admin Central admin

Page 15: Jboye slides-27-02-2013
Page 16: Jboye slides-27-02-2013
Page 17: Jboye slides-27-02-2013

Web frontend

Site

Load balance

Central admin Central admin

Web frontend

Site

Web frontend

Site

Web frontend

Site

Page 18: Jboye slides-27-02-2013
Page 20: Jboye slides-27-02-2013
Page 21: Jboye slides-27-02-2013
Page 22: Jboye slides-27-02-2013

All servers that belong to a server farm,

including database servers, must physically

reside in the same datacenter. Redundancy

and failover between closely located data

centers that are configured as a single farm

("stretched farm”) is not supported in

SharePoint 2013.

http://technet.microsoft.com/en-us/library/cc262485.aspx

Page 23: Jboye slides-27-02-2013
Page 24: Jboye slides-27-02-2013
Page 25: Jboye slides-27-02-2013

Web frontend

Site

Load balance

Central admin Central admin

Web frontend

Site

Web frontend

Site

Web frontend

Site

Page 26: Jboye slides-27-02-2013
Page 27: Jboye slides-27-02-2013
Page 28: Jboye slides-27-02-2013
Page 29: Jboye slides-27-02-2013
Page 30: Jboye slides-27-02-2013
Page 31: Jboye slides-27-02-2013
Page 32: Jboye slides-27-02-2013

Web frontend

Site

Load balance

Central admin Central admin

Web frontend

Site

Web frontend

Site

Web frontend

Site

Page 33: Jboye slides-27-02-2013

Med en farm offline:

Page 34: Jboye slides-27-02-2013
Page 35: Jboye slides-27-02-2013

http://www.pa.com.au/promo/sharepoint-2013/highavailability/

http://technet.microsoft.com/en-us/library/jj715263.aspx

http://blog.appliedis.com/2012/12/12/sharepoint-conference-2012-high-availability-solutions-with-sharepoint-2013/

http://www.slideshare.net/michaeltnoel/sql-2012-alwayson-availability-groups-for-sharepoint-2013-sharepoint-connections-amsterdam-2012

Page 36: Jboye slides-27-02-2013