jb capital, johor bahru

2
©Copyright BCI Asia Construction Information Pte. Ltd. All rights reserved. Published in Singapore by BCI Asia Construction Information Pte. Ltd. Total Project Count: 1 (To email these projects, please press Ctrl-A to select all projects and copy and paste to Outlook/Outlook Express.) Note: You are NOT using your "Print Preview Filters", please click here if you w ish to change your setting. JB CAPITAL Iskandar Malaysia , Johor Bahru , Johore , Malaysia Project Value RM 600.00 mn (US$ 171.43 mn ) Approximate . Town Johor Bahru Project Category Retail / Hotel / Office / Health / Education and Research Project Stage Design Province Johore Subcategory Shops, Shopping Centre, Supermarket / Hotel / Commercial Complex / Hospital, Disease Control Center / College, University, Institute Project Status On-track Region Malaysia 2B ProjectID 37078003 Construction Start 3rd quarter 2014 Floor Area 100,000 m 2 Ownership Type Commercial Construction End 3rd quarter 2016 Site Area Development Type New Building/Construction Time Stamp 31 Aug 2012 00:00 Storeys 52 Green Building Rating A commercial development to include: • a six-storey shopping complex • tw o 52-storey office tow ers • tw o 35-storey hotels • tw o 45-storey tow ers w ith 875 serviced apartments • a 25-storey private specialist hospital (medical hub) • a 25-storey private international college (educational hub) • a conventions centre Works w ill include: • a guard house • internal road netw orks • main w ater supply reticulation • drainage system • common lightings • lift systems Proposed building elements w ill include: • metal deck roofing w ith steel trusses • reinforced-concrete framew ork and structures • brick w alls w ith plasters and emulsion paint finishes • solid timber doors and plyw ood flush doors • aluminium-framed casement w indow s • cement render and homogeneous tile flooring Development order (DO) approval is underw ay and building plan is expected to be submitted by end of 2013. Developer Sazean Development Sdn Bhd Contact Mr Sabri Bin Sumail (Project General Manager) R 60 3 5569 7000 Fax 60 3 5569 6222 Email: [email protected] Website: w w w .sazean.com 48 Jalan Jubli Perak 22/1, Seksyen 22, 40300 Shah Alam, Selangor, Malaysia Contact Mr Meor Zed Zulkifli (Director)

Upload: ainhazwan

Post on 26-Nov-2015

47 views

Category:

Documents


0 download

DESCRIPTION

Bci Project

TRANSCRIPT

Page 1: Jb Capital, Johor Bahru

©Copyright BCI Asia Construction Information Pte. Ltd. All rights reserved. Published in Singapore by BCI Asia Construction Information Pte. Ltd.

Total Project Count: 1

(To email these projects, please press Ctrl-A to select all projects and copy and paste to Outlook/Outlook Express.)

Note: You are NOT using your "Print Preview Filters", please click here if you w ish to change your setting.

JB CAPITALIskandar Malaysia , Johor Bahru , Johore , Malaysia

Project Value RM 600.00 mn (US$

171.43 mn )

Approximate .

Town Johor Bahru Project

Category

Retail / Hotel / Off ice / Health / Education

and Research

Project Stage Design Province Johore Subcategory Shops, Shopping Centre, Supermarket /

Hotel / Commercial Complex / Hospital,

Disease Control Center / College,

University, Institute

Project Status On-track Region Malaysia 2B ProjectID 37078003

Construction

Start

3rd quarter 2014 Floor Area 100,000 m2 Ownership

Type

Commercial

Construction

End

3rd quarter 2016 Site Area Development

Type

New Building/Construction

Time Stamp 31 Aug 2012 00:00 Storeys 52

Green

Building

Rating

A commercial development to include:

• a six-storey shopping complex

• tw o 52-storey off ice tow ers

• tw o 35-storey hotels

• tw o 45-storey tow ers w ith 875 serviced apartments

• a 25-storey private specialist hospital (medical hub)

• a 25-storey private international college (educational hub)

• a conventions centre

Works w ill include:

• a guard house

• internal road netw orks

• main w ater supply reticulation

• drainage system

• common lightings

• lif t systems

Proposed building elements w ill include:

• metal deck roofing w ith steel trusses

• reinforced-concrete framew ork and structures

• brick w alls w ith plasters and emulsion paint f inishes

• solid timber doors and plyw ood f lush doors

• aluminium-framed casement w indow s

• cement render and homogeneous tile f looring

Development order (DO) approval is underw ay and building plan is expected to be submitted by end of 2013.

Developer Sazean Development Sdn Bhd

Contact Mr Sabri Bin Sumail (Project General Manager) R

60 3 5569 7000 Fax 60 3 5569 6222

Email: [email protected] Website: w w w .sazean.com

48 Jalan Jubli Perak 22/1, Seksyen 22, 40300 Shah Alam, Selangor, Malaysia

Contact Mr Meor Zed Zulkif li (Director)

Page 2: Jb Capital, Johor Bahru

60 3 5569 7000 ext. 203 Fax 60 3 5569 6222

Email: [email protected] Website: w w w .sazean.com

48 Jalan Jubli Perak 22/1, Seksyen 22, 40300 Shah Alam, Selangor, Malaysia

Architect Akitek Jururancang (Malaysia) Sdn Bhd

Contact Ar Choo Teok Yuang (Director)

60 3 2274 5544 Fax 60 3 2274 2241

Email: [email protected] Website: w w w .ajm.com.my

19, Jalan Kampung Attap, 50460 Kuala Lumpur, Federal Territory, Malaysia

Contact Madam Anizan binti Aris (Architect)

60 3 2274 5544 Fax 60 3 2274 2241

Email: [email protected] Website: w w w .ajm.com.my

19, Jalan Kampung Attap, 50460 Kuala Lumpur, Federal Territory, Malaysia

Civil & Structural Engineer To be appointed

Mechanical & Electrical Engineer To be appointed

Quantity Surveyor To be appointed

Contractor To be appointed

Researched By: Mimi Nadiah

Notes

Follow-ups

My Project Enquiries

Quotations, Products & CompetitorsNo competitor, quotation or productine entries for this project.

©Copyright BCI Asia Construction Information Pte. Ltd. All rights reserved. Published in Singapore by BCI Asia Construction Information Pte. Ltd.