january/february 2008 presentation -...

48
LACMA West: Thursday, January 31, 2008 Westwood Presbyterian Church: Tuesday, February 5, 2008 Plummer Park: Wednesday, February 6, 2008 All meetings 6:00 – 8:00 p.m. Westside Extension Transit Corridor Study Community Update Meetings

Upload: others

Post on 04-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • LACMA West: Thursday, January 31, 2008Westwood Presbyterian Church: Tuesday, February 5, 2008Plummer Park: Wednesday, February 6, 2008

    All meetings 6:00 – 8:00 p.m.

    Westside Extension Transit Corridor StudyCommunity Update Meetings

  • Metro System & Westside Extension Transit Corridor

    • Since 1990, Metro has opened and is building over 80 miles of new rail transit lines that will carry over 300,000 boardingsper day

    • The Westside Corridor has to date been left out of the expanding Metro System

    • The Metro Board authorized a restart of studies in this corridor in July 2007

  • What is an Alternatives Analysis?

    • First step in defining a project

    • Evaluation of a wide range of alternatives

    • Screening of alternatives to move into environmental analysis

    • Includes public comments

  • Purpose of Tonight’s Meeting

    • Summary of Early Scoping Comments

    • Identification of Representative Alternatives for Screening– Modes– Alignments– General Station Locations

    • Evaluation Criteria to be Used for Screening (Ready in April)

  • Study Area

  • Early Scoping

    • Federal Register Notice: Oct. 1, 2007

    • 6 Community Meetings: Oct. 9 – Oct. 30, 2007

    • November 7, 2007: Close of Early Scoping Comment Period

  • Summary of Scoping Comments

    484 Comments were received during the Early Scoping Period:

    • 133 Verbal comments at Public Scoping Meetings

    • 347 Written comments at Public Scoping Meetings, or via email, US mail & hand delivered

    • 4 Verbal comments on the Telephone Info Line

  • Subway Aerial/

    Monorail

    LRT BRT

    Yes No Yes No Yes No Yes No

    262 8 22 1 18 8 14 22

    Summary of Comments from Early Scoping (Mode)

    Mode

  • Wilshire Santa Monica Both

    Yes No Yes No Yes No

    107 3 49 1 52 9

    Alignments

    Summary of Comments from Early Scoping (Alignment)

  • General Tone of Comments

    • The overwhelming majority of comments received supported the need for a transit improvement in the Westside Extension Corridor.

    • The Wilshire subway alignment was the most favored route and mode, with nearly as many people advocating a subway on both the Wilshire and Santa Monica alignments.

    • Most thought that the Wilshire alignment should take precedence over the Santa Monica alignment.

    • Limited support was voiced for aerial/monorail, light rail or bus rapid transit modes, with opposition to each of these modes expressed as well.

  • Why Consider a Major Investment for the Westside?

  • Westside Year 2030 Employment Density by TAZ

  • Westside Year 2030 Transit Trips Density by TAZ

  • Grouping of Alternatives

    • No Build

    •Transportation System Management (TSM)

    •Wilshire Subway (3 Alternatives)

    • Santa Monica Subway (5 Alternatives)

    • Wilshire/Santa Monica Combined Subway (5 Alternatives)

    • Elevated Alternatives (3 Alternatives)

    • BRT Alternative (1 Alternative)

  • No Build

  • Transportation System Management (TSM)

  • Universe of Representative Fixed-Route Alignments and Potential Stations

  • Wilshire Subway Alignment Alternatives

    • Alternative 1

    • Alternative 12

    • Alternative 14

  • Wilshire Subway: Alternative 1

  • Wilshire Subway: Alternative 12

  • Wilshire Subway: Alternative 14

  • All Wilshire Subway Alignments

  • Santa Monica Subway Alignment Alternatives

    • Alternative 4

    • Alternative 6

    • Alternative 7

    • Alternative 7a

    • Alternative 8

    • Alternative 13

  • Santa Monica Subway: Alternative 4

  • Santa Monica Subway: Alternative 6

  • Santa Monica Subway: Alternative 7

  • Santa Monica Subway: Alternative 7a

  • Santa Monica Subway: Alternative 8

  • Santa Monica Subway: Alternative 13

  • All Santa Monica Subway Alignments

  • Wilshire/Santa Monica Combined Subway Alternatives

    • Alternative 9

    • Alternative 10

    • Alternative 11

    • Alternative 15

    • Alternative 16

  • Wilshire/Santa Monica Combined: Alternative 9

  • Wilshire/Santa Monica Combined: Alternative 10

  • Wilshire/Santa Monica Combined: Alternative 11

  • Wilshire/Santa Monica Combined: Alternative 15

  • Wilshire/Santa Monica Combined: Alternative 16

  • All Wilshire/Santa Monica Combined Subway Alignments

  • Elevated Alternatives

    • Alternative 2 (HRT)

    • Alternative 3 (LRT or Monorail)

    • Alternative 5 (HRT, LRT or Monorail)

  • Elevated HRT: Alternative 2

  • Elevated LRT or Monorail: Alternative 3

  • Elevated HRT, LRT or Monorail: Alternative 5

  • Combined Elevated Alternatives (HRT, LRT & Monorail)

  • Bus Rapid Transit (BRT) Alternative

    • Alternative 17

  • BRT: Alternative 17

  • Evaluation Criteria

    1. Mobility Improvement

    2. Transit Supportive Land Use Policies & Conditions

    3. Cost Effectiveness

    4. Project Feasibility

    5. Equity

    6. Environmental Considerations

    7. Public Acceptance

  • Alternatives Analysis Schedule

    Public Scoping Meetings October 2007 (completed)

    Public Comment Period Closed November 7, 2007 (completed)

    Community Update Meetings &

    Initial Alternatives DefinitionJanuary/February 2008

    Community Update Meetings & Performance Comparison of Alternatives

    April 2008

    Community Update Meetings & Completion of AA Study Report

    Recommendation to Board of Locally Preferred Alternative (LPA)

    Summer 2008

  • Additional Public Meetings

    Public Meetings• Wilshire/Fairfax area: Thursday, Jan. 31st 6:00 p.m. - 8:00 p.m.

    LACMA West, 6607 Wilshire Boulevard

    • Westwood area: Tuesday, Feb. 5th 6:00 p.m. – 8:00 p.m. Westwood Presbyterian Church, 10822 Wilshire Boulevard

    • West Hollywood area: Wednesday, Feb 6th 6:00 p.m. – 8:00 p.m. Plummer Park, 8300 Santa Monica Boulevard

    Other Meetings• Progress Report to Metro Planning & Programming Committee

    Feb. 20, 2008, 1:00 p.m.

  • Question & Answer Session

    www.metro.net/westside

    213.922.6934

    Westside Extension Transit Corridor Study�Community Update MeetingsMetro System & Westside Extension Transit CorridorWhat is an Alternatives Analysis?Purpose of Tonight’s MeetingStudy AreaEarly ScopingSummary of Scoping CommentsSummary of Comments from Early Scoping (Mode)Summary of Comments from Early Scoping (Alignment)General Tone of CommentsWhy Consider a Major Investment for the Westside?Westside Year 2030 Employment Density by TAZWestside Year 2030 Transit Trips Density by TAZGrouping of AlternativesNo BuildTransportation System Management (TSM)Universe of Representative Fixed-Route Alignments and Potential StationsWilshire Subway Alignment AlternativesWilshire Subway: Alternative 1Wilshire Subway: Alternative 12Wilshire Subway: Alternative 14All Wilshire Subway AlignmentsSanta Monica Subway Alignment AlternativesSanta Monica Subway: Alternative 4Santa Monica Subway: Alternative 6Santa Monica Subway: Alternative 7Santa Monica Subway: Alternative 7aSanta Monica Subway: Alternative 8Santa Monica Subway: Alternative 13All Santa Monica Subway AlignmentsWilshire/Santa Monica Combined Subway AlternativesWilshire/Santa Monica Combined: Alternative 9Wilshire/Santa Monica Combined: Alternative 10Wilshire/Santa Monica Combined: Alternative 11Wilshire/Santa Monica Combined: Alternative 15Wilshire/Santa Monica Combined: Alternative 16All Wilshire/Santa Monica Combined Subway AlignmentsElevated AlternativesElevated HRT: Alternative 2Elevated LRT or Monorail: Alternative 3Elevated HRT, LRT or Monorail: Alternative 5Combined Elevated Alternatives (HRT, LRT & Monorail)Bus Rapid Transit (BRT) AlternativeBRT: Alternative 17Evaluation CriteriaAlternatives Analysis ScheduleAdditional Public MeetingsQuestion & Answer Session