jan 24, 2005tracking upgrades welcome and agenda carl haber 1 us atlas: meeting on slhc tracking...

11
Jan 24, 2005 Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome and Agenda

Upload: jason-holt

Post on 18-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 3 Participants Berkeley UC Santa Cruz Brookhaven Hampton Univ. Ohio State RAL Liverpool

TRANSCRIPT

Page 1: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 1

US ATLAS: Meeting on SLHC Tracking Upgrades

24-25 Jan 2005Lawrence Berkeley Lab

Welcome and

Agenda

Page 2: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 2

Welcome to Berkeley

Page 3: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 3

Participants

• Berkeley• UC Santa Cruz• Brookhaven• Hampton Univ.• Ohio State• RAL• Liverpool

Page 4: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 4

Goals

• Review status of silicon upgrade efforts• Prepare for upcoming ATLAS-wide

tracking upgrade discussions– Feb meeting at CERN for all upgrades– Tracking specific meeting, July in Genoa

• Plans for efforts over the next 6-12 months• “Hands-on” lab discussion of electronics

testing and stave assembly• Design review of phase-1 stave hybrid

Page 5: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 5

Broad Agenda

• Monday AM: talks, video• Monday PM: hybrid review, lab time• Monday eve: group dinner at XXX, 7pm,

map handout, rides needed?• Tues AM: talks, video• Tues PM: lab time, assembly• Lunches will be at LBNL cafeteria

Page 6: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 6

Monday Jan 240900-0930 Welcome and agenda Carl Haber0930-1015 Overview of program, funding etc Abe Seiden1015-1045 Report from UK Marc Weber1045-1115 Report from UK Phil Allport1115-1130 break1130-1200 Inner Detector Simulation results David Lissauer1200-1230 Stave development project Carl Haber1230-1300 Update on Stripixel development at BNL David Lynn1300-1400 Lunch at the LBNL cafeteria1400-1500 design review of Phase-1 stave, hybrid, continued discussion1500-1600 discussion of testing procedures1600-1730 lab time1900 DinnerTues Jan 250900-0915 Intro and agenda Carl Haber0915-1000 Viking & ABCD test station development David Lynn1000-1030 DC-DC converters/power schemes Maurice Garcia-Sciveres1030-1100 Front End Electronics developments Ned Spencer1100-1115 break1115-1145 New materials Hartmut Sadrozinski1145-1300 Discussion of issues, plans,design aspects (redundancy, power, segmentation…)1300-1400 Lunch at the LBNL Cafeteria1400-1500 discussion continuation1500-1730 lab time, examination of stave assembly process

Page 7: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 7

Parameters LHC, SLHC

LHC SLHC

s 14 TeV 14 TeVL 1034 1035

Bunch spacing t 25 ns 12.5 ns pp (inelastic) ~ 80 mb ~ 80 mbN. interactions/x-ing ~ 20 ~ 100(N=L pp t) dNch/d per x-ing ~ 150 ~ 750<ET> charge particles ~ 450 MeV ~ 450 MeV

Track density 1 10Pile-up noise in cal 1 ~3Dose central region 1 10

Page 8: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 8

Elements of an SLHC Tracker• < 20 cm: inner, dose:1016 /cm2

– new technology• 20 < r < 50 cm: intermediate, dose: 1014-1015 /cm2

– pixels, short strips, strip-pixels– modularity, mass, reliability, system issues– 60 m2, 4K “SCT modules”

• > 50 cm: outer 1012-1013 /cm2

– strips– modularity, mass, construction logistics – 140 m2, 16K “SCT modules”

Page 9: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 9

300

500

1070

Page 10: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 10

Development of Tracking Structures

• Address here the SCT region and the replacement of the TRT with silicon strip modules.

• Pursue certain generic or basic R&D to flesh out eventual direction(s).

• The modularity required or adopted will be effected by a number of factors– Experience from present SCT effort– Radius, occupancy, simulations– Material– Assembly logistics, cost, and schedule

• Starting concept is a stave (multi-module) structure as was studied for CDF Run2b

Page 11: Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades 24-25 Jan 2005 Lawrence Berkeley Lab Welcome

Jan 24, 2005 Tracking UpgradesWelcome and Agenda

Carl Haber 11

3 Phases + Related Project• Phase 1: (FY05) Explore behavior of ATLAS electronics on a stave,

leverage Run2b experience.– Assemble mock and real staves at LBNL and then BNL

• BNL Strip-pixel project: (FY05) Development of an ATLAS specific single-sided 2D detector.

• Phase 2: (FY05)Test of strip-pixel detector with analog and ATLAS binary readout at BNL.

• Phase 3: (FY06) Development of new ATLAS specific stave with strip-pixel or other appropriate readout.