Page 1: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Basin ProjectsJan 2005Jan 2005

Kissimmee Basin ProjectsJan 2005Jan 2005

Page 2: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Basin Projects Kissimmee Basin Projects Kissimmee River Restoration Project

(KRR) Kissimmee Chain of Lakes Long Term

Management Plan (KCOL LTMP) Kissimmee Basin Modeling and

Operations Study (Model) EIS for Modification of Kissimmee

Basin Structure Operating Criteria (EIS)

Kissimmee River Restoration Project (KRR)

Kissimmee Chain of Lakes Long Term Management Plan (KCOL LTMP)

Kissimmee Basin Modeling and Operations Study (Model)

EIS for Modification of Kissimmee Basin Structure Operating Criteria (EIS)

Page 3: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee River Restoration Project

Kissimmee River Restoration Project

Goal is to restore ecological integrity to the central region of the Kissimmee river and floodplain

Projected cost = $578 million 50/50 cost share USCOE/SFWMD Backfill 22 mi of C-38 canal Recarve/reconnect more than 40 mi

of river channel Remove 2 water control structures

(one has been removed) Headwaters Revitalization Project

provides additional water storage from headwater lakes for river restoration

Comprehensive restoration evaluation program

Goal is to restore ecological integrity to the central region of the Kissimmee river and floodplain

Projected cost = $578 million 50/50 cost share USCOE/SFWMD Backfill 22 mi of C-38 canal Recarve/reconnect more than 40 mi

of river channel Remove 2 water control structures

(one has been removed) Headwaters Revitalization Project

provides additional water storage from headwater lakes for river restoration

Comprehensive restoration evaluation program

Page 4: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

KRR Comprehensive Restoration Evaluation Program ComponentsKRR Comprehensive Restoration Evaluation Program Components

Hydrology Geomorphology Dissolved Oxygen and

Water Quality Plant communities Invertebrate

communities Reptile and Amphibian

communities Fish communities Bird communities Threatened and

Endangered species

Hydrology Geomorphology Dissolved Oxygen and

Water Quality Plant communities Invertebrate

communities Reptile and Amphibian

communities Fish communities Bird communities Threatened and

Endangered species

Page 5: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee River Restoration Project Status

Kissimmee River Restoration Project Status

Phase I construction completed - 2001

Initiation of next backfilling phase – by 2006

All construction completed - 2012

Headwaters Revitalization Project – underway, will be completed in 2010

Restoration Evaluation - through 2017

Phase I construction completed - 2001

Initiation of next backfilling phase – by 2006

All construction completed - 2012

Headwaters Revitalization Project – underway, will be completed in 2010

Restoration Evaluation - through 2017

Real Estate

Headwaters

Phase I

Phase II/III

Phase IVa

Phase IVb

Restoration Evaluation

1990 20202000 2010

Page 6: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Chain of Lakes Long Term Management Plan

Kissimmee Chain of Lakes Long Term Management Plan

Purpose: improve, enhance and/or sustain ecosystem health of regulated lakes in the Kissimmee Upper Basin while balancing basin impacts

Collaborative effort SFWMD, USCOE, FFWCC,

USFWS, EPA, DEP, FDACS local governments, and other stakeholders

Purpose: improve, enhance and/or sustain ecosystem health of regulated lakes in the Kissimmee Upper Basin while balancing basin impacts

Collaborative effort SFWMD, USCOE, FFWCC,

USFWS, EPA, DEP, FDACS local governments, and other stakeholders

Page 7: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

1) Assess Status Ecosystem Health / Develop Performance Measures2) Determine Baseline Conditions3) Identify opportunities for individual action by stakeholder agencies for situations where Baseline Conditions do not meet Performance Measures

Page 8: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Chain of Lakes Long Term Management Plan -

Products

Kissimmee Chain of Lakes Long Term Management Plan -

Products Stakeholder values survey

Conceptual ecosystem model

Assessment of current (baseline) and reference characteristics of lakes

Assessment performance measures that describe desired characteristics of lakes Examples: wading bird reproduction, invertebrate

community composition, desired fluctuation levels, etc.

Stakeholder values survey

Conceptual ecosystem model

Assessment of current (baseline) and reference characteristics of lakes

Assessment performance measures that describe desired characteristics of lakes Examples: wading bird reproduction, invertebrate

community composition, desired fluctuation levels, etc.

Page 9: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Chain of Lakes Long Term Management Plan -

Products

Kissimmee Chain of Lakes Long Term Management Plan -

Products Monitoring plan

Review of existing monitoring data

Address knowledge gaps

Are performance measures being met?

Agency action plans How can agency

mandates and resources be applied to achieve unmet performance measures?

Monitoring plan Review of existing

monitoring data Address knowledge

gaps Are performance

measures being met?

Agency action plans How can agency

mandates and resources be applied to achieve unmet performance measures?

Page 10: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Basin Modeling and Operations Study

Kissimmee Basin Modeling and Operations Study

Flows through the Kissimmee Chain of Lakes and Kissimmee River are regulated by control structures

Goal: assess whether existing operations can be modified to achieve a better balance among

Flood control

Water supply

Aquatic plant management

Kissimmee Basin natural resources (KRR, KCOL)

Downstream discharge area (Lake Okeechobee)

Flows through the Kissimmee Chain of Lakes and Kissimmee River are regulated by control structures

Goal: assess whether existing operations can be modified to achieve a better balance among

Flood control

Water supply

Aquatic plant management

Kissimmee Basin natural resources (KRR, KCOL)

Downstream discharge area (Lake Okeechobee)

Page 11: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee Basin Modeling and Operations Study - Approach

Kissimmee Basin Modeling and Operations Study - Approach

Geographic scope includes entire Kissimmee Basin

Hydrologic/hydraulic simulation model

Simulate a suite of regulation schedules for 13 structures in the Kissimmee Basin

Use performance measures to evaluate and select “best” operational criteria

Recommend regulation changes based on operational criteria selected

Geographic scope includes entire Kissimmee Basin

Hydrologic/hydraulic simulation model

Simulate a suite of regulation schedules for 13 structures in the Kissimmee Basin

Use performance measures to evaluate and select “best” operational criteria

Recommend regulation changes based on operational criteria selected

Page 12: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

KB Modeling & Operations Study

Flood Control

Water Supply

Aquatic Plant Management

Natural Resources

Downstream Ecosystems

KB Modeling & Operations Study

Flood Control

Water Supply

Aquatic Plant Management

Natural Resources

Downstream Ecosystems

Page 13: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Progress to dateProgress to date Completed Basin Assessment and model implementation

strategy

3 Modeling Tools will be developed

Screening Tool

Alternative Formulation / Evaluation Tool

Performance Measure Evaluation Tool

Reconnaissance and data collection efforts for modeling tool implementation are complete

Design for tool implementation is 80% complete.

Tool implementation 10% complete

Beginning alternative plan formulation process

Completed Basin Assessment and model implementation strategy

3 Modeling Tools will be developed

Screening Tool

Alternative Formulation / Evaluation Tool

Performance Measure Evaluation Tool

Reconnaissance and data collection efforts for modeling tool implementation are complete

Design for tool implementation is 80% complete.

Tool implementation 10% complete

Beginning alternative plan formulation process

Page 14: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

EIS for Modification of Kissimmee Basin

Structure Operating Criteria

EIS for Modification of Kissimmee Basin

Structure Operating Criteria

Parallel project with KB Modeling & Operations Study

Perform NEPA work associated with developing EIS USACE & USFWS

Parallel project with KB Modeling & Operations Study

Perform NEPA work associated with developing EIS USACE & USFWS

Page 15: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

PurposePurpose

Provide a balanced approach to formulating and evaluating modifications to Kissimmee Basin operating criteria

Approach will take into account flood control, water supply, aquatic plant management, and natural resource requirements

Provide a balanced approach to formulating and evaluating modifications to Kissimmee Basin operating criteria

Approach will take into account flood control, water supply, aquatic plant management, and natural resource requirements

Page 16: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

GoalGoal

Seek an alternative that maximizes benefits while minimizing potential adverse impacts

Seek an alternative that maximizes benefits while minimizing potential adverse impacts

Page 17: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Major ActivitiesMajor Activities Evaluate alternatives relative to potential beneficial and

adverse effects on Flood control Navigation Water quality Water supply Wetlands and fish and wildlife habitats and values Endangered and threatened species Historical or archaeological resources Public use and recreation

Evaluate alternatives relative to potential beneficial and adverse effects on Flood control Navigation Water quality Water supply Wetlands and fish and wildlife habitats and values Endangered and threatened species Historical or archaeological resources Public use and recreation

Page 18: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee

EIS

Geographic

Scope

Page 19: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Kissimmee EIS StatusKissimmee EIS Status Project Management Plan, Kissimmee

Basin, Modification of Kissimmee Basin Structure Operating Criteria, USACE, July 2005

Notice of Intent to Prepare a Draft Environmental Impact Statement, USACE, July 2005

Scoping Letter, Modification of Kissimmee Basin Structure Operating Criteria, July 2005

Currently working on DRAFT EIS

Project Management Plan, Kissimmee Basin, Modification of Kissimmee Basin Structure Operating Criteria, USACE, July 2005

Notice of Intent to Prepare a Draft Environmental Impact Statement, USACE, July 2005

Scoping Letter, Modification of Kissimmee Basin Structure Operating Criteria, July 2005

Currently working on DRAFT EIS

Page 20: Jan 2005 Kissimmee Basin Projects Jan 2005. Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management

Questions?