jan ‘19 mk
TRANSCRIPT
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
1
Width
Hei
ght
Hei
ght
Width
Hei
ght
Width
.01
Minimum Requirements of Enclosures for Meter Sockets
Services up to 600 A 120/240 V
Type of Enclosure Sockets
Minimum Outside Dimensions (mm)
Minimum K.O. and Duct Size
Minimum Line Side Connector Range
Height Width DepthUp to 200 A
Single Service1 430 240 130 3" #2-3/0 Cu
#2-250 kcmil Al
200 A Main BusMultiple Main
2 380 435 1303" #2-3/0 Cu
#2-250 kcmil Al3 380 650 1304 380 870 130
400 A Main BusMultiple Main
2 508 665 1403" #4/0-500 kcmil Cu/Al3 508 880 140
4 508 1110 140400 A with Integral CT Single Service 1 915 520 210 3" #4/0-500 kcmil Cu/Al
400 A with Integral CT and Breaker Single Service
1 1067 660 133 3" #4/0-500 kcmil Cu/Al
600 A with CT Single Service 1
Meter Socket: Wall mountOutdoor Kiosk: Pad-mounted
2 x 3"#4/0-500 kcmil Cu/Al
2 Lugs/Phase
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
2
Customerconductors75Ø duct(option 1)
Customerservice
Figure 1 - 200 A Meter Socket - Hot StyleCustomer Bottom Exit
Customerconductors75Ø duct(option 2)
BC Hydro supply
BC Hydroconductors
Figure 2 - 200 A Meter Socket - Hot Style Customer Back Exit
8 9
7
2
8 9
7
2
N N
BC Hydrosupply
Figure 3 - 200 A Meter Socket - Cold StyleCustomer- owned Pedestal
Detail _2
RM
1500
- 18
00
Detail _2
900
MIN
600
MIN
Frostline
Customer concretebase or engineeredstructure
Customer 200Abreaker enclosure.Access interlocked withRM cover plate above.
600 N Tippingresistance
7
2
Grade
N
200A
150
MIN
8 98 9
Customerconductors
CSA certified200A breakerenclosure,Dead-front(sealable)
Hasp
300
MIN
Customerconductors& breaker
8 98 9
7
2 BC Hydrosupply
100
MIN
8 98 9
Isolatedneutral lug
BC Hydrocables
Removablebarrier
Isolatedneutral
5
5
55
BC Hydroconductors
.02Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
Servicemain
5
2
3
2
1
10
4
1500
MIN
1800
MA
X
13
900
MIN
Drainrock
75
50
4
2
1
3
2
5
Meter Socket Installedon Wall Surface
See note 4.6
Perimeterdrainage
300
11
.033
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
.044
200
150
App
rox.
140175
450
(App
rox.
)
150
50
300(Approx.)
200(Approx.) 50 concrete encasement
(Refer to note 4.6 and RMSecondary Guide 750 V & less)
Foundation wall
150
Footing
Dripshield Building
insulation(per BCBC)
Front SideOptional Installation
(Per Note 3.3)
Section B_ Detail A_
Section A_
A_
B_
40
Hardi lap siding
Detail A_
12.5 OSBsheeting
16.0 Rainscreen cavity
200
150
App
rox.
2" x 6" studs
12.5 OSB sheeting
9.0 Hardi lap siding50 (±6)
50 Min. concrete
16.0 Rain screen cavity
2525Building wall(per BCBC)25 x 25
Access cavity
Drip shield
Hardi lapsiding
Hardi lapsiding
5
5
Total thickness
5 8 9
7
5
50
13
13
13
13
Hardi lapsiding
OSBsheeting
2" x 6"studs
Metalflashing
25 MIN
Accesscavity
Cover (removable)
25MIN
5
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
.055
Customerbuilding
Customer400 A 120/240 Vmeter socket
1000
BCHLPT
BCHLPT 900
BCHcounterpoise
Customer gradientcontrol conductor
3000(or less)
300
1000
300
Customerground electrode
Servicegrounding
conductors
2
Customer400 A 120/240 Vmeter socket(See note 3.1f)
Customerbuilding
BCHground
electrode
Ø3" PVCservice duct
900
900BCHcounterpoise
3000
or le
ss
Servicegroundelectrode
Customergradient controlconductor(2/0 Cu bare)
1000
BCHgroundelectrode
Plan View
ServicegroundingconductorsA_
Section A_
BCHgroundelectrode
3
1
44
1310 1
62
400/600 A 120/240 VSingle or Multiple Meter Socket
(See note 3h)
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
.066
300 MINutility compartment
50-100MAX
Figure 1 - 400 A with Integral CT Meter Socket Single Service - Wall Mounted
Integral 400 A bus
Customer 400 Aservice main(See note 3.1f)
XXX:5 A CT(BCH supplied)
LineN
N
G
To customerservice panel
To serviceground
From BCHydro
Socketbracket(above)
Transformertype revenue
meter
XXX:5 A CT block(BCH supplied)
400 A 1Ømeter socketwith CT(See note 3.1f)
To customerservice panel
NLine
To service ground
Figure 2 - 400 A Single Service Field Assembled Main/Meter Socket - Wall Mounted
From BC Hydro
600
MIN
Line
Load
8 9
7
2
8 9
7
2
Customerservice main
Transformer typerevenue meter
Utilityconductors
RMCustomer conductors
RM
Customerconductors
N
N
G
L1 L2
L1L2
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
.077
450 MINutility compartment
BCHCT Cabinet
Figure 1 - 600 A Single Service Integral Meter Socket - Wall Mounted
Figure 2 - 600 A Single Service Field Assembled Main/Meter Socket - Wall Mounted
From BC Hydro
900
MIN
Line
Load
8 9
7
2
Customerservice main
RM
N
G
Line
G
To CustomerServiceGround
To CustomerService Panel
XXX:5 A CT(BCH supplied)
Grade/Floor
1500
MIN
BCHCT Cabinet
Line
Load
Customerservice main
RM
Transformertype metersocket
N
G
Line
G
To CustomerServiceGround
To CustomerService Panel
XXX:5 A CT(BCH supplied)
450 MINutility compartment
From BC Hydro
750
MIN
7
2 Grade/Floor
1500
MIN
8 9
7
2
L1
L2N
Utilityconductors
Customerconductors
Transformertype metersocket
Isolatedterminal
50-100MAX
50-100MAX
L1 L2 N
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
.088
BCH hasp
Customerlock
From BCHydro
To serviceground
To customerservice panel
Groundingstud
(Machinedtype)
Cableclamp
Transformer typerevenue meter
(external)
Customerlock
400/600 A 1ØCT block
(BCH supplied)
Kiosk hingedaccess door
Concrete pad(by customer)
1500
to 1
800
Kioskaccess
door
BCH lock(see detail 1)
400/600 A 120/240 Voutdoor type kiosk,dead-front, sealablecover plate behindexternal door
300 for 400 A450 for 600 A
utility compartment
L1
L2
N N
Line
RM RM
LoadGG
N X2 X1G
600
MIN
600
MIN
400/600 A - Service Kiosk(Front Elevation - Door Open)
See detail 1_
Detail
400/600 A - Service Kiosk(Side Elevation)
_1
1
13
6
Customerservice main
1500
MIN
300MIN
400 A or 600 A
( )*
( )* Customer could apply for special permissionto mount revenue meter inside the kioskenclosure - refer to Revenue Metering guide.
Coverplate
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
3
BC Hydroservice duct
Customerservice duct
Customerservice duct
Customerservice duct
Customerservice duct
Sealant
Utilitycompartment
Finished grade
200 A or 400 A Multiple Main Meter Socket
Customer service ducts
Detail _1
Detail
2
_1
2
1
1500
- 18
00
℄
2
4
9 .09Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
10 .10
Schematic Diagram - Multiple Main Splitter Box ( )Single-Phase up to 600 A
Single pointgrounding strap
Grounding stud(Machined type)
Grounding bus
BC Hydrowireway
Revenue meteringand customer loads
Customer servicegrounding conductors
L1L2N
NL2L1
BC Hydro cables only(No other equipment,
conductors or conduits)
Cable clamp
Customersplitter box ( )(Sealable)
BC Hydro supply
Customerservice main
1500
MIN
Finished grade
G
N
G
RM RM
Splitter box ( )
*
* For 3-PH Splitter used in 1-PH installation redundant bus bar shall be bonded.
*
*
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
11 .11
Building wall
5
Minimum area ofselect backfill
1000
600 to 1500 TYP
LLExisting BC Hydro 3" duct
PL
1000TYP
MarkerFinished grade
Building wall
Floor slab
Service duct
Outline of excavationfor foundation
Existing BC Hydro 3" duct Service duct
Elevation
Plan
900
MIN
900
MIN
Foundation wallR900
1500
MIN
1800
MA
X
Outline of excavationfor foundation
Perimeter drainage(installed by others)
10
131
1
13
10
4
5
3
21
200
MIN
Point A
11
300
Building wall
5
Minimum area ofselect backfill
1000
1000
600 to 1500 TYP
LL
PL
Existing BC Hydro 3" duct
PL
1000TYP
MarkerFinished grade
Building wall
Floor slab
Service duct
Outline of excavationfor foundation
Existing BC Hydro 3" duct Service duct
Elevation
Plan
900
MIN
900
MIN
Foundation wallR900
1500
MIN
1800
MA
X
Outline of excavationfor foundation
Perimeter drainage(installed by others)
10
131
1
13
10
4
5
3
21
200
MIN
Point A
11
300
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
12 .12
Building wall
Minimum area ofselect backfill
1000
1000
600 to 1500 TYP
LL
PL
Existing BC Hydro 3" duct
PL
1000TYP
Marker
Finished grade
Building wall
Floor slab
Service duct
Outline of excavationfor foundation
Existing BC Hydro3" duct
Service duct
Elevation
Plan90
0 M
IN
900
MIN
Foundation wall
R900
1500
MIN
1800
MA
X
Outline of excavationfor foundation
Finished grade
Perimeter drainage(installed by others)
5
10
13
Point A
10
4
5
3
2
13
1
12
1
120
0M
IN
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
13 .13
Notes1. Types of Installation
1.1 Conductor in duct is the standard installation method.
1.2 Direct burial of service cables shall not be used for new installations.
2. Materials2.1 All materials from the stub-off on private property shall be supplied and installed by the
customer. Minimum depth of burial for all ducts shall be 900 mm below the finished grade.
2.2 All materials installed on private property, including the meter socket, shall be CSA certified. However, all material and electrical equipment, up to the utility’s point of connection to the customer-owned equipment, is exempt from the BC Electrical Safety Regulation, including all grounding, duct work, etc. These materials are not the jurisdiction of the electrical inspection authorities, and permits are not required per Technical Safety BC Directive D-El 2017-01.
3. Installation Requirements3.1 General
a. All civil work and grounding installations shall be the responsibility of the customer.
b. All civil and grounding installations shall comply with BC Hydro standards, the BCEC and applicable bulletins issued by the TSBC.
c. The trench shall be in a direct line-of-sight from the property line stub-off to the service duct entry into the building. The base of the trench shall be graded to the depth of the BC Hydro duct stub-off.
d. The service location on the building shall be on the wall closest to Point A (See page 11 & 12), or within one metre back from that wall on either side.
e. The service location on the building and the location of the trench shall be coordinated with other utilities to avoid crossovers and dig-ins, and to maintain clearances.
f. All residential type 400 A and 600 A 120/240 V services shall be installed inside a detached power shed, or an outdoor type pad-mounted power kiosk, or an external closet attached to a dwelling. For all such installations, BC Hydro personnel shall have unrestricted access directly from outside. However, BC Hydro shall not accept 400 A and 600 A residential services installed in an electrical room inside a dwelling, regardless of any unrestricted access for BC Hydro personnel.
g. Commercial and industrial type 400 A and 600 A 120/240 V service equipment located inside a customer building is acceptable.
h. For LPT installations which require CL fuses for 200 A single and 400 A multiple main services, LPT shall be placed on top of pyramid pad to accommodate large service cable bending radii.
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
i. Free-standing outdoor type support structures for mounting customer service equipment shall be concrete, masonry or rock walls or galvanized steel. Support structures made of treated lumber (except power poles) and plywood shall not be acceptable to BC Hydro.
3.2 Service in Duct
a. The customer shall couple their duct onto the BC Hydro duct stub-off at Point A, except as stated in note 3.2 (f), and discard any markers and/or duct caps.
b. If the length of service duct between Point A and the meter socket enclosure exceeds 50 m, a 332 pull box may be installed in consultation with the BC Hydro designer.
c. If the aggregate duct bends installed on private property to the meter socket exceed 135°, a 332 pull box may be installed in consultation with the BC Hydro designer.
d. The minimum radius of any duct bend shall be 900 mm.
e. The customer is responsible for the installation of adequate service duct drainage, according to the BCEC. Duct sealing to prevent ingress of dangerous earth gases shall be installed by BC Hydro crew.
f. A #8 minimum diameter polypropylene pull string shall be installed in the service duct and tied securely at the meter base enclosure and to the string in the BC Hydro duct stub-off. If no string is found in the stub-off, the customer shall notify BC Hydro for further instructions.
g. Throughout its length, the service duct shall be kept free of any obstructions and foreign material, including sand and gravel. The duct shall be proved by mandrelling, before the final connection is made to the BC Hydro duct and before a pull string is installed.
h. The service duct shall be protected from damage caused by settlement of the foundation and excavation backfill. To minimize settlement and subsequent damage to the service duct and conductor, select backfill shall be used per Section W and compacted in 150 mm layers.
3.3 Residential Supply Service inside a Building Wall
Residential service duct inside a building wall shall be enveloped in, and encircled by, a minimum of 50 mm of concrete per BCEC Rule 6-208. Concrete encasement shall extend up to the meter socket duct terminator because service cables do not have adequate overcurrent protection.
BC Hydro will accept optional installation of Hardi lap siding on top of reduced concrete encasement for improved street appeal of the installation and reduced protrusion of the revenue meter into a side yard. For further construction details of this installation option refer to ES54 S1-01.04.
4. 400 A and 600 A ServicesCAUTION: Due to liability and restricted access, BC Hydro will no longer terminate utility supply conductors directly onto a customer-owned service main switch or breaker lugs.
4.1. BC Hydro standards show the minimum size of service entrance enclosures. Larger size enclosures may be used as required by the customer.
14 .14Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
4.2. All service entrance assemblies shall have separate utility service cable compartment. Customer service busbars shall extend into utility cable compartment and fitted with line-side lugs for terminating BC Hydro supply cables.
4.3. Install the U/G service duct on the left-hand side of the meter socket to accommodate the bending radius of the BC Hydro large incoming service cables. For a right-handed connection, please contact the BC Hydro local Design Representative.
4.4. The load-side lug range shall comply to BCEC requirements.
4.5. Line-side lugs shall be tunnel type and shall accept the conductors tabulated in BC Hydro standard ES53 S1-01. All BC Hydro conductors have compact stranding.
4.6. The U/G service duct shall be installed outside the foundation walls, and run on the surface of the finished exterior building walls, unless they are encased in concrete, 50 mm minimum.
4.7. Minimum dimensions shown are required for adequate working space for BC Hydro personnel.
Bill of Material
Item Description Quantity1 Coupling, PVC, 3" dia., CSA DB2 12 Duct, PVC, 3" dia., CSA grey Sched40 – UV rated for exposed installation As Required3 Expansion joint, PVC, 3" dia., CSA grey Sched40 14 90° bend, 900 mm radius, PVC, 3" dia. CSA DB2 15 Meter socket, CSA certified, acceptable for BC Hydro revenue meter 16 Bell end, PVC duct, 3" dia., CSA DB2 part of Item 13 17 Terminal adapter, PVC, 3" dia., CSA grey Sched40 18 Locknut, 3" dia., for Item 7 19 Bushing, 3"dia., PVC CSA grey Sched40 1
10 Drainage tee, PVC, 3" dia., CSA DB2 As Required
11 Warning tape, "CAUTION ELECTRIC LINE BELOW", orange or yellow, 150 mm wide As Required
12 Coupling, PVC, 5º, 3" dia., CSA DB2 As Required
13 Duct, PVC, 3" dia., CSA DB2 for direct burial and concrete encasement As Required
15 .15Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.
DESIGNED RECOMMENDED ACCEPTED
ISSUED:JAN 2019REPLACES:APR 2017ORIGINALLYISSUED:OCT 1979
PAGEOF
R
16 9ES54 S1-01
RE
VISI
ON
S: R
.8 -
RE
SID
ENTI
AL
REQ
UIR
EME
NTS
REV
ISE
D. A
PR
‘17
MK
| R
.9 -
MET
ER S
OC
KE
T P
RO
TRU
SIO
N A
DD
ED
& D
ESIG
N D
ETA
ILS
RE
VISE
D. J
AN
‘19
MK
M. KELVIN C. PICASSI F. DENNERT
ENGINEER OF RECORDSECONDARY SINGLE-PHASE SERVICES
120/240 V UP TO 600 AREVENUE METER SOCKET INSTALLATION
Reference DocumentsSecondary Metering Secondary Voltage Revenue Metering – 750 V and Less
DI S10-4 Electric Service Connections - Voltages
CSA C22.1 Canadian Electrical Code, Part I
Technical Safety BC Directive D-El 2017-01
Reference StandardsES54 H1-05 Service Duct Stub-Off Marker Installation
ES53 S1-01 Secondary Customer Services, Single-Phase up to 600 A, Revenue Meter Socket Installations
ES54 Section W Construction Specifications
.1616
Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at www.bchydro.com/distributionstandards.