EXECUTIVE SUMMARY
Anyone who has taken to London’s roads - be it by car, taxi, bus or bicycle - will be acutely aware of the congestion that blights many of the city’s highways and byways.
The introduction of a Congestion Zone in 2003 offered a brief respite for the very centre of the city. But a reduction in congestion and an increase in traffic speeds soon disappeared as freed-up road space was given over to other modes of transport, in particular buses and cycling, as well as to better quality public space.
Without radical intervention congestion will only get worse and risks bringing London to a standstill. The capital’s population is growing by 100,000 a year and that means more people and more vehicles, causing greater delays and more unpredictable journeys. On top of this, there remains a strong demand for better public spaces, which will further limit existing road capacity.
Increasing congestion is also likely to have a detrimental impact on the health of the city’s inhabitants. Road transport accounts for around 60% of London’s particulate emissions and nearly 50% of emissions of nitrogen oxides (two of the most hazardous air pollutants to health). Air quality is particularly poor in areas with high densities of slow-moving or congested traffic.
The Mayor’s recent commitment to examine the feasibility of new underground roads is welcome, but, given the scale of demand, even the most ambitious programme of road-building would by itself be inadequate to meet London’s congestion challenge.
Therefore, on top of road building plans, the Mayor must champion more effective management of demand - and that will mean moving to a more sophisticated system of congestion charging in the capital.
The current situation is bad news for London’s competitiveness and for Londoners’ overall quality of life meaning something has to be done above and beyond current plans. This is why smarter congestion charging should be at the heart of the battle of ideas for City Hall – both now and post May 2016.
Polling undertaken for this study found Londoners are well aware of the problem – 79% of those asked by YouGov thought traffic on the capital’s roads will increase in the next five years, with 40% believing it will increase a lot.
1
But there is no consensus on how to solve the problem. The most popular solution – introducing a higher congestion charge during rush hour – garnered support from less than one in three respondents (29%).
Across the different solutions, support was on average around 20%. However, fewer than one in ten (8%) said they were against any new measures designed to cut congestion.
This points to there being a political mountain to climb, but it is not a Sisyphean task if certain steps are taken. The key is to convince the public and the business community that if they pay more, they will get something in return.
Motorists and passengers must enjoy swifter and more reliable journey times, while freight transporters and the businesses they serve must see any extra cost off-set by the increased efficiency in deliveries.
To achieve this, any future congestion scheme has to be better targeted than London’s existing one, with charges varying according to those roads and times of day where congestion is worst.
Furthermore, the revenues from any scheme should be reinvested in the capital, ensuring those paying enjoy the benefits of new charging. This could be through investment in roads, managing the network better, or through reductions in existing taxes and charges.
If we are to keep London moving there is a tough journey ahead that will require vision and leadership to win over understandably cautious public and business communities. But the alternative is greater congestion, more unpredictable journey times, and greater delays on deliveries.
The sooner Londoners and London government come to terms with this reality, develop and agree practical solutions, and implement them, the better.
THE CHALLENGE FACING LONDON’S ROADS
Each day London’s road network caters for nearly 10 million car trips, more than four million bus trips, 500,000 cycle trips and 300,000 taxi or minicab trips. It carries 80% of passenger journeys and 90% of freight movements. The road network also accounts for some 80% of London’s public space1.
One inevitable consequence of the growing - and conflicting- demands for road space is congestion. London has around 20% of the UK’s traffic congestion. Three quarters of this congestion is on roads managed by Transport for London (TfL) or London boroughs (the rest is on those motorways and ‘A’ roads managed by the Highways Agency).
This means that around 15% of all the UK’s overall traffic congestion is concentrated on less than 0.5% of the country’s 400,000 km of roads2.
The performance of London’s roads: some key facts3
• Across London between 1980/82 and 2006/09, average weekday traffic speeds fell by 18% in the AM peak, by 14% in the inter-peak, and by 12% in the PM peak.
• Current average traffic speeds in central London are around 14kph, in inner London around 20kph and those in outer London vary between 30 and 35kph.
• Congestion is defined as an excess travel rate (minutes per km) compared to that which would be expected under uncongested conditions. In the AM peak in central London, delay on average is 1.4 minutes per km, in inner London 1.2 minutes per km, and in outer London 0.7 minutes per km.
• Journey time reliability is measured as the percentage of journeys completed within five minutes of a standard 30 minute journey. According to this metric at least one in ten journeys in London is unreliable, with particular problems on congestion hotspots such as the Inner Ring Road and Blackwall Tunnel.
• Recurring congestion, caused by an excess of demand over supply, is responsible for 75 per cent of congestion in London.
1 Roads Task Force final report, July 20132 Ibid3 Ibid: Technical Note 9. How does the road network perform in terms of speed, congestion and journey time reliability.
Long and unpredictable journey times have an economic, social and environmental cost. It is estimated that London’s road congestion costs the UK economy £4bn per year, with an average cost of around £17 per hour delay to a vehicle in London.
3
Roads and traffic can also have a detrimental impact on Londoners’ quality of life. Road transport accounts for around 60% of particulate emissions in London and nearly 50% of emissions of nitrogen oxides. Pollution levels in congested parts of London frequently breach EU limits, with areas such as the Marylebone Road showing pollution levels double the EU maximum4.
With London’s population due to rise from 8.3 million today to 9 million by 2020 and 10 million around 2030, the demands on London’s road space will only increase as a result of more people, more jobs and more goods movements. TfL forecasts suggest that every five years the transport system will need to cater for more than one million extra trips per day. Many of these will be catered for by the planned expansion of rail capacity with schemes like Crossrail, but a significant number will need to be provided for on London’s roads. Figure 1 below shows the likely increase in delay for motor vehicles by 2031. This will have a particular impact on central London, where congestion is already worst, but all areas of London will be affected5.
Figure 1: Indicative increase in delay per kilometre travelled by motorised traffic*Seconds delay per km
*Forecast by TfL’s strategic models based on committed transport investment and forecast growth to 2011
4 Roads Task Force final report, July 20135 Ibid
+10%+10%
+14%+18%
+17%
+8%
North East Central2007 2007 2007 2007 2007
2031 2031 2031 2031 2031
40 41 57 46 69
44 49 62 52 80
South West
THE MAYOR’S ROADS TASK FORCE
In recognition of the challenges facing London’s roads, the Mayor of London set up an independent Roads Task Force (RTF) in 2012 - on which London First sat - to identify potential solutions. Its report, published in summer 2013, set out a future vision for London’s roads and made a number of recommendations. The Mayor’s response committed TfL to a ten year, £4 billion investment programme. This covers improved use of new technologies (such as traffic signalling and network control rooms) as well as junction improvements in areas like Elephant & Castle and Old Street to tackle congestion hot spots and improve traffic flow, while also improving the quality of public space.
For the first time in a generation, TfL also committed to assess the case for adding capacity to London’s road network, launching feasibility studies into the scope for new underground road tunnels in London. One proposal, set out enthusiastically by the Mayor (see figure 2 below), would be for a new 22 mile underground ring road, potentially costing some £30 billion to construct.
European cities such as Paris and Oslo have successfully built major new underground roads in recent decades - providing both better journeys for motorists as well as freeing up existing road space on the surface for other uses. Such an approach is radically different to the now discredited road-building plans of the 1960s and 1970s which required large scale surface demolition and saw communities like Hammersmith cut in half. Building new underground roads is an idea whose time has come for London. The Mayor should now set out firm proposals over the coming year so as to inform the inevitable jockeying for resources at the post-election spending review.
9
8
7
6
5
4
32
1
10
A503Camden
A1 Highbury& Islington
A10Shoreditch
A12HackneyWick
A1203Wapping
A2 Old Kent Road, nearElephant & Castle
A3205 Battersea
A4 nearEarl’s Court
A41St John’s Wood
A40 Westway,near Latimer Road
Inner ring road
Figure 2: Proposed Orbital Tunnel
Possibly entrance/exits to the tunnel Locations are approximate, only indicators at this stageSource: Evening Standard, 12 May 2014
5
The RTF was, however, clear that taken together these measures would be inadequate to meet our long-term ambitions for London’s roads (particularly given the challenges around pursuing a large scale road-building programme under the capital thanks to its likely cost and the scope for opposition in directly affected areas).
The RTF therefore called on London to consider smarter charging more widely, beyond London’s existing congestion charging scheme: “The RTF recommends that proper consideration is given to the wider use of smarter charging in the longer-term as a means to manage demand and make more efficient use of road space”
Indeed, the existing Mayoral Transport Strategy, as updated in 2010, is clear that demand management may have a role to play if other policy tools prove insufficient. Proposal 130 states:
“The Mayor, through TfL, and working with the London boroughs and other stakeholders, if other measures are deemed insufficient to meet the strategy’s goals, may consider managing the demand for travel through pricing incentives (such as parking charges or road user charging scheme). This would depend upon there being a reasonable balance between the objectives of any scheme and its costs and other impacts. Any scheme would need to take account of local conditions as well as the impact on surrounding regions, and to be fair and flexible relating charges to the external costs of travel with sensitivity to time of day, and with scope for discounts or exemptions for specific user groups The Mayor will also consider imposing charges or tolls to support specific infrastructure improvements, such as river crossings.”6
While the current Mayor has been explicit that he has no plans to consider wider charging during his current Mayoral term, the absence of any credible strategy for bridging the gap between the demand for London’s road space and likely supply means that this is a challenge that the next Mayor must grip swiftly post May 2016.
6 Mayor of London’s Transport Strategy, 10 May 2010, p272
LONDON’S EXPERIENCE OF CONGESTION CHARGING
London has had a congestion charging scheme since 2003, as championed by London First to the then incoming Mayor Ken Livingstone (see box for details). The scheme has brought significant benefits to the capital.
HYDE PARK
KENSINGTONGARDENS
GREEN PARK ST.JAMES’S
PARK
REGENT’S PARK
KENNINGTONPARK
K I N G ’ S
R O A D
SYDNEY
STREET
HARRINGTON ROAD
GLO
UC
ESTER
ROA
D
QU
EENS
GATE
S TREET
KENS INGTON ROAD
KE
NS
ING
TO
NC
HU
R CH
STREET
KENS I NGTON ROAD K N I G H T S B R I D G E
SLO
AN
ES
T.
B R OMP T ON
R OA D
ONSLOWSQ.
SEMLEY PL.
ELIZABETHSTREET
B IS HOP’S B RIDGE ROAD
PO
RC
HESTER
RD.
EPS
TOW
RO
AD
RNE
GROVE
GARWAY
RD.
B A Y S W A T E RR O A D
I LL GATE
EVIL
LAS
PO
RTLA
ND
PLAC
E
RE
GE
NT
ST
RE
ET
RE
GEN
T
S T R E E T
P I C C A DI L LY
BERKELEYST.
DA
VI E
SS
TR
EE
T
BERKELEY
SQUARE
NEW
BOND
S TREET
BRUTONST.
O X F O R D S T R E E T
O X F O R D S T R E E T
B A Y S W A T E R R O A DMARBLE ARCH
CUMB ERLAND GATE
ROYALHOSPIT
ALROAD
FULHAMROAD
NORFOLK
BA
KE
RS
TR
EE
T
GL
OU
CE
ST
ER
PL
AC
E
WOBURN
PLACE
SOUTHAMPTON
ROW
RUSSELL SQ.BEDFORD
PL.
RUSSELL ST.
GREAT
GO
WE
R
ST
RE
ET
BLOOMSBURY
ST.
TO
TT
EN
HA
M
CO
UR
T
RO
AD
NEW OXFORD S TR E E TBLOOMSBURY WAY
THEOB ALDSROAD
GILT
SPUR
ST.
SHOELN
.
KI N
GS
WA
Y
ALDW YC H
S T R A N D
S T R A N D
CH
AR
ING
REGENTST.
HAYMARKET
HANOVER
STREET
C A N N ONS T R E E T
LUDGATE HILL
LONDON WALL LONDON WALL
CI RCUS
OLDBROAD
STRE
ET
LIVERPOOL ST.
MO
OR
GA
TE
KING
WILLIAM
ST.
THREADNEEDLE ST.
LEADENHALL STREETCORNHILLPOULTRY
LON
DO
NB
RID
GE
EASTCHEAP
TOWER HILL
FENCHURCH S TREET
GR ACECHU
RCH
ST.
BI S
HO
PS
GA
TE
SH
OR
ED
I TC
HH
IGH
STR
EET
O L DS T R E E T
ALD
ER
SG
AT
E
CITY
RO
AD
FINSBUR
Y
NO
RTO
NFO
LGAT
E
ALDGATE
DEVONSHIRE ST.
GR
AY
’ SI N
NR
OA
D
GRAY’SIN
NRD
.
RO
SE
BE
RY
AV
ENU
E
FA R R I N GDON
ROA
D
C L E R K E N W E L L R OA D
GO
SW
ELLR
OA
D
ST.J
OH
NS
TREET
FARRIN
GD
ON
ST.
FLE E T S T R E E T
WATERLOO
BRIDGE
WES TMINS TER
NEW
BR.
ST.
CHEAPS IDE
ACTON ST.
HOUN DS DI T CH
MIN
OR
IES
BEVISMARKS
CHELSEABRIDGE
ROAD
AL
BE
RT
EM
BA
NK
ME
NT
LAMBETH BR.
LAM
BET
HPALACE
RO
AD
LAM B E T HR OA D
KE
NN
ING
TO
NR
OA
D
S T. GEOR GE ’S R OAD
ROAD
WESTMINS TER B RIDGE
LUPU
S ST.
CLAVERTO
NST.
WH
I TE
HA
LL
S TAMFORD S TREET
S OU T H W A R K S T R E E T
SOU
THW
ARK
BRID
GE
BLA
CK
FRIA
RS
RO
AD
WAT E R LO
O
R OA
D
LONDONROAD
B OROUGHH
IGH
STRE
ET
GR
E ATD
OV E R
S T R E E T
TOOLEYS TREETYO
RKRD
.
NEW
INGT
ONCAUSEW
AY
V I C T OR I AS T R E E T
GR
OS V E NOR
PLACE
SUTHERLANDST.
PIM LI CO ROAD
LOW
ERSLOANE ST.
HO
R
S E F E R R Y ROA D
MA
RSHA
MSTREET
GT.
SMITH
ST.
LUP US S T R E E T
JOHN
ISLI
PST
.
MI L
LBA
NK
MI L
LB
AN
K
SQUARE
D
QU
EE
NS
WA
Y
PALA
CE
GA
TE
BUCKINGHAM
PALA
CERO
AD
WILTON
ROAD
B E LGRAVEROAD
DRUID
S TR E E T
CROSS
RO
AD
SHAFTESBURYAV.
P I C C A DI L LY
PALL MALL
STR
EET
NEW
FETT
ERLN
. HOLB ORN VIADUCT
HOLB OR NHIGH HOLB ORN
LOWER THAMES S TREET
HIGHHOLBORN
BAY
LIS
RO
AD
THUR LOEPLACE
INV
ERN
ESS
TERR
AC
E
VAUX HA LLB R I DGE
R OA D
RUSSELL
SQUARE
E D G WA R E
R O AD
OLD B R OMPTONROAD
PR
INC
E ’ SS
T.
S T. THOMASS TREET
B EECH S TR EET
SILK ST.
BA
KERS
T.
KING
’SCROSS
RD.
LANGHAM PL.
MONTAGUE
ST.
EBURY BR.
GREYCOAT PL.
BLA
CKFR
IARS
BRI
DG
E
ROA
D
SOUT
HWAR
KBR
IDGE
NEW
CHANGE
ELDON ST.
GREAT TOWER ST.
ST. BOTOLPH ST.
UPPERGROUND
STREET
UPPERBELGRAVE
EATONSQUARE
B OR OUGH R OAD
DRAYCOTTPLACES LOANE
AVENUEB LACK
PRINCER OAD
QUEEN VICTORIA
STREET
CHARTERHOUS ES TREET
GREAT
PORTLA
ND
STREET
CROMW ELL R OAD
BRESSENDENPL.
BERM
ON
DSEY
STREET
SUMNERS T.
BELGRAVE
SUSSEXGARDENS
NEWCAVE N DI S H
ST.GEORGE’S
DRIVE
SMITH
STREETCA
DO
GA
NS
QU
ARE
WA
LT ON
ST R
EE T
BAS I L
S T.
DRAYCOTTAVENUE
S E R P E N T I N ER O A D
OAKLEY
STREET
OLDC
HU
RCH
DRAYTONGARDENS
CO
LLING
HA
MRD
.
HARRINGTON GDNS .
MA
RLOE S
RO
AD
TH
EB
RO
AD
WA
LK
GLOUCESTERSQUARE
CONNAUGHT S T.
MA
RYLEBO
NE
HIG
HST.
SEYM
OU
RP
LAC
E
CURZONS T R EET
GROS VENOR S T.
PAR
KS
TREET
SO
UTH
AU
DLEY
ST.
LEIN
STER
GARDENS
WARW I CK
WAYBELGRAVEROAD
ECCLESTON BR.
SHAFTES
BURY
AV
ENU
E
CHA
NCERY
LAN
E
TUDOR S T.
VI CTOR I A EM B AN K M E N T
TY
ERS
ST
RE
ET
CALT
HORPE
ST.
GUI LFOR D S TR EETGORDON
S Q.
CLEVELANDST.
NEW
M
ANSTR
EET
BREWER
ST.
WA
RDO
UR
S TREET LONGACRE
FINSBURY
MIDDLESEX
ST.
BU
NH
ILLRO
W
B ANNER S T.
WORSHIP STREET
LEVER S TR EET
OLD
BA
ILEY
MIN
CING
LANE
MARSHALSEA
UN I ONS TREET
S UFFOLK
S TREET
LONGLA N E
EXH
IBITIO
NR
OA
D
MO
NM
OU
THS
T.
CEN
TRA
LS
TREET
J UD
DSTREET
S QUARE
HATTON
GA
RDEN
BELGRAVE PL.
ECCLES TON S T.
ROCH
ESTE
RRO
W
DRURYLANE
THE R I NG
THE
RI N
G
S OUTH CAR R I AGE DR I VE
WIGMORE STREET
YORKST.
C ON S T I T UT I ON HI L L
GLOUCESTER
TERRACE
P E TTYFRANCE
B I R D C A G EW A L K
T H E
M A L L
AM
WELL
STR
EET
PALLM ALL
PRINCE CONSORT
ROAD
LAMBETH RD.
CATHCART ROAD
FLOOD
S TREET
HA
RL
EY
ST
RE
ET
ARGYLL
S TR EET
PAU
LST
REET
WIL
SON
STR
EET
B RUS HFIELD S T.
HARPER
ROA
D
FALM
OU
TH
ROAD
RENFREW
RD.
S ANCROFT S T.
VAU
XHA
LLSTREET
SQU
ARE
ST. GEO
RGE’S
REG
ENC
YS
TREET
PA
R K
L AN
E
P AR
K
LA
NE
B RIDGE
PLACE
QUEEN ELIZAB ETH S TREET
CAM
BRI
DGE
AV.
ALBERT
ALB
AN
YS
TR
EE
T
MS
TRE E T
S TREET
ST R
E E T
PA
NIA
NR
OA
D
OL D S T R E E T
POWNALL ROAD
KIN
GS
LA
ND
RO
AD
B E T HNALGR EE N R OA D
HACKNEY ROAD
CALVERT AV.
CURT
AIN
RD.
E S S E
N I N EE L M S
LA N E
CAMBERWE
GRANGE RD.
S OUT HWARK PARK RD.
OL DK E N T
R D.
W
LORRIMORE
RD.
DE L A N C E YS T.
DUNTO
NRO
AD
W HI S TON R OA D
PANCRASROAD
FALKIRK
COOK’S
ROAD
BARING
NEW
NO
RTH
RO
AD
BU
RN
PAR
KR
OA
D
WROAD
CLIFTONGARDENS
E DG
WA
R E
R OA
D
ROS S MOREROAD
L I S S O N
G R O V E
PA R K
R OA D
GLO
UC
ESTER
PLA
CE
YOR
KW
AY
WHARFDALE RD.
CALE
DON
IAN
RD.
EV
ER
SH
OL T
ST
RE
ET
HA
MP
ST
EA
DR
OA
D
PENTONVILLE ROAD
COPENHAGEN
HALL RD.
WELLINGTON
ROAD
GOODS WAY
PANCRASR
OA
D
CIRCUS
ROAD
RANDOLPHAVENUE
WARWICKAVENUE
K
R OA D
FINBOROUG
H ROAD
AD
BATTERSEA
BRIDGE
BRID
GE
CHELSEA
KENNINGTON OVAL
HARLEYFORD RD.
KENN
INGTO
NPA
RKROAD
TOWERBRIDGE
GREATEASTERN
ST.
R ODN E Y R OADHEYGATE ST.
J AM AI CA R OAD
WA
LWO
RT
HR
OA
D
PENR
OSEST.
EAS T S M I THFIELD
EAST ST.
VA
LLAN
CE
RO
AD
NEW
RO
AD
CANN
ON
STREET
ROAD
EAS
TRO
AD
WHITECHAPEL HIGH ST.
M UR R AY GR OVE
WHITE LION ST.
PROVO
STST.
ISLI
NGT
ONHI
GHST
.
ST.
AY A40W ES TWAY A40
PRINCE ALBERT ROAD
PENYWERN
RD
DO
UN
RO
AD
HAMI LTON
TERRACE
VENUEROADQUEEN’S
G
CHURCHS TREET
OU
TE
RC
IRC
LE
OU T E R
C I R C L E
I N N E R C I R CLE
S T.J OHN’S
WOOD
ROAD
NGAR
ROAD
ELGI NAVENUE
UNDER
PASS
ROA
DCOP E N HAGE N S T.WA
Y
T
ST.
STREET
PRESCOT ST.
DO
CK
ST.
HO
XTO
NS
TR
EE
T
PI T
FIE
LD
ST
RE
ET
WHARF
ROAD
SH
EPH
ERD
ESS
WA
LK
BR
I CK
LAN
E
CHE S HI R ES T.
GOS S E T S T.COLUM
B IAROAD
THOMA
SM
ORES
T.
BR
ICK
LAN
E
WA
RN
ERPL.
POOLE ST.
MINTERN ST.
PEARSON ST.
WH
IT B
EAS TS TR EET
POR
TLAN
D
PENTONPLACE
R OLLS R OAD
S HADTHAM
ES
S PA R OAD
WILL OW
WALK
LYN TON R OAD
ERNPL.
AB BEY STREET
WENLOCKSTREET
CROPLEYSTREET
PR
ITCH
AR
D’S
ROAD
PO
OL
RO
AD
STREET
RISE
ROAD
B ELLS TREET
HA
REWO
OD
AV.
I FI E LDROAD
RIVINGTON S T.
TANNERS T R EET
MANDELAWAY
LEMAN
ST.
HANB URY S TREET
QUAKER ST.
WENT-WORTH
WEN
LOCK
RO
AD
COLE
BRO
OKE
ROW
GRAHAMSTREET
KILLIC
KS
T.
CA
LSH
OT
ST.
RO
DN
EYS
TREET
NORTHGOW
ERST.
OSSULSTONSTREET
CHALTONS TREET
MAIDA
AVENUE
UE
S UTHERLAND AV.
M
ARYLANDSROAD
HARROW ROAD
HARROW ROAD
UPPER
MO
NTA
GU
STREET
ALLS OPPL.
GLEN
TWO
RTHST. LU
XBO
ROU
GH
STREET
WARREN
MELTO
NST.
CARDINGTONST.
GO
RDO
NSTREET
PEN
TON
STR
EET
CHAPEL MARKET
CITYGRDN
. ROW
B RUNS WICK PL.
LEONARD S TREET
LAMB S T.FOLGATE S T.
APPOLDST
.
ALIE ST.
ROYAL MINT ST.CROS S WALL
GRANGE WALK
RILE
YR
D.
TABARDSTREET
B ROOK DRIVE DAN
TERD.
ELEP
HA
NT
ROA
D
CHESTERWAY
MANORPLACE
BRAGANZAST.
TITEST.
CHEYNEWALK
TREBOVIR
ROAD
BA
THS
TREET
SO
UT
S T.
WESTBOURNE
TERRACE
CHURCHILL GARDENS ROAD
TURPEN
TINE
LANE
STR
EET
S TREET
REDCLIFFEGDNS
REDCLIFFE GARDENS
GROS VENOR
ROAD
C HE L S E AE M B A N K M E N T
GR OS VEN OR R OAD
EAR L’ S
COUR TR OAD
KENNINGTON LANE
VAUXHALLBRIDGE
K E N N I N GT ONL A N E
N E W K E N T R OA D
KEN
NI N
GTO
NPA
RK
RO
AD
TOWER
B RIDGE
RO
AD
MA
NSELL
COM
MER
CIAL
STREET
COMMERCIALSTREET
C I T YR O A D
CI T YROAD
SWINTON ST.
PENTONVILLE ROAD
GRAY’SIN
NRD.
PENTO
N
GRAFTON WAY
EUS TONROAD
EUS TONROAD
M A R Y L E B O N ER O A D
EUSTON RD.
PAR K C R ES.
SUSSEXGARDENS
OLDM
ARYL
EBON
ERD
.
EASTBOURNETERRACE
PRAED
S TR EET
C HE L S E A
BromptonCemetery
T he S erpentin
RoundPond
TheLong
Water
City
Road
Bas in
Wenlock
Bas in
Regent’s Canal
Regent’s Canal
R I VER THAM ES
St. Katharine’sDock
SOHO
BLOOMSBURY
MAYFAIR
EUSTON
CLERKENWELLCLERKENWELL
BARBICAN
MARYLEBONE
BAYSWATER
SOUTHKENSINGTON
CHELSEA
ST. JOHN’SWOOD
MAIDAVALE
KILBURN
ST. PANCRAS
FINSBURY
CITYHOLBORN
COVENTGARDEN
WESTMINSTER
PIMLICO
BELGRAVIA
KNIGHTSBRIDGE
BROMPTON
SPITALFIELDS
BERMONDSEYNEWINGTON
LAMBETH
WALWORTH
SOUTHWARK
KENNINGTON
VAUXHALLNINE ELMS
WESTBROMPTON
SHOREDITCH
CHARINGCROSS
WATERLOO
PADDINGTON
BOROUGH
ST.JAMES’S
Central LondonCongestion Charging zone –residents’ 90% discount applies
Additional residents’ 90%discount area
Congestion Charging zoneboundary
Main roads within charging zone
Uncharged roads
© Transport for LondonJanuary 2011
Congestion Charging zone
0
0
0.25 0.5 0.75 Mile
1 Kilometre
Marylebone
Paddington
Euston
St. PancrasKing’s Cross
Moorgate
LiverpoolStreet
FenchurchStreet
BlackfriarsCannon Street
London Bridge
Waterloo
Charing Cross
Victoria
KensingtonPalace
Figure 3: Congestion Charging Zone
Source: Transport for London
London’s congestion charging scheme
An £11.50 daily charge applies for driving a vehicle within the charging zone (see figure 3 below) between 07:00 and 18:00, Monday to Friday. There is no charge on weekends, public holidays, between Christmas Day and New Year’s Day inclusive, or between 18:00 and 07:00 on weekdays. There are a range of exemptions and discounts available to certain vehicles and individuals, for example residents within the zone. Enforcement is based primarily on automatic number plate recognition (ANPR).
Debate continues around which users have benefited most from the scheme, but the general consensus is that the charge reduced the number of vehicles entering the central zone. This led to a short term reduction in congestion and increase in traffic speeds, which then dissipated as freed-up road space was consciously re-allocated to other modes of transport, in particular buses and cycling as well as to better quality public space. As a result, congestion in central London now is no better than when the charge was introduced, but of course it would now be significantly worse if the substantial improvements to buses and cycling had been introduced with no charge in place.
7
This conclusion is supported by recent TfL statistics which show that whilst the population and total trips increased by around 13% between 2001 and 2011, car driver trips in London dropped by a similar amount. In contrast, rail trips increased by just over 40%, bus trips by 60% and cycling trips by 66%. So while total trips increased, the number of car driver trips decreased. Average traffic speeds in the central zone increased when the charge was introduced but then fell away and are now lower than in 2003. Improvements to public transport have been supported by net revenues of over £1 billion generated by the scheme which have been reinvested in transport in the capital.
The current congestion charging scheme appears now to be broadly accepted by all political parties in London. The proposed Western extension was opposed by the current Mayor at the 2008 election and scrapped following his victory, but in the 2012 election congestion charging was not a political issue.
However, the current received political wisdom is that introducing additional congestion charging would be controversial and high risk.
PUBLIC PERCEPTIONS OF CONGESTION IN LONDON
London First commissioned YouGov to undertake opinion polling to better understand Londoners’ views of congestion in the capital. The results were striking. Significantly, nearly four out of five Londoners polled thought that congestion would increase either a lot (40%) or a little (38%) over the next five years. Just 2% thought congestion would decrease a little – and a negligible 0.4% thought it would decrease a lot. (See figure 4 below)7
Increased a lot
Increased a little
Stay at about the same level
Decreased a little
Decreased a lot
Don’t know
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
40
38
13
2
0.4
5
Figure 4: Do you think congestion on London’s roads will have increased or decreased in 5 years’ time (i.e. in July 2019), or do you think it will stay about the same level?
Source: YouGov surveyBase: All London adults (1050)
7 All polling figures, unless otherwise stated, are from YouGov Plc. Total sample size was 1,055 adults. Fieldwork was undertaken between 1st - 3rd July 2014. The survey was carried out online. The figures have been weighted and are repre-sentative of all London adults (aged 18+)
The fact that Londoners recognise that roads congestion in the capital will worsen is an important and necessary – if not sufficient – condition for additional action on congestion charging.
9
We asked Londoners’ for their views on some of the many potential options for cutting congestion on London’s roads. The response was extremely mixed (see figure 5 below). While only a small minority of people (8%) said they would support none of the measures, no single measure commanded more than 30% support.
The challenge is therefore to better articulate how any new scheme could benefit Londoners as a reasonable and proportionate response to the congestion challenge we face.
A higher congestion charge during the rush hour
A wider zone for congestion charging
A higher congestion charge for the most congested roads
A higher daily congestion charge overall
A lower charge for less congested roads
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Other
Don’t know
Not apllicable - I wouldn’t support any measures that try to cut congestion on
London’s roads
29
21
21
19
16
15
10
17
8
More roads built in London to lower congestion
Figure 5: Which, if any, of the following measures would you support in order to try and cut congestion on London’s roads?
Source: YouGov surveyBase: All London adults (1050)
LEARNING FROM OTHER CITIES
While seeking to change the way people consume and pay for an everyday good or service, such as using the roads, undoubtedly carries complexity and risk, it is instructive to look at how other cities around the world have responded to congestion. The successful examples of Singapore and Stockholm show us how things could be done differently in London.
Singapore
Singapore has one of the oldest and best known congestion charging schemes. A scheme was originally introduced in 1975, which was then replaced by a fully automated Electronic Road Pricing (ERP) scheme in 19988. The ERP operates as a cordon in central Singapore as well as on expressways and outer ring roads. Charges are very responsive to demand, changing every half hour in peak times, and are reviewed every three months to maintain efficient traffic flow.
Drivers must install an ‘in-vehicle unit’ which enables automatic charges via either a debit or credit card. Prices can vary from zero to about SG$3 (around £1.50) per cordon crossing and are in effect from 7am to 8pm on weekdays. A recent US Department of Transportation study concluded that the ERP successfully achieved target speeds of 45 to 65 km/h on expressways and 20 to 30 km/h on arterial roads, with net revenue of SG$100 million (around £50m) in 2008.
The Singaporean Government has announced its intention to move to an even more sophisticated satellite based system in 2020 which will allow more dynamic and variable pricing by individual road and time of day. This would also do away with the need for a large and cumbersome network of gantries across streets.
8 Roads – International Case Studies, work undertaken for the RTF, Sept 2012, Steer Davies Gleave
11
Stockholm
In central Stockholm, a congestion charge applies between 06.30 and 18.30 on weekdays. Each passage into or out of central Stockholm costs 10, 15 or 20 krona, depending on the time of day. The maximum amount per day and vehicle is 60 krona (or around £5).
The congestion charge was originally introduced for a six month trial period in 2006. A subsequent referendum saw it passed by 53% of residents and it was introduced as a permanent measure in 2007. In 2011 traffic remains 20% below the levels experienced ahead of its introduction, despite charges having stayed flat.
Moreover, support for the charge has steadily grown since the beginning of the pilot when 70% of people were opposed to it. Now those numbers have flipped and 70% of people in 2011 supported the charge. This can partly be explained by the fact that drivers have seen benefits to them in terms of reduced congestion. Also, all net revenues have gone to transport projects – particularly major highway improve-ments.
The experience of Stockholm and Singapore shows that congestion charging can bring beneficial impacts to major cities. Moreover, Stockholm’s experience shows that the argument for introducing charging can be made and won provided users can see a benefit.
Figure 6: Stockholm congestion tax cordon map
Source: The Swedish Transport Agency
Sodermalm
S
odermalm
Congestion charge gate
Congestion charge zone
Djurgarden
E4
E4
E20
E20
E18
277
277
222
222
275
75
75
73
Kungsholmen
Sodermalm
Ostermalm
Norrmalm
Nacka
Lidingo
Solna
WHERE NEXT FOR CONGESTION CHARGING IN LONDON?
So how might congestion charging in the capital evolve to address its recognised and growing congestion problem? We see three main sets of options, which are not mutually exclusive.
OPTION 1
The first option would be to introduce additional charging schemes, beyond the existing central zone, targeted at particular centres of congestion. Under the previous Mayor, Transport for London explored the scope to introduce new congestion charging schemes in suburban centres outside central London. This isn’t currently being proposed, but interest has emerged around the potential to introduce a new congestion charging scheme at Heathrow. (Figure 7 below shows the road network around Heathrow at present).
A30
A30
A315
A315
A4
A4
A4
A4
A3113
A3044
A3044
A3044
A408
A437A312
M4
M4
M4
M25
M25
J14
J15
J4b
J4
J4a
J3
H O L L O W A Y L A N E
HA
TC
H L
AN
E
SI PSO
N R
OA
D
B A T H OR A D
B A T H R O A D
S T A I N E S R O A D
G R E A T S O U T H W E S T RO A D
TH
E P AR K W
AY
FAG
G’ S
RD
TH
E CA
US E
WA
Y
TU
NN
EL
T1 & T3Short stay
T1, T2 & T3Business
BusinessParking PlusT5
Long Stay
T5Short Stay
T4Short Stay
T2Short Stay
T5Business
T4Long Stay & Business
Terminal 1
Terminal 4Underground
Heathrow Express
Heathrow Connect
Buses & coaches
Terminal 5Underground
Heathrow Express
Heathrow Connect
Buses & coaches
Terminal 2CentralBus StationUnderground
Heathrow Express
Heathrow Connect
Buses & coaches
Terminal 3
T1, T2 & T3Long stay
Heathrow AirportAA p
London
SloughReadingThe West
N
0km
0mi 1mi0.5mi
mk5.1mk5.0 1km
HertzEnterpriseEuropcarNationalAlamo
DollarThrifty
AvisBudget
AvisBudget
Sixt
Heathrow AirportOverview
Version 1 Heathrow T2 05/14 ©2014 LHR Airports Limited. Published May 2014.
ContentsHeathrow Airport overview 1
Check-in 2
Departures
Level 5 (Check-in level) 3
Level 4 (Gates A1–A26) 4
Terminal 2B (Gates B31–B49) 5
Arrivals 6
Figure 7: Road network around Heathrow Airport
Source: Heathrow Airport
As part of its submission to the Airports Commission, Heathrow Airport has signalled its intention to consult on a congestion charging zone around the airport to encourage the use of public transport and the more efficient use of cars. Heathrow has suggested that this should only be introduced once suitable public transport alternatives are in operation and that exemptions should be considered for certain types of user. Revenues would be recycled into transport infrastructure and initiatives9.
Further feasibility work is now due to take place on the geographical extent of the zone, charging levels and the legal powers required to implement a scheme. Targeted new schemes such as this could play a useful role in addressing localised hot spots of congestion, but given the scale of the congestion pressures across London, broader solutions must also be explored.
9 Heathrow Airports Ltd, submission to Airports Commission, 17 July 2013 13
OPTION 2
As highlighted above, the experience of Stockholm and Singapore shows that congestion charging can bring beneficial impacts to major cities. Drawing on such examples, a more sophisticated congestion charging scheme should be introduced to replace the existing central London one.
This could cover a broader area, with charges varying more in response to congestion levels at different times of day and in different places (for example applying to the North or South Circulars during rush hour, but not at other times, so as to reduce peak congestion while maintaining the accessibility of local high streets).
Since the London charge was introduced there have been significant advances in electronic payment, detection and surveillance technologies, meaning that more complex schemes are now possible and cost-effective.
While we have already noted divisions in Londoners’ opinions on how to address the problem, Stockholm’s experience shows that the argument for introducing charging in this way can be made and won provided users can see a benefit.
The Mayor should therefore ask TfL to conduct a study on the experience of other cities such as Stockholm and Singapore and set out proposals for smarter congestion charging in London, drawing on the lessons of those schemes.
OPTION 3:
Another solution which should be explored under any scenario, would be to introduce charging where any significant new road capacity is built. As mentioned above, the Mayor is currently considering the feasibility of new underground roads in London, which TfL has suggested could be charged.
More immediate are the proposals for new river crossings in east London (see figure 8 below), starting with a new tunnel at Silvertown to relieve congestion on the existing Blackwall tunnel. TfL will consult on a detailed scheme in the autumn which will include charging of both the new crossing and also the existing one at Blackwall.
It should be noted that, ideally, the funding of river crossings in east London would be met by central government, as it has been in wealthier west London. However, it seems highly unlikely the Treasury will meet this bill.
The reality is that introducing charging for new roads would help fund their construction and, crucially, lock in the benefits of new capacity so as to avoid seeing new space rapidly fill up with no enduring benefits to traffic flow. It would also help condition drivers to the reality that the ways we pay for road use will in future need to change.
UK drivers have some experience of paying for new roads (such as the M6 toll) and new bridges (such as the Dartford Crossing), but paying for roads which have previously been free inevitably generates greater controversy.
New polling undertaken by YouGov on behalf of London First suggests that Londoners could be persuaded of the case for tolling new river crossings. First, we asked Londoners their views on the introduction of tolls for river crossings, given the absence of available funding to pay for their construction. The findings, set out in figures 9 below, show that there was a narrow majority in favour of tolling (yes 46%, no 43%, don’t know 11%). Perhaps unsurprisingly, adults living in East London had the highest opposition rate (51%).
A102
A12
A406
A13
A
B C
Deptford
CanningTown
Beckton
Royal Docks
Woolwich
Dagenham
Rainham
CanaryWharf
B
A11
A13
A2
Greenwich
A
B
C
Silvertown TunnelWoolwich Ferry ReplacementGallions Reach: Ferry or BridgeBelvedere Crossing
A205
A207
ThamesmeadBelvedere
A13
A
Figure 8: East London tunnel options
Source: Transport for London
15
Figure 9: Toll support/ opposition for new crossings
It has been suggested that there should be new road crossings over the River Thames in East London to support economic development in the area. There is currently no funding set aside for these projects.If the crossings were to be built, do you think motorists who use these crossings should or should not be asked to pay a toll to help cover the cost of construction? (For reference, the toll fees are likely to be similar to the Dartford Crossing, which is £2 for a car, £2.50 for a van, and £5 for a lorry)
Source: YouGov surveyBase: All London adults (1050)
Motorists should not be asked to pay a toll
Don’t know
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Motorists should be asked to pay a toll
46
43
11
We then asked how Londoners felt about tolls also being introduced for existing free crossings alongside proposed new ones (for example the Blackwall Tunnel, alongside the proposed new Silvertown tunnel). Unsurprisingly, Londoners were more resistant to paying for something they currently receive for free (with 54% against tolls and 32% in favour). This shows that TfL and the Mayor have more work to do to secure Londoners’ backing for tolls as part of any funding package for new river crossings in east London.
Motorists should not be asked to pay a toll
Don’t know
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Motorists should be asked to pay a toll
32
54
14
Figure 10: Toll support/ opposition for nearby crossings
Please imagine these new crossings were built in East London and were subject to a toll...Do you think motorists on nearby existing crossings, such as the Blackwall Tunnel, should or should not also pay a toll to avoid potential delays caused by people switching to toll-free options close by?
Source: YouGov surveyBase: All London adults (1055)
CONCLUSION: A SOLUTION FOR LONDON
The case for smarter congestion charging in London – as in other major cities - is strong. But Londoners want to know the detail of what any scheme might mean for them in practice, not just in theory.
Drawing from previous experience both here and abroad, we propose 5 key tests which any new scheme must meet if it is to win sustained support from Londoners.
1. Any future scheme should be better targeted than London’s existing one, with charges varying more according to those roads and times of day where congestion is worst.
2. Any scheme must be able to demonstrate that it is consistent with and contributes towards meeting our main objectives for London’s roads - reduc-ing congestion, benefiting bus passengers and cyclists, and supporting the creation of better quality public spaces.
3. Those who pay the charge must themselves see some sustained benefits in the form of more predictable and reliable journeys for people and goods. It is neither equitable nor politically sustainable for benefits to accrue largely to those who don’t pay, as is currently the case with London’s existing conges-tion charging scheme.
4. All net revenues from any scheme should be reinvested in transport in the capital. Again, road users who pay the charge should see at least some of the benefits, whether through investment in roads infrastructure and network management, or through offsetting reductions in existing taxes and charges.
5. There will need to be scope for targeted discounts or exemptions where these may be justified for particular groups of users. These should, however, be limited so as not to undermine any scheme.
At the same time, sustained investment must continue in London’s wider public transport system so as to ensure that Londoners continue to have a range of choic-es open to them for the journeys they choose to make.
We believe that these tests can be met and urge anyone aspiring to be London’s next Mayor to embrace smarter congestion charging as a key policy for their first term. If we carry on as now, congestion on London’s roads will inexorably get worse. Something must be done – and now.