Page 1: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

James Walker, Oregon Shakespeare Festival

Andrew Recinos, Tessitura Network

Ravi Ranjan, Tessitura Network

Page 2: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

About Us

James Ravi Andrew

Page 3: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Agenda

Brief overview of Agile Methodology

Key concepts enacted – from ticketing perspective

Summary of take-aways and resources

Page 4: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Brief Agile Overview

“Agile is the best kept

management secret on the planet”

- Forbes Magazine

Page 5: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

How Technology Projects Traditionally Work

Figure out what you

want to do

Create detailed

specification

Do all the work to

complete the project

Do all the testing

Go live with everything!

Page 6: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Waterfall Project

Page 7: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Fake Example of a Waterfall Project

Figure out what you

want to do

Create detailed

specification

Do all the work to

complete the project

Do all the testing

Go live with everything!

Page 8: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Figure out what you

want to do

Let’s build a highly-addictive

geometric video game!

Page 9: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Create detailed

specification

Perfect from the start! No detail left out!

Page 10: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Do all the work to

complete the project

Hi nerds! Tell us when it’s done and awesome!

Page 11: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Do all the testing

Now that’s done, let’s see it!

Page 12: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Go live with everything!

Everything is perfect!

Page 13: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Benefits of Waterfall Projects

All requirements known in detail from the start

No opportunity for scope to change

Completed product is unveiled at the end of the project

Page 14: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Problems with Waterfall Projects

All requirements must be known in detail from the start

No opportunity for scope to change

Completed product is unveiled at the end of the project

Page 15: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Problems with Waterfall Projects

All requirements must be known in detail from the start

No opportunity for scope to change means that mid-project

change is difficult and costly

Completed product is unveiled at the end of the project

Page 16: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Problems with Waterfall Projects

All requirements must be known in detail from the start

No opportunity for scope to change means that mid-project

change is difficult and costly

Completed product is unveiled at the end of the project

meaning that users/stakeholders have little or no opportunity

for feedback

Page 17: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

What is more likely…

January:

Let’s build a video game!

February:

Totally detailed

specifications

Mar – Aug: developers go

away and build to spec

Page 18: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

What is more likely…

January:

Let’s build a video game!

February:

Totally detailed specs

Mar – Nov: developers go away and build to

spec

testing

Go

Live?

This is the first time

many of the

stakeholders or

users see the

“finished product”

And – oh no! there

are major changes!

And this late in the game,

either the changes can’t

happen, will be hugely

costly or will delay the go-

live!

Development takes

longer than

expected

Testing is rushed!

Page 19: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Where it ends up

Finger-pointing and recrimination

More processes, policies, documentation

Major changes kill the timeline and the budget

Page 20: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

A New Way of Thinking…

Page 21: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Manifesto for Agile Software Development

We are uncovering better ways of developing software by doing it

and helping others do it. Through this work we have come to value:

Individuals and interactions over processes and tools

Working software over comprehensive documentation

Customer collaboration over contract negotiation

Responding to change over following a plan

Page 22: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Individuals and interactions over processes and tools

January: Let’s build a video

game!

February:

Totally detailed

specifications

Mar – Aug: developers go

away and build to spec

Sep – Oct:

extensive testing

November:

Go-live!

Decision

Makers Builders Users

Page 23: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Working software over comprehensive documentation

January: Let’s build a video

game!

February:

Totally detailed

specifications

Mar – Aug: developers go

away and build to spec

Sep – Oct:

extensive testing

November:

Go-live!

Comprehensive

Documentation

Software not ready or visible

until end of the project

Page 24: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Responding to change over following a plan

January: Let’s build a video

game!

February:

Totally detailed

specifications

Mar – Aug: developers go

away and build to spec

Sep – Oct:

extensive testing

November:

Go-live!

If testing isn’t

happening until now,

hard to respond to

change

Page 25: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

So – let’s do this Agile…

Page 26: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

1. Break project into short, complete cycles

2. Focus on outcomes instead of output

3. Make work visible and transparent

4. Track progress

5. Embrace change

6. Eliminate waste

7. Let teams self organize for best results

8. Inspect & adapt

Page 27: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Figure out what you

want to do

Let’s build a highly-addictive

geometric video game!

(still a good way to start)

Page 28: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Create broad specification

(not a detailed specification)

Page 29: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Prioritize

Page 30: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Break into Releases

Release Three

1. Ability to play against friends on FB

Page 31: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Choose small chunk of

work

(something you can accomplish in a few weeks)

Page 32: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Fill in details

Shapes should fall from the top

Mouse can

control

position as

it falls

When it

lands, next

SQUARE

starts

(just for the work you plan to do now)

Page 33: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Do just that small chunk

of work

Page 34: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Thoroughly test just that

chunk of work

(testing as you go, rather than all at the end)

Page 35: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Release-ready code

(live software in front of some users after 2 weeks rather than all at the end)

Page 36: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Return to your list and

repeat

(if things have changed in the past two weeks, there is time to adjust to change)

Page 37: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Analyze: Here are details for dropping a square

Develop: Code dropping a square

Test Dropping a Square

Dropping a Square is Release ready

Now more shapes!

Page 38: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

January November

January: Let’s build a video

game!

February:

Totally detailed

specifications

Mar – Aug: developers go

away and build to spec

Sep – Oct:

extensive testing

November:

Go-live!

Waterfall

Page 39: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

January November

Analyze

Develop

Test

Release ready

Prioritize Analyze

Develop

Test

Release ready

Prioritize Analyze

Develop

Test

Release ready

Prioritize

Pieces Dropping Piece Rotation Scoring

Agile

Page 40: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

In Summary

Waterfall Agile

Everything decided up front vs. Main ideas up-front, details later

All work delivered at the end vs. Work delivered continuously

Massive testing at the end vs. Testing throughout

User feedback late in game vs. User feedback throughout

Many risks left to the end vs. Risks uncovered throughout

Page 41: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Let’s Look at Agile

OUTSIDE of Software Development

Page 42: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

How this will run

Introduce a scenario from the ticketing world

Discuss key agile concepts that could be used

Act out the concepts

Discuss

Page 43: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Beck Arena

• Premiere multi purpose

venue

• 18,576 seats

• Hockey, basketball,

Moto-X

• Bieber, Elton John,

Metallica

Page 44: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Monsters of Rock

We need to put the concerts on sale and fulfill ticket distribution.

1 Smashing

Pumpkins

March 7, 8 ,9

2 Radiohead March 19, 20,

21

3 The Tessiturians April 11, 12, 13

Page 45: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Assumptions

Beck Arena has:

o an existing ecommerce website o ‘print at home’ with access control

o a 15 window box office

Page 46: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Out of Scope

Beck Arena has:

o all stage, production and artist requirements

o event security

o Event marketing (excluding web content)

o social & digital media

Page 47: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Create a Vision

“Have a successful on sale and fulfill ticket distribution of the Monsters of Rock Series.”

Page 48: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Break The Vision Into Broad Specifications

o Let’s call them ‘Epics’

o Very high level

o Placeholders

Page 49: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Create broad specification

(not a detailed specification)

Remember this?

Page 50: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play: Epic Story Creation

Page 51: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About
Page 52: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Now we need to prioritize our items…

o Collaborate

o Strategize at a high level

o Build a roadmap

Page 53: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play: Roadmap Creation

Page 54: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

1. Pricing and Fees

2. Seating Maps

3. System - Event Setup

4. Anti-fraud & Scalping

5. Event Reporting

6. Schedule Staff

7. Website Content

8. Facebook Sales

1st

2nd

3rd

4th

Page 55: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Break It Down… User Stories

o A small unit of work o Smaller pieces of a larger epic

o Usually written from the perspective of the

person needing the item

Page 56: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About
Page 57: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play: User Story Creation

Page 58: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

User Stories

example

Page 59: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About
Page 60: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About
Page 61: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Releases Summary

Release 1 Release 2 Release 3 Release 4

Pricing and

Fees

Seating Maps

System – Event

Setup

Anti-fraud &

Scalping

Event Reporting Schedule Staff

Website

Content

Facebook Sales

Page 62: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Planning a release

Release One (6 Weeks)

Iteration 1

2 Weeks

Iteration 2 Iteration 3

2 Weeks 2 Weeks

Page 63: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Planning a release

Release One (6 Weeks)

Iteration 1

2 Weeks

Iteration 2 Iteration 3

2 Weeks 2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Page 64: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play : Release Planning

Page 65: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Planning a release – 2

Release One

Iteration 1 Iteration 2 Iteration 3

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

As a marketer, I want a top

ticket price under $300,

because our market is price

sensitive.

As a promoter, I want 15% of

the face value of the ticket, to

cover promotional costs.

As a facility manager, I want a

$5 per ticket maintenance

fee, to ensure the facility is

kept in top shape.

As a presenter, I want 75% of

the face value of the ticket to

a sold capacity of 90%, to

ensure we make a profit.

As a marketer, I want a scaled

house, to ensure we optimize

our revenue.

As a box office manager, I

want a processing fee of $7

per ticket, to cover handling

costs.

Page 66: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration Planning

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

Page 67: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play: Iteration Planning

Page 68: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration 1 : Day 1

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

Page 69: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play: A Day on the Project

Page 70: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration 1 : Day 1

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

Andrew

James

Page 71: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration 1 : Day N

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

Andrew

James

Page 72: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration 1 : Day 10

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

Andrew

James

Page 73: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Retrospective – Prime Directive

Regardless of what we discover,

We understand and truly believe that everyone did the best job he or she could,

given what was known at the time,

his or her skills and abilities,

the resources available,

and the situation at hand.

Page 74: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Retrospective : the three questions

What went well?

What could have gone better?

What is puzzling us?

Action Items

Clearly Defined actionable items

Assign responsibility

Check status of action items from last retrospective

Page 75: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Role Play: Retrospective

Page 76: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration 2 : Day 1

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

Andrew

James

As a marketer, I want a top

ticket price under $300,

because our market is price

sensitive.

As a promoter, I want 15% of

the face value of the ticket, to

cover promotional costs.

As a facility manager, I want a

$5 per ticket maintenance

fee, to ensure the facility is

kept in top shape.

As a presenter, I want 75% of

the face value of the ticket to

a sold capacity of 90%, to

ensure we make a profit.

Page 77: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Iteration 2 : Day 1

Release One

Iteration 1

2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Card Wall

To Do In Progress Done

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

James

As a marketer, I want a top

ticket price under $300,

because our market is price

sensitive.

As a promoter, I want 15% of

the face value of the ticket, to

cover promotional costs.

As a facility manager, I want a

$5 per ticket maintenance

fee, to ensure the facility is

kept in top shape.

As a presenter, I want 75% of

the face value of the ticket to

a sold capacity of 90%, to

ensure we make a profit.

Andrew

Page 78: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Release Summary - Stories

Release One

Iteration 1 Iteration 2 Iteration 3

As a web manager, I want a

$5 per ticket processing fee,

to cover our processing costs.

As a box office manager, I

want a maximum of 5 fees. to

help ensure smooth

reconciliation

As a marketer, I want a bottom

ticket price of $50, to ensure

we make a profit.

As a web manager, I want to

eliminate the handling fee for

print at home tickets, to

encourage web sales.

As a marketer, I want a top

ticket price under $300,

because our market is price

sensitive.

As a promoter, I want 15% of

the face value of the ticket, to

cover promotional costs.

As a facility manager, I want a

$5 per ticket maintenance

fee, to ensure the facility is

kept in top shape.

As a presenter, I want 75% of

the face value of the ticket to

a sold capacity of 90%, to

ensure we make a profit.

As a marketer, I want a scaled

house, to ensure we optimize

our revenue.

As a box office manager, I

want a processing fee of $7

per ticket, to cover handling

costs.

Page 79: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Release Summary - Iterations

Release One (6 Weeks)

Iteration 1

2 Weeks

Iteration 2 Iteration 3

2 Weeks 2 Weeks

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Day 1 : IPM Iteration Planning

Meeting

Day 10 :

Retrospective

Everyday : Daily

Standup

Page 80: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Releases Summary

Release 1 Release 2 Release 3 Release 4

Pricing and

Fees

Seating Maps

System – Event

Setup

Anti-fraud &

Scalping

Event Reporting Schedule Staff

Website

Content

Facebook Sales

Page 81: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Summary

1. Break project into short, complete cycles

Releases, Iterations, Epic Stories, User Stories

2. Focus on outcomes instead of output

Prioritize, Delivery stories with maximum user value first

3. Make work visible and transparent

Card Wall, Daily Standup, Retrospective

4. Track progress

Release Planning, Iteration Planning, Card Wall

Page 82: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Summary

5. Embrace change

All phases are open for modification, (Release Planning, Iteration Planning, Daily Standup)

6. Eliminate waste

Identify blocks at daily standup, retrospective and iteration planning

7. Let teams self organize for best results

Card signup at standup

8. Inspect & adapt

Retrospective, Daily Standup, Iteration Planning

Page 83: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Using Agile Tomorrow

Try a retrospective as a routine part of your process (every two weeks, one a

month, etc.)

Try daily standups (a refreshing way to rethink the “daily check in meeting”)

Invite stakeholders/interested parties into your planning meetings

Start a project with broad brush-strokes and don’t get hung up on details until

you have to

Page 84: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

Questions?

Page 85: James Walker, Oregon Shakespeare Festival Andrew Recinos ... · James Walker, Oregon Shakespeare Festival Andrew Recinos, Tessitura Network Ravi Ranjan, Tessitura Network . About

References

The Wall Street Journal recently posted on how modern families are using agile to improve communication within the family.

http://online.wsj.com/news/articles/SB10001424127887323452204578288192043905634

NPR has written about how they are using agile to reduce the costs of their programming by up to 66%.

http://www.innovation-series.com/2013/10/23/nprs-gone-agile-even-their-newsroom/

Here’s a recent TED talk about again, using agile in the family.

http://www.ted.com/talks/bruce_feiler_agile_programming_for_your_family.html

The Director of Marketing for REI recently published a video talking about how they use agile for marketing at REI.

http://moz.com/blog/agile-marketing-whiteboard-friday

http://www.cmo.com/content/cmo-com/home/articles/2013/2/14/agile_marketing_is_m.html

Finally, there was a recent article on Forbes about how agile is the “best kept management secret on the planet”.

http://www.forbes.com/sites/stevedenning/2012/04/09/the-best-kept-management-secret-on-the-planet-agile/