Table 2.1 - Number and Value of Projects Awarded by Status of Contractor as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.45 1,934 22,699.19 5,974 93,043.78 0 0.00 132 15,295.48
Jan. / Jan. 682 9,016.03 162 2,597.05 514 5,443.50 - - 6 975.48
Feb. / Feb. 651 7,335.28 252 1,971.88 393 5,208.72 - - 6 154.68
Mac./ Mar. 713 19,718.61 158 3,306.44 538 10,085.29 - - 17 6,326.88
Apr. / Apr. 701 13,620.01 179 2,658.65 512 10,304.50 - - 10 656.86
Mei. / May. 717 9,629.63 180 1,448.28 524 7,175.06 - - 13 1,006.29
Jun. / Jun. 600 7,797.67 111 886.52 478 6,739.98 - - 11 171.17
Jul. / Jul. 782 8,387.21 195 1,844.95 571 5,635.22 - - 16 907.04
Ogos. / Aug. 583 14,634.38 121 1,703.64 450 12,427.64 - - 12 503.10
Sep. / Sep. 659 9,493.24 135 1,465.49 514 7,726.47 - - 10 301.28
Okt./ Oct. 699 10,375.53 144 1,546.05 539 7,545.91 - - 16 1,283.57
Nov./ Nov. 644 13,745.43 153 2,024.31 482 8,883.99 - - 9 2,837.13
Dis./ Dec 609 7,285.43 144 1,245.93 459 5,867.50 - - 6 172.00
2014 7,765 162,221.58 1,657 20,366.03 5,934 101,189.67 5 2,046.83 169 38,619.05
Jan. / Jan. 561 8,581.30 95 1,395.91 454 6,215.09 - - 12 970.30
Feb. / Feb. 580 8,486.91 105 2,131.97 466 6,004.70 - - 9 350.24
Mac./ Mar. 645 13,258.77 92 2,201.07 536 9,572.15 1 306.74 16 1,178.81
Apr. / Apr. 654 11,374.00 105 1,021.27 540 9,518.76 - - 9 833.97
Mei. / May. 680 13,291.65 138 1,662.61 522 7,763.17 1 1.09 19 3,864.78
Jun. / Jun. 628 10,118.00 125 1,666.62 489 7,855.57 - - 14 595.81
Jul. / Jul. 712 16,311.18 218 1,818.83 479 11,876.90 - - 15 2,615.45
Ogos. / Aug. 656 22,670.50 142 657.22 504 6,350.82 - - 10 15,662.46
Sep. / Sep. 641 12,626.92 153 1,604.46 467 5,784.67 1 214.68 20 5,023.11
Okt./ Oct. 652 18,858.03 137 1,934.64 497 10,210.27 1 1,505.52 17 5,207.60
Nov./ Nov. 679 8,939.19 170 1,471.63 499 6,993.31 1 18.80 9 455.45
Dis./ Dec 677 17,705.13 177 2,799.80 481 13,044.26 - - 19 1,861.07
2015 3,910 69,526.99 788 9,963.29 3,054 51,965.73 2 85.79 66 7,512.18
Jan. / Jan. 564 13,891.53 115 1,254.86 442 10,782.83 - - 7 1,853.84
Feb. / Feb. 451 8,489.14 96 877.76 340 5,913.97 - - 15 1,697.41
Mac./ Mar. 613 11,196.53 136 3,421.35 460 6,219.76 1 63.52 16 1,491.90
Apr. / Apr. 539 7,826.84 82 1,158.18 441 5,014.87 - - 16 1,653.79
Mei. / May. 474 7,111.87 74 563.95 394 6,261.91 1 22.27 5 263.74
Jun. / Jun. 500 7,613.43 117 1,039.85 380 6,513.23 - - 3 60.35
Jul. / Jul. 405 4,455.91 102 579.11 299 3,385.65 - - 4 491.15
Ogos. / Aug. 300 5,800.10 55 937.71 245 4,862.39 - - - -
Sep. / Sep. 64 3,141.64 11 130.52 53 3,011.12 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Tahun
Year
Jadual 2.1 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor Pada September 2015.
Projek Swasta
Private Projects
Status kontraktor / Status of Contractor
Kontraktor Asing / Foreign Contractor
Projek Kerajaan
Government Projects
Kontraktor Tempatan / Local Contractor
Projek Swasta
Private Projects
Projek Kerajaan
Government ProjectsTotal Project
Value (RM m)
Total Number
of Projects
Jumlah
Bilangan
Projek
Jumlah Nilai
Projek (RM j)
Jadual 2.2 - Bilangan dan Nilai Projek Diaward Berdasarkan Kategori Projek Pada September 2015.
Table 2.2 - Number and Value of Projects Awarded By Project Category as of September 2015.
Total Number of
Projects
Total Project Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.45 2,317 37,774.20 3,011 52,306.68 718 9,699.09 1,994 31,258.48
Jan. / Jan.Jan. / Jan. 682 9,016.03 176 2,644.57 254 3,025.08 70 621.81 182 2,724.57
Feb. / Feb.Feb. / Feb. 651 7,335.27 156 1,879.79 207 3,122.48 76 795.90 212 1,537.10
Mac./ Mar.Mac./ Mar. 713 19,718.61 219 2,759.39 256 11,857.25 62 1,969.86 176 3,132.11
Apr. / Apr.Apr. / Apr. 701 13,620.01 201 2,803.57 270 4,412.69 69 2,517.40 161 3,886.35
Mei. / May.Mei. / May. 717 9,629.64 228 3,668.84 239 2,374.60 82 437.81 168 3,148.39
Jun. / Jun.Jun. / Jun. 600 7,797.67 157 2,411.28 239 3,629.17 43 193.16 161 1,564.06
Jul. / Jul.Jul. / Jul. 782 8,387.20 207 2,269.42 323 3,946.09 65 1,011.45 187 1,160.24
Ogos. / Aug.Ogos. / Aug. 583 14,634.38 187 4,109.07 231 3,480.78 35 415.33 130 6,629.20
Sep. / Sep.Sep. / Sep. 659 9,493.24 191 3,800.33 272 3,593.43 50 435.91 146 1,663.57
Okt./ Oct.Okt./ Oct. 699 10,375.54 192 4,354.77 273 2,710.24 58 419.46 176 2,891.07
Nov./ Nov.Nov./ Nov. 644 13,745.43 219 4,953.83 220 6,712.59 57 488.57 148 1,590.44
Dis./ DecDis./ Dec 609 7,285.43 184 2,119.34 227 3,442.28 51 392.43 147 1,331.38
2014 7,765 162,221.57 2,330 44,871.94 2,814 75,084.66 686 7,996.56 1,935 34,268.41
Jan. / Jan.Jan. / Jan. 561 8,581.29 185 3,763.65 208 2,413.99 49 248.87 119 2,154.78
Feb. / Feb.Feb. / Feb. 580 8,486.90 198 3,837.61 192 2,374.03 56 292.41 134 1,982.85
Mac./ Mar.Mac./ Mar. 645 13,258.78 177 3,243.02 283 5,215.25 51 1,756.62 134 3,043.89
Apr. / Apr.Apr. / Apr. 654 11,373.99 203 3,070.57 237 5,126.48 41 736.50 173 2,440.44
Mei. / May.Mei. / May. 680 13,291.65 221 3,908.66 237 7,081.00 41 297.89 181 2,004.10
Jun. / Jun.Jun. / Jun. 628 10,118.00 191 2,848.82 243 5,035.72 47 446.82 147 1,786.64
Jul. / Jul.Jul. / Jul. 712 16,311.19 185 5,422.63 223 7,765.32 94 737.02 210 2,386.22
Ogos. / Aug.Ogos. / Aug. 656 22,670.50 207 3,380.08 230 18,163.43 60 544.37 159 582.62
Sep. / Sep.Sep. / Sep. 641 12,626.92 184 3,236.40 237 3,298.02 67 1,400.12 153 4,692.38
Okt./ Oct.Okt./ Oct. 652 18,858.03 205 6,137.83 235 7,831.73 55 985.91 157 3,902.56
Nov./ Nov.Nov./ Nov. 679 8,939.19 193 3,246.89 232 3,882.20 67 276.70 187 1,533.40
Dis./ DecDis./ Dec 677 17,705.13 181 2,775.78 257 6,897.49 58 273.33 181 7,758.53
2015 3,910 69,526.98 1,153 29,544.58 1,463 24,952.43 329 2,621.97 965 12,408.00
Jan. / Jan.Jan. / Jan. 564 13,891.53 181 4,963.61 212 7,488.96 47 224.76 124 1,214.20
Feb. / Feb.Feb. / Feb. 451 8,489.13 146 3,809.98 159 2,261.74 31 137.08 115 2,280.33
Apr. / Apr.Mac./ Mar. 613 11,196.52 181 5,598.16 209 1,680.66 46 315.94 177 3,601.76
Mei. / May.Apr. / Apr. 539 7,826.84 148 3,455.46 214 2,792.85 41 264.87 136 1,313.66
Jun. / Jun.Mei. / May. 474 7,111.87 131 3,174.36 207 3,073.90 30 132.41 106 731.2
Mac./ Mar.Jun. / Jun. 500 7,613.44 137 2,982.79 169 2,374.03 55 999.15 139 1,257.47
Jul. / Jul. 405 4,455.91 122 2,061.12 161 1,646.76 40 277.33 82 470.7
Ogos. / Aug. 300 5,800.11 92 2,760.43 103 1,525.49 34 250.05 71 1,264.14
Sep. / Sep. 64 3,141.63 15 738.67 29 2,108.04 5 20.38 15 274.54
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Total may not necessarily add up due to rounding.
Kategori Pembangunan Projek / Project Category
Kediaman / ResidentialBukan Kediaman
Non Residential
Infrastruktur
Infrastructure
Jumlah Bilangan
ProjekJumlah Nilai Projek (RM j)
Tahun
Year
Kemudahan Sosial
Social Amenities
Jadual 2.3 - Bilangan dan Nilai Projek Diaward Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2013 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade for 2013
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM million) Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000Exceeding 1,000 Total
Bilangan Kontraktor /No. of Contractor 26 10 3 1 - - - - - 40
Bilangan Projek / No. of Projects 26 10 3 1 - - - - - 40
Nilai Projek (RM j) / Project Value (RM m) 15.84 26.61 18.77 14.8 - - - - - 76.02
Bilangan Kontraktor /No. of Contractor 30 27 3 3 - - - - - 63
Bilangan Projek / No. of Projects 34 28 3 3 - - - - - 68
Nilai Projek (RM j) / Project Value (RM m) 24.94 55.17 18.35 51.7 - - - - - 150.16
Bilangan Kontraktor /No. of Contractor 356 234 32 16 - - - - - 638
Bilangan Projek / No. of Projects 449 280 34 18 - - - - - 781
Nilai Projek (RM j) / Project Value (RM m) 340.9 617.17 229.18 298.28 - - - - - 1,485.53
Bilangan Kontraktor /No. of Contractor 152 542 18 7 1 - - - - 720
Bilangan Projek / No. of Projects 184 735 18 7 1 - - - - 945
Nilai Projek (RM j) / Project Value (RM m) 139.33 1,395.64 116.82 104.97 60 - - - - 1,816.76
Bilangan Kontraktor /No. of Contractor 131 564 88 47 1 - - - - 831
Bilangan Projek / No. of Projects 169 808 94 51 1 - - - - 1,123
Nilai Projek (RM j) / Project Value (RM m) 124.53 2,298.04 639.36 926.37 68 - - - - 4,056.30
Bilangan Kontraktor /No. of Contractor 73 203 194 26 1 - - - - 497
Bilangan Projek / No. of Projects 116 308 243 30 1 - - - - 698
Nilai Projek (RM j) / Project Value (RM m) 83.87 812.33 1,768.74 470.89 79.27 - - - - 3,215.10
Bilangan Kontraktor /No. of Contractor 257 789 495 790 213 133 17 7 3 2,704
Bilangan Projek / No. of Projects 439 1473 658 1241 239 172 20 8 3 4,253
Nilai Projek (RM j) / Project Value (RM m) 325.51 3,890.92 4,756.12 28,029.83 17,150.50 28,687.34 7,965.55 5,774.72 8,362.61 104,943.10
Bilangan Kontraktor /No. of Contractor 6 19 15 24 17 9 5 2 2 99
Bilangan Projek / No. of Projects 7 40 20 30 17 9 5 2 2 132
Nilai Projek (RM j) / Project Value (RM m) 5.5 101.81 142.36 696.53 1,208.32 1,711.86 1,778.14 1,619.75 8,031.19 15,295.46
Bilangan Kontraktor /No. of Contractor 1,031 2,388 848 914 233 142 22 9 5 5,592
Bilangan Projek / No. of Projects 1,424 3,682 1,073 1,381 259 181 25 10 5 8,040
Nilai Projek (RM j) / Project Value (RM m) 1,060.42 9,197.69 7,689.70 30,593.37 18,566.09 30,399.20 9,743.69 7,394.47 16,393.80 131,038.43
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
G3
G4
G5
G1
G2
Note : Figures are subject to change due to late notification.
Jumlah
Total
G6
G7
Asing
Foreign
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Jadual 2.3 - Bilangan dan Nilai Projek Diaward Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2014 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade for 2014
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM million) Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000Exceeding 1,000 Total
Bilangan Kontraktor / No. of Contractor 21 12 - 2 - - - - - 35
Bilangan Projek / No. of Projects 21 12 - 2 - - - - - 35
Nilai Projek (RM j) / Project Value (RM m) 17.72 31.16 - 34.69 - - - - - 83.57
Bilangan Kontraktor /No. of Contractor 46 26 3 5 - - - - - 80
Bilangan Projek / No. of Projects 49 29 3 5 - - - - - 86
Nilai Projek (RM j) / Project Value (RM m) 35.22 68.35 20.22 87.62 - - - - - 211.41
Bilangan Kontraktor /No. of Contractor 322 220 33 10 1 - - - - 586
Bilangan Projek / No. of Projects 418 272 37 15 1 - - - - 743
Nilai Projek (RM j) / Project Value (RM m) 316.24 543.04 251.26 330.41 59 - - - - 1,499.95
Bilangan Kontraktor /No. of Contractor 127 533 20 13 - - - - - 693
Bilangan Projek / No. of Projects 156 736 23 14 - - - - - 929
Nilai Projek (RM j) / Project Value (RM m) 120.76 1,459.30 150.64 266.66 - - - - - 1,997.36
Bilangan Kontraktor /No. of Contractor 122 495 76 34 1 1 - - - 729
Bilangan Projek / No. of Projects 166 706 83 40 1 1 - - - 997
Nilai Projek (RM j) / Project Value (RM m) 120.49 2,050.87 574.77 623.17 85.23 122.59 - - - 3,577.12
Bilangan Kontraktor /No. of Contractor 83 184 172 38 1 - - - - 478
Bilangan Projek / No. of Projects 146 310 262 42 1 - - - - 761
Nilai Projek (RM j) / Project Value (RM m) 105.57 826.76 1,927.28 723.24 65.98 - - - - 3,648.83
Bilangan Kontraktor /No. of Contractor 254 721 456 787 229 131 24 14 2 2,618
Bilangan Projek / No. of Projects 501 1333 597 1134 271 155 32 15 2 4,040
Nilai Projek (RM j) / Project Value (RM m) 370.2 3,475.62 4,424.72 25,703.57 18,694.93 26,648.75 12,022.45 11,004.01 8,193.25 110,537.50
Bilangan Kontraktor /No. of Contractor 3 27 17 27 10 18 7 7 12 128
Bilangan Projek / No. of Projects 6 46 24 40 10 21 8 7 12 174
Nilai Projek (RM j) / Project Value (RM m) 4.81 104.98 175.47 1,058.68 798.63 3,931.42 2,749.25 4,144.23 27,698.39 40,665.86
Bilangan Kontraktor /No. of Contractor 978 2,218 777 916 242 150 31 21 14 5,347
Bilangan Projek / No. of Projects 1,463 3,444 1,029 1,292 284 177 40 22 14 7,765
Nilai Projek (RM j) / Project Value (RM m) 1,091.01 8,560.08 7,524.36 28,828.04 19,703.77 30,702.76 14,771.70 15,148.24 35,891.64 162,221.60
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
G1
G2
Asing
Foreign
Jumlah
Total
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
G3
G4
G5
Total may not necessarily add up due to rounding.
G6
G7
Jadual 2.3 - Bilangan dan Nilai Projek Diaward Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi September 2015 Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade for September 2015.
Gred Julat Nilai Projek (RM juta)Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1,000Melebihi 1,000 Jumlah
Grade Project Value Range (RM million) Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000Exceeding 1,000 Total
Bilangan Kontraktor / No. of Contractor 6 4 1 2 - - - - - 13
Bilangan Projek / No. of Projects 6 4 1 2 - - - - - 13
Nilai Projek (RM j) / Project Value (RM m) 4.08 5.67 9.6 27.41 - - - - - 46.76
Bilangan Kontraktor /No. of Contractor 27 8 1 1 - - - - - 37
Bilangan Projek / No. of Projects 30 8 1 1 - - - - - 40
Nilai Projek (RM j) / Project Value (RM m) 20.85 21.13 9.31 18.12 - - - - - 69.41
Bilangan Kontraktor /No. of Contractor 165 106 18 12 - - - - - 301
Bilangan Projek / No. of Projects 218 124 18 12 - - - - - 372
Nilai Projek (RM j) / Project Value (RM m) 167.45 270.8 121.51 206.73 - - - - - 766.49
Bilangan Kontraktor /No. of Contractor 66 300 4 3 - - - - - 373
Bilangan Projek / No. of Projects 92 381 4 3 - - - - - 480
Nilai Projek (RM j) / Project Value (RM m) 74.3 731.03 28.09 48.8 - - - - - 882.22
Bilangan Kontraktor /No. of Contractor 65 293 39 18 2 - - - - 417
Bilangan Projek / No. of Projects 80 378 42 19 2 - - - - 521
Nilai Projek (RM j) / Project Value (RM m) 62.14 1,100.85 274.26 387.72 115.65 - - - - 1,940.62
Bilangan Kontraktor /No. of Contractor 47 114 95 23 - - - - - 279
Bilangan Projek / No. of Projects 66 177 112 24 - - - - - 379
Nilai Projek (RM j) / Project Value (RM m) 49.62 427.64 791.57 493.53 - - - - - 1,762.36
Bilangan Kontraktor /No. of Contractor 145 423 231 420 104 87 14 4 5 1,433
Bilangan Projek / No. of Projects 271 687 271 575 113 97 14 4 5 2,037
Nilai Projek (RM j) / Project Value (RM m) 203.08 1,778.88 1,944.66 13,323.38 7,961.69 16,037.95 4,999.18 2,652.04 7,560.29 56,461.15
Bilangan Kontraktor /No. of Contractor 4 11 5 13 10 8 2 2 2 57
Bilangan Projek / No. of Projects 4 16 7 17 10 8 2 2 2 68
Nilai Projek (RM j) / Project Value (RM m) 2.96 43.46 45.61 456.59 644.91 1,618.84 717.62 1,300.30 2,767.68 7,597.97
Bilangan Kontraktor /No. of Contractor 525 1,259 394 492 116 95 16 6 7 2,910
Bilangan Projek / No. of Projects 767 1,775 456 653 125 105 16 6 7 3,910
Nilai Projek (RM j) / Project Value (RM m) 584.48 4,379.46 3,224.61 14,962.28 8,722.25 17,656.79 5,716.80 3,952.34 10,327.97 69,526.98
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Asing
Foreign
Jumlah
Total
G2
G3
G7
G1
Note : Figures are subject to change due to late notification.
G5
G6
G4
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Jadual 2.4 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada September 2015.
Jumlah Bilangan
Projek
Jumlah Nilai Projek
(RM juta)
Total Number of
Projects
Total Project Value (RM
million)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.46 1,934 22,699.20 6,106 108,339.26
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,424 1,060.44 372 286.26 1,052 774.18
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,682 9,197.69 1,013 2,427.37 2,669 6,770.32
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,073 7,689.71 201 1,404.39 872 6,285.32
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,381 30,593.36 245 5,631.90 1,136 24,961.46
Melebihi 50 hingga 100 / Exceeding 50 to 100 259 18,566.10 57 4,089.62 202 14,476.48
Melebihi 100 hingga 300 / Exceeding 100 to 300 181 30,399.21 42 7,005.78 139 23,393.43
Melebihi 300 hingga 500 / Exceeding 300 to 500 25 9,743.69 4 1,853.88 21 7,889.81
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 10 7,394.46 - - 10 7,394.46
Melebihi 1,000 / Exceeding 1,000 5 16,393.80 - - 5 16,393.80
2014 7,765 162,221.60 1,662 22,412.87 6,103 139,808.73
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,463 1,091.02 357 271.12 1106 819.9
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,444 8,560.07 807 1,957.89 2637 6,602.18
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,029 7,524.36 185 1,358.22 844 6,166.14
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,292 28,828.04 221 5,289.03 1071 23,539.01
Melebihi 50 hingga 100 / Exceeding 50 to 100 284 19,703.77 54 3,546.35 230 16,157.42
Melebihi 100 hingga 300 / Exceeding 100 to 300 177 30,702.77 29 5,030.78 148 25,671.99
Melebihi 300 hingga 500 / Exceeding 300 to 500 40 14,771.69 7 2,599.23 33 12,172.46
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 22 15,148.24 1 854.73 21 14,293.51
Melebihi 1,000 / Exceeding 1,000 14 35,891.64 1 1,505.52 13 34,386.12
2015 3,910 69,526.99 790 10,049.08 3,120 59,477.91
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 767 584.48 163 127.53 604 456.95
Melebihi 1 hingga 5 / Exceeding 1 to 5 1,775 4,379.47 407 967.45 1368 3,412.02
Melebihi 5 hingga 10 / Exceeding 5 to 10 456 3,224.60 92 661.8 364 2,562.80
Melebihi 10 hingga 50 / Exceeding 10 to 50 653 14,962.28 89 1,923.44 564 13,038.84
Melebihi 50 hingga 100 / Exceeding 50 to 100 125 8,722.25 24 1,850.36 101 6,871.89
Melebihi 100 hingga 300 / Exceeding 100 to 300 105 17,656.79 12 1,986.27 93 15,670.52
Melebihi 300 hingga 500 / Exceeding 300 to 500 16 5,716.80 - - 16 5,716.80
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 6 3,952.34 2 1,282.23 4 2,670.11
Melebihi 1,000 / Exceeding 1,000 7 10,327.98 1 1,250.00 6 9,077.98
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Projek Kerajaan
Government Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification.
Total may not necessarily add up due to rounding.
Julat Nilai Projek (RM juta)
Project Value Range (RM million)
Table 2.4 - Number and Value of Projects Awarded By Status of Contractor and Project Value Range as of September 2015.
Projek Swasta
Private Project
Jadual 2.5 - Bilangan Projek Diaward Berdasarkan Julat Nilai dan Kategori Projek Pada September 2015. Table 2.5 - Number of Projects Awarded By Project Value Range and Category as of September 2015.
Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1000Melebihi 1,000
Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000
Exceeding to
1,000
2013 8,040 1,424 3,682 1,073 1,381 259 181 25 10 5
Kediaman
Residential2,317 311 953 333 552 92 72 4 - -
Bukan Kediaman
Non Residential3,011 523 1,392 429 488 97 62 11 7 2
Kemudahan Sosial
Social Amenities718 158 360 79 88 12 15 5 1 -
Infrastruktur
Infrastructure1,994 432 977 232 253 58 32 5 2 3
2014 7,765 1,463 3,444 1,029 1,292 284 177 40 22 14
Kediaman
Residential2,330 340 939 336 505 127 66 13 3 1
Bukan Kediaman
Non Residential2,814 505 1255 407 448 87 72 20 11 9
Kemudahan Sosial
Social Amenities686 154 340 80 91 10 7 1 3 -
Infrastruktur
Infrastructure1,935 464 910 206 248 60 32 6 5 4
2015 3,910 767 1,775 456 653 125 105 16 6 7
Kediaman
Residential1,153 166 457 140 253 68 54 10 4 1
Bukan Kediaman
Non Residential1,463 296 671 178 243 39 26 6 - 4
Kemudahan Sosial
Social Amenities329 67 179 39 37 2 5 - - -
Infrastruktur
Infrastructure965 238 468 99 120 16 20 - 2 2
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Projek
Project Category
Jumlah Bilangan
Projek
Total Number of
Projects
Jadual 2.6 - Nilai Projek Diaward Berdasarkan Julat Nilai dan Kategori Projek Pada September 2015. Table 2.6 - Value of Projects Awarded By Project Value Range and Category as of September 2015.
Melebihi
0.5 hingga 1
Melebihi
1 hingga 5
Melebihi
5 hingga 10
Melebihi
10 hingga 50
Melebihi
50 hingga 100
Melebihi
100 hingga 300
Melebihi
300 hingga 500
Melebihi
500 hingga 1000Melebihi 1,000
Exceeding
0.5 to 1
Exceeding
1 to 5
Exceeding
5 to 10
Exceeding
10 to 50
Exceeding
50 to 100
Exceeding
100 to 300
Exceeding
300 to 500
Exceeding
500 to 1,000
Exceeding to
1,000
2013 131,038.45 1,060.44 9,197.68 7,689.71 30,593.36 18,566.11 30,399.21 9,743.68 7,394.46 16,393.80
Kediaman
Residential37,774.20 236.83 2,486.90 2,431.31 12,985.21 6,367.89 11,704.55 1,561.51 - -
Bukan Kediaman
Non Residential52,306.69 386.97 3,517.08 3,093.37 10,101.25 7,107.02 10,964.35 4,106.74 4,998.72 8,031.19
Kemudahan Sosial
Social Amenities9,699.08 117.12 822.68 548.33 2,110.53 824.52 2,323.03 2,104.87 848.00 -
Infrastruktur
Infrastructure31,258.48 319.52 2,371.02 1,616.70 5,396.37 4,266.68 5,407.28 1,970.56 1,547.74 8,362.61
2014 162,221.54 1,091.01 8,560.06 7,524.34 28,828.03 19,703.77 30,702.76 14,771.70 15,148.23 35,891.64
Kediaman
Residential44,871.93 257.62 2,457.34 2,491.72 11,418.68 8,941.03 11,127.73 4,799.28 2,361.53 1,017.00
Bukan Kediaman
Non Residential75,084.65 375.78 3,149.70 2,920.46 9,752.90 5,923.45 12,881.29 7,299.09 6,997.61 25,784.37
Kemudahan Sosial
Social Amenities7,996.55 117.24 833.40 586.43 1,918.84 655.67 1,399.47 488.00 1,997.50 -
Infrastruktur
Infrastructure34,268.41 340.37 2,119.62 1,525.73 5,737.61 4,183.62 5,294.27 2,185.33 3,791.59 9,090.27
2015 69,526.97 584.48 4,379.45 3,224.61 14,962.28 8,722.25 17,656.79 5,716.80 3,952.34 10,327.97
Kediaman
Residential29,544.58 129.73 1,207.52 992.07 6,007.30 4,728.96 9,184.47 3,561.92 2,670.11 1,062.50
Bukan Kediaman
Non Residential24,952.44 225.01 1,642.22 1,258.92 5,538.01 2,657.86 4,648.10 2,154.88 - 6,827.44
Kemudahan Sosial
Social Amenities2,621.97 50.93 437.81 287.37 805.25 133.00 907.61 - - -
Infrastruktur
Infrastructure12,407.98 178.81 1,091.90 686.25 2,611.72 1,202.43 2,916.61 - 1,282.23 2,438.03
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Projek
Project Category
Jumlah Nilai Projek
(RM j)
Total Project Value
(RM m)
Jadual 2.7 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada September 2015. Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of September 2015.
Jumlah Bilangan
Projek
Total Number of
Projects
2013 8,040 1,446 302 148 337 362 576 547 613 52 1,520 348 531 504 754
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1 1,424 276 58 29 78 68 108 90 126 6 220 85 95 75 110
Melebihi 1 hingga 5
Exceeding 1 to 5 3,682 626 155 80 148 148 328 234 325 24 621 162 218 231 382
Melebihi 5 hingga 10
Exceeding 5 to 10 1,073 177 37 13 60 58 74 82 77 8 209 42 88 65 83
Melebihi 10 hingga 50
Exceeding 10 to 50 1,381 280 42 22 41 73 53 106 70 12 348 53 97 88 96
Melebihi 50 hingga 100
Exceeding 50 to 100 259 60 7 3 6 9 9 15 12 2 53 3 23 24 33
Melebihi 100 hingga 300
Exceeding 100 to 300 181 22 3 1 4 5 3 18 2 - 62 2 9 12 38
Melebihi 300 hingga 500
Exceeding 300 to 500 25 3 - - - - - 1 - - 4 - 1 7 9
Melebihi 500 hingga 1,000
Exceeding 500 to 1,000 10 2 - - - 1 1 - - - 3 - - 1 2
Melebihi 1,000
Exceeding 1,000 5 - - - - - - 1 1 - - 1 - 1 1
2014 7,765 1,328 274 134 312 454 577 545 590 40 1,587 266 385 469 804
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1 1,463 267 49 27 77 99 100 110 107 10 331 53 54 53 126
Melebihi 1 hingga 5
Exceeding 1 to 5 3,444 545 137 68 150 191 309 222 332 19 620 141 160 192 358
Melebihi 5 hingga 10
Exceeding 5 to 10 1,029 175 35 25 44 70 73 94 68 6 189 24 50 78 98
Melebihi 10 hingga 50
Exceeding 10 to 50 1,292 224 46 9 34 82 80 87 64 4 318 39 80 106 119
Melebihi 50 hingga 100
Exceeding 50 to 100 284 60 4 - 2 8 10 16 8 1 71 5 27 25 47
Melebihi 100 hingga 300
Exceeding 100 to 300 177 32 3 4 5 1 4 15 7 - 40 4 12 12 38
Melebihi 300 hingga 500
Exceeding 300 to 500 40 13 - - - - - 1 1 - 13 - - 2 10
Melebihi 500 hingga 1,000
Exceeding 500 to 1,000 22 4 - 1 - 1 1 - 3 - 3 - 1 1 7
Melebihi 1,000
Exceeding 1,000 14 8 - - - 2 - - - - 2 - 1 - 1
Johor Kedah
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Julat Nilai Projek
(RM juta)
Project Value Range
(RM million)
Kelantan MelakaNegeri
SembilanPahang
Total may not necessarily add up due to rounding.
Pulau
Pinang
Note : Figures are subject to change due to late notification
PerlisPerak Wilayah
PersekutuanSelangor Sabah SarawakTerengganu
Jadual 2.7 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada September 2015. Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of September 2015.
Jumlah Bilangan
Projek
Total Number of
Projects
Johor Kedah
Julat Nilai Projek
(RM juta)
Project Value Range
(RM million)
Kelantan MelakaNegeri
SembilanPahang
Pulau
PinangPerlisPerak
Wilayah
PersekutuanSelangor Sabah SarawakTerengganu
2015 3,910 632 179 75 155 251 227 276 259 16 853 163 193 267 364
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1 767 121 36 17 34 76 28 63 67 5 168 37 31 50 34
Melebihi 1 hingga 5
Exceeding 1 to 5 1,775 297 76 34 74 109 123 123 126 9 351 83 92 103 175
Melebihi 5 hingga 10
Exceeding 5 to 10 456 58 26 10 20 30 23 28 35 - 94 19 37 34 42
Melebihi 10 hingga 50
Exceeding 10 to 50 653 99 34 9 21 30 40 42 27 2 179 20 24 61 65
Melebihi 50 hingga 100
Exceeding 50 to 100 125 29 5 4 3 5 3 12 1 - 30 3 3 12 15
Melebihi 100 hingga 300
Exceeding 100 to 300 105 20 2 1 2 1 8 5 2 - 28 1 6 5 24
Melebihi 300 hingga 500
Exceeding 300 to 500 16 4 - - 1 - 1 3 - - 2 - - - 5
Melebihi 500 hingga 1,000
Exceeding 500 to 1,000 6 2 - - - - - - 1 - - - - 1 2
Melebihi 1,000
Exceeding 1,000 7 2 - - - - 1 - - - 1 - .- 1 2
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
Total may not necessarily add up due to rounding.
Jadual 2.8 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada September 2015.
Table 2.8 - Value of Projects Awarded By Site Location and Project Value Range as of September 2015.
2013 131,038.43 19,598.81 2,548.09 1,265.56 2,898.37 4,706.24 4,548.00 9,849.88 9,024.03 511.53 29,536.00 4,607.45 6,846.28 16,246.99 18,851.20
Melebihi 0.5 hingga 1
Exceeding 0.5 to 11,060.43 202.40 42.04 22.40 57.81 48.24 79.87 64.59 99.25 4.50 162.09 59.79 73.36 53.81 90.28
Melebihi 1 hingga 5
Exceeding 1 to 59,197.69 1,566.10 401.07 183.82 399.55 376.88 835.09 584.44 819.07 53.38 1,540.29 364.22 603.93 586.56 883.29
Melebihi 5 hingga 10
Exceeding 5 to 107,689.71 1,288.20 256.00 90.07 444.11 427.65 521.79 589.06 542.95 57.46 1,504.56 290.33 609.42 469.04 599.07
Melebihi 10 hingga 50
Exceeding 10 to 5030,593.37 6,201.29 801.54 581.19 814.59 1,654.33 1,087.29 2,303.80 1,352.98 279.95 8,323.73 1,050.60 2,014.26 1,882.77 2,245.05
Melebihi 50 hingga 100
Exceeding 50 to 10018,566.09 4,073.48 469.60 199.46 465.49 607.73 683.18 1,048.29 843.75 116.24 4,015.90 199.62 1,636.64 1,823.08 2,383.63
Melebihi 100 hingga 300
Exceeding 100 to 30030,399.19 3,761.65 577.84 188.62 716.82 782.78 532.45 2,604.47 345.20 - 10,243.57 351.65 1,513.71 2,053.32 6,727.11
Melebihi 300 hingga 500
Exceeding 300 to 5009,743.69 1,326.26 - - - - - 404.66 - - 1,701.06 - 394.96 2,758.13 3,158.62
Melebihi 500 hingga 1,000
Exceeding 500 to 1,0007,394.47 1,179.43 - - - 808.63 808.33 - - - 2,044.80 - - 880.34 1,672.94
Melebihi 1,000
Exceeding 1,00016,393.79 - - - - - - 2,250.57 5,020.83 - - 2,291.24 - 5,739.94 1,091.21
2014 162,221.60 47,344.80 2,476.53 2,202.36 2,464.48 7,054.66 5,206.86 6,873.32 6,436.25 305.29 36,604.77 2,517.57 10,407.86 8,249.20 24,077.65
Melebihi 0.5 hingga 1
Exceeding 0.5 to 11,091.00 197.23 37.26 19.42 56.60 70.27 74.87 83.72 81.68 7.56 246.48 38.94 38.61 39.90 98.46
Melebihi 1 hingga 5
Exceeding 1 to 58,560.07 1,345.21 337.88 157.39 374.04 471.01 786.48 550.41 814.30 38.60 1,552.19 361.42 410.92 505.16 855.06
Melebihi 5 hingga 10
Exceeding 5 to 107,524.36 1,250.72 247.50 188.55 327.37 540.70 541.98 705.45 472.48 39.90 1,380.13 169.17 370.59 578.93 710.89
Melebihi 10 hingga 50
Exceeding 10 to 5028,828.02 5,014.14 978.10 168.23 575.79 1,875.44 1,768.95 1,961.49 1,193.60 134.73 7,518.63 764.33 1,728.02 2,425.74 2,720.83
Melebihi 50 hingga 100
Exceeding 50 to 10019,703.78 4,154.20 258.55 - 164.10 535.98 697.52 1,103.24 501.52 84.50 4,964.37 366.69 1,834.52 1,665.62 3,372.97
Melebihi 100 hingga 300
Exceeding 100 to 30030,702.79 6,007.67 617.24 814.04 966.58 267.00 487.80 2,131.01 1,227.91 - 6,930.80 817.02 2,021.45 1,877.52 6,536.75
Melebihi 300 hingga 500
Exceeding 300 to 50014,771.70 4,432.53 - - - - - 338.00 306.74 - 5,221.02 - - 654.95 3,818.46
Melebihi 500 hingga 1,000
Exceeding 500 to 1,00015,148.24 2,632.35 - 854.73 - 753.51 849.26 - 1,838.02 - 2,241.63 - 530.13 501.38 4,947.23
Melebihi 1,000
Exceeding 1,00035,891.64 22,310.75 - - - 2,540.75 - - - - 6,549.52 - 3,473.62 - 1,017.00
Julat Nilai Projek (RM juta)
Project Value Range (RM m)
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Melaka Wilayah
PersekutuanPahangJohor Sabah Sarawak
Pulau
Pinang
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Selangor
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kedah Kelantan TerengganuPerak PerlisNegeri
Sembilan
Jadual 2.8 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada September 2015.
Table 2.8 - Value of Projects Awarded By Site Location and Project Value Range as of September 2015.
Julat Nilai Projek (RM juta)
Project Value Range (RM m)
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Melaka Wilayah
PersekutuanPahangJohor Sabah Sarawak
Pulau
PinangSelangorKedah Kelantan TerengganuPerak Perlis
Negeri
Sembilan
2015 69,526.98 15,511.53 2,013.82 913.83 1,612.66 1,680.50 4,076.50 4,167.00 2,327.56 64.55 14,532.53 1,159.38 2,139.19 6,083.12 13,244.81
Melebihi 0.5 hingga 1
Exceeding 0.5 to 1584.48 92.4 26.9 13.07 25.65 57.63 22.46 45.67 52.21 3.64 126.47 30.02 23.51 39.15 25.7
Melebihi 1 hingga 5
Exceeding 1 to 54,379.44 736.55 176.39 78.83 178.77 288.53 309.4 301.59 310.95 20.62 854.09 206.83 233.32 263.62 419.95
Melebihi 5 hingga 10
Exceeding 5 to 103,224.61 403.15 179.15 82.17 138.39 200.2 155.88 207.1 250.41 - 668.79 144.89 261.65 238.04 294.79
Melebihi 10 hingga 50
Exceeding 10 to 5014,962.27 2,148.36 796.38 252.14 465.58 664.64 733.46 981.39 570.02 40.29 4,531.89 406.14 489.85 1,391.46 1,490.67
Melebihi 50 hingga 100
Exceeding 50 to 1008,722.27 1,980.29 333.4 350.95 182.87 347.11 195.3 858.82 77.5 - 1,970.13 243 223 934.19 1,025.71
Melebihi 100 hingga 300
Exceeding 100 to 30017,656.80 3,784.83 501.6 136.67 294.33 122.39 1,093.65 715.85 421.99 - 4,679.42 128.5 907.86 873.73 3,995.98
Melebihi 300 hingga 500
Exceeding 300 to 5005,716.80 1,552.99 - - 327.07 - 378.32 1,056.58 - - 639.24 - - - 1,762.60
Melebihi 500 hingga 1,000
Exceeding 500 to 1,0003,952.34 1,300.30 - - - - - - 644.48 - - - - 637.75 1,369.81
Melebihi 1,000
Exceeding 1,00010,327.97 3,512.66 - - - - 1,188.03 - - - 1,062.50 - - 1,705.18 2,859.60
Note : Figures are subject to change due to late notificationNota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Jadual 2.9 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada September 2015. Table 2.9 - Number and Value of Projects Awarded By Status of Contractors and Project Value Range as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.45 132 15,295.46 7,908 115,742.99
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,424 1,060.43 7 5.50 1,417 1,054.93
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,682 9,197.69 40 101.81 3,642 9,095.88
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,073 7,689.71 20 142.36 1,053 7,547.35
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,381 30,593.36 30 696.53 1,351 29,896.83
Melebihi 50 hingga 100 / Exceeding 50 to 100 259 18,566.10 17 1,208.32 242 17,357.78
Melebihi 100 hingga 300 / Exceeding 100 to 300 181 30,399.20 9 1,711.86 172 28,687.34
Melebihi 300 hingga 500 / Exceeding 300 to 500 25 9,743.69 5 1,778.14 20 7,965.55
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 10 7,394.47 2 1,619.75 8 5,774.72
Melebihi 1,000 / Exceeding 1,000 5 16,393.80 2 8,031.19 3 8,362.61
2014 7,765 162,221.58 174 40,665.87 7,591 121,555.71
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,463 1,091.01 6 4.81 1,457 1,086.20
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,444 8,560.07 46 104.98 3,398 8,455.09
Melebihi 5 hingga 10 / Exceeding 5 to 10 1,029 7,524.35 24 175.47 1,005 7,348.88
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,292 28,828.03 40 1,058.68 1,252 27,769.35
Melebihi 50 hingga 100 / Exceeding 50 to 100 284 19,703.77 10 798.63 274 18,905.14
Melebihi 100 hingga 300 / Exceeding 100 to 300 177 30,702.77 21 3,931.42 156 26,771.34
Melebihi 300 hingga 500 / Exceeding 300 to 500 40 14,771.70 8 2,749.25 32 12,022.45
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 22 15,148.24 7 4,144.23 15 11,004.01
Melebihi 1,000 / Exceeding 1,000 14 35,891.64 12 27,698.39 2 8,193.25
2015 3,910 69,526.98 68 7,597.97 3,842 61,929.01
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 767 584.48 4 2.96 763 581.52
Melebihi 1 hingga 5 / Exceeding 1 to 5 1,775 4,379.47 16 43.46 1,759 4,336.01
Melebihi 5 hingga 10 / Exceeding 5 to 10 456 3,224.61 7 45.61 449 3,179.00
Melebihi 10 hingga 50 / Exceeding 10 to 50 653 14,962.28 17 456.59 636 14,505.68
Melebihi 50 hingga 100 / Exceeding 50 to 100 125 8,722.25 10 644.91 115 8,077.34
Melebihi 100 hingga 300 / Exceeding 100 to 300 105 17,656.79 8 1,618.84 97 16,037.95
Melebihi 300 hingga 500 / Exceeding 300 to 500 16 5,716.80 2 717.62 14 4,999.18
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 6 3,952.34 2 1,300.30 4 2,652.04
Melebihi 1,000 / Exceeding 1,000 7 10,327.98 2 2,767.68 5 7,560.29
Kontraktor Asing / Foreign Contractors Kontraktor Tempatan / Local Contractors
Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Julat Nilai Projek (RM juta)
Project Value Range (RM million)
Jumlah Bilangan Projek
Total Number of Projects
Jumlah Nilai Projek
(RM juta)
Total Project Value
(RM m)
2013 8,040 1,446 302 148 337 362 576 547 613 52 1,520 348 531 504 754
Kediaman
Residential 2,317 434 105 27 106 113 179 177 239 11 509 50 81 83 203
Bukan Kediaman
Non Residential 3,011 597 99 43 116 133 181 231 206 12 553 181 205 193 261
Kemudahan Sosial
Social Amenities 718 81 25 22 32 28 57 43 46 19 120 32 70 59 84
Infrastruktur
Infrastructure 1,994 334 73 56 83 88 159 96 122 10 338 85 175 169 206
2014 7,765 1,328 274 134 312 454 577 545 590 40 1,587 266 385 469 804
Kediaman
Residential 2,330 354 95 40 120 151 196 164 228 6 561 55 81 89 190
Bukan Kediaman
Non Residential 2,814 566 96 54 85 131 210 209 215 16 515 97 134 168 318
Kemudahan Sosial
Social Amenities 686 75 29 15 22 36 55 55 45 7 119 42 49 51 86
Infrastruktur
Infrastructure 1,935 333 54 25 85 136 116 117 102 11 392 72 121 161 210
2015 3,910 632 179 75 155 251 227 276 259 16 853 163 193 267 364
Kediaman
Residential 1,153 208 63 9 41 88 76 91 101 5 269 32 32 31 107
Bukan Kediaman
Non Residential 1,463 234 78 32 56 87 89 95 119 4 255 81 70 84 179
Kemudahan Sosial
Social Amenities 329 53 11 12 15 16 17 31 21 4 41 25 12 46 25
Infrastruktur
Infrastructure 965 137 27 22 43 60 45 59 18 3 288 25 79 106 53
Selangor
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Perlis SabahTerengganu
Jadual 2.10 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Kategori Projek Pada September 2015. Table 2.10 - Number of Projects Awarded By Site Location and Project Category as of September 2015
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kedah KelantanJohorKategori Projek Project
Category
Jumlah Bilangan
Projek
Total Number of
Projects
PahangMelakaNegeri
SembilanPerak
Pulau
Pinang
Wilayah
PersekutuanSarawak
Jadual 2.11 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Kategori Projek Pada September 2015.
Table 2.11 - Value of Projects Awarded By Site Location and Project Category as of September 2015.
2013 131,038.42 19,598.80 2,548.11 1,265.57 2,898.36 4,706.23 4,548.00 9,849.88 9,024.03 511.53 29,535.99 4,607.46 6,846.28 16,246.99 18,851.19
Kediaman
Residential37,774.19 7,904.73 740.06 347.46 825.05 1,499.48 1,025.16 4,230.76 1,379.62 73.27 10,973.24 288.97 1,058.32 919.94 6,508.13
Bukan Kediaman
Non Residential52,306.66 7,364.13 1,037.41 199.07 939.43 1,710.50 1,142.45 2,167.85 1,312.41 43.20 12,364.27 3,617.50 2,805.42 9,739.35 7,863.67
Kemudahan Sosial
Social Amenities9,699.08 1,948.75 75.25 177.10 179.86 621.13 443.47 199.11 527.30 210.30 1,517.85 206.30 396.45 1,354.90 1,841.31
Infrastruktur
Infrastructure31,258.49 2,381.19 695.39 541.94 954.02 875.12 1,936.92 3,252.16 5,804.70 184.76 4,680.63 494.69 2,586.09 4,232.80 2,638.08
2014 162,221.58 47,344.80 2,476.53 2,202.36 2,464.47 7,054.66 5,206.85 6,873.33 6,436.24 305.29 36,604.77 2,517.58 10,407.85 8,249.20 24,077.65
Kediaman
Residential44,871.93 8,439.37 895.42 208.80 823.99 1,656.12 1,152.59 3,085.29 1,868.30 15.01 12,694.75 217.68 2,039.17 908.49 10,866.95
Bukan Kediaman
Non Residential75,084.67 35,155.69 720.16 472.59 966.10 1,140.56 2,562.62 2,459.77 3,704.15 170.10 10,328.54 605.06 5,055.57 2,728.99 9,014.77
Kemudahan Sosial
Social Amenities7,996.56 858.31 173.48 309.24 84.55 251.22 290.97 330.18 159.48 20.47 2,838.12 127.40 979.81 640.51 932.82
Infrastruktur
Infrastructure34,268.42 2,891.43 687.47 1,211.73 589.83 4,006.76 1,200.67 998.09 704.31 99.71 10,743.36 1,567.44 2,333.30 3,971.21 3,263.11
2015 69,527.01 15,511.54 2,013.82 913.82 1,612.66 1,680.50 4,076.52 4,166.99 2,327.54 64.55 14,532.54 1,159.38 2,139.19 6,083.14 13,244.82
Kediaman
Residential29,544.59 6,861.64 690.97 120.62 417.93 769 553.15 1,846.44 816.81 45.97 8,362.72 146.62 829.84 625.77 7,457.11
Bukan Kediaman
Non Residential24,952.46 6,784.01 883.33 421.42 883.73 396.37 1,378.86 1,773.41 631.08 8.55 3,817.27 730.92 612.15 2,867.88 3,763.48
Kemudahan Sosial
Social Amenities2,621.98 943.6 39.92 52.74 37.58 72.62 75.11 101.66 115.94 4.77 676.23 77.38 36 203.17 185.26
Infrastruktur
Infrastructure12,407.98 922.29 399.6 319.04 273.42 442.51 2,069.40 445.48 763.71 5.26 1,676.32 204.46 661.2 2,386.32 1,838.97
Johor SelangorKelantan PerakPahangKedahKategori Projek
Project Category
Jumlah Nilai Projek
(RM j)
Total Project Value
(RM m)
Note : Figures are subject to change due to late notificationNota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Wilayah
PersekutuanPerlis Sarawak
Pulau
PinangMelaka
Negeri
SembilanTerengganu Sabah
Jadual 2.12 - Bilangan Projek Diaward Berdasarkan Lokasi Tapak dan Sektor Pada September 2015. Table 2.12 - Number of Projects Awarded By Site Location and Sector as of September 2015.
2013 8,040 1,446 302 148 337 362 576 547 613 52 1,520 348 531 504 754
Projek Kerajaan
Government
Projects
1,934 171 99 71 73 49 190 64 124 32 205 108 229 192 327
Projek Swasta
Private Projects 6,106 1,275 203 77 264 313 386 483 489 20 1,315 240 302 312 427
2014 7,765 1,328 274 134 312 454 577 545 590 40 1,587 266 385 469 804
Projek Kerajaan
Government
Projects
1,662 176 66 45 39 63 139 75 108 22 196 117 141 163 312
Projek Swasta
Private Projects 6,103 1152 208 89 273 391 438 470 482 18 1391 149 244 306 492
2015 3,910 632 179 75 155 251 227 276 259 16 853 163 193 267 364
Projek Kerajaan
Government
Projects
790 81 36 37 21 24 35 34 52 9 67 74 82 137 101
Projek Swasta
Private Projects 3,120 551 143 38 134 227 192 242 207 7 786 89 111 130 263
PerlisMelakaNegeri
SembilanPahang Perak
Pulau
Pinang
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Johor Kedah KelantanSektor
Sector
Jum. Bilangan
Projek
Total Number of
Projects
Total may not necessarily add up due to rounding.Note : Figures are subject to change due to late notification
TerengganuWilayah
PersekutuanSarawakSelangor Sabah
Jadual 2.13 - Nilai Projek Diaward Berdasarkan Lokasi Tapak dan Sektor Pada September 2015. Table 2.13 - Value of Projects Awarded By Site Location and Sector as of September 2015.
2013 131,038.45 19,598.80 2,548.11 1,265.57 2,898.36 4,706.24 4,548.00 9,849.88 9,024.04 511.53 29,535.99 4,607.46 6,846.28 16,247.00 18,851.19
Projek Kerajaan
Government Projects22,699.19 3,015.49 753.45 689.83 666.15 601.44 1,604.34 945.37 1,070.32 381.13 2,838.07 852.29 2,956.05 4,144.06 2,181.20
Projek Swasta
Private Projects108,339.26 16,583.31 1,794.66 575.74 2,232.21 4,104.80 2,943.66 8,904.51 7,953.72 130.40 26,697.92 3,755.17 3,890.23 12,102.94 16,669.99
2014 162,221.58 47,344.79 2,476.53 2,202.36 2,464.48 7,054.66 5,206.86 6,873.33 6,436.25 305.28 36,604.76 2,517.58 10,407.85 8,249.20 24,077.65
Projek Kerajaan
Government Projects22,412.86 1,100.98 894.28 1,559.63 680.16 609.82 1,184.36 831.64 945.82 217.41 4,377.34 1,252.06 2,971.43 2,748.08 3,039.85
Projek Swasta
Private Projects139,808.72 46,243.81 1,582.25 642.73 1,784.32 6,444.84 4,022.50 6,041.69 5,490.43 87.87 32,227.42 1,265.52 7,436.42 5,501.12 21,037.80
2015 69,526.98 15,511.53 2,013.82 913.82 1,612.65 1,680.50 4,076.52 4,166.99 2,327.55 64.55 14,532.54 1,159.37 2,139.20 6,083.13 13,244.81
Projek Kerajaan
Government Projects10,049.09 1,044.84 542.95 488.09 237.53 238.12 442.44 292.78 892.82 16.44 366.81 589.03 912.95 1,865.37 2,118.92
Projek Swasta
Private Projects59,477.89 14,466.69 1,470.87 425.73 1,375.12 1,442.38 3,634.08 3,874.21 1,434.73 48.11 14,165.73 570.34 1,226.25 4,217.76 11,125.89
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Total may not necessarily add up due to rounding.Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
PahangWilayah
PersekutuanSabahSelangorPerlisPulau Pinang SarawakTerengganuKelantan Melaka
Negeri
SembilanJohor Kedah
Sektor
Sector
Jumlah Nilai Projek
(RM juta)
Total Project Value
( RM million)
Perak
Jadual 2.14 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Kategori Projek Pada September 2015. Table 2.14 - Number and Value of Projects Awarded By Status of Contractors and Project Category as of September 2015.
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
Bilangan
Number
Nilai
(RM juta)
Value
(RM million)
2013 8,040 131,038.45 1,934 22,699.20 5,974 93,043.78 0 0.00 132 15,295.47
Kediaman / Residential 2,317 37,774.19 160 2,072.67 2,141 35,371.60 - - 16 329.92
Bukan Kediaman / Non Residential 3,011 52,306.68 347 3,476.04 2,580 36,677.98 - - 84 12,152.66
Kemudahan Sosial / Social Amenities 718 9,699.09 482 5,223.36 234 4,297.33 - - 2 178.40
Infrastruktur / Infrastructure 1,994 31,258.49 945 11,927.13 1,019 16,696.87 - - 30 2,634.49
2014 7,765 162,221.58 1,657 20,366.04 5,934 101,189.68 5 2,046.82 169 38,619.04
Kediaman / Residential 2,330 44,871.94 154 1,927.80 2156 40,832.18 - - 20 2,111.96
Bukan Kediaman / Non Residential 2,814 75,084.67 323 3,305.88 2382 41,186.29 2 307.83 107 30,284.67
Kemudahan Sosial / Social Amenities 686 7,996.56 423 3,201.45 256 3,733.56 - - 7 1,061.55
Infrastruktur / Infrastructure 1,935 34,268.41 757 11,930.91 1140 15,437.65 3 1,738.99 35 5,160.86
2015 3,910 69,526.99 788 9,963.29 3,054 51,965.73 2 85.79 66 7,512.18
Kediaman / Residential 1,153 29,544.59 73 1,275.71 1060 24,132.37 - - 20 4,136.51
Bukan Kediaman / Non Residential 1,463 24,952.43 184 1,413.86 1248 20,599.16 - - 31 2,939.41
Kemudahan Sosial / Social Amenities 329 2,621.98 199 872.53 130 1,749.45 - - - -
Infrastruktur / Infrastructure 965 12,407.99 332 6,401.19 616 5,484.75 2 85.79 15 436.26
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kontraktor Tempatan
Local Contractor
Kontraktor Asing
Foreign Contractor
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Projek Kerajaan
Government Project Kategori Projek
Project Category
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai Projek
(RM juta)
Total Project Value
(RM million)
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Projek Swasta
Private Project
Total may not necessarily add up due to rounding.
Jadual 2.15 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kontrak dan Kategori Projek Pada September 2015. Table 2.15 - Number and Value of Projects Awarded By Type of Contracts and Project Category as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.46 7,685 106,369.35 204 6,476.44 95 17,499.93 24 189.52 32 503.22
Kediaman
Residential2,317 37,774.20 2,263 36,794.35 38 694.57 10 149.17 3 48.96 3 87.15
Bukan Kediaman
Non Residential3,011 52,306.69 2,883 42,193.04 56 883.31 45 9,063.69 11 26.54 16 140.11
Kemudahan Sosial
Social Amenities718 9,699.09 679 8,473.25 27 855.05 8 160.43 3 6.44 1 203.92
Infrastruktur
Infrastructure1,994 31,258.48 1,860 18,908.71 83 4,043.51 32 8,126.64 7 107.58 12 72.04
2014 7,765 162,221.57 7,525 140,259.11 128 7,995.46 76 6,536.49 6 225.87 30 7,204.64
Kediaman
Residential2,330 44,871.94 2280 44,427.30 33 359.93 10 43.81 1 4.59 6 36.31
Bukan Kediaman
Non Residential2,814 75,084.66 2738 64,605.52 38 1,346.18 24 4,033.65 4 208.9 10 4,890.41
Kemudahan Sosial
Social Amenities686 7,996.56 661 7,877.58 19 113.34 5 4.92 - - 1 0.72
Infrastruktur
Infrastructure1,935 34,268.41 1846 23,348.71 38 6,176.01 37 2,454.11 1 12.38 13 2,277.20
2015 3,910 69,526.98 3,812 62,573.15 51 1,957.59 32 2,289.77 3 86.83 12 2,619.64
Kediaman
Residential1,153 29,544.58 1139 28,997.34 13 387.24 1 160 - - - -
Bukan Kediaman
Non Residential1,463 24,952.43 1426 19,969.52 16 541.33 16 1,831.79 1 75 4 2,534.79
Kemudahan Sosial
Social Amenities329 2,621.98 326 2,615.67 - - 2 5.51 - - 1 0.8
Infrastruktur
Infrastructure965 12,407.99 921 10,990.62 22 1,029.02 13 292.47 2 11.83 7 84.05
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Total may not necessarily add up due to rounding.
Konvensional
Conventional
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Kategori Projek
Project Category
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai
Projek (RM j)
Total Project
Value (RM m)
Jenis Kontrak / Type of Contract
Reka & Bina
Design & Build
Bina, Kendali & Pindah
Built, Operate & Transfer
(BOT)
Turnkey
Engineering, Procurement,
Construction and
Commissioning (EPCC)
Jadual 2.16 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Pengkhususan Kerja Pada September 2015. Table 2.16 - Number and Value of Projects Awarded By Status of Contractor and Work Specialisation as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.45 1,934 22,699.19 5,974 93,043.78 - - 132 15,295.48
Bangunan / Building 4,782 81,877.82 742 9,322.43 3,963 68,711.63 - - 77 3,843.76
Kejuruteraan Awam / Civil Engineering 2,577 25,985.02 1,037 11,886.11 1,517 13,391.05 - - 23 707.86
Elektrik / Electrical 343 12,366.74 97 1,175.07 224 8,915.31 - - 22 2,276.36
Mekanikal / Mechanical 338 10,808.87 58 315.58 270 2,025.79 - - 10 8,467.50
2014 7,765 162,221.58 1,657 20,366.03 5,934 101,189.68 5 2,046.82 169 38,619.05
Bangunan / Building 4,870 92,564.11 687 7,573.55 4088 74,940.12 1 306.74 94 9,743.70
Kejuruteraan Awam / Civil Engineering 2,291 42,942.99 876 11,749.35 1379 21,078.86 3 1,738.99 33 8,375.79
Elektrik / Electrical 319 7,000.03 57 898.34 241 1,670.27 1 1.09 20 4,430.33
Mekanikal / Mechanical 285 19,714.45 37 144.79 226 3,500.43 - - 22 16,069.23
2015 3,910 69,526.98 788 9,963.29 3,054 51,965.72 2 85.79 66 7,512.18
Bangunan / Building 2,305 44,180.75 339 2,938.36 1931 36,329.22 1 22.27 34 4,890.90
Kejuruteraan Awam / Civil Engineering 1,250 16,928.65 394 6,518.40 835 9,628.85 1 63.52 20 717.88
Elektrik / Electrical 173 2,141.08 31 395.13 135 1,563.83 - - 7 182.12
Mekanikal / Mechanical 182 6,276.50 24 111.4 153 4,443.82 - - 5 1,721.28
Pengkhususan Kerja
Work Specialisation
Jumlah
Bilangan
Projek
Total
Number of
Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kontraktor Tempatan
Local Contractor
Kontraktor Asing
Foreign Contractor
Projek Kerajaan
Government Project
Projek Swasta
Private Project
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Jadual 2.17 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kerja dan Pengkhususan Kerja Pada September 2015. Table 2.17 - Number and Value of Projects Awarded By Type of Work and Work Specialisation as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.47 6,238 120,111.36 598 4,345.28 145 1,224.29 370 2,091.50 397 1,597.51 292 1,668.53
Bangunan / Building 4,782 81,877.83 4,138 78,093.92 146 815.28 105 799.11 50 253.96 105 534.74 238 1,380.82
Kejuruteraan Awam /
Civil Engineering 2,577 25,985.03 1,658 19,917.74 386 3,097.73 28 348.32 195 1,387.68 268 979.18 42 254.38
Elektrik / Electrical 343 12,366.74 226 11,888.09 39 267.97 8 54.59 50 96.65 13 39.20 7 20.24
Mekanikal / Mechanical 338 10,808.87 216 10,211.61 27 164.30 4 22.27 75 353.21 11 44.39 5 13.09
2014 7,765 162,221.58 6,024 150,591.08 596 5,116.17 125 1,532.33 358 2,164.65 369 1,464.20 293 1,353.14
Bangunan / Building 4,870 92,564.10 4,191 88,369.66 183 953.4777499 94 1,137.08 49 243.9145623 111 744.8371904 242 1,115.13
Kejuruteraan Awam /
Civil Engineering 2,291 42,943.00 1459 37,139.68 333 3,627.66 14 129.9447355 218 1,196.70 229 647.709871 38 201.3015691
Elektrik / Electrical 319 7,000.03 210 5,967.93 48 365.8796645 10 248.1858492 33 387.3212939 15 27.259361 3 3.452195
Mekanikal / Mechanical 285 19,714.44 164 19,113.81 32 169.1473899 7 17.121014 58 336.7173873 14 44.39854532 10 33.2515791
2015 3,910 69,526.98 3,004 62,677.20 273 3,670.27 100 602.23 172 960.26 185 694.15 176 922.87
Bangunan / Building 2,305 44,180.75 1,945 42,447.86 82 360.54 62 311.02 28 87.77 52 179.15 136 794.41
Kejuruteraan Awam /
Civil Engineering 1,250 16,928.65 805 12,529.28 168 3,023.60 24 152.79 96 638.97 121 494.27 36 89.75
Elektrik / Electrical 173 2,141.08 131 1,697.12 10 189.41 10 134.18 15 76.36 5 6.80 2 37.22
Mekanikal / Mechanical 182 6,276.50 123 6,002.94 13 96.73 4 4.24 33 157.16 7 13.93 2 1.49
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Pengkhususan Kerja
Work Specialisation
Jumlah
Bilangan
Projek
Total Number
of Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Penyelenggaraan
Maintenance
Projek Baru
New Project
Naik Taraf
Upgrade
Baik Pulih
Repair
Ubah Suai
Renovation
Jenis Kerja / Type of Work
Pembesaran
Expansion
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Note : Figures are subject to change due to late notification
Jadual 2.18 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Jenis Kontrak Pada September 2015. Table 2.18 - Number and Value of Projects Awarded By Status of Contractor and Type of Contracts as of September 2015.
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
2013 8,040 131,038.45 1,934 22,699.19 5,974 93,043.78 0 0.00 132 15,295.48
Konvensional / Conventional 7,685 106,369.35 1,811 18,033.17 5,766 80,727.48 - - 108 7,608.70
Reka & Bina / Design & Build 204 6,476.45 90 3,563.73 99 1,419.11 - - 15 1,493.61
Turnkey 95 17,499.92 20 1,072.38 68 10,254.82 - - 7 6,172.72
Built, Operate & Transfer (BOT) 24 189.52 7 11.29 17 178.23 - - - -
Engineering, Procurement, Construction and
Commissioning (EPCC) 32 503.21 6 18.62 24 464.14 - - 2 20.45
2014 7,765 162,221.58 1,657 20,366.04 5,934 101,189.68 5 2,046.82 169 38,619.04
Konvensional / Conventional 7,525 140,259.10 1587 18,337.87 5785 90,995.45 4 1,740.08 149 29,185.70
Reka & Bina / Design & Build 128 7,995.47 38 1,330.93 83 6,165.79 - - 7 498.75
Turnkey 76 6,536.50 21 573.6 46 558.5 1 306.74 8 5,097.66
Built, Operate & Transfer (BOT) 6 225.87 3 21.47 3 204.4 - - - -
Engineering, Procurement, Construction and
Commissioning (EPCC) 30 7,204.64 8 102.17 17 3,265.54 - - 5 3,836.93
2015 3,910 69,526.97 788 9,963.29 3,054 51,965.72 2 85.79 66 7,512.17
Konvensional / Conventional 3,812 62,573.16 768 8,903.64 2983 48,234.60 1 63.52 60 5,371.40
Reka & Bina / Design & Build 51 1,957.58 11 861.31 36 715.7 1 22.27 3 358.3
Turnkey 32 2,289.76 5 182.73 26 401.85 - - 1 1,705.18
Built, Operate & Transfer (BOT) 3 86.83 2 11.83 1 75 - - - -
Engineering, Procurement, Construction and
Commissioning (EPCC) 12 2,619.64 2 3.78 8 2,538.57 - - 2 77.29
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kontrak
Type of Contract
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai
Projek (RM j)
Total Project
Value (RM m)
Kontraktor Tempatan / Local Contractor Kontraktor Asing / Foreign Contractor
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Jadual 2.19 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kerja dan Jenis Kontrak Pada September 2015. Table 2.19 - Number and Value of Projects Awarded By Type of Work and Type of Contracts as of September 2015.
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
Bilangan
Number
Nilai
(RM j)
Value
(RM m)
2013 8,040 131,038.48 6,238 120,111.35 598 4,345.29 145 1,224.29 370 2,091.50 397 1,597.52 292 1,668.53
Konvensional / Conventional 7,685 106,369.36 5,973 96,238.24 566 4,020.63 133 1,108.25 361 1,961.24 372 1,414.87 280 1,626.13
Reka & Bina / Design & Build 204 6,476.44 147 5,963.36 21 215.34 6 88.07 4 10.77 20 167.82 6 31.08
Turnkey 95 17,499.93 79 17,358.50 6 100.20 4 23.82 - - 2 8.66 4 8.75
Built, Operate & Transfer (BOT) 24 189.53 14 75.19 4 8.36 - - 2 98.75 2 4.66 2 2.57
Engineering, Procurement,
Construction and Commissioning
(EPCC)
32 503.22 25 476.06 1 0.76 2 4.15 3 20.74 1 1.51 - -
2014 7,765 162,221.59 6,024 150,591.09 596 5,116 125 1,532.33 358 2,164.65 369 1,464.21 293 1,353.14
Konvensional / Conventional 7,525 140,259.11 5834 129,282.24 574 4,839.05 115 1,290.03 352 2,146.55 365 1,426.61 285 1,274.63
Reka & Bina / Design & Build 128 7,995.46 104 7,697.43 7 154.22 4 22.27 2 6.34 4 37.6 7 77.6
Turnkey 76 6,536.51 62 6,218.28 9 105.38 4 211.94 - - - - 1 0.91
Built, Operate & Transfer (BOT) 6 225.87 3 205.4 1 12.38 2 8.09 - - - - - -
Engineering, Procurement,
Construction and Commissioning
(EPCC)
30 7,204.64 21 7,187.74 5 5.14 - - 4 11.76 - - - -
2015 3,910 69,526.98 3,004 62,677.21 273 3,670.27 100 602.23 172 960.26 185 694.14 176 922.87
Konvensional / Conventional 3,812 62,573.15 2927 56,626.06 264 2,868.98 95 519.9 171 959.61 181 686.54 174 912.06
Reka & Bina / Design & Build 51 1,957.59 41 1,148.02 7 792.24 1 9.5 - - 1 1.58 1 6.25
Turnkey 32 2,289.76 23 2,205.70 - - 4 72.83 1 0.65 3 6.02 1 4.56
Built, Operate & Transfer (BOT) 3 86.83 3 86.83 - - - - - - - - - -
Engineering, Procurement,
Construction and Commissioning
(EPCC)
12 2,619.65 10 2,610.60 2 9.05 - - - - - - - -
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kerja / Type of Work
Penyelenggaraan
Maintenance
Projek Baru
New Project
Naik Taraf
Upgrade
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Note : Figures are subject to change due to late notification
Pembesaran
ExpansionJenis Kontrak
Type of Contracts
Jumlah
Bilangan
Projek
Total
Number of
Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Baik Pulih
Repair
Ubah Suai
Renovation
Total may not necessarily add up due to rounding.
Jadual 2.20 - Bilangan dan Nilai Projek Diaward Berdasarkan Jenis Kerja dan Kategori Projek Pada September 2015. Table 2.20 - Number and Value of Projects Awarded By Type of Work and Projek Category as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.44 6,238 120,111.35 598 4,345.28 145 1,224.30 370 2,091.49 397 1,597.50 292 1,668.52
Kediaman
Residential 2,317 37,774.19 2,183 37,067.02 13 38.18 14 126.37 57 271.69 31 222.28 19 48.65
Bukan Kediaman
Non Residential 3,011 52,306.68 2,393 48,643.68 141 574.42 81 706.22 104 633.90 66 300.94 226 1,447.52
Kemudahan Sosial
Social Amenities 718 9,699.08 501 8,708.82 73 435.76 23 132.41 40 72.10 49 242.51 32 107.48
Infrastruktur
Infrastructure 1,994 31,258.49 1,161 25,691.83 371 3,296.92 27 259.30 169 1,113.80 251 831.77 15 64.87
2014 7,765 162,221.59 6,024 150,591.09 596 5,116.17 125 1,532.34 358 2,164.66 369 1,464.20 293 1,353.13
Kediaman
Residential 2,330 44,871.95 2206 44,449.11 28 80.92 9 47.13 34 106.39 31 147.34 22 41.06
Bukan Kediaman
Non Residential 2,814 75,084.66 2219 71,192.99 151 805.2 82 958.42 99 711.78 53 368.07 210 1,048.20
Kemudahan Sosial
Social Amenities 686 7,996.56 422 6,782.89 96 336.9 18 131.43 38 185.75 66 331.59 46 228
Infrastruktur
Infrastructure 1,935 34,268.42 1177 28,166.10 321 3,893.15 16 395.36 187 1,160.74 219 617.2 15 35.87
2015 3,910 69,527.02 3,004 62,677.20 273 3,670.28 100 602.24 172 960.27 185 694.15 176 922.88
Kediaman
Residential 1,153 29,544.60 1095 29,377.72 9 26.67 4 9.28 18 69.02 17 49.8 10 12.11
Bukan Kediaman
Non Residential 1,463 24,952.45 1093 23,205.10 85 473.14 67 302.32 47 175.61 37 161.22 134 635.06
Kemudahan Sosial
Social Amenities 329 2,621.98 215 2,071.05 44 144.15 11 61.64 15 73.62 26 65.01 18 206.51
Infrastruktur
Infrastructure 965 12,407.99 601 8,023.33 135 3,026.32 18 229 92 642.02 105 418.12 14 69.2
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Kategori Projek
Project Category
Jumlah
Bilangan
Projek
Total Number
of Projects
Jumlah Nilai
Projek
(RM j)
Total Project
Value
(RM m)
Note : Figures are subject to change due to late notification
Total may not necessarily add up due to rounding.
Baik Pulih
Repair
Penyelenggaraan
Maintenance
Jenis Kerja / Type of Work
Projek Baru
New Project
Naik Taraf
Upgrade
Ubah Suai
Renovation
Pembesaran
Expansion
Jadual 2.21 - Bilangan dan Nilai Projek Diaward Berdasarkan Status Kontraktor dan Jenis Kerja Pada September 2015. Table 2.21 - Number and Value of Projects Awarded By Status of Contractor and Type of Work as of September 2015.
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
Bilangan
Number
Nilai (RM j)
Value (RM m)
2013 8,040 131,038.47 1,934 22,699.20 5,974 93,043.79 0 0.00 132 15,295.48
Projek Baru / New Project 6,238 120,111.36 977 16,571.86 5,160 88,661.99 - - 101 14,877.51
Naik Taraf / Upgrade 598 4,345.29 375 3,277.47 219 829.97 - - 4 237.85
Pembesaran / Expansion 145 1,224.29 31 195.47 109 914.61 - - 5 114.21
Penyelenggaraan / Maintenance 370 2,091.49 238 1,316.91 128 754.80 - - 4 19.78
Baik Pulih / Repair 397 1,597.51 256 1,057.06 139 534.70 - - 2 5.75
Ubah Suai / Renovation 292 1,668.53 57 280.43 219 1,347.72 - - 16 40.38
2014 7,765 162,221.57 1,657 20,366.03 5,934 101,189.67 5 2,046.82 169 38,619.05
Projek Baru / New Project 6,024 150,591.07 800 14,054.56 5088 96,813.15 3 2,026.93 133 37,696.43
Naik Taraf / Upgrade 596 5,116.16 334 3,561.49 248 1,399.08 1 18.8 13 136.79
Pembesaran / Expansion 125 1,532.34 16 122.93 104 947.39 - - 5 462.02
Penyelenggaraan / Maintenance 358 2,164.65 244 1,374.00 111 558.4 - - 3 232.25
Baik Pulih / Repair 369 1,464.21 213 834.72 154 623.75 1 1.09 1 4.65
Ubah Suai / Renovation 293 1,353.14 50 418.33 229 847.9 - - 14 86.91
2015 3,910 69,526.97 788 9,963.28 3,054 51,965.72 2 85.79 66 7,512.18
Projek Baru / New Project 3,004 62,677.20 406 5,751.11 2536 49,462.63 1 22.27 61 7,441.19
Naik Taraf / Upgrade 273 3,670.26 148 2,905.22 124 699.77 - - 1 65.27
Pembesaran / Expansion 100 602.23 6 24.38 92 513.24 1 63.52 1 1.09
Penyelenggaraan / Maintenance 172 960.26 93 744.81 79 215.45 - - - -
Baik Pulih / Repair 185 694.15 103 476.67 82 217.48 - - - -
Ubah Suai / Renovation 176 922.87 32 61.09 141 857.15 - - 3 4.63
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat.
Jenis Kerja
Type of Work
Kontraktor Tempatan
Local Contractor
Kontraktor Asing
Foreign Contractor
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Projek Swasta
Private Project
Projek Kerajaan
Government Project
Jumlah Bilangan
Projek
Total Number of
Projects
Jumlah Nilai Projek
(RM j)
Total Project Value
(RM m)
Note : Figures are subject to change due to late notification
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.