jacomine grobler [email protected] 03 october 2014
DESCRIPTION
Jacomine Grobler [email protected] 03 October 2014. Agenda. Thoughts on the economy & cost drivers Actual cost of logistics Supply chain trend analysis State of infrastructure Improving efficiency through innovative regulation The talent gap. The logistics piece in the economic puzzle - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/1.jpg)
Jacomine [email protected] October 2014
![Page 2: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/2.jpg)
Agenda
• Thoughts on the economy & cost drivers• Actual cost of logistics• Supply chain trend analysis• State of infrastructure• Improving efficiency through innovative regulation• The talent gap
![Page 3: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/3.jpg)
The logistics piece in the economic puzzle
Ulrich Joubert Economist & advisor
![Page 4: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/4.jpg)
International factors influencing logistics in SA
• Growth prospects• Unemployment• Inflation• Interest rates• Commodity markets• Energy
![Page 5: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/5.jpg)
Local factors influencing logistics in SA
• Balance of payments• Budget deficit• The Rand• Inflation• Interest rates• Human resources
![Page 6: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/6.jpg)
Logistics costs and efficiency
Prof Jan HavengaZane SimpsonStellenbosch University
![Page 7: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/7.jpg)
![Page 8: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/8.jpg)
![Page 9: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/9.jpg)
![Page 10: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/10.jpg)
![Page 11: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/11.jpg)
![Page 12: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/12.jpg)
![Page 13: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/13.jpg)
![Page 14: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/14.jpg)
Moving towards integration
Dr Dinesh KumarKPMG
![Page 15: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/15.jpg)
Supply chain trends analysis
• Person-to-person interviews with supply chain directors of 80 companies from the KPMG network
• A broad cross-sector of industries and sectors were presented:– Consumer packaged goods– Retail– Diversified industries– Logistics providers– Utilities– Telecommunications
![Page 16: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/16.jpg)
• Various aspects were considered such as…• Customer focus:
– Essentiality accepted– Declining customer levels over last decade– Two constraints to customer focused businesses are lack of skills and silo-based
corporate cultures due to ineffective change management
• Agility in supply chains:– Not a big focus– Only 50% of retail organizations are barely or partially incorporating agile design– 68% of manufacturing organizations are barely or partially incorporating agile design
• Collaborating with supply chain partners:– 46% of organizations will never or rarely collaborate with SC partners– 46% of SA supply chains are only partially managing to collaborate
Supply chain trends analysis
![Page 17: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/17.jpg)
• Supply chain maturity:– 62% of FMCG supply chains considered themselves as mature – 44% supply chains in other industries considered themselves as mature
Supply chain trends analysis
![Page 18: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/18.jpg)
• Technology in SC:– Use of fragmented ERP systems were evident– Most companies focused on incremental upgrades, tweaking & customization– High focus on financial functionality
• Planning, forecasting and replenishment strategies:– Lack of planning capabilities one of the greatest challenges for South African companies– Use of supply chain coordination control methods specifically noted in the
manufacturing industry
• Inventory management:– High levels of buffer stock evident in retail, manufacturing and mining– Inventory carry cost contribution to total logistics cost on the rise
Supply chain trends analysis
![Page 19: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/19.jpg)
Future trends
• Demand-driven supply chains:– Supply chain partners are tuned in to the demand signal that originates at the furthest
points of consumption– DDSC has greater alignment, responsiveness and efficiencies impacting on customer
satisfaction.– 1 – 4% improvement in revenue and 20-30% reduction in working capital.
• Cloud-based supply chain management:– Real time access to critical information, transparency, cost reduction, scalability and
flexibility– The most important barrier relates to data security
• Talent:– Well qualified talented people required in all functions at all levels of the company
![Page 20: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/20.jpg)
Future trends
• Collaboration– Close collaborative ties result in optimized inventory and logistics processes. Also
greater responsiveness to volatile customer demand.– Joint innovation & R&D activities in future– Pooled warehousing, distribution and transport resources.
![Page 21: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/21.jpg)
Nissan SA case study
• In 2011 Nissan spent 27% more on production parts logistics than their benchmark global competitor.
• High inefficiencies due to high transport costs due to the landlocked position of the plant and frequent production line stoppages due to a lack of parts availability.
• Douki Seisan system implementation – customer driven production philosophy that syncronizes SC partners to cut lead times.
• Implementation of Nissan Manufacturing UK (NMUK) mainframe ERP system which seamlessly integrates with global Nissan systems
• Re-evaluate status quo transport decisions such as:– From Ro-ro vessels to containerized vehicles through their on-site vehicle
containerisation facility– From Road transport to containerized rail transport for imported production parts.
![Page 22: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/22.jpg)
Nissan SA case study
• After 12 months:– Full delivery timing visibility for all customers– Flexible vehicle ordering capabilities allowing changes in specs up to 4 weeks before
production– Finished vehicle inventory reduced by 20%– Domestic market volume flexibility from 20 to 12 weeks– Domestic market-mix flexibility from 15 to 4 weeks– In 2011 Nissan spent 27% more on production parts logistics than their benchmark
global competitor– A 21% reduction in supply chain CO2 footprint– A R387 million improvement in free cash flow– A R206 million year-on-year logistics cost reduction
![Page 23: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/23.jpg)
Logistics infrastructure capacity
Hans IttmannHWI Consulting
![Page 24: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/24.jpg)
State of roads
![Page 25: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/25.jpg)
State of roads
![Page 26: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/26.jpg)
• Decades of underinvestment in maintenance and expansion left a huge infrastructure backlog.
• SANRAL has been relatively effective in addressing this backlog, but still room for improvement
• Poor roads lead to increased vibrations and potential structural damages to vehicles, leading increased vehicle maintenance & repair costs & higher logistics costs.
• Certain road roughness – what is the percentage increase in VOCs. Model changes in cost of logistics based on changes in quality of roads.
State of roads
![Page 27: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/27.jpg)
State of roads
![Page 28: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/28.jpg)
State of rail
![Page 29: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/29.jpg)
• Mostly Iron ore, coal & manganese & agricultural dry bulk sector• Long haul general freight business is challenging with service delivery the
issue• 11.4% (2011) to 12.1% (2013) w.r.t. tonnage• 29.5% (2011) to 30.5% (2013) w.r.t. tonne-km• Investment, productivity, efficiency & skills development required
Road-to-rail
![Page 30: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/30.jpg)
• Iron ore, coal & manganese• Agricultural dry bulk sector• Long haul general freight business is challenging; service delivery the
issue• 11.4% (2011) to 12.1% (2013) i.t.o. tonnage• 29.5% (2011) to 30.5% (2013) i.t.o. tonne-km• Investment, productivity, efficiency, skills development – reduce cost of
logistics
State of rail
![Page 31: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/31.jpg)
State of air freight
![Page 32: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/32.jpg)
State of pipelines
![Page 33: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/33.jpg)
State of maritime
![Page 34: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/34.jpg)
Greater road efficiencies through innovative regulation
Dr Paul NordengenCSIR
![Page 35: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/35.jpg)
0
2
4
6
8
10
12
2001 2002 2003 2004 2005 2006
Year
Fa
tal
cra
sh
ra
te Aust
Can
France
Denmark
USA
South Africa
Switzerland
Fatal truck crash per 100 million vehicle kilometres travelled
Source: OECD report, Moving Freight with Better Trucks, 2010
Heavy Vehicle Fatal Crash Rates
![Page 36: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/36.jpg)
36
PERFORMANCE-BASED STANDARDS APPROACH
Prescriptive Standards Performance-Based Standards
What the vehicle looks like What the vehicle can do
Governs mass and dimensions Governs actual on-road performance
Constrains productivity Allows heavier and/or larger vehicles
Constrains innovation Promotes innovation
Prescriptive Standards Performance-Based Standards
Images courtesy of the Australian National Transport Commission
![Page 37: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/37.jpg)
Prescriptive Standards Performance-Based Standards
What the vehicle looks like What the vehicle can do
Governs mass and dimensions Governs actual on-road performance
Constrains productivityAllows heavier and/or larger vehicles• Improved productivity• Fewer trucks required on the road• Fuel and emissions savings
Constrains innovation Promotes innovation
Prescriptive Standards Performance-Based Standards (PBS)
![Page 38: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/38.jpg)
Baseline vehicle PBS vehicle
Three trailers Four trailers (higher payload, improved productivity)
Very poor “rearward amplification” performance (whipping effect on the rearmost trailer causing it to rollover).
Meets all performance standards (including rearward amplification). A more stable and safe vehicle.
Road-Train, Mining
Computer simulations performed by, and animations courtesy of, Wits University
![Page 39: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/39.jpg)
Baseline vehicle PBS vehicle
Current vehicle in operation Axles relocated to increase wheelbase
Poor “rearward amplification” and “yaw damping” performance. Sustained oscillations in response to a severe steer input.
Meets all performance standards. A more stable and safe vehicle.
Computer simulations performed by, and animations courtesy of, Wits University
Bi-Articulated Bus
![Page 40: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/40.jpg)
Baseline vehicle PBS vehicle
Six pallets of timber. Seven pallets of timber (higher payload, improved productivity).
Very poor “rearward amplification” performance (whipping effect on the rearmost trailer causing it to rollover).
Meets all performance standards (including rearward amplification). A more stable and safe vehicle.
Computer simulations performed by, and animations courtesy of, Mechanical System Dynamics, Australia
Timber Vehicle
![Page 41: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/41.jpg)
• High-speed lane-change manoeuvre, used to measure “rearward amplification” and “high-speed transient offtracking”.
• Trailer overshoot and yaw damping response have improved.
Computer simulations performed by the CSIR
Car-Carrier (1 of 3)
PBS vehicle (increased trailer wheelbase)
Baseline vehicle
![Page 42: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/42.jpg)
• Speed is increased on a constant-radius curve until rollover occurs.• Vertical arrows signify vertical tyre loads (colours as above).• The increased trailer wheelbase has increased the initial vertical load on the drive
axles. Without any changes to any other vehicle parameters, this results in delayed rollover (improved “static rollover threshold”).
Computer simulations performed by the CSIR
Car-Carrier (2 of 3)
PBS vehicle (increased trailer wheelbase)
Baseline vehicle
![Page 43: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/43.jpg)
• Low-speed 90° turn. Used to determine how much road-space a vehicle utilises when turning.
• The increased trailer wheelbase has reduced its rear overhang, resulting in improved “tail swing” performance. The rear corner of the PBS vehicle swings out less than half that of the baseline vehicle. This is important for pedestrian and cyclist safety.
Computer simulations performed by the CSIR
Car-Carrier (3 of 3)
PBS vehicle (increased trailer wheelbase)
Baseline vehicle
Top view
![Page 44: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/44.jpg)
![Page 45: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/45.jpg)
![Page 46: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/46.jpg)
The talent gap
Rose LukeGert HeynsUniversity of Johannesburg
![Page 47: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/47.jpg)
The talent gap
![Page 48: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/48.jpg)
The talent gap
![Page 49: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/49.jpg)
The talent gap
![Page 50: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/50.jpg)
The talent gap
![Page 51: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/51.jpg)
The talent gap
![Page 52: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/52.jpg)
The talent gap
![Page 53: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/53.jpg)
The way forward
Jacomine GroblerCSIR
![Page 54: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/54.jpg)
The way forward
?
![Page 55: Jacomine Grobler Jgrobler@csir.co.za 03 October 2014](https://reader038.vdocuments.us/reader038/viewer/2022103100/5681316e550346895d97e96a/html5/thumbnails/55.jpg)
Jacomine [email protected] October 2014