Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 1 of 24
Jackson Convention Complex Request for Proposals
for
Facility WiFi Replacement/Upgrade
RFP #10-‐07WF
Date Issued: October 7, 2013
Proposal Due Date: 4:00 p.m. CST, November 1, 2013
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 2 of 24
TABLE OF CONTENTS Description Page
1. INTRODUCTION 1(A) RFP Scope and Purpose 3 1(B) Background 4 1(C) Proposal Due Date 6 2. INSTRUCTIONS, INFORMATION, and FORMS 2(A) Timeline 7 2(B) Contact Information 8 2(C) Letter of Intent 8 2(D) Site Visit / Surveys 8 2(E) Questions and Amendments 9 2(F) Notices 9 2(G) RFP Cover Sheet 12 2(H) Non-‐Collusion Certification 13 2(I) No Response Form 14 3. TECHNICAL REQUIREMENTS AND EXPECTATIONS 3(A) Site Surveys 15 3(B) Hardware Requirements 15 3(C) Installation Considerations 15 3(D) Integration and Implementation 16 4. SUBMITTAL REQUIREMENTS 4(A) Table of Contents 18 4(B) Introduction 18 4(C) Respondent Information 18 4(D) Wifi Installation Proposal 19 5. SELECTION & NOTIFICATION 5(A) RFP Evaluation Criteria 21 5(B) Notification of Award 21 6. RFP RESPONSE SUBMITTAL CHECKLIST 22 APPENDIX A – Facility Maps and current AP locations APENDIIX B =-‐ Blank Facility Maps
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 3 of 24
1. INTRODUCTION 1(A) RFP Scope and Purpose SMG (“Operator”), as operator of the Jackson Convention Complex (“JCC”) is seeking proposals from qualified and experienced firms (“Contractor”) with demonstrated expertise in WiFi technology interested in designing, installing, and implementing a new WiFi system for the facility.
The Operator expects each proposing Contractor to perform a required site-‐walk (contact via email for preferred dates/times) and independent survey, which will determine the overall design and bill of materials for their respective response.
It is important that Contractors responding to this RFP are mindful that portions of this RFP may not adequately address various fundamental technical or mechanical functionalities. Any omission in this area is unintentional and is not intended to suggest that those fundamental items are unimportant. To the contrary, Contractors responding to this RFP should make a point to illustrate and assure the Operator that all fundamental technical functionalities will be part of the Contractor’s implementation of the Wifi service and equipment.
In rating responses to this RFP, the Operator will consider how well each Contractor is able to take the contents of the RFP, ask relevant questions, extract critical information, address the various technical issues and clearly communicate its plan to install and implement a quality Wifi system that meets the Operator’s standards and expectations.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 4 of 24
1(B) Background
Jackson Convention Complex: Opened in 2009, the Jackson Convention Complex (“JCC”) features 330,000 square feet of flexible exhibit, ballroom and meeting space and is located in the heart of downtown Jackson … Mississippi’s capital city and the heart of Southern hospitality. It hosts a wide range of events including conventions, trade shows, corporate meetings, banquets, weddings, receptions, concerts, sporting events, consumer shows, political events, community gatherings and religious services. Through its four years of operation (FY09 – FY12), the JCC has hosted 1,254 events days and over 550,000 guests, generating an estimated $100 Million in economic impact. In addition to offering first-‐rate amenities, state of the art technologies, resort quality service and in-‐house catering, the Complex is a LEED® Certified building as established by the U.S. Green Building Council (USGBC). The Jackson Convention Complex is owned by the Capital City Convention Center Commission and managed by SMG. For more information, visit www.jacksonconventioncomplex.com.
Capital City Convention Center Commission:
The Capital City Convention Center Commission (“Commission”) was formed in 2005 to oversee all matters related to the construction and operation of the Jackson Convention Complex and is comprised of a nine member board of commissioners. The Commission contracts with SMG for the management of the JCC.
SMG: In 2008, the Commission contracted with SMG (“Operator”) to manage the Jackson Convention Complex, including the authority to negotiate and contract for goods and services necessary for the successful management and operation of the facility. This agreement was extended an additional three years in 2013.
Founded in 1977, SMG provides management services to more than 230 public assembly facilities including convention and exhibition centers, arenas, stadiums, theatres, performing arts centers, equestrian facilities, science centers and a variety of other venues. With facilities across the globe, SMG manages more than 14.4 million square feet of exhibition space and over 1.75 million sports and entertainment seats. As the recognized global industry leader, SMG provides venue management, sales, marketing, event booking and programming, construction and design consulting, and pre-‐opening services for such landmark facilities as McCormick Place & Solider Field in Chicago, Moscone Convention Center in San Francisco, Houston's Reliant Park and the Mercedes-‐Benz Superdome. SMG also offers food and beverage operations through its concessions, catering and special events division, SAVOR, currently servicing more than 100 accounts worldwide. For more information, visit www.smgworld.com.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 5 of 24
Equal Business Opportunity Program:
SMG, in keeping with the City of Jackson’s Equal Business Opportunity Plan, is committed to the principle of non-‐discrimination in public contracting. It is the policy of SMG to promote full and equal business opportunity for all Contractors doing business with SMG and the Jackson Convention Complex.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 6 of 24
1(C) Proposal Due Date Responses submitted in response to this RFP must be submitted to the address below by 4:00 p.m. Central Standard Time on Friday, November 1, 2013. Proposals will not be accepted after the deadline for any reason.
J. Brian Swindoll, Senior Operations Manager Jackson Convention Complex / SMG 105 East Pascagoula Street Jackson, MS 39201 Telephone: 601.960.2321 ext: 1039 Fax: 601.960.2584 Email: [email protected]
Formats for submittal are as follows.
§ One (1) original hard copy (8 ½” x 11”, bound on the long side)
§ Two (2) additional hard copies (8 ½” x 11”, bound on the long side)
§ One (1) electronic copy (via USB drive)
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 7 of 24
2. INSTRUCTIONS, INFORMATION, and FORMS
2(A) Timeline – Timeline may be modified at Operator’s discretion.
Day/Date Description
Monday, October 21, 2013
Letter of Intent due from all Contractors who intend to respond to the RFP. Failure to submit a Letter of Intent may result in a Contractor’s disqualification.
October 22 -‐ 25, 2013 Site visits by Contractors(See section 2b for contact information to schedule walkthroughs).
Monday, October 28, 2013 Last Day to submit written questions from proposing Contractors
Tuesday, October 29, 2013
Written answers to all questions posed during site visits and via written submissions will be distributed by email by 5pm to all applicants.
Friday, November 1, 2013 RFP responses due by 4:00pm CST.
November 4 – 7, 2013 Applicants’ responses will be analyzed and scored by the evaluation team.
Friday, November 8, 2013
A decision is made as to which Contractors will be finalists, or a single Contractor will be chosen to enter into negotiations with. All applicants will be notified of the Operator’s decision.
Week of November 11, 2013
Finalist Contractor presentations at the Jackson Convention Complex. (Optional / If needed)
No later than Friday, November 15, 2013
Operator selection of WiFi Installer / Integrator. (If not selected on November 1)
December 2, 2013 Wifi replacement anticipated start date
December 20, 2013 Anticipated completion date of Wifi Installation and Implementation.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 8 of 24
2(B) Contact Information The official contact person(s) for the purpose of this RFP are…
Primary Contact: Brian Swindoll, Sr. Operations Manager Jackson Convention Complex / SMG 105 East Pascagoula Street Jackson, MS 39201 Telephone: 601.960.2321, ext. 1039 Fax: 601.960.2584 Email: [email protected] Secondary Contact: Kelvin D. Moore, CMP, General Manager Jackson Convention Complex / SMG 105 East Pascagoula Street Jackson, MS 39201 Telephone: 601.960.2321, ext. 1016 Fax: 601.960.2584 Email: [email protected]
All communication with the Operator regarding this RFP must be directed to Mr. Swindoll with copies to Mr. Herrington. 2(C) Letter of Intent Interested Contractors shall submit a letter of intent by Monday, October 21, 2013 acknowledging receipt of the RFP and informing the Operator of their intent to respond to the RFP. The letter of intent may be submitted by mail, fax or email to the official contact person(s), above. Contractors should also provide the name, address, telephone & fax numbers, and email address of the individual who can address inquiries related to this RFP and the Contractor’s proposal, and receive clarifications or addenda from the Operator. 2(D) Site Visits and Surveys Contractors are required to attend a pre-‐proposal site visit between Tuesday, October 22, 2013 and Friday, October 25, 2013 at the Jackson Convention Complex. Specific days and times must be scheduled with the Sr. Operations Manager (Please note that dates are subject to modification; all potential respondents will be duly advised of such within an ample time period to adjust schedules if such should occur). The purpose of these visits will be to allow each Contractor opportunity to walk the building and perform individual site surveys, as needed. Each Contractor will be allowed a 2 hour formal walkthrough with facility personnel, and additional time as needed, and as the
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 9 of 24
event schedule warrants, to complete surveys. Please note, event schedule will dictate what areas are openly accessible by Contractors. 2(E) Questions and Amendments Questions regarding this RFP may be asked at any time prior to, but no later than, 4:00pm, Monday, October 28, 2013. All questions must be submitted in writing to the official contact person, with the exception of the opportunity for all potential Contractors to ask questions in-‐person during the pre-‐proposal meeting times. Written responses to all questions will be sent to all potential Contractors who properly submitted a Letter of Intent.
Other than during the pre-‐proposal site visits, the Operator will not respond to oral requests.
Any amendment to this RFP will be sent to all potential Contractors who properly submitted a Letter of Intent
2(F) Notices
1. This RFP has been compiled in good faith. The information contained within is selective and subject to the Operator’s updating, expansion, revision and amendment.
2. The Operator reserves the right to change any aspect of, terminate, or delay this RFP, the RFP process and/or the program which is outlined within this RFP at any time, and notice shall be given in a timely manner thereafter.
3. Recipients of this RFP are advised that nothing stated herein, or any part thereof, or any communication during the evaluation and selection process, shall be construed as constituting, offering or awarding a contract, representation or agreement of any kind between the Operator and any other party, save for a formal written contract, properly executed by both parties.
4. Responses to this RFP will become the property of the Operator, and will form the basis of negotiations of an agreement between the Operator and the apparent successful respondent.
5. The Operator is not liable and will not be responsible for any costs incurred by any Contractor(s) for the preparation and delivery of the RFP responses, nor will the Operator be liable for any costs incurred prior to the execution of an agreement, including but not limited to, presentations by RFP finalists to the Operator.
6. During the review of this document, please note the Operator’s emphasis on the expectations, qualities, and requirements necessary to be positioned as an RFP finalist and apparent successful Contractor.
7. It is important that Contractors responding to this RFP are mindful that portions of this RFP may not adequately address various fundamental technical or
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 10 of 24
mechanical functionalities. Any omission in this area is unintentional and is not intended to suggest that those fundamental items are unimportant. To the contrary, Contractors responding to this RFP should make a point to illustrate and assure the Operator that all fundamental technical functionalities will be part of the Contractor’s implementation of the Wifi service and equipment.
8. The Operator reserves the right, at its sole discretion, to waive minor administrative irregularities contained in any proposal.
9. A single response to the RFP may be deemed a failure of completion, and in the best interest of the Operator, the RFP may be cancelled.
10. The Operator reserves the right to reject any or all proposals at any time without penalty. The Operator reserves the right to refrain from contracting with any Contractor. The release of this RFP does not compel the Operator to enter into a contract. The Operator may elect to proceed further with this project by interviewing other proposers, or proceeding with an award.
11. Contractors may withdraw a proposal that has been submitted at any time up to the proposal closing date and time. To accomplish this, a written request signed by an authorized representative of the Contractor must be submitted to the RFP Contact. The Contractor may submit another proposal at any time up to the proposal closing date and time.
12. As a result of the selection of a Contractor to supply products and/or services to the Operator, the Operator is neither endorsing nor suggesting that the Contractor's services are the best or only solution. The Contractor agrees to make no reference to the Operator in any literature, promotional material, brochures, sales presentation or the like without the express written consent of the Operator.
13. Any information contained in the proposal that is deemed proprietary must be clearly designated. Marking the entire proposal as proprietary will be neither accepted nor honored. If a request is made to view a Contractor’s proposal, the Operator will comply according to the Open Public Records Act. If any information is marked as proprietary in the proposal, such information will not be made available until the affected Contractor has been given a reasonable opportunity to seek a court injunction against the requested disclosure.
14. All materials submitted in response to this request become the property of the Operator. Selection or rejection of a response does not affect this right.
15. The Operator will not be liable for any errors in Contractor proposals. Contractors will not be allowed to alter proposal documents after the deadline for proposal submission. The Operator reserves the right to make corrections or amendments due to errors identified in proposals by the Operator or the respondent. This type of correction or amendment will only be allowed for such errors as typing, transposition or any other obvious error. Contractors are liable for all errors or omissions contained in their proposals.
16. A bid bond is not required. 17. A performance bond is not required.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 11 of 24
18. All proposals and related materials shall become the property of the Operator upon delivery and shall be subject to public inspection at the conclusion of the selection process.
19. This RFP and the selected Contractor’s submittals, including all provisos, warranties, commitments, and representations set forth therein, will be binding upon the selected Contractor and, at the Operator’s option, may be incorporated into any Operator contract with the Contractor.
20. The Operator shall not be liable under any circumstances for any cost incurred by any Contractor in the preparation, revision, or presentation of any proposal in response to this RFP.
21. When evaluating a Contractor’s proposal, the following factors will be considered... a. The ability, capacity and skill of the Contractor to provide the installation and
implementation services required b. The character, integrity, reputation, judgment, experience and efficiency of
the Contractor c. The quality of performance of previous WiFi services, including, but not
limited to, the Contractor’s failure to perform satisfactorily d. Evidence of collusion with any other Contractor, in which case colluding
Contractors may be restricted from submitting further bids on the subject project or future tenders
e. There is uncompleted work with the Operator or others, or an outstanding dispute on a previous or current contract that might hinder, negatively affect or prevent proper execution of the contract with the Operator
f. The Contractor or a representative of the Contractor has been convicted of a crime arising from a previous public contract
g. The Contractor or a representative of the Contractor has been convicted of a crime of moral turpitude or any felony. Contractors shall affirmatively disclose to the Operator all such convictions, especially of management personnel or the Contractor as an entity, prior to notice of award or execution of a contract, whichever comes first. Such disclosure shall not automatically be grounds for termination for default subsequent to award or execution of the contract. However, failure to make such affirm disclosure shall be grounds, in the Operator’s sole option and discretion, for termination for default subsequent to award or execution of the contract
h. The Operator concludes that the Contractor will be unable, financially or otherwise, to perform the work
i. At the time of RFP opening, the Contractor is not authorized to do business in the state of Mississippi or otherwise lacks a necessary license, registration or permit
j. Access to the Contractor is difficult within Operator’s normal business hours
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 12 of 24
2(G) RFP Cover Sheet
JACKSON CONVENTION COMPLEX RFP #10-‐07WF
Facility Wifi Replacement / Upgrade
Yes No Has your business entity operated at least five (5) years without interruption?
Has an owner or managing agent of your business entity been convicted of a crime within the past ten (10) years?
If selected, do you agree to execute a contract essentially the same in form as the sample contract attached in Section 5? (if no, this does not necessarily eliminate your Contractor from consideration, though this information may be used in the evaluation process):
If no, describe differences: Has your company been in bankruptcy, reorganization or receivership in the last five (5) years?
Has your company been disqualified by any public agency from participation in public contracts?
Is your company licensed to do business in the State of Mississippi?
The undersigned hereby accepts the terms and conditions as set forth herein. The undersigned hereby accepts the terms and conditions as set forth herein. This This page must be s igned and dated by the page must be s igned and dated by the ContractorContractor or a representative legal ly authorized or a representative legal ly authorized to bind the to bind the ContractorContractor ..
FULL LEGAL NAME OF COMPANY TYPE OF BUSINESS
o Corporation o Partnership (general) o Partnership (limited)
o Sole Proprietorship o Limited Liability Company
ADDRESS
CITY/STATE/ZIP
EMAIL ADDRESS
PHONE FAX NAME TITLE SIGNATURE __________________________________
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 13 of 24
2(H) Non-‐Collusion Certification
JACKSON CONVENTION COMPLEX RFP #10-‐07WF
Facility Wifi Replacement / Upgrade
NON-‐COLLUSION CERTIFICATION
I certify that this response is made without prior understanding, agreement, or connection with any corporation, Contractor, or person submitting an offer for this Request for Proposals, and is in all respects fair and without collusion or fraud. The below signed Contractor has not divulged to nor discussed or compared his/her response with other Contractors and has not colluded with any other Contractor or any other parties to this RFP whatsoever. Company Name: ______ Mailing Address: City-‐State-‐Zip: _____ Date: Authorized Signature: ______________________________ (Written) Authorized Signature: ________________________ (typed / printed) Title: ___________________________________________________________________
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 14 of 24
2(I) RFP No Response Form
JACKSON CONVENTION COMPLEX RFP #10-‐07WF
Facility Wifi Replacement / Upgrade No Response Form
Dear Prospective Contractor: If you decide not to submit a response to this RFP, we would very much appreciate your completing and returning this form for our records. Reason for not submitting a response in response to this solicitation:
______
FULL LEGAL NAME OF COMPANY
ADDRESS
CITY/STATE/ZIP
EMAIL ADDRESS:
PHONE FAX NAME (PLEASE PRINT) TITLE
SIGNED DATE Thank you for your assistance. Please mail, fax or email this document to:
Jackson Convention Complex Attn: Brian Swindoll, Senior Operations Manager
105 E. Pascagoula St Jackson, MS 39201 Fax: (601) 960-‐2584
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 15 of 24
3. TECHNICAL REQUIREMENTS AND EXPECTATIONS The selected Contractor shall be prepared to perform its obligations in a prompt, diligent, and professional manner. Respondents should have at least five (5) years of demonstrated successful experience with integrated WiFi systems.
3(A) Site Surveys The JCC’s future success depends, in part, on providing stable and responsive technology options to its clients. To better manage the project and understand the coverage and density requirements set forth in the RFP, the Operator is requiring all respondents to complete a walkthrough and independent site survey of the facility. Site surveys may be scheduled in two (2) hour windows by emailing the Sr. Operations Manager (see section 2b “Primary Contact”) and proposing a specific date/time to complete this requirement. Appointments will not be confirmed until the Operator has received official Letter of Intent to bid from the Proposer.
3(B) Hardware Requirements All proposed solutions should meet as many of the following technical requirements as possible:
• System must support Adaptive Smart Antennas System with both vertical and horizontal polarizations for maximum performance.
• Must support Dual Polarization – Maximum Ratio Combining (DP-‐MRC) for smart devices.
• Capable of supporting minimum of 500 clients in a dual radio (no more than two) access point
• System must support as an option, Dynamic Pre-‐Shared Keys (DPSK) using direct AD authentication, on a per user and per device basis
• Access Points must provide for concurrent dual-‐band (5GHz/2.4GHz) support • Access Points must provide minimum of 300 Mbps of throughput per radio • Access Points must be capable of support for spectrum analyzer and analysis for
troubleshooting. • System must be capable of both transmit (Tx) beamforming and adaptive
antenna adjustments simultaneously • Antennas must have support both spatial streams and transmit beam
concurrently • System must be capable of providing realtime RF capacity awareness on all
available channels for both 2.4 and 5 Ghz bands • System must be capable of setting up segregated individual SSID/networks based
on geographic location of the event in the facility.
3(C) Installation Considerations
The following list represents pertinent installation information that should be considered by all respondents when drafting proposals:
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 16 of 24
• The Jackson Convention Complex currently maintains 40 wireless access points throughout the facility. We understand that number may change based on manufacturers represented during the proposal process and their specific hardware differences.
• Contractor will be responsible for all wiring and mounting costs incurred during the installation process. This includes, but is not limited to: cabling, hardware, brackets, termination equipment/supplies and injectors and other electronics.
• The JCC allows only CAT6 cabling throughout the Complex. If additional access points will be added, Contractor will be required to use CAT6 cabling and termination.
• Contractors should provide all equipment necessary including, but not limited to, any ladders, man lifts, tools, supplies, etc. to complete this project.
o Note: OSHA regulations require the use of proper PPE (Personal Protective Equipment) be utilized while on, or in the vicinity of, power trucks and lifts. Awarded contractor will be expected to adhere to all OSHA regulations throughout the entire installation project. Failure to follow all OSHA safety regulations can result in immediate dismissal from the JCC and loss of the RFP award.
3(D) Integration and Implementation
After installation, Contractor will be required to ensure all access points are functioning and operating at acceptable levels and capabilities. To ensure a solid implementation and management of the new system, Contractor will be asked to provide the following:
• The Jackson Convention Complex utilizes 12 Cisco switches (all PoE) to connect and power its wireless access points. As part of the implementation process, Operator will ask the awarded Contractor to ensure all access points are on the proper VLAN(s) and clean up old VLAN/routing architecture as deemed necessary.
• As part of the implementation of the system, Contractor should be available for ample training on the system and assist with initial setup of SSIDs and security. Details will be determined by the Operator at the time of setup and implementation of the system.
o The Operator will also need to be trained on how to add, delete, and localize/isolate SSIDs as needed by events for future deployments.
• Operator requests, if applicable and available for the proposed system, a current generation iPad to control, test, and troubleshoot the hardware and
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 17 of 24
configuration throughout the facility. Operator will be responsible for iPad case and any “app” purchases.
• Contractor should provide system support and any system adjustments as needed for no less than 120 days after completion of Wifi system implementation at no additional fee to the Operator.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 18 of 24
4. SUBMITTAL REQUIREMENTS The proposer shall complete and submit one (1) original hard copy, three (3) additional hard copies, and one (1) electronic copy of its proposal. All original submissions shall be signed by the proposer. Unsigned submissions will be rejected. Submissions transmitted by fax will not be accepted or reviewed. A checklist to assist respondents has been provided in Section 6.
4(A) Table of Contents Proposers must include a table of contents, which lists sections and subsections with page numbers that follow the organization and sequence of their submission. 4(B) Introduction The introduction should include the following items:
§ A fully executed RFP cover sheet. See Section 2(G) § The identity of the proposing Contractor and any partners or consultants
included as part of the response. § The names of individuals involved in the preparation of the RFP response along
with their relationship to the proposing Contractor. § A statement confirming that the respondent has sole and complete responsibility
for providing the services as defined in the RFP and any addenda issued to this RFP.
§ A statement signed by a representative authorized to legally bind the respondent, which shall include an identification of the respondent as a corporation or other legal entity.
§ A fully executed non-‐collusion certification. See Section 2(H). 4(C) Respondent Information The proposal shall include the following information:
1. Organization: Data describing the proposing Contractor’s current organization, ownership, legal entity designation (corporation, LLC, etc…), address, number of years in business, size of business, and services offered.
2. Relevant Experience: Describe the Contractor’s overall qualifications to fulfill the requirements of this RFP, including experience in designing, installing, and servicing large commercial-‐grade WiFi deployments.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 19 of 24
Identify all personnel who will work on this project and provide their qualifications and experience related to the RFP’s requested services. Provide a listing of comparable WiFi systems that the Contractor has designed and/or administered within the last five (5) years.
3. References: Include five (5) references that have contracted with the respondent for WiFi services. Provide the following for each reference: name, title, name of organization, address and telephone number, email address, website address, as well as a brief description of the services provided.
4(D) WiFi System Design and Installation Proposal The proposal shall include the following minimum information about the Contractor’s design installation and implementation process.
1. Site Survey Overview and Explanation:
Contractor will describe findings in the site survey and any potential items of interest that were found as a result of the site visit. Also, an explanation to how the proposed system will perform and overcome any found obstacles or challenges.
2. Contractor’s preferred Manufacturer:
Describe the Contractor’s chosen equipment manufacturer and a detailed explanation of the benefits of their equipment over their competitors.
3. Technical Submittal:
a. Hardware Specifications: Provide a complete listing of ALL equipment and supplies proposed to complete the project – include manufacturer/model information, quantities, and a description of the items. This section should adequately address how the hardware meets the requirements set forth in section 3(b).
b. Proposed Hardware Locations: Using the blank maps provided (Appendix B), each contractor will indicate locations of their proposed access points.
c. Configuration Information: Please provide a description how the proposed WiFi system operates. This section should address user interface, topography, programming and maintenance information, as well as configuration backup options. Screenshots are encouraged.
d. Timeline: Anticipated timeline of progression through the WiFi system installation, implementation, and training. If the proposed window of time allotted in section 2(a) is not adequate, this should be addressed here.
e. Operator Responsibilities – Contractor should include a comprehensive list of requests and/or requirements of the Operator to complete this project.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 20 of 24
4. Pricing:
Contractors should present detailed and itemized pricing proposals that outline a general understanding of different elements involved in the pricing structure. This section should include details of anticipated parts, labor, and ancillary expenses the Contractor foresees incurring during the system installation and implementation process.
5. Sponsorship / Commercial Rights Marketing Opportunity:
The Jackson Convention Complex has a naming rights and advertising program in place to offset some of the costs associated with this project. Contractors are welcome to articulate any potential sponsorship and/or trade opportunities in lieu of cash for this service and should outline that interest in this area.
6. Other:
This section is open for Contractors to outline any pertinent information not already covered in the RFP. This section is NOT required.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 21 of 24
5. SELECTION & NOTIFICATION
Proposals will be evaluated based primarily on the evaluation criteria described below. The approach and procedures are those, which are applicable to a competitive negotiated procurement, whereby proposals are first evaluated to determine which proposals are within a competitive range. The Operator reserves the right to reject any proposal from potential Contractors that are not fully qualified to perform the required services. Discussions and negotiations may then be carried out with potential Contractors within the competitive range, after which Best and Final Offers ("BAFO") may be requested.
Operator reserves the right to select a proposal for an award without any discussions or negotiations or a request for any BAFO. Subject to Operator's right to reject any or all proposals, the potential Contractor whose proposal is found to be most advantageous to the JCC will be selected.
5(A) RFP Evaluation Criteria
An evaluation team composed of the General Manager, the Sr. Operations Manager and/or other parties at the Operator’s discretion, will evaluate the RFP responses received from each Contractor. The Operator reserves the right to, but shall not be obligated to, require potential Contractors to participate in a presentation to the evaluation team of items contained in the RFP response and any other items deemed appropriate by the Operator.
Contractor selection will be based primarily on the following set of criteria and scoring. SELECTION SCORE SHEET
CRITERION EVALUATION
POINTS
1. Relevant Experience – Section 4(C)-‐2 15 2. References – Section 4(C)-‐3 20 4. Technical Submittal – Section 4(D)-‐3 33 5. Pricing / Value – Section 4(D)-‐4 32
100
5(B) Notification of Award The Operator intends to contact all Contractors at the conclusion of the RFP process to let each Contractor know the outcome of the bidding process. Notification will be sent via email to the individual(s) listed in the Contractor’s Letter of Intent
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 22 of 24
6. RFP RESPONSE SUBMITTAL CHECKLIST Each Contractor shall submit a response in the following format:
1. Each Contractor shall create one (1) original response (labeled “original”) with
original signature and three (3) identical copies (for a total of four (4) hard copy responses), and one (1) electronic copy.
2. The original and each of the three (3) identical copies shall be sent to the official contact person at the address shown in Section 2(B), on or before the due date shown in Section 1(C). The electronic copy should be emailed to the official contact person at the email address shown in Section 2(B).
3. The original and each of the three (3) copies shall be organized as described in Section 4:
Table of Contents Introduction Respondent Information WiFi System Design and Installation Proposal [Maps of intended Access Point locations]
This checklist is intended merely as an aid to the Contractor in providing a response to this RFP. The Contractor retains the sole responsibility for accuracy and completeness of the response.
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 23 of 24
APPENDIX A FACILITY MAPS WITH CURRENT AP LOCATIONS
Req
uest
ing
new
AP
for F
&B.
Doe
s no
t pre
sent
ly e
xist
.
Requesting new
AP for O
perations department. D
oes not presently exist.
Outside of door(s)
overlooking gallery.
Requesting AP to
provide wireless to
the theatre. C
urrently does not exist
Request for Proposals Wifi Replacement
JCC RFP# - 09-13N Facility WiFi Replacement Revised 10.7.2013 / JBS Page 24 of 24
APPENDIX B Blank Facility Maps