Tennessee First to the Top
Local System Scope of WorkInstructions
The Scope of Work provides the plan for use of money designated for a local school system from the
Race to the Top grant. The funds are for a four-year period and the Scope of Work should specify use
for each year. General guidelines are as follows:
1. Total planned expenditures over four years must match the total amount designated for the
local system.
o Budgeted amounts for individual years may vary, but the minimum appropriation for
year 1 should be no less than 25% of the total LEA award. LEAs may request all of the
money in year 1 if justifiable to accomplish bold and innovative reform.
o Actual expenditures may fall within 90% - 110% of budgeted amount without
submission of a budget amendment.
o Money not spent during a designated year may be rolled to the ensuing year.
o In general, there are few restrictions on the use of RTTT funds except that they must be
related to the state proposal and not supplant existing expenditures. The purpose of the
grant is to provide bold and innovative reform that supports the State's approved Race to the
Top application. They must also
Payment of maintenance costs
Stadiums or other facilities primarily used for athletic contests or exhibitions or other
events for which admission is charged to the general public
Purchase or upgrade of vehicles
Improvements of stand-alone facilities whose purpose is not the education of
children, including central office administration or operations or logistical
support facilities
School modernization, renovation, or repair that is inconsistent with State law
2. Planned activities mustrelate to and support the state application. Allowable uses of RTTT
funds are outlined on a separate page and must be coded in the Scope of Work.
3. Planned activities that create recurring costs for the local system beyond the four-year scope
of the grant must be noted. The local funding body must attest that they are aware of the
recurring costs and that they acknowledge that these costs will become the responsibility of
the local funding body.
4. The Scope of Work may be submitted by a local system or by a consortium of systems. If
submitted by a consortium, all of the above stipulations apply to each participating system.
A lead system must be identified that will receive, disburse, and account for all funds.
Separate cost centers must be maintained by the lead system to account for all RTTT funds.
Instructions:
1. Each year of expenditures should be detailed on a separate sheet. Complete the system (or
consortium)
2. Complete the Scope of Work for each year. A sample sheet is included.
o Activity Describe the activity planned for supporting the state RTTT application.
o Correlation to state plan Code the activity to the appropriate aspect of the state grant
application using coding in chart on separate page.
o Correlation to TCSPP Provide a brief explanation of how this activity
supports the system TCSPP.
o Plan for Implementation Outline the system plan for implementing this activity.
-
8/13/2019 Jackson County RTTT MOU December 2009
2/22
o Recurring expense Indicate if this use of funds will create recurring expenses for the
local system beyond the four-year scope of the funding. If a system indicates that any
recurring costs will be incurred in any planned area, the local funding agency must sign
the attestation on the signature page.
-
8/13/2019 Jackson County RTTT MOU December 2009
3/22
Date Action
March 29, 2010 Announcement of RTTT award
April 19, 2010 Letter of announcement to local systems
April 21, 2010Jackson (West Tennessee Grand Division)
explanation of Scope of Work
April 22, 2010Nashville (Middle Tennessee Grand Division)
explanation of Scope of Work
April 23, 2010Knoxville (East Tennessee Grand Division)
explanation of Scope of Work
May 14, 2010 Scope of Workdue to Field Service Center
May 17-18, 2010 Field Service Center review of Scope of Work
May 19-20, 2010 Findings presented to DOE review team
State Department of Education
Tennessee Race to the Top
Timeline
May 21, 2010 Systems notified of disposition of Scope of Work
May 27, 2010 Resubmission of Scopes of Worknot meeting requirements
May 28, 2010 Final review of Scope of Work
June 1, 2010 Submission to USDOE of all Scopes of Work
-
8/13/2019 Jackson County RTTT MOU December 2009
4/22
Elements of the State Reform Plan
B. Standards and Assessments (State Application pages 53-62)
(3) Supporting the transition to enhanced standards and high-quality assessments
C. Data Systems to Support Instruction (State Application pages 63-74)
(3) Using data to improve instruction:
(i) Use of local instructional improvement systems
(ii) Professional development on use of data
(iii) Availability and accessibility of data to researchers
D. Great Teachers and Leaders (State Application pages 75-118)
(2) Improving teacher and principal effectiveness based on performance: (pages 80-96)
(i) Measure student growth
(ii) Design and implement evaluation systems (iii) Conduct annual evaluations
(iv) (a) Use evaluations to inform professional development
(b) Use evaluations to inform compensation, promotion, and retention
(c) Use evaluations to inform tenure and/or full certification
(d) Use evaluations to inform removal
(3) Ensuring equitable distribution of effective teachers and principals: (pages 97-111)
(i) High-poverty and/or high-minority schools
(ii) Hard-to-staff subjects and specialty areas
- -
(i) Quality professional development (ii) Measure effectiveness of professional development
E. Turning Around the Lowest-Achieving Schools State Application pages 119-130)
(2) Turning around the lowest-achieving schools
-
8/13/2019 Jackson County RTTT MOU December 2009
5/22
System:
$460,008
Correlation t ostate plan
Correlation t oTCSPP
B(3)
D (5)(i)Goals 1, 2, & 3
Provide professional development to teachers to ensure
awareness of new standards. Involve teachers in in-depth
revision of current local curriculum and pacing guides to reflect
new standards. Provide technology necessary to enable teachers
to maximize use of these guides thereby increasing teacher
Activi ty
Tennessee First to the Top
Local System Scope of Work
Total amount of award (over four years):
Jackson County
* If consortium, list all participating systems with lead system first
Year 1 (2010-11)
Plan for Implemen
Contract with curriculum experts in core subj
science first) to assist teachers in mapping s
guides across curriculum ($10,000). Provide
50 teachers for one day (50 days x $70 = $3
scheduled so as not to require substitutes).
Provide technology to enable teachers to util
B(3)
C(3) (i)Goals 1, 2, & 3
effectiveness & improving student learning.
Extend current local formative assessment measurements for use
in all classes grades K - 6 in all schools.
instructional practices ($19,250).
Involve 18 teachers in training to expand DIB
assessments to all classes in all schools gra
for 18 for one day, 18 teachers x $70 = $126
provide training and provide release time for
($5000)
-
8/13/2019 Jackson County RTTT MOU December 2009
6/22
B(3) Goals 1, 2, & 3Support teachers as they transition to more stringent standardsand stricter assessments designed to increase teacher
effectiveness through professional development and enhanced
technology for their classrooms.
Provide hardware (including white boards, do
response systems, & interactive slates) softw
to enhance teaching practices to better addreper teacher) thus meeting student needs in t
reading/language arts, math, science, and so
performance on TCAP assessments includin
8, writing assessments, Gateway, and End-o
C(3)(ii) Goals 1, 2, & 3
Provide multi-day training for teachers on use of data (TVAAS,
TCAP, formative & summative assessments) for guiding
instructional decisions. (One full day of overview for all teachers,
then additional site- specific training utilizing each school's most
current data.)
First day training provided free of charge by s
Trainer for 4 additional days - $4000. Subst
(25 subs to be shared among school facultie
$1,750)
-
8/13/2019 Jackson County RTTT MOU December 2009
7/22
D(2)
D(5)(I) Goals 1 - 4
Join with neighboring Clay, Macon, and Smith counties to provide
training for prospective administrative leaders. Shared training and
experiences will be designed to increase teacher effectivness &
increase student learning.
Pool $10,000 in funding with nearby Clay, Ma
a Leadership Academy for prospective admi
toward providing quality training (utilizing traifour systems) and provide stipends to approx
Jackson County.
-
8/13/2019 Jackson County RTTT MOU December 2009
8/22
-
8/13/2019 Jackson County RTTT MOU December 2009
9/22
-
8/13/2019 Jackson County RTTT MOU December 2009
10/22
D(2)(ii) Goals 1-4
Priovide professional development on use of devaluation system and provide administrators aopportunities to participate in identifying data thprovides insight into teacher effectiveness. Proadministrators the technology necessary to useevaluation system and the necessary data inv
Provide professional development foradministrators & teachers on the new evaluationsystem, data training necessary to provideaccurate evaluations to allow systemadministrataors to pinpoint problems, offeringtargeted assistance to teachers, identifyingexemplar teachers , & improving instructionthrough increased teacher effectiveness
-
8/13/2019 Jackson County RTTT MOU December 2009
11/22
-
8/13/2019 Jackson County RTTT MOU December 2009
12/22
D(2)(ii) Goals 1-4
Total budget for 2
Priovide professional development on use of datnew evaluation system and provide administratoteachers opportunities to participate in identifyingthat best provides insight into teacher effectiveneProvide administrators the technology necessarythe new evaluation system and the necessary da
involved.
Provide professional development foradministrators & teachers regarding newevaluation system, including data trainingnecessary to provide accurate evaluations, thusallowing system administrators to pinpointproblems, offer targeted assistance, identifyexemplary teachers , & improve instruction
through increased teacher effectiveness.
-
8/13/2019 Jackson County RTTT MOU December 2009
13/22
-
8/13/2019 Jackson County RTTT MOU December 2009
14/22
D(2)(ii) Goals 1-4
Total Budge
Priovide professional development on use of new evaluation system & provide administratopportunities to participate in identifying data provides insight into teacher effectiveness. Padministrators the technology necessary to uevaluation system & the necessary data invo
Provide professional development for administrators& teachers regarding the new evaluation system,including data training necessary to provideaccurate evaluations that allow systemadministrataors to pinpoint problems, offer targetedassistance to teachers, identify exemplary teachers, & improve instruction to increase teacher
effectiveness.
-
8/13/2019 Jackson County RTTT MOU December 2009
15/22
System:
$460,008
Budget
115,002
115,002
115,002
115,002
2010-11
2013-14
2011-12
Tennessee First to the Top
Local System Scope of Work
* If consortium, list all participating systems with lead system first
Total amount of award (over fou r years):
Jackson County
Year
Summary of Four-Year Scope of Wo
2012-13
$460,008.00
Director of Schools
Chair, Board of Education
TEA Representative (O*
Required System Signatures
Total four-year budget must match amount o
Total Four-Year Budget
I have approved the "Scope of Work" for use of funds generated by the "Race to the Top" grant, am fully committedcan be paid from curent level LEA funding do not require a funding agency sign off.
On behalf of the funding agency for the Board of Education, I affirm that the funding agency is aware that "Scope orecurring costs beyond the four-year scope of the grant and that they acknowledge that these costs will become th
On behalf of the Board of Education, I affirm that the Board has approved the "Scope of Work" for use of funds genand will support its implementation.
(Joe D. Barlow, Director)
( Dewey C. Mabery, Chair)
Chair, Local Funding Agency
-
8/13/2019 Jackson County RTTT MOU December 2009
16/22
-
8/13/2019 Jackson County RTTT MOU December 2009
17/22
-
8/13/2019 Jackson County RTTT MOU December 2009
18/22
-
8/13/2019 Jackson County RTTT MOU December 2009
19/22
-
8/13/2019 Jackson County RTTT MOU December 2009
20/22
-
8/13/2019 Jackson County RTTT MOU December 2009
21/22
-
8/13/2019 Jackson County RTTT MOU December 2009
22/22