• Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce traffic and revenue estimates which are in turn utilized by Turnpike’s finance department to conclude feasibility of a proposed project. Project levels range from a basic feasibility analysis to an investment grade level study.
![Page 2: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/2.jpg)
Analysis Tool for Model Output to Analysis Tool for Model Output to Evaluate Express Toll Lanes Evaluate Express Toll Lanes
FeasibilityFeasibility
Analysis Tool for Model Output to Analysis Tool for Model Output to Evaluate Express Toll Lanes Evaluate Express Toll Lanes
FeasibilityFeasibility
Jack Klodzinski, PhDFlorida’s Turnpike Enterprise
Tom Adler, PhDResource Systems Group, Inc.
William T. Olsen, PE, PhDFlorida’s Turnpike Enterprise
![Page 3: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/3.jpg)
Introduction• Regional models used for producing travel
demand forecasts• Interpretation of traffic volume estimates • Daily Vs. Time of Day • Estimating toll rates
and traffic for a proposed toll facility – By section– By hour
![Page 4: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/4.jpg)
Methodology
OUTPUT: Estimated Hourly
Traffic and Toll Rates
ELTOD Spreadsheet Application
INPUT: Hourly Traffic &
Distribution, Facility Geometry, Max/Min Toll Rates.
INPUT: Run Travel
Demand Network Model to Produce
Estimated Corridor Volumes
![Page 5: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/5.jpg)
Development
• Estimate of split between General Use (GU) & Toll lanes using a supply/demand equilibrium process – Supply: Akcelik curves for travel time estimates – Demand: Toll Choice Model
![Page 6: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/6.jpg)
Volume/Delay Curves
The Akcelik curve has been found to better represent traffic The Akcelik curve has been found to better represent traffic in corridors with over capacity conditions. in corridors with over capacity conditions.
![Page 7: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/7.jpg)
Development
• Hourly toll rates by V/C ratio & specified limits – Determined by a power curve, exponent (input
parameter), and travel times – Limits are pre-determined minimum & maximum
rates
• Easily modified to represent alternative dynamic tolling policies
![Page 8: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/8.jpg)
$0.00
$0.20
$0.40
$0.60
$0.80
$1.00
$1.20
$1.40
$1.60
To
ll R
ate
pe
r M
ile
($
/mi)
V/C value
LOS D Threshold for Maximum Rate Charged (min toll = $0.05)
Example of Pricing Policy Curves
Parameters with min/max toll rates with selected EXP values and LOS E limit
Traffic Volume Served Increases
Revenue Potential increases
These curves are defined
by the selected EXP
value.
![Page 9: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/9.jpg)
Development: Primary Input
• Total daily traffic, hourly distribution (by direction), geometry of facility
• Geometry includes: section lengths, free flow speed, lane capacity, PCE factor, # of lanes (GU & Toll), max/min toll rates
• Secondary Input are scale factors • Spreadsheet format with calculations
between supply & demand done iteratively to achieve user equilibrium
![Page 10: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/10.jpg)
Example of Hourly Distribution by Roadway Segment and Direction
Plot shows ADT for 24 hourly intervals for each count station on a portion of the Interstate 75 corridor.
These curves represent a
section of I-75 for one
direction.
![Page 11: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/11.jpg)
Application
Florida District 1: Lee & Collier County Express Lanes
on Interstate 75
![Page 12: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/12.jpg)
Lee/Collier County Networks
I-75 Corridor
Gulf of Mexico
To Miami
Toll Collection Location
SuccessfulApplication
!
![Page 13: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/13.jpg)
Application Menu
![Page 14: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/14.jpg)
Application: Input
Toll Choice Model
Pricing Curve Values
V/C and Other Values
![Page 15: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/15.jpg)
Application: Input O-D Table from
Demand Model
![Page 16: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/16.jpg)
Application: Hourly Output by Section
• Traffic Volumes (also by time period)• V/C Ratios• Toll Rates & Projected Revenue• Travel Times• Link Speeds• Cost per Trip Summary• Results Display (network layout)• Model Run Summary
![Page 17: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/17.jpg)
Application: Sample Output - XLPeak Periods
of Hourly Volume and
toll rates.
Hourly Volume and toll rates, by section & direction
![Page 18: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/18.jpg)
Application: Sample Output - XL
Graphical Representation of Hourly Volume and toll rates, by section
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Hour Ending
Xpress Lanes Volume by Section (Northbound)Section 1
Section 2
Section 3
Section 4
Section 5
Section 6
Section 7
Section 8
NORTHBOUND VOLUME
![Page 19: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/19.jpg)
Sample Network Display of ResultsLocal
Streets
General Use Lanes
Express Toll Lanes
Slip Ramps
![Page 20: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/20.jpg)
Example of a Potential Project
3 YEARS
7 ALTERNATIVES
21 INITIAL MODEL RUNS
Complete Network Model Runs Needed
![Page 21: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/21.jpg)
1 MODEL
RUN
Example of a Potential Project
NETWORK MODELING(4 periods)
SPREADSHEET MODELING
(24 hour periods)
1 YEAR
Model Runs Needed to Estimate an Optimal Toll Rate for One Alternative
9 SECTIONS
1 YEAR
9 SECTIONS
13 TOLL RATES
117 MODEL RUNS
OR
…and this doesn’t consider the pricing policy available in the ELTOD!
![Page 22: Jack is currently performing travel demand model forecasting for Florida’s Turnpike. Specifically he works on toll road project forecasting to produce](https://reader035.vdocuments.us/reader035/viewer/2022062519/5697bfdc1a28abf838cb11cb/html5/thumbnails/22.jpg)
Express Lanes Time of Day (ELTOD) Model Future Enhancements
• Validation Update• Expanded O/D matrix input • Toll Choice Model update• Additional parameter control • Peak Spreading • Feedback loop with network model• Reporting options• Additional output data