j delimitation error at plant (new)

30
1 The INCREMENT DELIMITATION ERROR at the plant The INCREMENT DELIMITATION ERROR IDE introduces the largest biases encountered in sampling. x y z 1. A sample must be equiprobabilistic. 2. A process stream is always segregated. 3. A process stream is 3-dimensional. 4. But, it is up to us to perform 3- dimensional, 2- dimensional, or 1-dimensional sampling.

Upload: segundo-colorado-villar

Post on 13-Dec-2015

15 views

Category:

Documents


0 download

DESCRIPTION

Error de Delimitación en planta

TRANSCRIPT

Page 1: J Delimitation Error at Plant (New)

1

The INCREMENT DELIMITATION ERROR at the plant

The INCREMENT DELIMITATION ERROR IDE introduces the largest biases encountered in sampling.

x

y

z

1. A sample must be equiprobabilistic.

2. A process stream is always segregated.

3. A process stream is 3-dimensional.

4. But, it is up to us to perform 3-dimensional, 2-dimensional, or 1-dimensional sampling.

Page 2: J Delimitation Error at Plant (New)

2

One-dimensional samplingOne-dimensional sampling

F lo w in gs tream

C o n s is ten t s l iceacro ss th e s tream

For accurate metallurgical accounting, it is a must to perform 1-dimensional sampling.

For effective process control, it is recommended to perform 1-dimensional sampling.

Page 3: J Delimitation Error at Plant (New)

3

Examples of 3-dimensional sampling

Case #1: Sampling of a railroad car

Examples of 3-dimensional sampling

Case #1: Sampling of a railroad car

Find at least 3 problems.

Page 4: J Delimitation Error at Plant (New)

4

Examples of 3-dimensional sampling

Case #2: Sampling a front-loader bucket

Examples of 3-dimensional sampling

Case #2: Sampling a front-loader bucket

Com posite sam ple

S tockp ile

G rab increm ent

Find at least 3 problems.

Page 5: J Delimitation Error at Plant (New)

5

Stream SamplingStream Sampling

The entire stream part of the time

Part of the stream all the time

Part of the stream part of the time

There are 3 choices, but only one can be performed correctly.

Page 6: J Delimitation Error at Plant (New)

6

Increment Delimitation Correctness:

It does not take fragments into account.

Increment Delimitation Correctness:

It does not take fragments into account.

F lo w in g s tre am

T he w id th of theincre m ent m ust re m ain

c on stan t all the w ayacross the stre am .

Page 7: J Delimitation Error at Plant (New)

7

Correct frame positioned on a

Stopped conveyor belt

Correct frame positioned on a

Stopped conveyor belt

S to p p edco n veyo r b e lt

h yd rau licp o sitio n in g

R e fere n c esam p le

This system can provide a good reference sample when performing a bias test.

Page 8: J Delimitation Error at Plant (New)

8

Straight-path

Cross-stream Sampler

Straight-path

Cross-stream Sampler

F a llin gs trea m

S a m p lein c rem e n t

S a m p lein c rem e n t

T o p v iew

S tream

C u tte rd ire c tio n

W id th o f c u tke p t c o n s tan t

The cutter must cross the

Stream at constant speed.

Page 9: J Delimitation Error at Plant (New)

9

The cutter may get damaged

over time.

The cutter may get damaged

over time.

F a llin gs tre am

S am p lein c rem en t

T o p v iew

S tream

C u tte rd ire c tio n

W id th o f cu tn ot co n s tan t

Careful, systematic maintenance

of the cutter edges is a must.

Page 10: J Delimitation Error at Plant (New)

10

The cutter and cutter edges

must be cleaned every working shift.

The cutter and cutter edges

must be cleaned every working shift.

F a llin gs tream

S am p lein c rem en t

T o p v iew

S tream

C u tte rd ire c tio n

W id th o f cu tn ot co n s tan t

The cutter edges must be carefully washed after each cut.

Page 11: J Delimitation Error at Plant (New)

11

The Drive System of the cutter

must not be under-designed.

The Drive System of the cutter

must not be under-designed.

S tream

C u tte r d irec tio n W id th o f c u tn o t c o n sta n t

Page 12: J Delimitation Error at Plant (New)

12

The Parking Position of the cutter

must be far away from the stream.

The Parking Position of the cutter

must be far away from the stream.

S tream

C u tte r d ire c tio n W id th o f c u tn o t c o n sta n t

The Drive System of the cutter must be electric.

Page 13: J Delimitation Error at Plant (New)

13

The Rotating Vezin Sampler The Rotating Vezin Sampler

u 3 d

S a m pleincrem en tS trea m

S trea m

T o p vie w

S tre am

C u tte r d ire c tio n W id th o f c u tk e pt c o n sta n t

Page 14: J Delimitation Error at Plant (New)

14

Correctness of a Vezin Sampler Correctness of a Vezin Sampler

C utte r o p ening W

C utte r o p ening w

C ircum ference c

C ircum ference C

ConstantRatio Sampling W

w

C

c

Page 15: J Delimitation Error at Plant (New)

15

A common, incorrect Vezin Sampler A common, incorrect Vezin Sampler

S a m pleincrem en tS trea m

T o p vie w

Page 16: J Delimitation Error at Plant (New)

16

If part of the stream is missed by the

sampler, a delimitation bias results.

If part of the stream is missed by the

sampler, a delimitation bias results.

F a llin gs tream

S am p lein c rem en t

T o p v iew

S tream

C u tte rd ire c tio n

P a rt o f th es tream is m is s in g

Page 17: J Delimitation Error at Plant (New)

17

The cutter must not collect any material

when stopped in a parked position.

The cutter must not collect any material

when stopped in a parked position.

S trea m

A re a a ffe c te d b y a d u s t p ro b le m

S tream

C u tte rd ire c tio n

C o n tam in a tio n

Page 18: J Delimitation Error at Plant (New)

18

If only one parked position is available,

the cutter must not return across

the stream too soon.

If only one parked position is available,

the cutter must not return across

the stream too soon.

O nly o ne p a rk ingp o s itio n

S tream

D uring the re turn traje ctory,the re is an are a w he re

noth ing can be take n by the cu tte r.

Page 19: J Delimitation Error at Plant (New)

19

Stationary in-stream probes Stationary in-stream probes

S tream

S am ple

S tream

S am ple

S tream

S am ple

The intolerable assumption:

“The stream is not segregated, therefore collecting any part of the stream is good enough.”

Page 20: J Delimitation Error at Plant (New)

20

Introduction of a stream turbulence

to minimize segregation across the stream

Introduction of a stream turbulence

to minimize segregation across the stream

S tream

S am ple

Moving from very bad to bad!

Page 21: J Delimitation Error at Plant (New)

21

Flushing the probe is a must,

prior to collecting the sample.

Flushing the probe is a must,

prior to collecting the sample.

S tream

S am ple

Page 22: J Delimitation Error at Plant (New)

22

Stationary by-stream gate Stationary by-stream gate

S treamS am p lin g p o in t

S am p lein crem en t

T h e fin e m ateria l m o vin g a t th e to p o f th e s tream is n ever sam p led .

Page 23: J Delimitation Error at Plant (New)

23

The Grouping and Segregation Error

to the rescue: An attractive alternative

The Grouping and Segregation Error

to the rescue: An attractive alternative

• Dimension X is sampled all the time.

• Dimension Y is completely represented.

• Dimension Z is represented by grouping several increments minimizing the effect of across-the-stream segregation.

Un d er f lo w in d u c in gtu rb u len ce

M ain s treamS am p le s tream go in gto a s im ila r , sm a lle r

sam p lin g s tage

F ive C u tte rs

S uggested sam p ling system fo r p ro cess co ntro l sam p ling o f slur r ie s:T herm o G am m a-M etr ics A nsta t S ystem .

X

YZ

Page 24: J Delimitation Error at Plant (New)

24

Across the stream sampling slot Across the stream sampling slot

Exercise: Find what is wrong with this sampling system.

S tream

S am p leinc rem ent

Page 25: J Delimitation Error at Plant (New)

25

Stabilizing the flow rate of the stream

Prior to the on-line analyzer

Stabilizing the flow rate of the stream

Prior to the on-line analyzer

O n -lin ea n a ly z e r

S tre a m

S tre a m

Page 26: J Delimitation Error at Plant (New)

26

Exercise:

What is basically wrong

with a flap sampler?

Exercise:

What is basically wrong

with a flap sampler?

S tre a m S a m p lein c re m e n t

1

2

C losed , id leposition

O pened, id leposition

F alling stre am

1 2

T h e w id th o f th e in c re m e n ta c ro ss th e s tre a m

is n ot k e p t c o n sta n t.

S tre a m

Page 27: J Delimitation Error at Plant (New)

27

Most stream diversion systems lead

to an increment delimitation bias.

Most stream diversion systems lead

to an increment delimitation bias.

S tre a m

S a m p lein c re m e n t

S tre a m

S a m p lein c re m e n t

Page 28: J Delimitation Error at Plant (New)

28

Exercise:

What is basically wrong

with this hose sampler?

Exercise:

What is basically wrong

with this hose sampler?

H o se tra je c to ry

F all in gs tream

1

2

S tre a m S am p lein c re m en t

1

2

T h e w id th o f th e in c re m e n ta c ro ss th e s tre a m

is n ot ke p t co n s tan t.

S tre a m

Page 29: J Delimitation Error at Plant (New)

29

Exercise:

Why is this hose sampler correct?

Exercise:

Why is this hose sampler correct?

H o se tra je c to ry

F allin gs tream

1

2

S tre a m

S am p lein c rem en t

1

2

T h e w id th o f th e in c re m e n ta c ro ss th e s tre a mis k ep t co n s tan t.

S tre a m

S id e view o f th e cu tte r T o p view o f th e cu tte r

Page 30: J Delimitation Error at Plant (New)

30

Exercise:

Is the shape of the stream relevant?

Exercise:

Is the shape of the stream relevant?