ASME lnterpretation: IX-83 -25 Page I of I Code Interpretations Choose the- scop_e of the list of Code Interpretations you wish to see: TqEil@@ro Status: .i Currently Valid Status Description: Interpretation: IX-83-25 Subject: Section IX, QW-200 Date fssued: September 28, I9B2 File Number: BC81-160 Related Documents: Question (1): A parent company has WPS's qualified by a wholly owned subsidiary. Both parent company and subsidiary have "N" Certificates of Authorization. If the parent company changes its name, is it necessaiy to change the WPS's to reflect the new name on the revised Certificates of Authorization? Reply (l): No, provided there is documented traceability from the new company name to the WPS qualified under the old company name. Question (2): A WPS is qualified using a filler material not listed in ASME Section II, part C. Does the WPS have to be requalified if a later edition of Section II, Part C, incorporates this material? Reply (2): No, provided all filler material specification requirements remain the same. Theabove interpretation wastranscribed by HSBCode Servicesfrom the official publications [ASME published volumes, Nationat Board, Eurodynel. Although every effortwas made to accurately reproduce this interpretation, useof this information should be for research only.It is strongly recommended that the official published document be used for Code business. UserProfile I Termsof Use I privacy Copyright 2002. All RightsReserved. HSB Global Standards http://www.hsbct.com/trsbcVasmeinterps.nsf/0/57496020F5F8DDD48525665D00458F5C 3/4/2005

Upload: brunomdq77

Post on 30-Nov-2015

4 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: IX-83-25

ASME lnterpretation: IX-83 -25 Page I of I

Code In te rp re ta t i ons

Choose the- scop_e of the list of Code Interpretations you wish to see:

TqEil@@roStatus: .i Currently ValidStatus Description:

Interpretat ion: IX-83-25

Subject : Sect ion IX, QW-200

Date fssued: September 28, I9B2

F i le Number : BC81-160

Related Documents:

Quest ion (1) : A parent company has WPS's qual i f ied by a whol ly owned subsid iary. Both parent company andsubsidiary have "N" Cert i f icates of Author izat ion. I f the parent company changes i ts name, is i t necessaiy tochange the WPS's to reflect the new name on the revised Certif icates of Authorization?

Reply ( l ) : No, provided there is documented t raceabi l i ty f rom the new company nameto the WPS qual i f ied under the old company name.

Quest ion (2) : A WPS is qual i f ied using a f i l ler mater ia l not l is ted in ASME Sect ion I I , partC. Does the WPS have to be requal i f ied i f a later edi t ion of Sect ion I I , Part C,incorporates th is mater ia l?

Reply (2) : No, provided al l f i l ler mater ia l speci f icat ion requirements remain the same.

The above interpretation was transcribed by HSB Code Services from the official publications [ASME published volumes, Nationat Board,Eurodynel. Although every effort was made to accurately reproduce this interpretation, use of this information should be for research only. It isstrongly recommended that the official published document be used for Code business.