IWCF Well Control Level 5Celle Drilling Conference 2017
Contents
IWCF well control level 5 course program
Background - who is it for
Structure and contents
Delivery approach
Questions
Why?
Level 5 background and audience
Level 5 background
New training level recommended by
the International Association of Oil &
Gas Producers
Report 476 recommends
enhancements to well control training,
examination and certification
Level 5 background
Engineers and approving authorities training
Part of role specific training (level 1, 2, 3, 4 and 5)
Engineers, senior engineers, managers, team leaders, well examiners,
technical authorities
• Drilling, completion, well services
• Operations, design, petroleum, regulator
Level 5 background
Learning outcome
Capable of planning and performing safe well design and intervention
operations that maintain well control and integrity
Able to evaluate technically on deviations to the well operations plan
and advise accordingly
Level 5 objectives
Overall
Guarantee well
integrity over the
lifecycle
Design and maintain
well barriers for the
well lifecycle
Cross-discipline
Well planning
Drilling
Well intervention
Well abandonment
Consistent
Definitions
Standards
Procedures
Competence
requirements
Structure
Level 5 program structure and contents
Level 5 structure
Course structure and length
5 days / max 12 candidates
Pre-work and case study project
Drilling and well intervention participate together
Written assessment with invigilation
Level 5 content and delivery method
IWCF requirements
Information on recent well control or well integrity events
Case studies
Region-specific standards and regulatory requirements
Scenario exercises on full-scale simulator
If applicable, detailed course content is decided by the employer
together with the training provider
Minimum content according to IOGP 476, Appendix C
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
References
API Spec 6A/ISO 10423:2009:
Specification for Wellhead and Christmas
Tree Equipment
API Std 65-2: Isolating Potential Flow Zones
During Well Construction
API Spec 16A/ISO 13533:2001:
Specification for Drill-Through Equipment
API Spec 16C: Choke and Kill Equipment
API Spec 16D: Specification for Control
Systems for Drilling Well Control Equipment
and Control Systems for Diverter Equipment
Guidelines for the Abandonment of Wells
(Issue 5, July 2015)
API RP 59: Recommended Practice for Well
Control Operations
API RP 64: Recommended Practice for
Diverter Systems Equipment and Operations
API Std 53: Blowout Prevention Equipment
Systems for Drilling Wells
API RP 90: Annular Casing Pressure
Management for Offshore Wells
API RP 96: Deepwater Well Design and
Construction
API Bull 97: Well Construction Interface
Document Guidelines
ISO 31010 Risk management - Risk
assessment techniques
IADC Deepwater Well Control Guidelines
ISO 16530-1: Well integrity Life cycle
governance
Norsok D-010: Well integrity in drilling and
well operations
117 Recommended guidelines for Well
Integrity - NEW REVISION 08.06.2016
OP119: Well Life Cycle Integrity Guidelines,
Issue 3, March 2016
EU: Offshore Safety Directive 2013/30/EU
Oil & Gas UK:
Well Life Cycle Integrity Guidelines (Issue 3,
March 2016)
ISO 31000 Risk management
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Well integrity throughout the well lifecycle
Enhance knowledge and skills in planning and performing safe well design
and/or intervention operations to ensure well control and well integrity is
maintained throughout the well life cycle
Well integrity guidelines:
• Norsok: D-010 Well Integrity in drilling and well operations
• O&G UK: Well Life Cycle Integrity Guidelines
• EU: Offshore Safety Directive 2013/30/EU
• ISO 16530-1:2017 Well Integrity – Part 1: Life Cycle Governance
ISO 16530: well integrity
Minimum requirements to ensure management of well integrity
Assuring well integrity comprises two main building blocks: 1. Ensure well integrity during well design and construction2. Manage well integrity throughout the remaining well life thereafter
Addresses minimum compliance requirements for well operators
Developed by oil and gas operating companies
Practical recommendations and techniques
Well integrity management system
Operators implement a WIMS to ensure that well integrity is maintained
throughout the well life cycle
In the WIMS a combination of technical, operational and organizational
processes are applied
At the highest level, a well integrity policy shall be defined
Well integrity management system
WIMS should address
• Risk assessment
• Organizational structure
• Well barriers
• Performance standards
• Well barrier verification
• Reporting and documentation
• Management of change process
• Continuous improvement process
• Auditing
Well integrity management system
Basis of design phase
Design phaseConstruction
phaseOperational
phaseIntervention
phaseAbandonment
phase
WIMS elements are common to all phases
Lessons
learned
Optional workflow
Delivery
Insight into detailed contents and delivery approach
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Inflow testing
Annular cement
integrity
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Inflow testing
Annular cement
integrity
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Risk assessment
Delegates should be able to evaluate technically on deviations to the
well operations plan and advise accordingly
Example: during well execution, the casing got stuck 300m off bottom
can’t move up or down. Only option is to cement it in place.
Now what?
Risk assessment: management of change
The MOC process should include the following steps
a) Identify a requirement for change.
b) Identify the impact of the change and the key stakeholders involved. This includes identifying what standards, procedures, work practices, process systems, drawings, etc. would be impacted by the change.
c) Perform an appropriate level of risk assessment in accordance with the well operator risk assessment process. This includes:
— identifying the change in risk level(s) via use of a risk assessment matrix or other means;
— identifying additional preventive and mitigating measures that can be applied to reduce the risk level;
— identifying the residual risk of implementing the change/deviation;— reviewing the residual risk level against the well operator’s risk tolerability/ALARP acceptance criteria;
— updating the risk register accordingly.
d) Submit the MOC proposal for review and approval in accordance with the well operator’s MOC system.
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Annular cement integrity
Objective of cementing operations is to successfully seal the annulus with
cement
Many wells suffer from sustained casing pressure or other well integrity
issues related to non-successful cementing operations
API Standard 65 part 2 and API RP 10 series
Annular cement integrity
Isolating potential flow zones in wells during well construction
Effective fluid displacement
Loss of hydrostatic pressure when cement sets
Practices and factors that affect cementing success
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Annular cement
integrity
Inflow testing
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Maintenance and
failure of well
integrity
Management of
corrosive fluids
Formation strength
testing
Rock mechanics
Kick tolerance
Well barriers
Barrier verification
Inflow testing
Annular cement
integrity
Risk assessment
techniques
Risk management
Shallow gas
Tertiary well control
Well abandonment
Well integrity
management and
maintenance
Well integrity
deliverables lifecycle
phases
Inflow testing
Incomprehension about inflow testing
Incorrect usage of horner plots
Incorrect interpretation of horner plots (too quick)
No official standard
Are supervisors on the rig trained
Supervisory personnel on the rig who have to make decisions are often
not trained to make those
0
0.5
1
1.5
2
2.5
3
Flo
w r
ate
(ltr/
min
)
Time (minutes)
INFLOW TEST
Return flowisreducingduetocoldfluidheatingup
Isthisstillfluidheatinguporabarrierleak?
Summary
IWCF Well Control Level 5 Training
Guarantee well integrity over the lifecycle
Design and maintain well barriers for the well lifecycle
Plan and perform safe well design and intervention operations
Evaluate and act technically on deviations to the plan
The endany questions?