IWCDP SUMMIT

N2 DEVELOPMENTLOGISTICS PLATFORM FOR

THE WILD COAST

14 November 2013

Page 2: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

PART 1

ROAD CONSTRUCTION PROJECTS IN THE EASTERN

CAPE

Page 3: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Project Types

Corridor Development Bypass Development Conventional Projects Routine Road Maintenance Community Development Projects

Page 4: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Corridor Development

Proposed N2 Wild Coast Highway

Page 5: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Bypass Development

Butterworth & Dutywa Public participation completed. Final scoping report compiled. Scoping report to be advertised for comments. Construction estimated to commence 2016.

King William’s Town Route location to be identified. Consulting Firm to be appointed.

Page 6: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Bypass Development

Mount Frere Possible routes (six options have been identified) Public participation to commence March 2014.

Qumbu Currently no need for a bypass, but urgent need for public transport and trading

facilities. If Municipality provides the necessary taxi/bus

ranks, SANRAL will consider providing a dual carriageway

Page 7: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Conventional Projects

Route

Recently Completed

In Constructi

on

In Design or

Planning

Total Estimated

Value

N2 5 7 8 R 4 624 mill

N6 3 1 2 R 503 mill

N9 0 0 1 R 350 mill

N10 5 2 1 R 1 034 mill

R56 0 0 1 R 90 mill

R58 0 0 1 R 85 mill

R61 2 7 8 R 4 539 mill

R72 1 0 2 R 700 mill

Page 8: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Routine Road Maintenance Routes

N2 Tsitsikamma to Brooksnek N6 East London to Aliwal North N9 WC Border (Willowmore) to

Middelburg N10 Nanaga to Middelburg R56 Middelburg to EC Border (Matatiele) R58 EC Border (Venterstad) to Elliot R61 WC Boarder to Aberdeen R61 Queenstown to Port St Johns R62 EC Border (Haarlem) to N2

(Humansdorp)

Page 9: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Routine Road Maintenance Routes

R63 West EC Border (Graff Reinet) to N10 (Cookhouse)

R63 East N10 (Bedford) to N2 (Komga) R67 N2 (Grahamstown) to R61

(Queenstown) R72 N10 (Nanaga) to East London Airport R75 N2 (Port Elizabeth) to R63 (Graaff

Reinet)Year Funding

2012/2013 R 94 973 048

2013/2014 R 74 707 645

2014/2015 R 125 323 335

Page 10: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Community Development Projects

In Construction Brooksnek Various Facilities Mar. 2013 to Mar. 2014 Est. R 34 mill Tombo Various Facilities Oct. 2011 to Feb. 2014 Est. R 54 mill St Barnabas Various Facilities Aug. 2013 to Apr. 2014 Est. R

27 mill Misty Mt. Various Facilities Jun. 2012 to Jun. 2014 Est. R 42 mill Mafini Various Facilities Jun. 2012 to Nov. 2013 Est. R 60 mill Umngazi Various Facilities Oct. 2012 to Oct. 2014 Est. R 52 mill Maqwathini CAR Nov. 2012 to Nov. 2014 Est. R 18 mill Nyhwarha CAR Oct. 2012 to Nov. 2014 Est. R 32 mill Magalakangqa CAR Aug. 2013 to Jun. 2015 Est. R 50 mill Engcobo Pedestrian Facilities Aug. 2013 to Jun. 2015 Est. R

36 mill

Total Est. R 405 m

Page 11: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Community Development Projects

In Planning Ndabakazi Intersection Start April 2014

Est. R 25 mill Breidbach IC Pedestrian Fac.Start June 2015

Est. R 8 mill KWT Pedestrian Facilities Start June 2015

Est. R 8 mill Fort Beaufort Various Start January 2014 Est. R

10 mill Tsolomnqa Various Facilities Start January 2014 Est. R

12 mill Whittlesea Pedestrian Start January 2014 Est. R

16 mill Ngcweleni Various Facilities Start Oct. 2015

Est. R 36 mill Mzeke Various Facilities Start Jul 2014 Est. R

21 mill

Page 12: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

PART 2

N2 WILD COAST HIGHWAY PROJECT

Page 13: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Socio-economic Benefit

Give access to untapped potential of former Transkei.

Address the primary inequity of lack of access, which

has led to being the most impoverished region of SA.

Page 14: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Road User Benefits

Linking East London with Durban. 69 km shorter than the existing N2

route. Estimated time savings of 1¼ to 2¼

hours. This time and cost savings due to:

distance saving, Improved alignment, lower altitude.

Page 15: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Basic Scope of the Work

Corridor development: Durban to East London.

New alignment: Port Edward to Port St Johns.

Development of approximately 560 km of road.

Construction of 9 bridges, largest being: Mtentu Msikaba

Page 16: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Msikaba River Bridge

Page 17: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Mtentu River Bridge

Page 18: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Status Quo

RoD received April 2010. RoD endorsed July 2011. Detail design of two major bridges

complete. Preliminary design of 7 other bridges in

progress. Preliminary alignment of road works

complete. Commencement pending court cases.

Page 19: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Estimated Project Cost

Two major bridges (greenfields) R 2.1 bill

Roadworks (greenfields) R 5.1 bill Roadworks (existing route) R

1.8 billTotal project cost R 9–

10 bill

Page 20: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Estimated Job Creation Potential

Construction Period Construction – Direct 6 800 jobs Construction – Indirect 28 100

jobs

Maintenance Period (continuous per annum) Operation – Direct 900 jobs Operation – Indirect 18 900 jobs

Page 21: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Estimated Local Socio-economic Impact

During Construction only Wages and salaries R 480.5

mill Income to local industry R 360.4

mill Income to retailers R 240.2

mill Income to service providers R

120.1 mill

Page 22: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Potential Opportunities

Potential opportunities exists in: Road Construction Projects (direct

opportunities). Non-road Construction Projects (indirect

opportunities). Sustainable socio-economic development.

Page 23: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Potential Opportunities During Construction (Examples)

Construction of roadworks. Plant and machinery hire. Establishment of quarries and borrow pits.

Construction of ancillary works. Establishment of site offices and utilities Establishment of contractor villages.

Providing support services. Servicing of plant, vehicles, printers, etc. Accommodation, catering, retail services.

Page 24: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Unlocking Opportunities24

SANRAL’s Contribution to Unlock Opportunities Development and training Inclusion mechanisms

Page 25: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Contractor Growth Path

Community Development Projects

Model 1ALabour Based

Labour

Model 1BSMME Based

- Labour- CE1- CE2

Model 1COutcomes Based

- CE3-CE4

Routine Road Maintenance Projects

Model 2

- CE6 to CE7- CE2 to CE4

Conventional Projects

Model 3ASmall Conventional

Contracts

- CE6 to CE7

Model 3BConventional

- CE8 to CE9

Development and Training Model

Page 26: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Inclusion Mechanisms

Conventional Projects Contract Participation Goals

Routine Road Maintenance Projects Enhanced sub-contractor methodology

Community Development Projects Labour and SMME based contracts.

26

Page 27: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Conventional Projects

Contract Participation Goals: Labour Maximisation: 4 - 6% of tender

sum. SMME/BE Utilisation : 8 - 12% of tender

sum. 90% of 8 – 12% black owned. 40% woman owned. 40% youth.

27

Page 28: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Routine Road Maintenance Projects Enhanced Sub-contractor Methodology

Main contractor typically CIDB grade 6 and upwards.

Main contractor executes 30 to 40 % of the work. Sub-contractors typically CIDB grade 2 to 4. Sub-contractors executes 60 to 70% of the work. 90% of SMME’s black owned. 40% of SMME’s woman owned. 40% of SMME’s youth owned. All unskilled labour from the local community.

28

Page 29: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Community Development Contracts Labour and SMME Based Contracts

SANRAL contracts with Construction Manager (CM). CM tenders for training, mentoring, overseeing, etc. CM does not tender for construction of the works. All SMME’s are recruited from the local community. SMME’s construct 90% of the work, 10% large

plant. 40% of SMME’s must be woman owned. 40% of SMME’s must be youth owned. All labour recruited from the local community. Local suppliers are utilised as far as possible.

29

Page 30: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

How to get involved?30

Develop local skills Develop local SMME’s Develop local business Share development plans Share development programmes Share data bases

Page 31: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

Look out for SANRAL Tenders

Register with statutory controls CIDB, UIF, SARS, Compensation Commissioner, etc.

SANRAL web-site: www.nra.co.za Service Provider Zone Tenders All projects Current Tenders/Tenders Awarded

Local media RRM & CD projects

Local notice boards

31

Page 32: IWCDP SUMMIT N2 DEVELOPMENT LOGISTICS PLATFORM FOR THE WILD COAST 14 November 2013

MARLIZE NEL-VERWEY(041) 398-3220

[email protected]

Fraud Hotline: 0800 204 [email protected] www.nra.co.za