Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES Vol. IV of VI IV.20-1 August 2014 IV.20 VISUAL RESOURCES The analysis in this chapter addresses potential impacts to visual resources from the No Action Alternative and implementation of the various action alternatives of the Desert Renewable Energy Conservation Plan (DRECP). The analysis includes impacts from covered renewable energy and transmission development activities, the Reserve Design, and Bureau of Land Management (BLM) Land Use Plan Amendment (LUPA) decisions proposed under each alternative, including proposed Visual Resource Management (VRM) Classes. The DRECP would encourage the development and operation of covered renewable energy facilities and transmission lines within Development Focus Areas (DFAs). The VRM Class designations on BLM-administered lands indicate the level of visual change allowed. The primary consideration in quantifying visual impacts at a programmatic and plan level of analysis is the extent to which the visual resource elements described in Volume III, Chapter III.20, Visual Resources, are affected by the proposed DFAs, transmission, and reserve design conservation land designations and management. IV.20.1 Approach to Impact Analysis IV.20.1.1 General Methods Visual impacts from development on BLM-administered lands are analyzed using BLM’s VRM system. This approach considers scenic quality, viewer sensitivity, and distance zones when conducting a Visual Resource Inventory (VRI). The VRI describes existing conditions but does not prescribe management actions. BLM considers information from the inven- tory when assigning VRM classifications to specific geographic areas. Specific projects or sites resulting from a proposed planning direction are not identified or under review in this programmatic Environmental Impact Report/Environmental Impact Statement (EIR/EIS). On BLM lands, the approach to analysis of visual impacts used in the EIR/EIS identifies the amount of BLM land that would fall under various VRI and VRM classifications for each alternative and the extent to which those lands are or would be under conservation management or available for development. This approach is used to understand the potential impact on visual resources and their differences under each alternative. On non-BLM lands, visual impacts from development are analyzed using a somewhat differ- ent approach, one that considers visual quality, viewer concern and exposure, and overall visual sensitivity from key observation points. Factors include visual contrast, project dominance, view blockage, and overall visual change. As with BLM-administered lands, a proxy is used to represent the amount of land on which visual impacts could occur. This

Upload: phamliem

Post on 29-May-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-1 August 2014

IV.20 VISUAL RESOURCES

The analysis in this chapter addresses potential impacts to visual resources from the No

Action Alternative and implementation of the various action alternatives of the Desert

Renewable Energy Conservation Plan (DRECP). The analysis includes impacts from covered

renewable energy and transmission development activities, the Reserve Design, and Bureau

of Land Management (BLM) Land Use Plan Amendment (LUPA) decisions proposed under

each alternative, including proposed Visual Resource Management (VRM) Classes.

The DRECP would encourage the development and operation of covered renewable energy

facilities and transmission lines within Development Focus Areas (DFAs). The VRM Class

designations on BLM-administered lands indicate the level of visual change allowed.

The primary consideration in quantifying visual impacts at a programmatic and plan level

of analysis is the extent to which the visual resource elements described in Volume III,

Chapter III.20, Visual Resources, are affected by the proposed DFAs, transmission, and

reserve design conservation land designations and management.

IV.20.1 Approach to Impact Analysis

IV.20.1.1 General Methods

Visual impacts from development on BLM-administered lands are analyzed using BLM’s

VRM system. This approach considers scenic quality, viewer sensitivity, and distance zones

when conducting a Visual Resource Inventory (VRI). The VRI describes existing conditions

but does not prescribe management actions. BLM considers information from the inven-

tory when assigning VRM classifications to specific geographic areas.

Specific projects or sites resulting from a proposed planning direction are not identified

or under review in this programmatic Environmental Impact Report/Environmental

Impact Statement (EIR/EIS). On BLM lands, the approach to analysis of visual impacts

used in the EIR/EIS identifies the amount of BLM land that would fall under various VRI

and VRM classifications for each alternative and the extent to which those lands are or

would be under conservation management or available for development. This approach is

used to understand the potential impact on visual resources and their differences under

each alternative.

On non-BLM lands, visual impacts from development are analyzed using a somewhat differ-

ent approach, one that considers visual quality, viewer concern and exposure, and overall

visual sensitivity from key observation points. Factors include visual contrast, project

dominance, view blockage, and overall visual change. As with BLM-administered lands, a

proxy is used to represent the amount of land on which visual impacts could occur. This

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-2 August 2014

analysis identifies the acreage in the DFA under each alternative that potentially would be

available for development of renewable energy facilities.

Future projects constructed pursuant to Plan approval will be reviewed when they are pro-

posed, on a case-by-case basis and on a site-specific scale, to determine their consistency

with the adopted VRM objectives of the applicable land use plan.

IV.20.1.2 CEQA Standards of Significance

Appendix G of the California Environmental Quality Act (CEQA) Guidelines identifies four

standards for determining the significance of impacts to aesthetics from a project. Impacts

could be considered significant if the project would:

Have a substantial adverse effect on a scenic vista.

Substantially damage scenic resources, including trees, rock outcroppings, and

historic buildings within a State Scenic Highway.

Substantially degrade the existing visual character or quality of the site and

its surroundings.

Create a new source of substantial light or glare, which will adversely affect day or

nighttime views in the area.

These CEQA standards of significance are subsumed under the broader impact statements

applied to the visual impact analysis of each alternative (e.g., see Section IV.20.3.2.1, Plan-

wide Impacts of Implementing the DRECP: Preferred Alternative). These impact statements

(1) identify the short-term and long-term diminution of scenic quality resulting from

project implementation and (2) consider impacts on scenic vistas, scenic resources along

State Scenic Highways, the visual character and quality of a site and its surroundings, and

the introduction of light and glare, among other factors.

IV.20.2 Typical Impacts Common to All Action Alternatives

This section describes visual impacts typically associated with solar, wind, and geothermal

energy development, and transmission requirements (rights-of-way, major transmission

lines, generator tie-lines [i.e., electrical lines connecting energy facilities to the larger elec-

tric grid], and substations). The impact of a given project would depend upon the intensity

of project-specific resource development, including energy type, technologies used, site

layout, scale, location, impact minimization strategies employed, timing and degree of dis-

turbance, complexity of the facilities, and other factors analyzed at the project level.

The analysis in this programmatic EIR/EIS draws on information in other environmental

documents. Typical effects of renewable energy development on visual resources were

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-3 August 2014

evaluated by reviewing the Programmatic Environmental Impact Statement for Solar

Energy Development in Six Southwestern States (Solar PEIS), the Wind Energy Develop-

ment Programmatic Environmental Impact Statement (Wind Energy PEIS), and the Pro-

grammatic Environmental Impact Statement for Geothermal Leasing in the Western United

States (Geothermal PEIS). In these documents, potential effects from actions similar to

those that might occur under the DRECP alternatives were assessed.

Visual impacts can be divided into short-term impacts, generally associated with site char-

acterization and active construction and decommissioning activities, and longer-term

impacts that result from the visible physical changes wrought by construction, including

site alterations, the physical presence of facilities, and facility operation. For purposes of

analysis, short-term visual impacts are considered to occur and be present for no more

than 5 years. These impacts are associated with visible construction activities and mate-

rial/equipment staging and would cease once construction is completed. Long-term visual

impacts extend beyond a 5-year period, when construction has been completed and opera-

tions are ongoing.

IV.20.2.1 Impacts of Renewable Energy and Transmission Development

Impacts can occur at various phases of a project: site characterization, construction and

decommissioning, and operation and maintenance. Many types of impacts on visual resources

are common among renewable energy projects, regardless of the technology employed.

Visual changes due to utility-scale renewable energy and transmission development activities

result from a range of actions or activities, including:

Disturbance of ground surface.

Alteration or removal of vegetation and landforms.

Introduction of structures (e.g., energy collection and generation units, buildings,

towers, and ancillary facilities).

New or upgraded roads.

New or upgraded utilities and/or rights-of-way (e.g., widening of rights-of-way,

addition of transmission lines, and upgrading of transmission capacity).

Presence and movement of workers, vehicles, and equipment.

Visible emissions (e.g., dust and water vapor plumes).

Reflectance, glare, and lighting.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-4 August 2014

IV.20.2.1.1 Impacts of Site Characterization

Site characterization activities can introduce visual impacts due to:

Contrasts in form, line, color, and texture resulting from vegetation clearing and sur-

face disturbance (if required for activities such as meteorological tower and access

road construction and drilling of temperature gradient wells).

Presence of trucks and other vehicles and equipment.

Presence of idle or dismantled equipment and litter, if allowed to remain on the site.

During site characterization, ruts, windblown dust, and visible vegetation damage may

occur from cross-country vehicle traffic if existing or new roads are not used. Soil distur-

bance can lead to growth of invasive species or erosion of soil, both of which could intro-

duce contrasts in line, color, and texture, primarily for foreground and near-middle ground

views. Site characterization visual impacts, such as occur with the presence of equipment

and vehicles, are short-term. However, impacts due to road construction, erosion, landform

alteration, or vegetation clearing may be visible for an extended period.

IV.20.2.1.2 Impacts of Construction and Decommissioning

Construction and decommissioning activities can introduce contrast in form, line, color,

and texture resulting from:

Vegetation clearing and ground disturbance needed to prepare project sites and

laydown/staging areas.

Road building and improvement.

Night lighting.

Debris.

Physical presence of project elements (solar energy collectors, wind turbines, geo-

thermal generating plants, and support facilities).

Presence and movement of vehicles, equipment, and workers.

Dust and other visible emissions.

Construction visual impacts vary in intensity, frequency, and duration during construction

and, later, decommissioning. For a utility-scale project, these activities may last several years.

Solar project visual impacts vary based on the technology used, but they have a number of

common features, including extensive grading to prepare areas for installing solar-collector

or focusing arrays. This creates color and texture contrasts between existing soil and vege-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-5 August 2014

tation conditions and the disturbed, unvegetated project footprint. Clearing also creates

opportunities for visible windblown dust clouds to occur. Numerous vehicles are required

to deliver and install the arrays, resulting in movement, dust, and the presence of the vehi-

cles themselves. Often, temporary structures are installed or erected for component assem-

bly and finishing and to provide project site offices.

For wind energy projects, large cranes and other equipment would be needed to construct

foundations and assemble and mount towers, nacelles (turbine housings), and rotors. This

equipment would be especially visible near the activity and from a middle distance.

Construction equipment would produce emissions and may create visible exhaust plumes.

The disturbed footprint of individual turbines typically would be small, but for a field of

turbines can be extensive. Collectively, multiple turbines would create a visual impact due

to the size of their vertical and rotating elements and from required night safety lighting.

For geothermal projects, facilities to capture and use the geothermal resource would be

constructed. Needed infrastructure can include roads, sump pits, production-size wells,

injection wells, well field equipment, power plant facilities, pipelines, and transmission lines.

For all renewable energy projects, decommissioning the project and restoring the site to

pre-project condition would entail removing structures and equipment, earthwork (re-

contouring, grading, scarifying), and revegetation (stabilizing surfaces, seeding/planting,

and providing temporary irrigation, if needed). Restoration might not be possible in all

cases. The contours of restored areas might not be identical to pre-project conditions.

Under the arid conditions generally found in the Plan Area, disturbed soils can create a

visual contrast that persists for many years, until vegetation could begin to disguise past

disturbance. Without proper management, invasive plant species may colonize reclaimed

areas, producing contrasts in color and texture noticeable for many years. Unsuccessful

restoration of previously cleared areas could erode soil, collapse slopes, and create gullies,

which could result in or continue long-term adverse visual impacts.

IV.20.2.1.3 Impacts of Operations and Maintenance

The operation and maintenance of renewable energy projects and associated electricity

transmission lines, roads, and rights-of-way would have long-term adverse visual effects.

Among these are land scarring, introduction of structural contrast and industrial elements

into natural settings, view blockage, and skylining (silhouetting of elements against the

sky). All renewable energy facilities would include enclosed and open workspaces, exterior

lighting around buildings, access roads, fencing, and parking areas. Built structures (build-

ings, piping, fencing, collector arrays, etc.) would introduce industrial elements into the

landscape and contrast with surrounding undisturbed areas in form, line, color, and

texture. They also can block views and create skylining, depending on their dimensions and

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-6 August 2014

location relative to the viewer. The need for security and safety lighting could contribute to

light pollution in areas where night lighting is otherwise absent or minimal. Light impacts

include skyglow, off-site light trespass, and glare. Another impact common to renewable

energy facilities is dust generated by vehicle movement within a site or along a right-of-

way or access road. Without proper disturbed soil management strategies, wind can

mobilize dust from project sites and create visible plumes or clouds of dust.

Solar

Some impacts are common to all utility-scale solar projects, regardless of the technology

employed. Solar projects introduce strong geometric shapes and repeated linear elements

into the visual environment. Typically, these projects have a large footprint and are in open

and relatively flat settings with little to no vegetative or other screening. Valley floor loca-

tions are visible from nearby mountains and elevated viewpoints. Solar energy collectors

rely on mirrored or glass surfaces that are highly reflective and produce glare (U.S. Depart-

ment of Energy 2013). In addition to the collector or reflector arrays, solar projects can

include other components with reflective surfaces, such as array support structures, steam

turbine generators, piping, fencing, and transmission towers and conductors. Under certain

viewing conditions, these surfaces give rise to specular reflections (glint and glare) visible

to stationary or moving observers from long distances, and can constitute a major source of

visual impact. Glint and glare from photovoltaic facilities are typically lower than solar

concentrating facilities using trough, power tower, and solar dish technologies that employ

mirrors and lenses. During the life of a solar project, panels, towers, troughs, and associated

structures may need to be upgraded or replaced, creating visual impacts similar to impacts

occurring during initial construction and assembly.

Solar energy projects also vary in their visual impacts because of the different technologies

employed. Solar technologies include both concentrating solar power systems (which gene-

rate power using focused sunlight to either heat liquid to drive a turbine or generate elec-

tricity directly) and traditional photovoltaic systems. For example:

Parabolic trough systems comprise rows of trough-shaped mirrors that direct solar

insolation to a receiver tube running along the axis of the trough. Solar trough facili-

ties have a relatively low profile when viewed from a distance, but a high potential

for glare because they rely on reflected, focused light from large mirrors. Reflectivity

varies widely during daylight hours based on sun angle but can be highly visible

from elevated viewpoints.

Power tower systems consist of thousands of ground-mounted sun-tracking mirrors

that direct sunlight to a receiver atop a tall tower, where a liquid is heated then

piped to a ground-based steam generator. Power tower projects have greater visual

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-7 August 2014

impacts over larger areas than photovoltaic or thermal trough technologies because

of their high vertical profile (i.e., one or more towers rising 300 to 700 feet above

ground level with brightly glowing reflections at the receiver location), power plant,

cooling towers, steam plumes, and highly visible and pulsing day/night aircraft

safety beacons.

Photovoltaic technologies differ from concentrated solar technologies; instead of

concentrating sunlight to generate heat, they use panels to convert solar energy

directly to electrical current (BLM 2013). Photovoltaic projects generally have lower

visual impacts than the other solar technologies because of the comparatively low

profile of the collector arrays and the lower reflectance from photovoltaic panels, as

compared with mirrors used in other technologies. They do not have cooling towers,

plumes, or power plants and do have fewer lights and low worker activity. Still,

some panels can be reflective, especially when seen from higher elevations, and can

be visible for long distances (up to 20 miles). Power conversion units (inverters)

associated with these facilities can also cause visual contrasts (U.S. Department of

Energy 2013). Because photovoltaic facilities do not require the generation infra-

structure of other solar technologies (turbines, boilers), they are visually simpler

and associated with lower visual contrasts (BLM 2013).

Concentrated photovoltaic systems work like simple photovoltaic technologies, but

they include lenses to focus the sun’s rays on photovoltaic cells to generate more

electricity than standard photovoltaic systems.

Wind

Wind energy projects would be highly visible because of the large vertical towers and

rotating turbines that would be erected in an area where there are few, if any, comparable

tall structures in the generally strongly horizontal landscapes typical of BLM lands in the

Plan Area. Visibility and contrast would be heightened at locations where they these struc-

tures are sited along mesas or ridgelines, silhouetting them against the sky. Additionally,

strong nighttime visual contrasts would occur from aviation warning lighting on the towers

(BLM 2013). Wind turbines may create visually incongruous “industrial” associations for

viewers, particularly in a predominantly natural landscape. Their moving blades attract

visual attention. Depending on the time of day, the shadows of tall turbine towers extend

great distances across the landscape, in a sundial effect. The direction and length of this

effect varies with the relative position of the sun in various seasons and at different times

of the day, with morning and evening producing the longest shadows. The regular periodic

interruption of sunlight by rotating turbine blades may produce a strobe-like effect,

flickering alternating light and shadow over the area where the shadow is cast. During the

life of a wind project, towers, nacelles, and rotor blades may need to be upgraded or

replaced, creating visual impacts similar to impacts occurring during initial construction

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-8 August 2014

and assembly. Collectively, multiple turbines would create a visual impact due to the num-

bers in close proximity to each other, their vertical and rotating elements, and the required

night aviation safety lighting.

Geothermal

Visual impacts associated with the operation and maintenance of geothermal energy proj-

ects largely derive from ground disturbance and the visibility of industrial power plants,

wells, pipes, steam plumes, and transmission lines.

Transmission

Visual impacts associated with the operation and maintenance of transmission facilities

include the visual contrast of the transmission lines, support structures, and access road-

ways, as well as the occasional vehicle, equipment, and helicopter use along the transmission

right-of-way or at substations, and the presence of workers conducting inspections or

making repairs. Roads used for access are kept relatively free of vegetation. These features in

the landscape can result in a strong visual contrast in form, line, color, and texture. Visibility

and contrast would be heightened where towers and other structures are sited along mesas

or ridgelines, resulting in skylining. Lattice towers are considered less visually obtrusive in

natural landscape than monopoles when not close to sensitive viewing locations, because

they are more transparent against background textures and colors (BLM 2013).

IV.20.2.2 Impacts of the Reserve Design

In general, the DRECP reserve design and associated Conservation and Management

Actions (CMAs) would encourage projects to be located within the DFAs, thereby

concentrating effects on visual resources in these areas. The avoidance, minimization, com-

pensation, conservation, and management actions required to achieve the conservation

strategy would reduce the proliferation of impacts on visual resources to some extent by

encouraging development in specific areas and not in others, in contrast to permitting dis-

persed development throughout the Plan Area.

While the reserve design and CMAs vary among the action alternatives, there are simi-

larities among all alternatives. The Reserve Design Lands (comprising existing conserva-

tion areas, the BLM LUPA Conservation Designations, and the Conservation Planning Areas

[CPAs]) would limit or exclude renewable energy development in these areas, thereby

protecting visual resources in large areas of the desert.

Visual resources are enhanced when desert areas are protected other reasons, such as for

species and habitat protection. For example, the legislative and/or legal restrictions rele-

vant to existing conservation areas direct that they be managed for the benefit of Covered

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-9 August 2014

Species. These protective actions afford visual resource protections to these areas as well

by limiting or excluding development.

The proposed BLM LUPA Conservation Designations are administrative designations

intended to reduce or expand National Landscape Conservation System (NLCS) lands,

Areas of Critical Environmental Concern (ACECs), and wildlife allocation designations on

BLM-administered land. In addition to other resource values, relatively high levels of scenic

quality and visual resources typically are associated with these areas.

Under the DRECP, not all conserved areas would be on existing public land. Conservation

areas not otherwise protected in the reserve design by BLM designations are lands that

would be conserved through acquisition or conservation easements from willing sellers of

lands within the mapped CPAs. Conservation of these lands would be part of the compensa-

tion required for allowing various project impacts to occur. CPAs, acquisition agreements,

and conservation easements would have restrictions limiting development and ground dis-

turbing activities, thereby protecting or enhancing habitat for Covered Species. Such limita-

tions would benefit visual resources as well.

The CMAs are critical components of the conservation strategy for the DRECP and serve to

avoid and minimize impacts and contribute to the assembling of the reserve design through

compensation for the loss of biological and other resources. CMAs would generally reduce

the severity of impacts to visual resources by requiring impact avoidance and minimization

measures for siting, design, construction, and decommissioning of renewable energy facilities.

BLM-specific CMAs for VRM include measures that apply Plan-wide, measures specific to

DFAs, DRECP Study Areas (Future Assessment Areas, Special Analysis Areas, and DRECP

Variance Lands), and transmission corridors, and a detailed set of visual resource best

management practices (BMPs). The BMPs incorporate the measures identified in Best Man-

agement Practices for Reducing Visual Impacts of Renewable Energy Facilities on

BLM-Administered Lands (BLM 2013). This publication identifies 122 BMPs that can be

used to avoid or reduce potential visual impacts associated with the siting, design,

construction, operation, and decommissioning of utility-scale renewable energy generation

facilities, including wind, solar, and geothermal facilities. The BMPs were compiled from a

variety of sources, including guidance documents developed by various federal and state

agencies; existing environmental analyses, including programmatic and project-specific

environmental impact statements and assessments; professional practice literature; con-

sultations with landscape architects, engineers, and renewable energy professionals; and

field observations of existing renewable energy facilities and facilities under construction.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-10 August 2014

In addition to technology-specific BMPs, more general BMPs for design, construction, oper-

ation, and decommissioning activities include the following:

Visual impact analysis and mitigation planning

Facility siting and design

Structure design and materials selection

Materials surface treatments

Lighting design and operation

Avoiding unnecessary disturbance

Soil management and erosion control

Vegetation management

Interim and long-term reclamation

“Good housekeeping” practices

Together, these VRM CMAs provide a comprehensive framework of guidelines and spe-

cifications under which visual impacts would be avoided where possible and minimized

and/or mitigated to the extent practicable. They would avoid or reduce visual contrast in

form, line, color, and texture using a range of techniques, such as sensitive siting, revegeta-

tion, recontouring to match existing terrain characteristics, or painting facility components

to blend with the landscape.

BLM-specific CMAs for other resources could also benefit visual resources. These include

CMAs applicable to

Air resources (stringent dust control requirements).

Trails and travel (protecting views by buffering trails and managing travel routes

and corridors).

Cultural resources (prioritizing protection of visual resources on landscapes consid-

ered culturally significant to Native Americans).

Lands and realty (acquisition and protection of visual resources of

conservation lands).

Livestock grazing (protection and restoration of scenic riparian and wetland systems).

Recreation (maintenance and/or enhancement of naturalness).

Soil and water (protection of scenic qualities of water systems, riparian, and

wetland habitat, and soil surfaces).

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-11 August 2014

Appendix H provides a detailed listing of CMAs.

Collectively, the proposed reserve design and conservation actions would increase the

amount of conserved land, thereby protecting scenic values in those areas. Conservation

would protect visual values by protecting natural, cultural, or other resources with associ-

ated visual values.

IV.20.2.3 Impacts of BLM Land Use Plan Decisions

IV.20.2.3.1 Impacts of Renewable Energy Development and Transmission on BLM Lands

The typical visual impacts from the various renewable energy and transmission technolo-

gies on BLM lands would be the same as those described in Section IV.20.2.1, Impacts of

Renewable Energy and Transmission Development. However, the specific locations in

which energy and transmission development will be allowed will be driven by LUPA

decisions, which may encourage or restrict development in some areas.

IV.20.2.3.2 Impacts of BLM Land Designations and Management Actions

Because the BLM LUPA land designations would be managed to protect ecological, historic,

cultural, scenic, scientific, and recreation resources and values, they also would confer

general protection for visual resources. While other land uses are allowed within these

areas, these uses must be compatible with the resources and values that the land des-

ignation is intended to protect.

Designation of VRM Classes, as proposed under all of the action alternatives, would estab-

lish visual management objectives for all BLM land areas in the Plan Area. VRI and the VRM

system provide a framework for managing visual resources on BLM-administered lands.

Included in this system is a mechanism for identifying visual resource values, minimizing

the impacts of surface-disturbing activities on visual resources, and maintaining the scenic

value of land tracts for the future.

Land designations protect visual resources by imposing restrictions on renewable energy

development and limiting the amount of surface disturbance allowed. For example, pro-

posed NLCS lands have disturbance caps of from 0.25% to 1%, ACECs exclude renewable

energy and have disturbance caps of from 0.1% to 1%, and wildlife allocations and Special

Recreation Management Areas (SRMAs) exclude renewable energy facilities. Another

benefit to visual resources of land designations is the buffering of National Trails with Trail

Management Corridors 0.25 to 10 miles in width. Disturbance caps and corridor widths

vary by alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-12 August 2014

Details on allowable uses and management within NLCS lands are in the proposed LUPA

description in Volume II. Details on the goals, objectives, allowable uses, and management

actions for each ACEC and SRMA unit are presented in the LUPA worksheets in Appendix H.

IV.20.2.4 Impacts of Natural Community Conservation Plan and General Conservation Plan

The Natural Community Conservation Plan (NCCP), administered by the California Depart-

ment of Fish and Wildlife, would apply to state special-status species throughout the Plan

Area. The General Conservation Plan (GCP), administered by the U.S. Fish and Wildlife Ser-

vice, would apply to federal special-status species on nonfederal lands, a subset of the

entire Plan Area.

IV.20.2.4.1 Natural Community Conservation Plan

The impacts of renewable energy development permitted under the NCCP would be the

same as those defined for the Plan-wide impacts, including the typical impacts described in

Section IV.20.2, Typical Impacts Common to All Action Alternatives, and for each alterna-

tive as described in this chapter.

IV.20.2.4.2 General Conservation Plan

The types of impacts resulting from renewable energy development permitted under the

GCP would be the same as those defined for the Plan-wide impacts, including the typical

impacts described in Section IV.20.2. However, the locations where these impacts would

occur would vary by alternative. Any differences in these impacts that result from the loca-

tional differences are described for each alternative.

IV.20.3 Impact Analysis by Alternative

This section presents the impact analysis for the No Action Alternative, the Preferred Alter-

native and Alternatives 1 through 4. Table IV.20-1 summarizes the amount of visually sen-

sitive area occurring under each alternative. For reference, columns from this table are

repeated in the discussion of each alternative to compare the Preferred Alternative with

the No Action Alternative and then with Alternatives 1 through 4.

IV.20.3.1 No Action Alternative

The No Action Alternative assumes the state’s renewable energy goals would be achieved

without implementing the DRECP and that mitigation for visual resource impacts from

renewable energy and transmission projects in the Plan Area would occur on a project-by-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-13 August 2014

project basis in a pattern and manner similar to past and ongoing projects and under

applicable laws and regulations.

Under the No Action Alternative, the BLM would not designate new VRM Classes for the

California Desert Conservation Area (CDCA). Under the CDCA plan, visual resources are

addressed through the multiple-use classes, and these designations would remain as they

are currently. In accordance with BLM policy, all wilderness areas and wilderness study

areas (WSAs) are managed as VRM Class I and would continue as VRM Class I under the No

Action Alternative (Figure IV.20-1, BLM VRM Classifications, No Action Alternative).

The No Action Alternative would continue the existing VRM policies or designations in the

CDCA Plan, Bishop Resource Management Plan (RMP), and Imperial Sand Dunes Recreation

Area Management Plan (RAMP) applicable to the Plan Area and the CDCA outside the Plan

Area. (No goals and objectives or management actions were identified for visual resources

under the Caliente RMP.) No new or modified BLM LUPA Conservation Designations would

be implemented, except as they may be required of individual projects. In the absence of

specific resource decisions, management would occur (1) on BLM lands based on existing

federal law, regulations, and BLM policy and guidance and (2) on nonfederal lands based

on applicable federal, state, and local laws, regulations, and plans.

Under the No Action Alternative, visual impacts of future renewable energy development

would be similar to those from current development patterns and technology mixes:

Solar development would be emphasized in the Cadiz Valley and Chocolate Moun-

tains and the Imperial Borrego Valley ecoregion subareas; wind development in the

West Mojave and Eastern Slopes ecoregion subarea; and geothermal in the Imperial

Borrego Valley ecoregion subarea.

One new transmission line is estimated to extend from Imperial Substation to

Sycamore Substation in San Diego.

Solar PEIS Variance Lands would be available for development, as would other lands.

Conservation would continue on existing protected lands (Legislatively and Legally

Protected Areas) and existing areas managed by the BLM for the conservation of

resource values (existing ACECs or wilderness areas), but additional conservation

areas would not be designated.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-14 August 2014

Table IV.20-1

Potentially Affected Visual Resources and Visually Important Management Units by Alternative

No Action

Alternative Preferred

Alternative Alternative 1 Alternative 2 Alternative 3 Alternative 4

Development Areas (acres)

Available Development Area 9,788,000 — — — — —

DFAs — 2,024,000 1,070,000 2,473,000 1,406,000 1,608,000

Visual Resource Elements Within Development Areas (acres unless otherwise indicated)

Visual Resource Inventory

Class I 0 0 0 0 0 0

Class II 36,000 17,000 4,000 39,000 5,000 200

Class III 41,000 61,000 8,000 89,000 20,000 3,000

Class IV 35,000 27,000 7,000 66,000 25,000 2,000

Visual Resource Methodology

Class I 0 0 0 0 0 0

Class II 10 0 0 0 0 0

Class III 3,000 0 0 0 0 0

Class IV 0 106,000 19,000 191,000 50,000 5,000

National Scenic Byways 1 mi 0 0 0 0 0

National Trails 20 mi 1 mi 2 mi 6 mi 2 mi 1 mi

California State Parks 1,000 0 0 0 0 0

State Scenic Highways 6 mi 0 0 0 0 0

Wild and Scenic Rivers 0 0 0 0 0 0

Reserve Design Lands (Conservation Lands) (acres)

Reserve Design Lands — 14,920,000 15,885,680 15,085,000 15,159,000 14,476,000

No Action Alternative (existing conservation only)

7,662,000 — — — — —

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are pro-vided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

DRECP Plan Area Boundary

Ecoregion Subareas

CDCA Boundary

County Boundary

Non-BLM Land

BLM VRM Classifications

Assigned

Class I

Class II

Class III

Class IV

BLM Land with No Assigned VRM

M:\JOBS4\6287\common_gis\EIR_Figures_Spring_2014\Vol_IV\IV_20_Visual\figIV.20-1.mxd 8/18/2014

FIGURE IV.20-1

BLM Visual Resource Management Classifications, No Action Alternative

0 2010

MilesI

Draft DRECP and EIR/EIS

Sources: ESRI (2014); CEC (2013); BLM (2013); CDFW (2013); USFWS (2013)

August 2014

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-16 August 2014

INTENTIONALLY LEFT BLANK

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-17 August 2014

IV.20.3.1.1 Impacts Within the Entire Plan Area in No Action Alternative

IV.20.3.1.1.1 Impacts and Mitigation for Renewable Energy and Transmission Development

in No Action Alternative

Impacts

There are more than 9.7 million acres of Available Development Areas (ADAs) in the Plan

Area under the No Action Alternative, resulting in a projected 123,000 acres of long-term

disturbance (see Table IV.1-1). ADAs include both federal and nonfederal lands and repre-

sent nearly half of the entire Plan Area. Visual impacts associated with this scale of devel-

opment would be dispersed across the Plan Area in accordance with allowances within

existing BLM multiple-use classes and County plans.

Current development patterns emphasize solar in the Cadiz Valley and Chocolate Moun-

tains and the Imperial Borrego Valley ecoregion subareas; wind in the West Mojave and

Eastern Slopes ecoregion subarea; and geothermal in the Imperial Borrego Valley

ecoregion subarea.

Impacts to visual resources in various areas under the No Action Alternative are as follows

(see Appendix R2.20, Table R2.20-1 for additional detail):

There are approximately 36,000 acres of VRI Class II lands, 41,000 acres of VRI Class

III lands, and 35,000 acres of VRI Class IV lands within ADAs under the No Action

Alternative. Protection of the scenic values identified for these lands would continue

to be through the application of current CDCA multiple-use class guidelines or from

existing VRM assignments under existing management plans.

Approximately 10 acres of BLM land in ADAs are VRM Class II, and 3,000 acres are

VRM Class III under the No Action Alternative. These lands would continue to be

managed according to their VRM classifications. New VRM Classes would not be

assigned under the No Action Alternative. VRM objectives would be applied only to

existing classified lands, wilderness areas (VRM I), and WSAs (VRM Class I).

Less than 1 mile of Bradshaw Trail National Back Country Byway is within an ADA.

Approximately 20 miles of National Scenic and Historic Trails are within ADAs,

potentially affecting the visitor experience of people using those trails. Under the No

Action Alternative, no Trail Management Corridors would be established along these

trails, although buffering of trails could be imposed on a case-by-case basis during

project review and approval.

Approximately 900 acres of California State Park lands are within ADAs.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-18 August 2014

ADAs do not include any portion of National Parks or Preserves or segments of State

Scenic Highways under the No Action Alternative.

ADAs do not include any designated or eligible Wild and Scenic River corridors

under the No Action Alternative.

Under the No Action Alternative, there would be a high potential for visual impacts to occur

where land available for facility development abuts or is visible from Legislatively and

Legally Protected Areas. These include Mojave National Preserve, Death Valley National

Park, Joshua Tree National Park, numerous Congressionally designated wilderness areas,

and the west side of the Imperial Sand Dunes Recreation Area.

The impacts to visual resources resulting from the No Action Alternative are as follows.

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Pre-construction activities and equipment visible from residences, public roads, and public

preserves would result in short-term diminished scenic quality for viewers. Examples

include road upgrading, damage to or removal of native vegetation, construction of

meteorological towers, drilling of temperature gradient wells, vehicles, and lighting.

During construction and decommissioning, activities and equipment visible from residences,

public roads, and public preserves would result in short-term diminished scenic quality for

viewers. Examples include dust and exhaust emissions, removal of vegetation during site

clearing, contouring and grading, use of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, assembly of components, site light-

ing, and construction of and later removal of structures.

Impact VR-2: The presence of Plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

The continued presence of equipment, structures, fencing, roads, lighting, and other ele-

ments required to operate a facility would have a long-term adverse effect on the visible

landscape. Areas of persistent surface and vegetation disturbance and the presence of

structures would create visual contrast in form, line, color, and texture as compared with

pre-project conditions. Depending on viewer location, physical elements introduced by a

project could block views or create skylining. Even after project removal and site reclama-

tion are completed, visual contrast would remain. Restoring the natural, pre-disturbance

visual character of a desert environment is extremely difficult, can take decades, and often

is unsuccessful. Therefore, surface and vegetation disturbance would create long-term

visual impacts due to the persistence of scars in arid and semi-arid landscapes.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-19 August 2014

Renewable energy projects, particularly utility-scale solar facilities, would create new

sources of light and/or glare that would affect daytime and nighttime views and result in

long-term impairment of scenic quality. Depending on the technology, solar facilities use a

multitude of mirrored surfaces that can be sources of glint (a brief flash of light) or glare

(light bright enough to cause annoyance or discomfort) (BLM 2013). Solar facilities are

capable of causing off-site glare that may cause annoyance, discomfort, or in certain cir-

cumstances, ocular damage. In some instances, the glare can be bright enough to cause a

viewer to close their eyes in reaction (Sullivan, et al. 2012).

Glint and glare are safety concerns, particularly with regard to vehicle operators and pilots

for whom even momentary blindness is a human safety threat. Recently, the Federal

Aviation Administration received complaints in which glare was identified as a flight haz-

ard because it allegedly impaired the ability of the pilot to fully scan the sky for other

aircraft (The Press-Enterprise 2014). Two pilot complaints of adverse visual impacts from

the Ivanpah Solar Electric Generating System were received by the California Energy Com-

mission from the Clark County Department of Aviation (Spectrus 2014).

Glare from solar receivers also adversely affects the views and visitor experience of recrea-

tionists and can be seen from wilderness areas at distances less than 5 miles (California

Energy Commission 2013).

Glint and glare from wind and geothermal facilities is a concern as well. Glare and glinting

from white wind turbine blades increases their contrast with the surrounding natural land-

scape. If geothermal facilities and pipe networks are not painted or coated appropriately to

reduce reflectance and blend with the landscape, their surfaces may be highly visible.

The structure, size, and industrial character of utility-scale renewable energy and transmis-

sion facilities during their operation and maintenance—as well as any associated glare,

reflectivity, and lighting—would visually contrast with surrounding undeveloped land and

result in long-term diminished scenic quality.

Laws and Regulations

Existing laws and regulations would reduce the impacts of renewable energy

development projects in the absence of the DRECP. Relevant regulations are presented in

the Regulatory Setting in Volume III. Note that because this EIR/EIS addresses

amendments to BLM’s land use plans, these plans are addressed separately and are not

included in this section. The requirements of relevant regulations would reduce impacts

through the following mechanisms:

Federal Land Policy and Management Act of 1976 – This act mandates public

lands be managed in a manner that will protect the quality of the scenic (visual)

values of these lands.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-20 August 2014

Solar PEIS – Numerous design features have been adopted by BLM that would

avoid, minimize, and/or mitigate potential impacts on visual resources from solar

energy development (see Appendix W). It is assumed that these or similar design

features would apply to all renewable energy and transmission projects developed

within the Plan Area. These design features include various actions listed as num-

bers VR-1 through VR-4 in the Solar PEIS to reduce visual impacts (BLM and Depart-

ment of Energy 2010):

o VR1-1: Requires assessing conformance to VRM Class designations and iden-

tifying visual resource conflicts. Among the actions to be taken are consulting

with BLM; factoring VRI Class values into project planning and design; including

a qualified professional with VRM experience on the development team; consult-

ing the local public to identify important visual resources in the area; consulting

on viewshed protection with managers responsible for areas with special desig-

nations; evaluating impacts on historic trails; considering landscape setting

observed from National Parks, National Historic Sites, and similar areas; using

topographical data of engineering-design quality and digital terrain mapping for

project planning and design; preparing simulations depicting project facilities as

seen from key observation points and visual resource–sensitive locations; con-

ducting public outreach to disseminate visual resource information; and per-

forming visual mitigation planning and design based on field assessments and

other means.

o VR2-1: Requires consideration of siting and design to minimize glint and glare

and taking appropriate actions. These actions include identifying glint and glare

effects, assessing and quantifying these effects to determine potential safety and

visual impacts, and having qualified people conduct such assessments. Methods

to minimize glint and glare include limiting use of signs; using reflective or

luminescent markers instead of permanent lighting; minimizing off-site visibility

of signs and lighting; using nonglare materials and appropriate colors; mitigating

or offsetting visual impact by reclaiming unnecessary roads, removing abandoned

buildings, using undergrounding utility lines, and rehabilitating and revegetating

disturbed areas; and other actions determined in consultation with the BLM.

o VR2-2: Requires solar facilities be sited and designed to minimize night-sky

effects. Identification of night-sky effects is to include assessing and quantifying

potential lighting impacts and conducting assessments by using qualified indi-

viduals. Methods to minimize night-sky effects include using minimum intensity

lighting of an appropriate color consistent with safety needs, prohibiting strobe

lighting except where it is required for safety; shielding all permanent lighting

unless otherwise required for safety; mounting lighting so that light is downward

focused; controlling lighting with timers, sensors, and dimmers; and using

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-21 August 2014

vehicle-mounted lights for nighttime maintenance work rather than permanently

mounted lighting.

o VR2-3: Requires that the siting and design of solar and related facilities explore

and document means to reduce visual dominance in the viewshed and that the

project comply with VRM Class objectives. Methods include conforming with

VRM Class objectives (through use of BLM Handbook H-8431-1); determining

the extent of the viewshed and selecting key observation points where people

are expected to be observing the landscape; integrating visual design elements

into plans, details, drawings, and specifications; and siting the facility to mini-

mize the profile of all structures. Ways to minimize visual dominance include

using existing topography and vegetation as screening; considering visual design

elements when clearing vegetation and doing earthwork; siting projects outside

of key observation point viewsheds; avoiding locating facilities near visually

prominent landscape features; avoiding skylining of structures; designing linear

features to follow natural land contours rather than straight lines; locating linear

features at the edges of natural lines of transition between vegetation types and

topography; using alternative means of access in visually sensitive areas to

preserve landscape conditions; minimizing vegetation and ground disturbance;

reducing cut and fill; shaping, staining, and vegetating excavations to conform

with local conditions; creating natural-looking earthwork forms; repeating char-

acteristics of naturally occurring openings in vegetation for roads, structures,

and similar elements; burying linear utilities and lines along roads or paths;

selecting appropriate materials and surface treatments for structures to reduce

visual contrast; using nonspecular conductors and nonreflective coatings on

transmission lines; minimizing signage; delineating construction limits and mini-

mizing area of surface disturbance; salvaging vegetation and topsoil for reuse;

and removing stakes and flagging after construction.

o VR2-4: Requires preconstruction meetings with the BLM and designated spe-

cialists to coordinate the VRM mitigation strategy. This includes a review of final

design and construction documents with regard to visual impacts and mitigation.

o VR3-1: Requires the project developer to monitor compliance with VRM mitiga-

tion requirements and consult with the BLM during operations and maintenance.

Maintaining visual resource design elements would include maintaining

revegetated surfaces until self-sustaining; keeping facilities in good repair and

repainting as necessary; restoring lands as soon as possible after disturbance;

controlling dust and noxious weeds; and operating so as to avoid high-intensity

light (glare) being reflected off site.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-22 August 2014

o VR4-1: Requires immediate reclamation of the site after construction. Methods

for minimizing visual contrast during reclamation and decommission include

undertaking treatments such as thinning and feathering vegetation at project

edges, enhancing contouring, salvaging landscape materials, and revegetating;

restoring the project area to predevelopment visual conditions and the inven-

toried visual quality rating; removing aboveground and near-ground-level struc-

tures; contouring soil borrow areas and other features to approximate natural

slopes; using native vegetation to establish form, line, color, and texture con-

sistent with the surrounding undisturbed landscape; distributing stockpiled

topsoil to disturbed areas and replanting; and removing or burying gravel or

other surface treatments.

Existing VRM policies or designations – These incorporate those in the CDCA

Plan, Bishop RMP, Imperial Sand Dunes RAMP, and other BLM guidance, including:

o BLM’s Manual 8400 – VRM system addresses BLM’s basic responsibility to

identify and protect the quality of the scenic (visual) values on all BLM lands.

The VRM system requires visual design considerations be incorporated into

all surface-disturbing projects regardless of size or potential impact.

Guidance on visual management for renewable energy projects is in BLM’s Best

Management Practices for Reducing Visual Impacts of Renewable Energy Facilities on

BLM-Administered Lands (BLM 2013). These BMPs provide a comprehensive set of

strategies for avoiding and reducing visual impacts associated with renewable

energy generation facilities and ancillary components, such as electric transmission,

roads, and structures. They also address project siting and design and other key

activities that can have a major effect on visual quality. Examples include mitigation

planning, structure design and materials selection, paint colors, material surface

treatments, lighting practices, and soils and vegetation management.

Mitigation

Many visual impact mitigation measures applicable to existing renewable energy projects

would be adopted and applied to future projects under the No Action Alternative (see

Appendix W and the previous discussion under Laws and Regulations). Examples of gen-

eral visual impact mitigation measures applicable to any project implemented in the

absence of Plan approval include:

Modifying facility designs, colors, locations, and materials to reduce visibility

and contrast.

Adjusting site configurations and harmonizing earthwork with local topographic

forms and contours.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-23 August 2014

Treating structure surfaces to reduce contrast and glare.

Minimizing lighting overall, using fixtures that minimize night-sky impacts and

down-focus fixtures.

Avoiding unnecessary ground disturbance beyond what is required for the project.

Controlling dust and erosion.

Restoring and managing disturbed land and vegetation.

Restoring and reclaiming areas as soon as feasible.

Examples of visual mitigation measures applicable to solar projects include development

and implementation of a glint and glare mitigation and monitoring plan; screening of solar

collectors from roads; retaining vegetation beneath solar collector arrays; prohibiting com-

mercial signs, logos, or messages on towers and arrays; and using visually compatible color

treatments and nonreflective materials for support structures and other components. In

addition to direct reduction in visual quality, visual quality degradation can compromise

the integrity of historical resources or traditional cultural places. In cases where such

visual impacts occur, compensatory mitigation can include requiring research, field

inventories, worker training, and other efforts specific to the resource and groups affected.

Examples of visual mitigation measures for wind energy projects include siting to reduce

visibility, clustering turbines, creating visual order and unity among groups of turbines,

using radar-activated visual warning systems to reduce night-sky impacts, prohibiting

signs and messages on towers, keeping turbines clean and in good repair, and promptly

removing disused or abandoned equipment and parts.

Examples of visual mitigation measures specific to geothermal energy projects include using

air-cooled systems (to avoid plumes that water-cooled systems may generate under some

conditions), minimizing drill rig and well-test facility lighting, and screening of pipelines.

IV.20.3.1.1.2 Impacts from Reserve Design in the No Action Alternative

There would be no reserve design under the No Action Alternative. Renewable energy proj-

ects would be evaluated and approved on a case-by-case basis with project-specific mitiga-

tion requirements imposed by the responsible agencies. In the absence of approval of a

DRECP action alternative, there would be continued protection of existing Legislatively and

Legally Protected Areas, such as parks and wilderness areas, under existing laws

and regulations.

It is assumed that under the No Action Alternative, mitigation requirements would include

conservation actions to offset resource impacts to particular resources, such as protected

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-24 August 2014

species. These measures would include land acquisition, conservation easements, or other

agreements that would set aside and protect areas, which would increase the amount of

conserved land under the No Action Alternative compared with the current amount of con-

served land. Such conservation actions would reduce the potential for long-term adverse

impacts to visual resources to occur or persist on lands being conserved or restored as part

of biological or other resource mitigation requirements.

Tables in Appendix R2 quantify the amount of visual resource elements of concern occur-

ring within existing protected areas (Legislatively and Legally Protected Areas, Military

Expansion Mitigation Lands, and BLM ACECs). Under the No Action Alternative, existing

protected areas and BLM Conservation Designations would provide ongoing conservation

of resources, including visual resources; however, there would be no reserve design estab-

lished to guide where BLM Conservation Designations might be established in the future or

where reserves and conservation areas could be assembled to offset the effects of renew-

able energy or transmission development. Any additional conservation associated with

renewable energy or transmission development would derive solely from the mitigation

requirements imposed on a project-by-project basis.

Existing conservation areas in the No Action Alternative cover approximately 7.7 million

acres of the Plan Area. Conserved and protected lands include wilderness areas, Military

Expansion Mitigation Lands, and ACECs as well as portions of National Scenic and Historic

Trails, Scenic Highways, and Wild and Scenic Rivers. Visual resources in these areas would

continue to benefit from the policies and requirements applicable to the conservation of

these lands. (See Appendix Table R2.20-2, for detailed data.) The amount and location of

any additional conserved lands that might be added to the total through mitigation

acquisition would be determined on a project-by-project basis as impacts become known

and offsets required.

IV.20.3.1.2 Impacts on BLM Lands of Existing BLM Land Use Plans in No Action Alternative

The No Action Alternative would continue the existing visual management policies set forth

in the CDCA Plan, Bishop RMP, and Imperial Sand Dunes RAMP. (The Caliente RMP does not

include goals and objectives or management actions specifically identified for visual

resources.) The Bishop RMP and Imperial Sand Dunes RAMP each have assigned VRM

Classes, which would continue to set objectives for visual resource management in

those plan areas.

Under the No Action Alternative, existing BLM land use plans within the Plan Area would

continue to apply and renewable energy development would be allowed in certain land

designations, including Solar Energy Zones and Solar PEIS Variance Lands. In addition, as

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-25 August 2014

has been the case for previous individual solar, wind, and transmission projects on BLM

land, new projects would be approved along with project-specific LUPAs, if required. In all

cases, BLM’s policies and guidance for visual impact assessment and impact reduction

would apply.

Existing BLM plans identify various land designations and associated management actions

for existing protected areas, such as ACECs, SRMAs, and National Scenic and Historic Trails.

Protective measures in these designations offer a level of protection for visual resources

under the No Action Alternative.

Under the No Action Alternative, solar energy development on BLM-administered land

would be subject to the Solar PEIS. The Solar PEIS created a comprehensive set of updated

and revised policies and procedures, including standards for visual resource management,

and established categories of lands excluded from utility-scale solar development. Both

actions could help protect visual resources within the Plan Area.

The Wind PEIS Record of Decision (December 2005) established policies, BMPs, and mini-

mum mitigation requirements for wind development on BLM land. However, the Wind PEIS

did not amend BLM plans in the Plan Area. Therefore, under the No Action Alternative,

wind energy development within the Plan Area would be under the existing CDCA Plan;

and wind energy right-of-way applications would continue to be considered on a case-by-

case basis. (The Bishop and Caliente RMPs do not address wind energy.)

The following summarizes the key aspects of visual impacts on BLM lands under existing

BLM Land Use Plans in the No Action Alternative. These include visual resources within

BLM conservation lands (i.e., existing SRMAs and ACECs). Table R2.20-3 in Appendix R2

includes detailed information. The following are within existing SRMAs and/or ACECs:

3.3 million acres of VRI classified lands

898,000 acres of VRM classified lands

23 miles of the Bradshaw Trail National Back Country Byway

157 miles of National Trails

22 miles of the Amargosa River

Currently, VRM Classes are assigned only for the Bishop Field Office and the Imperial Sand

Dunes RAMP. As well, under BLM policy, VRM Class I is assigned to wilderness areas and

WSAs. This would not change under the No Action Alternative. Generally, a low correlation

between the VRM Classes and the underlying VRI Classes results in a greater potential for

adverse impacts to visual quality (e.g., VRI Class II or III lands managed to meet the objec-

tives of VRM Class IV). Conversely, impacts would most likely be reduced by alternatives

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-26 August 2014

proposing visual resource management that either closely corresponds to the VRI classes

or proposes a more restrictive (higher) class designation (e.g., VRI Class III lands managed

to meet the objectives of VRM Class II.)

Under the No Action Alternative, VRI Class lands within the VRM Classes on BLM LUPA

lands would be as shown in Table IV.20-2.

The following summarizes the key points from this comparison of VRI Classes and existing

VRM Classes under the No Action Alternative:

By BLM policy, all existing VRI Class I lands in the Plan Area are assigned VRM Class

I for management purposes. This is due to wilderness areas and WSAs being desig-

nated VRM Class I. The breakdown by VRI Classification is as follows:

o VRI I: 100% of VRI Class I lands, including wilderness areas and WSAs, would

continue to be managed as VRM Class I, reflecting a high level of

management protection.

o VRI II: 75% of VRI Class II lands would continue to be managed as VRM Class II,

reflecting a moderately high level of management protection. Approximately

20% would continue to be managed as VRM Class III and 5% as VRM Class IV.

o VRI III: More than 84% of VRI Class III lands would continue to be managed as

VRM Class III or as II, reflecting a moderate to high level of management protec-

tion. Approximately 35% would continue to be managed to meet VRM Class II

objectives, which restrict visual contrast and affect more than VRM Class III

does. Approximately 16% would be managed as VRM Class IV, which allows for

more visual contrast and impact than VRM Class III objectives allow.

o VRI Class IV: More than 58% of VRI Class IV lands would continue to be man-

aged as VRM Class II or III; 41% would continue to be managed as VRM Class IV.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-27 August 2014

Table IV.20-2

VRI Classes Within Existing VRM Classes on BLM LUPA Lands – No Action Alternative

LUPA-VRM Class Designations

Existing Visual Resource Inventory Classes

Total

VRI Class I VRI Class II VRI Class III VRI Class IV

Acres Percent Acres Percent Acres Percent Acres Percent

VRM Class I 3,866,000 100% 0 0% 0 0% 0 0% 3,866,000

VRM Class II 0 0% 100,000 75% 25,000 35% 3,000 22% 128,000

VRM Class III 0 0% 65,000 20% 15,000 49% 65,000 36% 145,000

VRM Class IV 0 0% 18,000 5% 1,000 16% 3,000 41% 22,000

Total 3,866,000 100% 183,000 100% 41,000 100% 71,000 100% 4,161,000

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. Under the No Action Alternative, VRM Classes are assigned only for the Bishop Field Office and the Imperial Sand Dunes RAMP. By BLM policy, VRM Class I is assigned to wilderness areas and WSAs. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are pro-vided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-28 August 2014

IV.20.3.1.3 Impacts of Natural Community Conservation Plan in No Action Alternative

The NCCP would apply to all lands within the Plan Area. In the absence of Plan implementa-

tion, the NCCP would not be approved; and no incidental take permits would be issued

under the NCCP. Projects would continue to be considered by the appropriate lead agency

on an individual basis. The impacts that would occur in the absence of the NCCP would be

the same as those described in Section IV.20.3.1.1.1, Impacts and Mitigation for Renewable

Energy and Transmission Development in No Action Alternative, (Plan-wide analysis).

IV.20.3.1.4 Impacts of General Conservation Plan in No Action Alternative

As described in Appendix M, the GCP would apply to nonfederal lands in the Plan Area. In

the absence of Plan implementation, the GCP would not be approved; and no incidental

take permits would be issued under the GCP. Projects would continue to be considered by

the appropriate lead agency on an individual basis. The impacts that would occur in the

absence of the GCP would be the same as those described in Section IV.20.3.1.1.1 (Plan-wide

analysis) but would be specific to nonfederal lands.

IV.20.3.1.5 Impacts Outside the Plan Area in No Action Alternative

It is feasible to characterize existing visual conditions in identified transmission

corridors, but project-level analyses would be required to determine specific future

projects’ impacts on visual resources. The methodology used for project-level analyses

would vary depending on the agency with jurisdiction over the land involved. Analyses of

visual impacts on BLM lands use BLM’s VRM system (described in detail in Volume III,

Section III.20.1.1.2). For facilities on lands administered by the Angeles, San Bernardino,

and Cleveland National Forests, the analytical approach is described in the U.S. Forest

Service’s Scenery Management System. For projects subject to CEQA, the analysis would

address the criteria established in the CEQA Guidelines to determine the significance of

impacts to aesthetics and visual resources.

Development or enhancement of transmission and substation facilities outside the Plan

Area would occur in a variety of remote, rural, suburban, and urban settings. In general, the

visual character of a landscape is defined by the amount and type of development found

within the setting, natural variations in topography, and the density and height of vegeta-

tion. Color, hue, and contrast are important variables to be considered in any analysis. The

geographic area from which a transmission line or substation would be visible is referred

to as the facility’s viewshed; this is primarily determined by the surrounding land elevation

relative to the facility location and the landforms, structures, or vegetation that would

block views that otherwise would exist. A facility’s effective viewshed is limited by dis-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-29 August 2014

tance; with increased distance between a facility and a viewer, atmospheric moisture and

particles affect the visibility and distinctness of the facility. The perceived color, contrast,

and size of a facility relative to its surroundings diminish; and the facility becomes

indistinct and blends into the background.

Transmission lines and substations differ in their visible elements, how they are situated in

the landscape, and the duration of views. Transmission lines are linear facilities that intro-

duce rhythmic, repeating elements across a landscape. These ribbon-like facilities extend

many miles. They consist of stand-alone tower structures ranging from 100 to 160 feet

high. Although it varies by terrain, spacing can be uniform, typically 4 to 5 per mile for 500-

kilovolt lines and 7 to 10 per mile for 230-kilovolt lines. Depending on tower types, they

may require a permanently cleared area beneath them. They also may require new access

roads to and along their rights-of-way, and stub roads extended from those roads to tower

sites if they do not already exist.

In contrast to transmission lines, substations are confined, single-site facilities. Outside the

Plan Area, such facilities receiving renewable power are expected to be sited at or near

existing 500/230-kilovolt substations. Large substations can include pads that extend over

dozens of acres, with additional space for access roads, water tanks, and buffers. For exam-

ple, the DRECP Transmission Technical Group assumed that 176 acres would be required

for a high transmission substation to incorporate the disturbance from additional infra-

structure. Circuit breakers, disconnect switches, transformers, capacitors, and associated

equipment, as well as control or equipment buildings and firewalls, are typical ground-

level elements of a substation. Dead-end structures used to loop lines in and out of the sub-

station, busses, and overhead structures above the equipment and facilities are also

situated on the substation pad. Typically, these are lattice- or tubular-steel components

with cross members.

IV.20.3.1.5.1 Impacts of Transmission Outside the Plan Area

Outside the Plan Area, additional transmission lines would be needed to deliver the addi-

tional renewable energy to load centers (areas of high demand). It is assumed that

transmission outside the Plan Area would use existing transmission corridors that run

between the Plan Area and existing substations in the more populated coastal areas of the

state. Existing substations would serve as the portals for the power to be transmitted from

the desert to load centers. These portals include Whirlwind, Vincent, Lugo, Devers,

Suncrest, and Imperial substations. These are the same under the No Action Alternative,

the Preferred Alternative, and Alternatives 1 through 4. Likewise, the transmission

corridors outside the Plan Area are the same for all alternatives. Therefore, at a

programmatic level, there is no difference among the alternatives based on transmission

outside the Plan Area. The actual corridors used and the number and type of transmission

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-30 August 2014

lines installed would depend upon the ultimate location of generation facilities in the Plan

Area. Any transmission projects proposed outside the Plan Area would need a project-

specific environmental review.

Existing corridors contain transmission towers, conductors, and access roads; therefore, a

degree of visual impact already is present. The type and degree of visual impacts in these

corridors would vary based on whether the area through which the corridor passes is

undeveloped or urbanized.

There are relatively open landscapes between the substations acting as portals from the

Plan Area to the urbanized areas where the electrical demand exists. This open landscape is

in a mix of public and private ownership. In Southern California, the transition from open

landscapes to urban landscapes can be abrupt. Areas subject to BLM or U.S. Forest Service

jurisdiction would require project-by-project analysis under their respective visual man-

agement protocols. Areas subject to state or local jurisdiction would be subject to project-

by-project analysis by the California Public Utilities Commission, which has authority over

high-voltage transmission lines.

Impacts to visual resources from construction of transmission lines outside the Plan Area

would be as follows:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Pre-construction activities and equipment would be visible to observers in the vicinity of

the work would result in short-term diminished scenic quality for viewers. Examples

include access road upgrading, damage to or removal of native vegetation, and presence

and movement of vehicles, dust, and lighting. This would be true for both open landscapes

and urbanized areas.

Impact VR-2: The presence of plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

Transmission towers and conductors would have an adverse effect on the visible land-

scape. Areas of persistent surface and vegetation disturbance, such as access roads and

tower footprints, and the presence of structures would create visual contrast with existing

conditions. Depending on viewer location, physical elements introduced by a project could

create skylining. These effects would be similar to those of existing lines. Surface and vege-

tation disturbance would create long-term visual impacts due to the persistence of scars in

arid and semi-arid landscapes. The presence of towers, roads, and other elements required

to operate a transmission facility would have a long-term effect on visual resources.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-31 August 2014

Notably, transmission lines create long linear features in the landscape visible from a con-

siderable distance in flat terrain.

In open landscapes through which portions of these corridors pass, such as national forests

or the desert, visual contrast would remain even after decommissioning and removal of

facilities. Restoring the natural, pre-disturbance visual character of an arid or semi-arid

environment is difficult, can take decades, and is not always successful. Surface and vegeta-

tion disturbance would create long-term visual impacts due to the persistence of scars in

arid and semi-arid landscapes.

In urbanized areas, the lines would be in existing transmission corridors mostly

surrounded by urban development. The presence of buildings and vegetation would tend

to block long sightlines to the transmission structures, limiting the area from which they

could be seen. If new towers are located near existing towers, this would increase the num-

ber of industrial-like elements visible within the urban setting. However, this would be an

incremental increase over existing conditions and not a radical departure. In some cases,

existing transmission lines would be replaced with upgraded towers and conductors. This

would exchange one set of visual impacts for another similar set, potentially reducing the

number of towers visible but possibly introducing taller towers into the view.

Visual impacts from the construction and operation of transmission lines outside the Plan

Area would be reduced by application of various mitigation measures. Generally, applicable

measures to lessen impacts include controlling dust, aligning tower locations so they are

adjacent, locating towers so they do not skyline on ridges, and using nonreflective

(nonspecular) surface treatments. The level of significance of the impacts can be deter-

mined only through a detailed analysis of proposed actions at specific locations.

IV.20.3.1.5.2 Impacts of Existing BLM Land Use Plans Outside the Plan Area

Under the No Action Alternative, the existing BLM CDCA land use plan would continue to be

implemented on CDCA lands; and renewable energy projects would still be developed

through BLM’s existing policies. Impacts on visual resources would be of the types described

in Section IV.20.2.1 with similar mitigation measures being included on a case-by-case

basis. Existing land designations—such as existing protected areas, ACECs, SRMAs, and

National Scenic and Historic Trails—would continue to be managed to protect their associ-

ated scenic values and visual resources.

The following summarizes the key aspects of the visual resource elements occurring on BLM

land designations outside the Plan Area (see Table R2.20-4 in Appendix R2 for detailed data).

VRI Classes: Approximately 233,000 acres of VRI lands are within existing SRMAs

and/or ACECs outside the Plan Area.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-32 August 2014

VRM Classes: Approximately 138,000 acres of VRM lands are within existing SRMAs

and/or ACECs outside the Plan Area.

National Scenic Byways: Approximately 6 miles of the Bradshaw Trail National

Back Country Byway are within existing SRMAs and/or ACECs outside the Plan Area.

National Scenic and Historic Trails: No segments of National Scenic and Historic

Trails are within existing SRMAs and/or ACECs outside the Plan Area.

Wild and Scenic Rivers: No segments of Wild and Scenic Rivers are within existing

SRMAs and/or ACECs outside the Plan Area.

IV.20.3.1.6 CEQA Significance Determination: No Action Alternative

Section IV.20.1.2, CEQA Standards of Significance, identifies four criteria to apply when

determining if there are significant impacts from a project under CEQA. These criteria are

included as part of the more general impacts identified in this section as VR-1 and VR-2.

The visual impacts and their associated significance determinations for the No Action Alter-

native are as follows:

VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality. Existing prescriptive

measures for avoiding, reducing, and mitigating short-term visual impacts, as required

under existing laws and regulations and described previously, would reduce short-term

visual effects. However, to fully mitigate these impacts to less than significant levels,

additional mitigation would be necessary. These measures, defined in Section IV.20.3.1.1.1,

include controlling dust, screening construction yards, and minimizing night lighting. If

fully and successfully implemented, these combined measures would reduce short-term

impacts to less than significant levels in most cases.

VR-2: The presence of plan components would create long-term visual contrast with

surrounding undeveloped land and result in long-term diminished scenic quality.

Long-term visual impacts would be significant and unavoidable, even with the application

of mitigation. The size and industrial character of utility-scale renewable energy and trans-

mission facilities would create visual contrast with the surrounding landscape and result in

long-term diminished scenic quality for viewers. Even with application of mitigation mea-

sures (such as use of earth-tone surface treatments, minimization of roads, and alternate

site layouts), the extensive alteration of the physical landscape and presence of numerous

manmade structures extending over considerable acreage would create a long-term signifi-

cant impact on visual resources.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-33 August 2014

Prescriptive measures for avoiding, reducing, and mitigating long-term construction, oper-

ations, and decommissioning visual impacts, as required under existing laws and regula-

tions, would have limited effectiveness, even if fully implemented. For example:

Tall and brightly illuminated power tower receivers would be highly visible over a

great distance, introducing a tall vertical element into the landscape and creating a

strong visual contrast to existing conditions. In addition, a solar project would dis-

turb large areas of ground surface, creating visual contrast; and operations would

contribute to glare, light pollution, and diminished night-sky darkness, resulting in

diminished scenic quality.

Tall and night-illuminated wind turbines and support structures would be highly

visible and create strong visual contrast, resulting in diminished scenic quality.

Towers, nacelles, and rotors may need to be upgraded or replaced, thereby

repeating initial visual impacts of construction and assembly.

Geothermal facilities and steam plumes would create a strong visual contrast and

result in diminished scenic quality.

Although photovoltaic projects would generally have lower visual impacts than the

other technologies because of the lower profile of collector arrays, reflective glass

plates would create glare, attracting visual attention and creating a strong visual

contrast under certain light conditions, resulting in diminished scenic quality.

Increased structure contrast, industrial character, tower and conductor reflectivity,

maintenance access, and skylining associated with additional transmission lines

would result in long-term diminished scenic quality for viewers. New substation

facilities would introduce strong visual contrast in line, form, texture, and color

when located in nonindustrial surroundings. Cleared and maintained access roads

would open views of scarring, especially down the length of the right-of-way, and

introduce changes in form, line, color, and texture.

Additional mitigation, if required on a case-by-case, site-specific basis, could reduce these

long-terms impacts, but not to less than significant levels.

IV.20.3.2 Preferred Alternative

The Preferred Alternative includes more than 2 million acres where development could

occur within DFAs and nearly 15 million acres of Reserve Design Lands (comprising more

than 7 million acres of Existing Conservation, 6 million acres of BLM LUPA Conservation

Designations, and more than 1 million acres of CPAs). (See Table IV.1-1)

Effects of the Preferred Alternative on baseline conditions, including transmission develop-

ment and BLM LUPA decisions outside of the DRECP area, are described in the following

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-34 August 2014

sections. For reference, Table IV.20-3 compares the No Action Alternative to the Preferred

Alternative for key visual elements occurring within development areas and within 5 miles

of development areas. The latter information is included because project visual impacts can

extend to lands outside development areas.

Table IV.20-3

Affected Visual Resources – No Action Alternative Compared to Preferred Alternative

No Action Alternative Preferred Alternative

Development Areas (acres)

ADA1 9,788,000 —

DFA2 — 2,024,000

Visual Resource Elements Within Development Areas (acres unless otherwise indicated)

VRI [Class] 0 [I]

36,000 [II]

41,000 [III]

35,000 [IV]

0 [I]

17,000 [II]

61,000 [III]

27,000 [IV]

VRM [Class] 0 [I]

10 [II]

3,000 [III]

0 [IV]

0 [I]

0 [II]

0 [III]

106,000 [IV]

National Scenic Byways 1 mi. 0

National Scenic and Historic Trails 20 mi. 1 mi.

California State Parks 1000 0

State Scenic Highways 6 mi 0

Wild and Scenic Rivers 0 0

Visual Resource Elements Within 5 miles of Development Areas (acres unless otherwise indicated)

VRI [Class] 1,847,000[I]

965,000 [II]

1,549,000 [III]

1,607,000 [IV]

366,000 [I]

389,000 [II]

731,000 [III]

709,000 [IV]

VRM [Class] 1,827,000 [I]

71,000 [II]

64,000 [III]

10,000 [IV]

351,000 [I]

515,000 [II]

555,000 [III]

694,000 [IV]

National Scenic Byways 83 mi. 13 mi.

National Parks and Preserves 1,670,000 15,000

National Scenic and Historic Trails 757 mi. 350 mi.

Trail Management Corridors N.A. 659,000

California State Parks 323,000 108,000

State Scenic Highways 34 mi. 0

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-35 August 2014

Table IV.20-3

Affected Visual Resources – No Action Alternative Compared to Preferred Alternative

No Action Alternative Preferred Alternative

Wild and Scenic Rivers 23 mi. 0

Reserve Design Lands (Conservation Lands) (acres)

Reserve Design Lands N.A. 14,984,000

Existing Conservation 7,662,000 (included in above acres) 1 Applies only to No Action Alternative

2 Applies only to action alternatives.

Note: The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

IV.20.3.2.1 Plan-Wide Impacts of Implementing the DRECP: Preferred Alternative

IV.20.3.2.1.1 Plan-Wide Impacts and Mitigation Measures from Renewable Energy and

Transmission Development

Impact Assessment

Under the Preferred Alternative, DFAs are areas within which the Covered Activities associ-

ated with solar, wind, and geothermal development and operation would be permitted.

Under the Preferred Alternative, renewable energy related activities covered by the Plan

would be confined to DFAs, resulting in a projected 145,000 acres of long-term disturbance

(See Table IV.1-1.) The DFAs are geographically dispersed in the Imperial Valley, eastern

Riverside, Lucerne Valley, Barstow, and Tehachapi areas, with smaller DFAs along the U.S.

395 corridor and near Hidden Hills. Solar energy is the largest renewable energy technol-

ogy type in most counties, but wind also is prominent in Riverside and San Bernardino

counties. Under the Preferred Alternative, geothermal development would have Covered

Activities only in Imperial and Inyo counties. Transmission development and operation

would be permitted both within and outside of DFAs.

The distribution of DFAs under the Preferred Alternative is far less widespread than the

broad distribution of ADAs under the No Action Alternative. Characteristics of the Pre-

ferred Alternative are as follows:

Ecoregion subareas that would have the smallest DFAs include Kingston and

Funeral Mountains, Mojave and Silurian Valley, Owens River Valley, and Providence

and Bullion Mountains.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-36 August 2014

Visual impacts from solar would be primarily in two ecoregion subareas: West

Mojave and Eastern Slopes, and Cadiz Valley and Chocolate Mountains.

Visual impacts from wind energy would be mostly in two ecoregion subareas: West

Mojave and Eastern Slopes, and Pinto Lucerne Valley and Eastern Slopes.

Visual impacts from geothermal energy would be in two ecoregion subareas: Impe-

rial Borrego Valley and Owens River Valley.

The following summarizes the key points in comparing the Preferred Alternative’s visual

impacts from renewable energy and transmission development to those of the No Action

Alternative (see Appendix R2, Table R2.20-5 for detailed data):

VRI Classes: Under the Preferred Alternative, there would be approximately 17,000

acres of VRI Class II lands, 61,000 acres of VRI Class III lands, and 27,000 acres of

VRI Class IV lands within DFAs. Per the CMAs for visual resources, these 78,000

acres of VRI Class II and III lands within DFAs would be managed as VRM Class IV

and thereby could sustain a degradation of underlying scenic values as identified by

BLM’s completed visual inventories (described in Volume III). Approximately

13,000 acres of transmission would occur on inventoried lands.

Under the No Action Alternative, 36,000 acres of VRI Class II, 41,000 acres of VRI

Class III, and 35,000 acres of VRI Class IV lands occur in ADAs and approximately

the same amount of transmission.

VRM Classes: Unlike the No Action Alternative, the Preferred Alternative would

have VRM Classes assigned under it; and VRM objectives would be applied to all

BLM lands. Under the Preferred Alternative, all DFAs on BLM land would be desig-

nated as VRM Class IV (106,000 acres); therefore there would be no VRM Class I, II,

or III lands in DFAs (Figure IV.20-2, Proposed BLM VRM Classifications, Preferred

Alternative). Approximately 13,000 acres of transmission would occur, the majority

of which would be on VRM Class III and IV lands.

Under the No Action Alternative, which does not assign new VRM Classes, there are

3,000 acres of VRM Class II or III lands in ADAs and approximately 40 acres of trans-

mission on those lands.

National Parks and Preserves: As with the No Action Alternative, the footprint of

renewable energy projects would not directly affect these lands under the Preferred

Alternative, but project facilities and activities that are visible from National Parks

and Preserves would diminish scenic quality for viewers in those conservation

areas, where expectations for scenic quality are typically high.

National Scenic Byways: No segments of the Bradshaw Trail National Back Country

Byway would be within DFAs under the Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-37 August 2014

National Scenic and Historic Trails: Under the Preferred Alternative, approxi-

mately 1 mile of the Old Spanish National Historic Trail alignment would be within a

wind energy DFA. Under the No Action Alternative, approximately 20 miles of

National Scenic and Historic Trails would be within ADAs for solar and wind.

As with National Parks and Preserves, renewable energy project facilities and activi-

ties visible from National Trails could diminish scenic quality for trail users, where

expectations for scenic quality are typically high. However, under the Preferred

Alternative, Trail Management Corridors would be established along National Scenic

and Historic Trails, generally at a width of 5 miles from the centerline of the trail, for

a total width of 10 miles (see Section IV.20.2.2, Impacts of the Reserve Design).

State Scenic Highways: There would be no segments of State Scenic Highways

within DFAs or ADAs under the Preferred Alternative or the No Action Alternative.

Proximity of Visual Resources to DFAs. Visual resource elements within 5 miles of

development areas can be compared between the Preferred Alternative and the No

Action Alternative. This information is summarized in Table IV.20-3. The Preferred

Alternative has far fewer visual resource elements within 5 miles of DFAs, as com-

pared with the same 5-mile distance from ADAs under the No Action Alternative.

One example of this is the acres of VRI Class I lands: nearly 1,850,000 acres are

within 5 miles of development areas under the No Action Alternative compared with

366,000 acres under the Preferred Alternative. There is more than 100 times the

National Parks and Preserves acreage within 5 miles of development areas under

the No Action Alternative as there would be under the Preferred Alternative.

This 5-mile distance is particularly important for visual resources, because 5 miles

is typically used as a measure of foreground and middleground distance zones, where

management activities and changes in the landscape might be viewed in detail. The

outer boundary of this distance zone is defined as the point where the texture and

form of individual plants are no longer apparent in the landscape (BLM 1984).

The visual impacts resulting from the Preferred Alternative are:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Preconstruction activities and equipment visible from residences, public roads, and public

preserves would result in short-term diminished scenic quality for viewers. Examples

include road upgrading, damage to or removal of native vegetation, construction of meteor-

ological towers, drilling of temperature gradient wells, vehicles, and lighting.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-38 August 2014

During construction and decommissioning, activities and equipment visible from residences,

public roads, and public preserves would result in short-term diminished scenic quality for

viewers. Examples include dust and exhaust emissions, removal of vegetation during site

clearing, contouring and grading, presence of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, assembly of components, site light-

ing, and construction of and later removal of structures.

Impact VR-2: The presence of project components and disturbance would result in

long-term diminished scenic quality.

The continued presence of equipment, structures, fencing, roads, and other elements

required to operate a facility would have a long-term adverse effect on the visible land-

scape. Areas of persistent surface and vegetation disturbance and the presence of struc-

tures would create visual contrast in form, line, color, and texture compared to pre-project

conditions. Depending on viewer location, physical elements introduced by a project could

block views or create skylining. Even after project removal and site reclamation are com-

pleted, visual contrast would remain. Restoring the natural, pre-disturbance visual charac-

ter of a desert environment is extremely difficult, can take decades, and often is unsuccess-

ful. Therefore, surface and vegetation disturbance would create long-term visual impacts

due to the persistence of scars in arid and semi-arid landscapes.

The structure, size, and industrial character of utility-scale renewable energy and transmis-

sion facilities during their operation and maintenance—as well as any associated glare,

reflectivity, and lighting—would visually contrast with surrounding undeveloped land and

result in long-term diminished scenic quality.

Impacts in Study Area Lands

Study Area Lands refer to three categories of lands shown on alternative maps: Future

Assessment Areas (FAAs), Special Analysis Areas (SAAs) and DRECP Variance Lands.

Future Assessment Areas (FAAs). Lands within FAAs are neither reserve lands nor DFAs;

they are simply areas that are deferred for future assessment. The future assessment will

determine their suitability for renewable energy development or ecological conservation. If

renewable energy development occurs on FAA lands, a BLM LUPA would not be required.

FAAs for each alternative are included and located as shown in Table IV.1-2 and Figure II.3-1.

The FAAs represent areas where renewable energy development or inclusion in the

reserve design could be implemented through an amendment to the DRECP, but additional

assessment would be needed.

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

DRECP Plan Area Boundary

Ecoregion Subareas

CDCA Boundary

County Boundary

Non-BLM Land

BLM VRM Classifications

Class I

Class II

Class III

Class IV

M:\JOBS4\6287\common_gis\EIR_Figures_Spring_2014\Vol_IV\IV_20_Visual\figIV.20-2.mxd 8/18/2014

FIGURE IV.20-2

Proposed BLM Visual Resource Management Classifications, Preferred Alternative

0 2010

MilesI

Draft DRECP and EIR/EIS

Sources: ESRI (2014); CEC (2013); BLM (2013); CDFW (2013); USFWS (2013)

August 2014

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-40 August 2014

INTENTIONALLY LEFT BLANK

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-41 August 2014

Because most of the FAAs are presented as “undesignated areas” in the action alternatives,

there would be no difference between the FAAs in the Preferred Alternative except that

renewable development in an FAA would not require a BLM LUPA; so the environmental

review process would be somewhat simpler than if the location were left undesignated.

Special Analysis Areas (SAAs). There are two areas defined as SAAs, representing areas

subject to ongoing analysis. These areas (in the Silurian Valley and just west of U.S. 395 in

Kern County) have high value for renewable energy development, ecological and cultural

conservation, and recreation. SAA lands are expected to be designated in the Final EIR/EIS

as either DFAs or included in the Reserve Design/Conservation Designation. Visual

resource elements within the SAAs of the Preferred Alternative include approximately

35,000 acres of VRI Class II, III, and IV lands and 35,000 acres of VRM Class III and IV lands.

No VRI Class I lands or VRM Class I or II lands are within SAAs.

DRECP Variance Lands. DRECP Variance Lands represent the BLM Solar PEIS Variance

Lands as screened for the DRECP and EIR/EIS based on BLM screening criteria. Covered

Activities could be permitted for NCCP purposes only through an NCCP plan amendment.

However, development of renewable energy on Variance Lands would not require a BLM

LUPA; so the environmental review process would be somewhat simpler than if the loca-

tion were left undesignated. Per CMAs for visual resources, development of DRECP

Variance Lands would be required to conform to the visual management objectives

of VRM Class III.

Impact Reduction Strategies and Mitigation

The implementation of the Preferred Alternative would result in landscape-scale

conservation of desert lands as well as the development of renewable energy generation

and transmission facilities on other lands. The impacts of the renewable energy

development covered by the Preferred Alternative would be lessened in a number of

ways. The Preferred Alternative would incorporate CMAs for each alternative, including

specific biological reserve design components and LUPA components. In addition, the

implementation of existing laws, orders, regulations, and standards would reduce the

impacts of project development.

Conservation and Management Actions

The conservation strategy for the Preferred Alternative (presented in Volume II, Section

II.3.1.2) defines specific actions that would reduce the impacts of this alternative. The con-

servation strategy includes a definition of the reserve design and specific CMAs for the

Preferred Alternative. While the CMAs were developed for BLM lands only, this analysis

assumes that all CMAs would be applied to nonfederal lands as well.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-42 August 2014

Specific visual resource CMAs have been developed. These visual resource CMAs apply to

the Preferred Alternative and all action alternatives and are summarized here:

CMAs for the entire Plan Area:

o Ensure that development within each area with a VRM Class designation meets

the VRM objectives described above as measured through a visual contrast

rating process.

o Ensure that transmission facilities are designed and located to meet the VRM

Class objectives for the area in which they are located. Transmission lines routed

through approved corridors where they do not meet VRM Class objectives will

require RMP amendments to establish a conforming VRM objective. All reason-

able effort must be made to reduce visual contrast of these facilities to meet the

VRM Class before pursing RMP amendments. This includes changes in routing,

using lattice towers (as opposed to monopoles), color treating facilities using an

approved color from the BLM Environmental Color Chart CC-001 (dated June 2008

or June 2013)(as opposed to galvanized metal) on towers and support facilities,

and employing other BMPs to reduce contrast. Such efforts will be retained even if

an RMP amendment is determined to be needed. Visual resource BMPs that

reduce adverse visual contrast will be applied in VRM Class conforming situations.

CMAs for DFAs and DRECP Study Area Lands:

o Manage all DFAs as VRM Class IV to allow for industrial-scale development.

Employ BMPs to reduce visual contrast of facilities.

o Manage all Variance Lands as VRM Class III.

o Require development to incorporate visual design standards and include latest

BMPs (from Solar, Wind, West Wide Energy Corridor, and Geothermal PEISs, the

Best Management Practices for Reducing Visual Impacts of Renewable Energy

Facilities on BLM-Administered Lands, and other programmatic BMP documents).

o Encourage development in a planned fashion within DFAs (e.g., similar to the

planned unit development concept used for urban design, i.e., in-fill vs. scattered

development, use of common road networks, generator tie-lines, use of similar

support facility designs materials, colors, etc.) to avoid industrial sprawl.

o Require regional mitigation for visual impacts for public lands outside of DFAs

but open to consideration for energy development (Variance Lands etc.). Mitiga-

tion will be based on the VRI Class and the underlying visual values (scenic

quality, sensitivity, and distance zone) for the development area as it stands at

the time the Record of Decision is signed for the DRECP. Compensation may

involve reclamation of visual impacts present within other areas designated as

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-43 August 2014

BLM VRM class I or II lands (so that they are no longer visible in the long-term),

mitigation on BLM lands inventoried as having equal to or greater visual

resource values, or amending RMPs for lands within VRM Class III or IV to a

higher level of protection (VRM Class I or II) for areas that are visually intact

with no cultural modifications and have visual resource inventoried values that

are equal to or greater in value and delineate a protective visual ACEC around

the compensatory mitigated area. The following mitigation ratios will be applied:

VRI Class II 2:1 ratio

VRI Class III 1:1 ratio

VRI Class IV no mitigation required

o Require compensatory mitigation on public lands developed within DFAs at one-

half the level of lands outside of DFAs;

VRI Class II 1:1 ratio

VRI Class III 2:1 ratio

VRI Class IV, no mitigation required

o Require additional mitigation measures where projects affect viewsheds of spe-

cially designated areas (e. g., National Scenic and Historic Trails, National Parks,

etc.) as discussed under those programs (See CMAs assigning VRM Class II for

National Scenic and Historic Trail Management Corridors.)

Required visual resource BMPs. All development within and outside the DFAs will

abide by the BMPs addressed in Reducing Visual Impacts of Renewable Energy Facili-

ties on BLM-Administered Lands, including, but not limited to the following:

o Transmission

Color treat monopoles Shadow Gray per the BLM Environmental Color Chart

CC001 unless the local Field Office VRM specialist selects a more effective color.

Lattice towers and conductors will have nonspecular qualities.

Lattice towers will be located a minimum of ¾ mile away from key observa-

tion points such as roads, scenic overlooks, trails, campgrounds, navigable

rivers, and other areas people tend to congregate and located against a land-

scape backdrop when topography allows.

o Solar – Color treat all facilities Shadow Gray from the BLM Environmental Color

Chart CC001 unless a more effective color is selected by the Field Office VRM

specialist, including but not limited to:

Concentrated solar thermal parabolic trough panel backs

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-44 August 2014

Solar power tower heliostats

Solar power towers

Cooling towers

Power blocks

o Wind – Color treat all facilities Shadow Gray with the exception of the wind tur-

bine and towers 200 vertical feet or more.

o Night Sky – BMPs to minimize impacts to night sky including light shielding will

be employed.

CMAs for ACECs and SRMAs:

o Manage Alabama Hills SRMA and Manzanar ACEC to conform to VRM

Class II standards.

CMA for lands managed for wilderness characteristics:

o Manage the areas as VRM Class II

These visual resource CMAs provide a comprehensive framework of state-of-the-art guide-

lines and specifications through which visual impacts would be avoided where possible,

minimized, and/or mitigated to the extent practicable.

Laws and Regulations

Similar to the No Action Alternative, existing laws and regulations will reduce certain impacts

of Plan implementation. Relevant regulations are presented in the Regulatory Setting in

Volume III. The requirements of relevant laws and regulations are summarized in

Section IV.20.3.1.1.1.

Mitigation Measures

The visual impact avoidance and reduction strategies in existing guidance, including Reduc-

ing Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands, are

detailed and comprehensive. The CMAs proposed under the DRECP (see Appendix H)

provide additional detail and direction. These represent state-of-the-art visual impact

avoidance and mitigation as they apply to the Plan Area; no additional mitigation has

been developed.

IV.20.3.2.1.2 Impacts of the Reserve Design

The reserve design area under the Preferred Alternative would total nearly 15 million

acres, which is approximately 70% of the Plan Area. This would result in the protection of

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-45 August 2014

visual resources in this portion of the Plan Area because of the limitations on development

incorporated in existing laws and regulations and in the CMAs associated with the Reserve

Design. Nearly half of the reserve design under the Preferred Alternative would be

Legislatively and Legally Protected Areas and Military Expansion Mitigation Lands that cur-

rently are under Conservation Designations.

Approximately 30% (6,118,000 acres) of the Preferred Alternative reserve design would be

composed of BLM LUPA Conservation Designations, including NLCS lands, ACECs, and

wildlife allocations.

Approximately 8% of the reserve design area under the Preferred Alternative is composed

of CPAs. The CPAs would include 1,139,000 acres of private and public land located outside

of existing Conservation Designations, including BLM LUPA Conservation Designations.

These CPAs would be part of mitigation to meet DRECP biological goals and objectives and

would be acquired from willing sellers. The conservation protections afforded the CPAs

also would protect visual resources.

There would be 14,920,000 acres of Reserve Design Lands under the Preferred Alternative,

whereas no equivalent reserve system would be established under the No Action Alterna-

tive. Key points in comparing the Preferred Alternative visual impacts of the reserve design

with those of the No Action Alternative are identified in Table R2.20-6 in Appendix R2.20

and summarized as follows:

VRI Classes: The Reserve Design Lands for the Preferred Alternative would include

100% of VRI Class I lands and approximately 74% of VRI Class II lands, 67% of VRI

Class III lands, and 72% of Class IV lands. Under the No Action Alternative, 100% of

VRI Class I lands, 24% of VRI Class II lands, 25% of Class III lands, and 22% of VRI

Class IV lands would be in conservation.

VRM Classes: Approximately 100% of VRM Class I lands, 83% of VRM Class II

lands, 79% of VRM Class III lands, and 38% of VRM Class IV lands would be in the

Reserve Design. More than 4 million acres of these lands are in BLM LUPA

Conservation Designations.

In the No Action Alternative, 100% of the VRM Class I lands are in conservation; but

very little (<1%) of VRM Classes II, III, and IV are in conservation lands.

National Parks and Preserves: The National Parks and Preserves would have

100% of their land areas in the Reserve Design Lands under both the Preferred

Alternative and No Action Alternative.

National Scenic Byways: Under the Preferred Alternative, approximately 51% of

the Bradshaw Trail National Back Country Byway and 15% of State Route (SR) 190

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-46 August 2014

would be in the Reserve Design. This provides a higher or similar level of protection

of visual and scenic values as in conservation under the No Action Alternative (33%

and 15% respectively.)

National Scenic and Historic Trails: Under the Preferred Alternative, approxi-

mately 4% of the Juan Bautista de Anza National Historic Trail, 58% of the Old

Spanish National Historic Trail, and 40% of the Pacific Crest National Scenic Trail

alignments would be in the Reserve Design.

Under the No Action Alternative, approximately 43% of the Juan Bautista de Anza

National Historic Trail, 46% of the Old Spanish National Historic Trail, and 32% of

the Pacific Crest National Scenic Trail alignments are in conservation.

The Preferred Alternative provides a lower level of conservation of the Juan Bautista

de Anza National Historic Trail alignment and a higher level of conservation of the

Old Spanish National Historic Trail and Pacific Crest National Scenic Trail align-

ments than the No Action Alternative.

California State Parks: Under the Preferred Alternative, most California State

Park land would be in Reserve Design Lands. This would vary by individual park

or preserve; but most parks would have more than 90% in existing conservation

areas, BLM LUPA designations, or CPAs. Exceptions are the (1) Desert

Cahuilla/Freeman Project (4%), (2) Picacho State Recreation Area (SRA) (78%),

and (3) Salton Sea SRA (86%).

Under the No Action Alternative, the extent of California State Parks under existing

conservation varies due to land ownership and management considerations. While

most of the California State Park lands are in conservation (95%), several have less

in conservation (e.g., Picacho SRA, Red Rock Canyon State Park, and Salton Sea SRA).

State Scenic Highways: Approximately 15% of SR 190 but no portion of the SR 78

and U.S. 395 alignments would be in Reserve Design Lands, compared to similar

portions under the No Action Alternative.

Wild and Scenic Rivers: 100% of the designated Amargosa Wild and Scenic River

corridor as well as the eligible Surprise Canyon Creek and Mojave River segments

would be within the reserve design under both the Preferred Alternative and No

Action Alternative.

IV.20.3.2.2 Impacts of DRECP Land Use Plan Amendment on BLM Land: Preferred Alternative

This section addresses two components of effects of the BLM LUPA: the streamlined

development of renewable energy and transmission on BLM land under the LUPA and the

impacts of the amended land use plans themselves.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-47 August 2014

IV.20.3.2.2.1 Impacts from Renewable Energy and Transmission Development on BLM Land

The visual impacts of DFAs on VRI and VRM lands for the Preferred Alternative would be

the same as those described in Section IV.20.3.2.1 for the Plan-wide analysis.

IV.20.3.2.2.2 Impacts of Changes to BLM Land Designations

The DRECP LUPA Preferred Alternative would establish VRM classes for all lands in the

CDCA. (Currently, only the Bishop RMP and the Imperial Sand Dunes RAMP have VRM

Classes designated. In accordance with BLM policy, all wilderness areas and WSAs are

managed as VRM Class I.) It also would (1) designate new NLCS lands; (2) designate new

ACECs and expand and reduce existing ACECs; (3) designate new SRMAs and expand and

reduce existing SRMAs; (4) create buffer corridors along National Scenic and Historic

Trails; (5) manage lands with wilderness characteristics to protect those characteristics;

and (6) designate new wildlife allocations. The BLM LUPA also would replace existing

multiple-use classes.

The VRM Classes and BLM land designations proposed under the Preferred Alternative

would offer protective measures that would avoid or reduce visual impacts. CMAs for

visual resources would be established and implemented. The BLM-specific CMAs proposed

under the Preferred Alternative would be the same for all action alternatives. These visual

resource CMAs and the restrictions and protective measures of the land designations pro-

vide a framework of guidelines and specifications through which visual impacts would be

avoided where possible, minimized, and/or mitigated to the extent practicable.

Under the Preferred Alternative, Trail Management Corridors would be established along

National Scenic and Historic Trails, at a width of generally 5 miles from the centerline of the

trail, for a total width of 10 miles. As discussed in Volume II, Section II.3.2.2.2, these Trail

Management Corridors would be managed as components of the BLM’s NLCS. Where

National Trails overlap other NLCS lands, the more protective CMAs or land use allocations

would apply. All Trail Management Corridors would be designated as VRM Class II, except

within approved transmission corridors (VRM Class III) and DFAs (VRM Class IV). How-

ever, state-of-the-art VRM BMPs for renewable energy would be employed commensurate

with the protection of nationally significant scenic resources and cultural landscapes to

minimize the level of intrusion and protect trail settings.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements under the Preferred Alternative (see Appendix R2, Table

R2.20-7 for detailed, quantitative data and analysis):

SRMAs: There would be the potential for recreational activities or facilities allowed

in SRMAs to affect scenic values, particularly those of the VRI Class I and II lands

(approximately 274,000 acres) with which they coincide.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-48 August 2014

NLCS: The management of these lands that have nationally significant ecological,

cultural, and scientific values would offer additional protection of intactness and

scenic quality, particularly to the VRI Class I, II, III, and IV lands (3.6 million acres)

with which they coincide.

ACECs: The special management measures given to protect the important historic,

cultural, and scenic values of these areas would generally benefit visual resources,

particularly the VRI Class II, III, and IV lands (1.4 million acres) with which

they coincide.

Wildlife Allocation Areas: The management of these areas must be compatible

with protection and enhancement of wildlife and plant habitat and would generally

benefit visual resources, particularly the VRI Class III and IV lands (approximately

18,000 acres) with which they coincide.

Lands Managed for Wilderness Characteristics: Management strategies to pro-

tect wilderness characteristics would benefit visual resources, particularly the VRI

Class II, III, and IV lands (approximately 299,000 acres) with which they coincide.

Trail Management Corridors: One effect of the 10-mile-wide corridors would be

to provide a higher level of protection (VRM Class II objectives) to approximately

50 acres of VRM Class III and IV lands that would otherwise be managed under

less restrictive visual management objectives. Importantly, the Trail Management

Corridors would provide a consistent framework for protecting and managing

scenic values along National Scenic and Historic Trails within National and

California state park lands. Trail Management Corridors are not established under

the No Action Alternative.

The Preferred Alternative would assign VRM classes to all BLM lands within the Plan Area.

Generally, a low correlation between the VRM classes and the underlying VRI classes (e.g.,

VRI Class II or III lands managed to meet the objectives of VRM Class IV) would result in

greater adverse impacts to visual quality. Conversely, impacts would most likely be less for

alternatives proposing visual management that either closely corresponds to the VRI

classes or proposing a more restrictive (higher) class designation (e.g., proposing VRM

Class II management of VRI Class III lands).

Under the Preferred Alternative, VRI Class lands within the proposed VRM Classes on BLM

LUPA lands would be as indicated in Table IV.20-4. Key effects of VRM classifications on

VRI lands under the Preferred Alternative are summarized here:

VRM Designations: The majority of inventoried lands would be designated as VRM

Class I, II, or III. Less than 10% would be designated as VRM Class IV.

o VRI Class I: 100% of VRI Class I lands would be managed as VRM Class I,

reflecting a high level of management protection.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-49 August 2014

o VRI Class II: Approximately 75% of VRI Class II lands would be managed as VRM

Class II or I, reflecting a moderate to high level of management protection.

Approximately 20% would be managed as VRM Class III, and approximately 5%

would be managed as VRM Class IV.

o VRI Class III: More than 80% of VRI Class III lands would be managed as VRM

Class III, II, or I, reflecting a moderate to high level of management protection.

Approximately 35% would be managed to meet VRM Class II objectives, which

restrict visual contrast and impact more than the VRM Class III objectives do.

Approximately 49% would be managed as VRM Class III, and 16% would be

managed as VRM Class IV, which allows for more visual contrast and impact than

the VRM Class III objectives.

o VRI Class IV: Approximately 58% of VRI Class IV lands would be managed as

VRM Class I, II, or III; 41% would be managed as VRM Class IV.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-50 August 2014

Table IV.20-4

VRI Classes Within Proposed VRM Classes on BLM LUPA Lands – Preferred Alternative

LUPA-Proposed VRM Class

Designations

Existing Visual Resource Inventory Classes

Total

VRI Class I VRI Class II VRI Class III VRI Class IV

Acres Percent Acres Percent Acres Percent Acres Percent

VRM Class I 3,842,000 100% 6,000 0% 3,000 0% 700 0% 3,851,700

VRM Class II 0 0% 1,622,000 75% 963,000 35% 444,000 22% 3,029,000

VRM Class III 0 0% 425,000 20% 1,364,000 49% 721,000 36% 2,510,000

VRM Class IV 0 0% 112,000 5% 437,000 16% 810,000 41% 1,359,000

Total 3,842,000 100% 2,165,000 100% 2,767,000 100% 1,975,700 100% 10,749,700

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. Acres above include CDCAs outside the Plan Area. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-51 August 2014

Compared to the No Action Alternative, the Preferred Alternative would result in a higher

potential for retaining the integrity of the inventoried visual resource values and, conse-

quently, a lower level of potential visual impact to those values compared with the No

Action Alternative. The designation of VRM Classes throughout the CDCA would have the

value of providing the level of visual change allowed prior to an area being considered for

projects that would introduce change. Currently, VRM Classes are designated only for the

Bishop Field Office, the Imperial Sand Dunes RAMP, wilderness areas, and WSAs.

Under the proposed CMAs, all DFAs would be managed as VRM Class IV lands to allow for

utility-scale development. In those cases, implementation or incorporation of BMPs

would still be required to reduce the visual contrast levels of proposed facilities to the

extent practicable.

IV.20.3.2.3 Impacts of Natural Community Conservation Plan: Preferred Alternative

The analysis of Covered Activities under the NCCP is equivalent to the Plan-wide analysis of

the interagency alternatives. Reserve design features and other conservation actions under

the NCCP alternatives represent more detailed categories of the reserve design under the

interagency Plan-wide alternatives. These NCCP differences in reserve design features do

not affect nonbiological resources analyzed in this document, and the analysis of reserve

design and conservation and management actions under the NCCP is therefore equivalent

to the Plan-wide analysis of the interagency alternatives. The visual impacts of the NCCP for

the Preferred Alternative would be the same as those defined in Section IV.20.3.2.1 for the

Plan-wide analysis.

IV.20.3.2.4 Impacts of General Conservation Plan

The visual impacts of the GCP for the Preferred Alternative would be similar to those

defined in Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur on

nonfederal lands only.

IV.20.3.2.5 Impacts Outside the Plan Area

IV.20.3.2.5.1 Impacts of Transmission Outside the Plan Area

The impacts of transmission outside the Plan Area would be the same under all alternatives.

These are as described for the No Action Alternative in Section IV.20.3.1.5.1, Impacts of

Transmission Outside the Plan Area.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-52 August 2014

IV.20.3.2.5.2 Impacts of BLM LUPA Decisions Outside the Plan Area

Under the proposed BLM LUPA, changes outside the Plan Area would include the designa-

tion of NLCS lands, ACECs, National Scenic and Historic Trails Management Corridors, VRM

classes, and new land allocations to replace multiple-use classes on CDCA lands.

The VRM Classes and other BLM land designations proposed under the Preferred Alterna-

tive would benefit visual resources to the extent that they offer protective measures that

would avoid or reduce visual impacts. CMAs for visual resources would be established and

implemented. The BLM-specific CMAs for the Preferred Alternative would be the same for all

action alternatives. These visual resource CMAs and the restrictions and protective measures

of the land designations provide guidelines and specifications through which visual impacts

would be avoided where possible, minimized, and/or mitigated to the extent practicable.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements, outside the Plan Area, under the Preferred Alternative

(see Appendix R2, Table R2.20-8 for detailed, quantitative data and analysis):

Proposed NLCS: The management of these lands that have nationally significant

ecological, cultural, and scientific values would offer additional protection of intact-

ness and scenic quality.

Existing and Proposed ACECs: The special management measures given to protect

the important historic, cultural, and scenic values of these areas would generally

benefit visual resources, particularly the VRM Class II, III, and IV lands (approximately

207,000 acres) with which they coincide.

Trail Management Corridors: The primary effect of these 10-mile-wide corridors

would be to provide a consistent framework for protecting and managing scenic

values along National Scenic and Historic Trails within National and California State

park lands. As with all action Alternatives, the Trail Management Corridors would

be managed to meet the visual management objectives of VRM Class II.

IV.20.3.2.6 CEQA Significance Determination for the Preferred Alternative

The significance determinations for short-term and long-term impacts are described in

Section IV.20.3.1.1.1 for the No Action Alternative. Section IV.20.1.2 identifies four

criteria to apply when determining if there are significant impacts from a project under

CEQA. These criteria are included as part of the more general impacts identified in this

section as VR-1 and VR-2.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-53 August 2014

The visual impacts and their associated significance determinations for the Preferred Alter-

native are as follows:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Activities and equipment visible from residences, public roads, and public preserves would

result in short-term diminished scenic quality for viewers. Examples of short-term impacts

are dust and exhaust emissions, presence of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, outdoor assembly of components,

temporary site lighting, and temporary trailers and structures.

The presence of vehicles and equipment, worker activity on a site, and the use of tempo-

rary trailers during construction are unavoidable; and short-term visual impacts end with

the end of construction. Because they are time-limited and are typical of any construction

project, they create less than significant impacts.

High daytime temperatures in the desert may make steel too hot for safe handling and pose

a health and safety risk to workers. During periods of very high daytime temperatures,

some work at night may be required, such as assembling steel lattice transmission towers.

This would require night lighting in the work area. Intense artificial lighting can have a sig-

nificant adverse effect on the desert night sky and on the night visual environment.

Implementation of Mitigation Measure AQ-1a (from Chapter IV.2, Air Quality) would con-

trol fugitive dust. Also, implementation of appropriate CMAs would address most other

short-term impacts, except night construction lighting.

Impact VR-2: The presence of plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

Long-term impacts to visual resources for the Preferred Alternative would be significant

and unavoidable, as described in detail for the No Action Alternative (Section IV.20.3.1.6,

CEQA Significance Determination: No Action Alternative). Changes in line, form, and color

introduced by large-scale development and the contrast of such development with sur-

rounding conditions create unmitigable degradation of views. The CMAs that apply to the

Preferred Alternative would reduce the impact on visual resources, but not to a less than

significant level.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-54 August 2014

IV.20.3.2.7 Comparison of the Preferred Alternative with No Action Alternative

Chapter IV.27 presents a comparison of all action alternatives and the No Action Alterna-

tive across all disciplines. This section summarizes the comparison of the Preferred Alter-

native with the No Action Alternative.

IV.20.3.2.7.1 Preferred Alternative Compared with No Action Alternative for Plan-wide DRECP

Similar types of visual impacts are expected to occur under both the Preferred and No

Action Alternatives, based on the assumptions that California’s renewable energy goals

would be achieved in both cases. The impacts would vary in geographic distribution and in

the mitigation measures applied to them. Importantly, the Preferred Alternative by desig-

nation of DFAs would concentrate development in smaller and less sensitive areas,

whereas development under the No Action Alternative is not similarly constrained.

Geographic Distribution. Under the Preferred Alternative, the eastern-northeastern por-

tion of the Plan Area, where there are large areas set aside as National Parks, Preserves,

and wilderness areas, has the lowest concentration of DFAs. As a result, fewer renewable

energy projects would be visible from extensive areas of existing or proposed conservation.

from a scenery management perspective, the concentration of development, especially

when facilities are visually intrusive, could increase localized adverse impacts as compared

with the No Action Alternative., which would continue to allow renewable energy develop-

ment across a larger area of the desert. However, under the Preferred Alternative, overall

impacts would be much lower, because the visual integrity of the large-scale open desert

landscapes would not be as compromised by concentrated development in DFAs as it

would be by the more widely dispersed development of the No Action Alternative.

The severity of visual impacts depends partly on the number of potential viewers. More

intense wind and solar project development in the West Mojave area, which has a large

DFA in the Preferred Alternative, would add to the existing visual disturbance experienced

by residents in the Mojave, Lancaster, and Palmdale areas due to extensive wind and solar

development in those areas. Similarly, the DFA around Victorville, Adelanto, and Lucerne

Valley surrounds another of the more densely populated areas of the Plan Area.

The severity of visual impacts also relates to expectations of viewers who are seeking to

enjoy the undeveloped desert environment. The areas of the eastern Plan Area are sensi-

tive because they contain the Mojave National Preserve, Death Valley National Monument,

and several BLM Wilderness Areas. The Preferred Alternative generally avoids develop-

ment in these areas, except for the Pahrump Valley. However, the Preferred Alternative

does include solar development in the entire East Riverside Solar Energy Zone, which is

visible from Joshua Tree National Park as well from BLM Wilderness Areas.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-55 August 2014

Extent of Potential Renewable Energy Development. The area in which development

could occur under the No Action Alternative is five times greater than the area of DFAs

under the Preferred Alternative (9.8 million acres of ADAs under No Action Alternative

compared with 2 million acres of DFAs in the Preferred Alternative). The more constrained

development within the DFAs of the Preferred Action would result in a much smaller areas

of the desert from which renewable energy development would create visual impacts.

Conservation. Conservation under the No Action Alternative would be limited to the exist-

ing 7.7 million acres currently conserved. Under the Preferred Alternative, there would be

nearly 15 million acres of conservation lands in the Reserve Design, or nearly twice the

amount of land in conservation.

In summary, the composition and structure of the Preferred Alternative would provide far

greater opportunities for the avoidance, reduction, and minimization of visual impacts than

the No Action Alternative.

IV.20.3.2.7.2 Preferred Alternative Compared with No Action Alternative for the BLM Land

Use Plan Amendment

VRM Classes have been assigned to BLM lands within the Bishop RMP and Imperial Sand

Dunes RAMP and by BLM policy to wilderness areas and WSAs. This would be the situation

under the No Action Alternative. The Preferred Alternative would assign VRM Classes to all

BLM lands within the CDCA, including those outside the Plan Area. This would provide a

unifying framework and an established system for addressing visual resources throughout

the desert and would eliminate the need to address visual resources under multiple-use

classes, which would be replaced by the LUPA. Additionally, because the Preferred Alterna-

tive proposes 10-mile-wide Trail Management Corridors, which would not occur under the

No Action Alternative, the scenic values and viewer experience along National Scenic and

Historic Trails would have a much greater level of protection under the Preferred Alterna-

tive than under the No Action Alternative.

IV.20.3.2.7.3 Preferred Alternative Compared with No Action Alternative for NCCP

The visual impacts of the NCCP for the Preferred Alternative are the same as those defined

in Section IV.20.3.2.1 for the Plan-wide analysis. As a result, the comparison of the

Preferred Alternative with the No Action Alternative for the NCCP is the same as described

previously for Plan-wide DRECP.

IV.20.3.2.7.4 Preferred Alternative Compared with No Action Alternative for the GCP

The visual impacts of the GCP for the Preferred Alternative would be similar to those defined

in Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur on nonfederal lands

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-56 August 2014

only. In the absence of Plan implementation, the GCP would not be approved; and the visual

impacts of projects would continue to be evaluated by the appropriate lead agency on an

individual basis.

IV.20.3.3 Alternative 1

Alternative 1 includes 1,070,000 acres of DFAs and 15,037,000 acres of Reserve Design

Lands (comprising existing Conservation, BLM LUPA Conservation Designations, and

CPAs). For reference, Table IV.20-5 compares the Preferred Alternative to Alternative 1 for

key visual elements.

Table IV.20-5

Affected Visual Resources – Preferred Alternative Compared to Alternative 1

Preferred Alternative Alternative 1

Development Areas (acres)

DFAs 2,024,000 1,070,000

Visual Resource Elements Within Development Areas (acres unless otherwise indicated)

VRI [Class] 0 [I]

17,000 [II]

61,000 [III]

27,000 [IV]

0 [I]

4,000[II]

8,000 [III]

7,000 [IV]

VRM [Class] 0 [I]

0 [II]

0 [III]

106,000 [IV]

0 [I]

0 [II]

0 [III]

19,000 [IV]

National Scenic Byways 0 0

National Scenic and Historic Trails 1 mi. 2 mi.

California State Parks 0 0

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Visual Resource Elements Within 5 miles of Development Areas (acres unless otherwise indicated)

VRI [Class] 366,000 [I]

389,000 [II]

731,000 [III]

709,000 [IV]

160,000 [I]

303,000 [II]

509,000 [III]

478,000 [IV]

VRM [Class] 366,000 [I]

515,000 [II]

555,000 [III]

694,000 [IV]

160,000 [I]

285,000 [II]

516,000 [III]

466,000 [IV]

National Scenic Byways 13 mi. 7 mi.

National Parks and Preserves 15,000 15,000

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-57 August 2014

Table IV.20-5

Affected Visual Resources – Preferred Alternative Compared to Alternative 1

Preferred Alternative Alternative 1

National Scenic and Historic Trails 350 mi. 212 mi.

Trail Management Corridors 659,000 40,000

California State Parks 108,000 104,000

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Reserve Design Lands (Conservation Lands) (acres)

Reserve Design Lands 14,920,000 15,037,000

Note: The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

IV.20.3.3.1 Plan-wide Impacts of Implementing the DRECP: Alternative 1

IV.20.3.3.1.1 Plan-wide Impacts and Mitigation Measures from Renewable Energy and

Transmission Development

Impact Assessment

Under Alternative 1, renewable energy related activities covered by the Plan would be

confined to just more than 1 million acres of DFAs, resulting in 148,000 acres of long-term

disturbance (see Table IV.1-1). This represents approximately 3,000 acres more long-term

disturbance than could occur under the Preferred Alternative.

The DFAs in Alternative 1 are focused in the Imperial Valley, Lucerne Valley, and Barstow

area. Alternative 1 has fewer DFAs in eastern Riverside and the Tehachapi area and very

small DFAs along the U.S. 395 corridor.

Approximately 1,070,000 acres would be within DFAs under Alternative 1 compared with

2,024,000 acres under the Preferred Alternative, representing a more confined area in

which visual impacts would occur. Alternative 1 would affect primarily three ecoregion

subareas, compared to five under the Preferred Alternative.

Visual impacts from solar development would be concentrated in three ecoregion

subareas: (1) Imperial Borrego Valley, (2) Pinto Lucerne Valley and Eastern Slopes,

and (3) West Mojave and Eastern Slopes.

Visual impacts from wind energy development would be in two ecoregion subareas:

(1) West Mojave and Eastern Slopes and (2) Pinto Lucerne Valley and Eastern Slopes.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-58 August 2014

Visual impacts from geothermal energy would occur in the Imperial Borrego Valley

ecoregion subarea, whereas in the Preferred Alternative they would be in the Impe-

rial Borrego Valley and the Owens River Valley ecoregion subareas.

The following summarizes the key points in comparing the visual impacts from renewable

energy and transmission development under Alternative 1 with those of the Preferred

Alternative (see Appendix R2, Table R2.20-9 for detailed, quantitative data and analysis):

VRI Classes: Under Alternative 1, there would be no VRI Class I lands, 4,000 acres of

VRI Class II lands, 8,000 acres of VRI Class III lands, and 7,000 acres of VRI Class IV

lands within DFAs. Per the CMAs for visual resources, these 12,000 acres of VRI

Class II and III lands within DFAs would be managed as VRM Class IV and thereby

sustain a potential degradation of underlying scenic values. Approximately 12,000

acres of transmission would occur on inventoried lands, compared with 13,000

acres under the Preferred Alternative.

A much larger amount of VRI Class II and III lands within DFAs would be managed

as VRM IV under the Preferred Alternative than under Alternative 1. This reflects a

potential degradation of underlying scenic values under Alternative 1 but to a lesser

extent than under the Preferred Alternative.

VRM Classes: As with the Preferred Alternative, there would be no VRM Class I, II,

or III lands in DFAs under Alternative 1 (Figure IV.20-3, Proposed BLM VRM Classifi-

cations, Alternative 1). This is because all DFAs would be managed as VRM IV under

all action alternatives. Approximately 12,000 acres of transmission would occur on

VRM-classified lands, compared with a slightly larger amount of 13,000 acres under

the Preferred Alternative.

National Parks and Preserves: These lands would not be within the DFA footprint

under Alternative 1 or the Preferred Alternative. Although the footprint of renew-

able energy projects would not directly affect these lands, project facilities and

activities that are visible from National Parks and Preserves would diminish scenic

quality for viewers in those conservation areas, where expectations for scenic

quality are typically high.

National Scenic Byways: No segments of the Bradshaw Trail National Back

Country Byway would be within DFAs under either Alternative 1 or the

Preferred Alternative.

National Scenic and Historic Trails: Approximately 2 miles of the Old Spanish

National Historic Trail alignment would be within DFAs under both Alternative 1

and the Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-59 August 2014

State Scenic Highways: No segments of State Scenic Highways would be within

DFAs under Alternative 1 or the Preferred Alternative.

Wild and Scenic Rivers: 100% of the designated Amargosa Wild and Scenic River

corridor as well as the eligible Surprise Canyon Creek and Mojave River segments

would be within the reserve design under both Alternative 1 and the

Preferred Alternative.

Proximity of Visual Resources to DFAs. Table IV.20-5 shows that Alternative 1

has generally fewer visual resource elements within 5 miles of DFAs than the Pre-

ferred Alternative. One example of this is the area of VRI Class I: there are 366,000

acres under the Preferred Alternative compared with 160,000 acres under Alterna-

tive 1. For Trail Management Corridors, there would be more than 15 times as many

acres within this 5-mile distance under the Preferred Alternative than there would

be under Alternative 1.

The visual impacts resulting from Alternative 1 are:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Preconstruction activities and equipment visible from residences, public roads, and public

preserves would result in short-term diminished scenic quality for viewers. Examples

include road upgrading, damage to or removal of native vegetation, construction of

meteorological towers, drilling of temperature gradient wells, vehicles, and lighting.

During construction and decommissioning, activities and equipment visible from residences,

public roads, and public preserves would result in short-term diminished scenic quality for

viewers. Examples include dust and exhaust emissions, removal of vegetation during site

clearing, contouring and grading, presence of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, assembly of components, site light-

ing, and construction of and later removal of structures.

Impact VR-2: The presence of plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

The continued presence of equipment, structures, fencing, roads and other elements

required to operate a facility would have a long-term adverse effect on the visible land-

scape. Areas of persistent surface and vegetation disturbance and the presence of struc-

tures would create visual contrast in form, line, color, and texture compared with pre-

project conditions. Depending on viewer location, physical elements introduced by a proj-

ect could block views or create skylining. Even after project removal and site reclamation

are completed, visual contrast would remain. Restoring the natural, pre-disturbance visual

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-60 August 2014

character of a desert environment is extremely difficult, can take decades, and often is

unsuccessful. Therefore, surface and vegetation disturbance would create long-term visual

impacts due to the persistence of scars in arid and semi-arid landscapes.

The structure, size, and industrial character of utility-scale renewable energy and transmis-

sion facilities during their operation and maintenance—as well as any associated glare,

reflectivity, and lighting—would visually contrast with surrounding undeveloped land and

result in long-term diminished scenic quality.

Impacts in Study Area Lands

Study Area Lands refer to three categories of lands shown on alternative maps: Future

Assessment Areas (FAAs), Special Analysis Areas (SAAs) and DRECP Variance Lands.

Future Assessment Areas (FAAs). Alternative 1 has no FAAs identified, therefore there

would be no associated impacts to visual resources.

Special Analysis Areas (SAAs). There are two areas defined as SAAs, representing areas

subject to ongoing analysis. These areas (located in the Silurian Valley and just west of U.S.

395 in Kern County) have high value for renewable energy development, ecological and

cultural conservation, and recreation. SAA lands are expected to be designated in the Final

EIR/EIS as DFAs or included in the Reserve Design/Conservation Designation.

Under Alternative 1, the SAAs would be designated as conservation, which would be gene-

rally beneficial to visual resources. Impacts would be the same as those explained for the

Plan-wide reserve design in Section IV.20.3.2.1.2, Impacts of the Reserve Design.

DRECP Variance Lands. DRECP Variance Lands represent the BLM Solar PEIS Variance

Lands as screened for the DRECP and EIR/EIS based on BLM screening criteria. Covered

Activities could be permitted for NCCP purposes only through an NCCP plan amendment.

However, development of renewable energy on Variance Lands would not require a BLM

LUPA; so the environmental review process would be somewhat simpler than if the loca-

tion were left undesignated.

Under Alternative 1, Variance Lands include 37,000 acres, development of which would

conform to the visual management objectives of VRM Class II.

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

DRECP Plan Area Boundary

Ecoregion Subareas

CDCA Boundary

County Boundary

Non-BLM Land

BLM VRM Classifications

Class I

Class II

Class III

Class IV

M:\JOBS4\6287\common_gis\EIR_Figures_Spring_2014\Vol_IV\IV_20_Visual\figIV.20-3.mxd 8/18/2014

FIGURE IV.20-3

Proposed BLM Visual Resource Management Classifications, Alternative 1

0 2010

MilesI

Draft DRECP and EIR/EIS

Sources: ESRI (2014); CEC (2013); BLM (2013); CDFW (2013); USFWS (2013)

August 2014

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-62 August 2014

INTENTIONALLY LEFT BLANK

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-63 August 2014

Impact Reduction Strategies and Mitigation

The implementation of Alternative 1 would result in conservation of some desert lands as

well as the development of renewable energy generation and transmission facilities on

other lands. The visual impacts of the renewable energy development covered by the Plan

would be lessened in several ways. The Plan incorporates CMAs for each alternative,

including specific biological reserve design components and LUPA components. In addition,

the implementation of existing laws, orders, regulations, and standards would reduce the

impacts of project development.

Conservation and Management Actions

The conservation strategy for Alternative 1 (presented in Volume II, Section II.3.1.1)

defines specific actions that would reduce the impacts of this alternative. The conservation

strategy includes a definition of the reserve design and specific CMAs for the Preferred

Alternative. While the CMAs were developed for BLM lands only, this analysis assumes that

all CMAs would be applied also to nonfederal lands.

Specific visual resource CMAs have been developed and apply to the Preferred Alternative

and all action alternatives. They are summarized in Section IV.20.3.2.1.1, Plan-wide Impacts

and Mitigation Measures from Renewable Energy and Transmission Development. These

CMAs for VRM include measures that apply Plan-wide, measures specific to DFAs and Study

Area Lands, and a detailed set of visual resource BMPs that apply to all action alternatives.

The BMPs incorporate the measures identified in Best Management Practices for Reducing

Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands. These visual

resource CMAs provide a comprehensive framework of guidelines and specifications through

which visual impacts would be avoided where possible, minimized, and/or mitigated to the

extent practicable.

Laws and Regulations

Similar to the No Action Alternative, existing laws and regulations will reduce certain

impacts of Plan implementation under Alternative 1. Relevant regulations are presented in

the Regulatory Setting in Volume III. The requirements of relevant laws and regulations as

related to impact reduction are summarized in Section IV.20.3.1.1.1.

Mitigation Measures

The visual impact avoidance and reduction strategies in existing guidance, such Reducing

Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands, are detailed and

comprehensive. The CMAs proposed under the DRECP (see Appendix H) provide additional

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-64 August 2014

detail and direction. These represent state-of-the-art visual impact mitigation as it applies

to the Plan Area; no additional mitigation is feasible.

IV.20.3.3.1.2 Impacts from Reserve Design

There would be approximately 15 million acres of Reserve Design Lands under both Alter-

native 1 and the Preferred Alternative. In general, visual resource elements would benefit

from the conservation policies and requirements of these lands. Alternative 1 has approxi-

mately the same amount of BLM LUPA Conservation Designations as the Preferred Alterna-

tive, with an emphasis on ACECs and wildlife allocations.

The following summarizes the key points in visual impacts of the reserve design for Alter-

native 1 compared with those of the Preferred Alternative (see Appendix R2, Table R2.20-10

for detailed data):

VRI Classes: Alternative 1 would have 100% of VRI Class I lands, 74% of VRI Class II

lands, 67% of VRI Class III lands, and 71% of VRI Class IV lands in Reserve Design

Lands, compared to similar amounts (100%, 74%, 67%, and 72% respectively)

under the Preferred Alternative.

VRM Classes: 100% of VRM Class I lands, 81% of VRM Class II lands, 65% of VRM

Class III lands, and 66% of the VRM Class IV lands would be in the Reserve Design

Lands under Alternative 1, compared with 100% of VRM Class I lands, 83% of VRM

Class II lands, 79% of VRM Class III lands, and 38% of VRM Class IV lands under the

Preferred Alternative.

National Parks and Preserves: The National Parks and Preserves would have

100% of their land areas in the reserve design under Alternative 1 and under the

Preferred Alternative.

National Scenic Byways: Under Alternative 1, approximately 50% of the Bradshaw

Trail National Back Country Byway and 11% of SR 190 would be in the Reserve

Design. This provides a similar level of protection of visual and scenic values as

would occur under the Preferred Alternative (51% and 15% respectively).

National Scenic and Historic Trails: Under Alternative 1, approximately 54% of

the Juan Bautista de Anza National Historic Trail, 58% of the Old Spanish National

Historic Trail, and 41% of the Pacific Crest National Scenic Trail alignments in the

Plan Area would be in the Reserve Design.

Under the Preferred Alternative, approximately 4% of the Juan Bautista de Anza

National Historic Trail, 58% of the Old Spanish National Historic Trail, and 40% of

the Pacific Crest National Scenic Trail alignments would be in conservation.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-65 August 2014

California State Parks: As with the Preferred Alternative, most California State

Park lands would be in Reserve Design Lands under Alternative 1. This would vary

by individual park or preserve; but most parks would have more than 90% in either

existing conservation areas, BLM LUPA designations, or CPAs. Exceptions are the (1)

Desert Cahuilla/Freeman Project (4%), (2) Picacho SRA (78%), and (3) Salton Sea

SRA (86%). Similar amounts and percentages of California State Park lands would

be in Reserve Design Lands under the Preferred Alternative.

State Scenic Highways: Approximately 16% of SR 190 but no portion of the SR 78

and U.S. 395 alignments would be in Reserve Design Lands, compared with similar

portions under the Preferred Alternative.

Wild and Scenic Rivers: 100% of the Amargosa Wild and Scenic River, and all

eligible segments of Surprise Canyon Creek and the Mojave River, would be within

the reserve design under Alternative 1 and the Preferred Alternative.

IV.20.3.3.2 Impacts of DRECP Land Use Plan Amendment on BLM Land: Alternative 1

This section addresses two components of effects of the BLM LUPA: the streamlined

development of renewable energy and transmission on BLM land under the LUPA, and the

impacts of the amended land use plans themselves.

IV.20.3.3.2.1 Impacts from Renewable Energy and Transmission Development on BLM Land

The visual impacts of DFAs on VRI and VRM lands for Alternative 1 would be the same as

those defined in Section IV.20.3.3.1 for the Plan-wide analysis. VRM Class I lands would not

exist within DFAs. However, renewable energy development on DFA lands would be visible

to viewers on adjacent lands outside of DFAs.

IV.20.3.3.2.2 Impacts of Changes to BLM Land Designations

The DRECP LUPA for Alternative 1 would establish VRM classes for all lands in the CDCA.

(Currently, only the Bishop RMP and the Imperial Sand Dunes RAMP have VRM Classes

designated. In accordance with BLM policy, all wilderness areas and WSAs are managed

as VRM Class I.) It also would (1) designate new NLCS lands; (2) designate new ACECs

and expand and reduce existing ACECs; (3) designate new SRMAs and expand and reduce

existing SRMAs; (4) create management corridors along National Scenic and Historic

Trails; (5) manage lands with wilderness characteristics to protect those characteristics;

and, (6) designate new wildlife allocations. The BLM LUPA would also replace the existing

multiple-use classes.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-66 August 2014

The VRM Classes and other BLM land designations proposed under Alternative 1 would

extend protective measures to these areas that would avoid or reduce visual impacts. As

with the Preferred Alternative, CMAs for visual resources would be established and imple-

mented. The BLM-specific CMAs proposed under the Preferred Alternative would be the

same for all action Alternatives. Together, these visual resource CMAs and the restrictions

and protective measures of the land designations provide a mutually supportive frame-

work of guidelines and specifications through which visual impacts would be avoided

where possible, minimized, and/or mitigated to the extent practicable.

Under Alternative 1, Trail Management Corridors would be established along National

Scenic and Historic Trails, at a width of generally 0.25 miles from the centerline of the trail,

for a total width of 0.5 miles (compared with the 20 times greater total width of 10 miles

under the Preferred Alternative). As discussed in Volume II, Section II.3.2.2.2, these Trail

Management Corridors would be managed as components of the BLM’s NLCS. Where

National Trails overlap other NLCS lands, the more protective CMAs or land use allocations

would apply. All Trail Management Corridors would be designated as VRM Class II, except

within approved transmission corridors (VRM Class III) and DFAs (VRM Class IV). How-

ever, state-of-the-art VRM BMPs for renewable energy would be employed commensurate

with the protection of nationally significant scenic resources and cultural landscapes to

minimize the level of intrusion and protect trail settings.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements under Alternative 1 (see Appendix R2, Table R2.20-11 for

detailed, quantitative data and analysis):

SRMAs: There would be the potential for recreational activities or facilities allowed

in SRMAs to affect scenic values, particularly those of the VRI Class I and II lands

with which they coincide (approximately 285,000 acres, similar to the

Preferred Alternative).

NLCS: The management of these lands that have nationally significant ecological,

cultural, and scientific values would offer additional protection of intactness and

scenic quality, particularly to the VRI Class I, II, III, and IV lands with which they

coincide (1.5 million acres, compared to 3.6 million acres under the

Preferred Alternative).

ACECs: The special management measures given to protect the important historic,

cultural, and scenic values of these areas would generally benefit visual resources,

particularly the VRI Class II, III, and IV lands with which they coincide (2.8 million

acres, compared with 1.4 million acres under the Preferred Alternative).

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-67 August 2014

Wildlife Allocation Areas: The management of these areas must be compatible

with protection and enhancement of wildlife and plant habitat and would generally

benefit visual resources, particularly the VRI Class III and IV lands with which they

coincide (approximately 528,000 acres, compared with a much smaller area of

18,000 acres under the Preferred Alternative).

Lands Managed for Wilderness Characteristics: No lands managed for wilder-

ness characteristics would be managed to protect wilderness characteristics under

Alternative 1. Under the Preferred Alternative, these lands would be managed as

VRM Class II. Other management strategies to protect the wilderness characteristics

of these lands would benefit visual resources, particularly the VRI Class II, III, and IV

lands with which they coincide (approximately 299,000 acres).

Trail Management Corridors: The primary effect of these 0.5-mile wide corridors

under Alternative 1 would be to provide a consistent framework for protecting and

managing scenic values along National Scenic Trails within National and California

State park lands. As with the Preferred Alternative, the Trail Management Corridors

would be managed to meet the visual management objectives of VRM Class II.

Alternative 1 would assign VRM classes to all BLM lands within the Plan Area. Generally, a

low correlation between the VRM classes and the underlying VRI classes would result in

greater adverse impacts to visual quality (e.g., VRI Class II or III lands managed to meet

the objectives of a VRM Class IV). Conversely, impacts would most likely be minimized by

alternatives proposing visual management that either closely corresponds to the VRI

classes, or proposing a more restrictive (higher) class designation (e.g., VRM Class II

proposed for VRI Class III lands).

Under Alternative 1, VRI Class lands within the proposed VRM Classes on BLM LUPA lands

would be as indicated in Table IV.20-6. Key points of the effects of VRM classifications on

VRI lands under Alternative 1 are summarized here:

VRM designations: As with the Preferred Alternative, the majority of lands would be

designated as VRM Class I, II, or III; and approximately 15% would be designated as

VRM Class IV.

VRI Class I: As with the Preferred Alternative, 100% VRI Class I lands would be man-

aged as VRM Class I, reflecting a high level of management protection.

VRI Class II: As with the Preferred Alternative, more than 75% of VRI Class II lands

would be managed as VRM Class II or I, reflecting a moderately high level of man-

agement protection. Approximately 22% would be managed as VRM Class III or IV,

which allows for more visual contrast and impact than the VRM Class II objectives

allow over the affected acres.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-68 August 2014

VRI Class III: Nearly 91% of VRI Class III lands would be managed as VRM Class

III, II, or I, reflecting a high correlation and level of management protection. Approx-

imately 35% would be managed to meet VRM Class II objectives, which restrict

visual contrast and impact more than VRM Class III. Approximately 9% would be

managed as VRM Class IV, which allows for more visual contrast and impact than

the VRM Class III objectives allow.

VRI Class IV: Approximately 43% of VRI Class IV lands would be managed as VRM

Class III, II, or I, reflecting more restrictive management than the VRM Class IV

objectives allow; and approximately 57% would be managed as VRM Class IV.

Compared with the Preferred Alternative, Alternative 1 would result in a similar but

somewhat higher level of correlation between VRI values and the proposed VRM

Classes. Overall, visual resource protection would benefit under Alternative 1 by the

designation of VRM Classes throughout the CDCA.

Under the proposed CMAs, all DFAs would be managed as VRM Class IV lands to

allow for utility-scale development. In those cases, implementation or incorporation

of BMPs would still be required to reduce the visual contrast levels of proposed

facilities to the extent practicable.

IV.20.3.3.3 Impacts of Natural Community Conservation Plan: Alternative 1

The impacts of the NCCP for Alternative 1 would be the same as those defined in

Section IV.20.3.2.1 for the Plan-wide analysis.

IV.20.3.3.4 Impacts of General Conservation Plan

The visual impacts of the GCP for Alternative 1 would be similar to those defined in

Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur on nonfederal

lands only.

IV.20.3.3.5 Impacts Outside the Plan Area

IV.20.3.3.5.1 Impacts of Transmission Outside the Plan Area

The impacts of transmission outside the Plan Area would be the same under all

alternatives. These are as described for the No Action Alternative in

Section IV.20.3.1.5.1.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-69 August 2014

Table IV.20-6

VRI Classes Within Proposed VRM Classes on BLM LUPA Lands – Alternative 1

(all ecoregion subareas, acres and percentage)

LUPA-Proposed VRM Class

Designations

Existing Visual Resource Inventory Classes

Total

VRI Class I VRI Class II VRI Class III VRI Class IV

Acres Percent Acres Percent Acres Percent Acres Percent

VRM Class I 3,842,000 100% 7,000 0% 3,000 0% 700 0% 3,852,700

VRM Class II 0 0% 1,680,000 78% 955,000 35% 274,000 14% 2,909,000

VRM Class III 0 0% 415,000 19% 1,548,000 56% 567,000 29% 2,530,000

VRM Class IV 0 0% 56,000 3% 251,000 9% 1,128,000 57% 1,435,000

Total 3,842,000 100% 2,158,000 100% 2,757,000 100% 1,969,700 100% 10,726,700

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. Acres above include CDCA outside the Plan Area. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-70 August 2014

IV.20.3.3.5.2 Impacts of BLM LUPA Decisions Outside the Plan Area

Under the proposed BLM LUPA, the changes outside the Plan Area would include the desig-

nation of NLCS lands, ACECs, National Scenic and Historic Trails Management Corridors,

VMR Classes, and new land allocations to replace multiple-use classes on CDCA lands.

The VRM Classes and other BLM land designations proposed under Alternative 1 would

extend protective measures that would avoid or reduce visual impacts. CMAs for visual

resources would be established and implemented. The BLM-specific CMAs for Alternative 1

would be the same as for all action alternatives. These visual resource CMAs and the restric-

tions and protective measures of the land designations provide a framework of guidelines

and specifications through which visual impacts would be avoided where possible, mini-

mized, and/or mitigated to the extent practicable.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements, outside the Plan Area, under Alternative 1 (see Appen-

dix R2, Table R2.20-12 for detailed, quantitative data and analysis):

Proposed NLCS: The management of these lands that have nationally significant

ecological, cultural, and scientific values would offer additional protection of intact-

ness and scenic quality.

Existing and Proposed ACECs: The special management measures given to protect

the important historic, cultural, and scenic values of these areas would generally

benefit visual resources, particularly the VRM Class II, III, and IV lands with which

they coincide (approximately 123,000 acres, compared with a larger area of 207,000

acres under the Preferred Alternative).

Trail Management Corridors: The primary effect of these 0.5-mile-wide corridors

would be to provide a consistent framework for protecting and managing scenic

values along National Scenic and Historic Trails within National and California State

park lands. As with the Preferred Alternative, the Trail Management Corridors

would be managed to meet the visual management objectives of VRM Class II.

IV.20.3.3.6 CEQA Significance Determination for Alternative 1

The visual impacts and their associated significance determinations for Alternative 1 are

as follows:

VR-1: Visibility of activities, materials, equipment, dust, and construction night light-

ing would result in short-term diminished scenic quality. Activities and equipment

visible from residences, public roads, and public preserves would result in short-term

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-71 August 2014

diminished scenic quality for viewers. This would be less than significant with implementa-

tion of appropriate CMAs.

VR-2: The presence of plan components would create long-term visual contrast with

surrounding undeveloped land and result in long-term diminished scenic quality.

Long-term impacts to visual resources for Alternative 1 would be significant and unavoid-

able, as described in detail for the No Action Alternative in Section IV.20.3.1.6. Impacts

would be significant because of the changes in line, form, and color introduced by large-

scale development and the contrast of any such development with surrounding conditions.

The CMAs relevant to Alternative 1 would reduce the impact on visual resources but not to

a less than significant level.

IV.20.3.3.7 Comparison of Alternative 1 with the Preferred Alternative

Chapter IV.27 presents a comparison of all action alternatives and the No Action Alterna-

tive across all disciplines. This section summarizes the comparison of Alternative 1 with

the Preferred Alternative.

IV.20.3.3.7.1 Alternative 1 Compared with Preferred Alternative for Plan-wide DRECP

Although similar visual impacts would occur under both Alternative 1 and the Preferred

Alternative, based on the assumption that California’s renewable energy goals would be

achieved in any case, the impacts would vary in key ways:

Geographic Distribution. As with the DFAs of the Preferred Alternative, the DFAs under

Alternative 1 are restricted in distribution and concentrated in areas considered less

environmentally sensitive. DFAs under Alternative 1 are focused in the Imperial Valley,

Lucerne Valley, and Barstow area. Alternative 1 has fewer DFAs in eastern Riverside and

the Tehachapi area than the Preferred Alternative and very small DFAs along the

U.S. 395 corridor.

The severity of visual impacts depends partly on the number of potential viewers. Alterna-

tive 1 has a smaller DFA in the more populated West Mojave area. As a result, less new

development would be added to the existing visual disturbance experienced by residents in

the Mojave, Lancaster, and Palmdale areas due to extensive wind and solar development in

those areas.

The severity of visual impacts also relates to expectations of viewers for pristine desert

vistas. The eastern and northeastern parts of the Plan Area are sensitive because they con-

tain the Mojave National Preserve, Death Valley National Monument, and several BLM Wil-

derness Areas. Alternative 1 completely avoids development in these areas, and does not

include SAAs or FAAs near these LLPAs.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-72 August 2014

Extent of Potential Renewable Energy Development. Although the geographic distribu-

tion of DFAs is generally similar under Alternative 1 and the Preferred Alternative, the

scale and extent of the DFAs vary. The DFAs under the Preferred Alternative are nearly

twice as large as those of Alternative 1 (2,024,000 acres of DFAs for the Preferred Alterna-

tive compared with 1,070,000 acres for Alternative 1). The smaller DFAs would result in

more concentrated development under Alternative 1, with renewable energy projects

being visible from far fewer areas than with the Preferred Alternative.

Conservation. Alternative 1 has slightly more acreage in the reserve design than the Pre-

ferred Alternative, and slightly less land in CPAs. The conservation strategy emphasizes

avoidance of impacts to visually sensitive areas.

In summary, the composition and structure of Alternative 1 would provide greater oppor-

tunities for the avoidance, reduction, and minimization of visual impacts from renewable

energy development but would result in greater impacts from transmission corridors, com-

pared with the Preferred Alternative.

IV.20.3.3.7.2 Alternative 1 Compared with Preferred Alternative for the BLM

Land Use Plan Amendment

The BLM LUPA under Alternative 1 would assign VRM Classes to all BLM lands within the

CDCA, including those outside the Plan Area, as would the Preferred Alternative. For both

alternatives, this would provide a unifying framework and an established system for

addressing visual resources.

The key difference is that Alternative 1 would have far fewer VRI Class II and III lands

(12,000 acres) in DFAs than would the Preferred Alternative (78,000 acres). This differ-

ence in the potential area of land disturbance impacts would result in a much smaller area

of land potentially subject to visual impacts under Alternative 1 than under the Preferred

Alternative. However, because Alternative 1 proposes 0.5-mile-wide Trail Management

Corridors, compared with the much greater 10-mile-wide corridors under the Preferred

Alternative, the scenic values and viewer experience along National Scenic and Historic

Trails would have a lower level of protection under Alternative 1 than under the

Preferred Alternative.

IV.20.3.3.7.3 Alternative 1 Compared with Preferred Alternative for NCCP

The visual impacts of the NCCP for Alternative 1 are the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis. As a result, the comparison of Alternative 1 with the

Preferred Alternative for the NCCP is the same as described for Plan-wide DRECP.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-73 August 2014

IV.20.3.3.7.4 Alternative 1 Compared with Preferred Alternative for the GCP

The visual impacts of the GCP for Alternative 1 and the Preferred Alternative would be sim-

ilar to those defined in Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur

on nonfederal lands only.

IV.20.3.4 Alternative 2

Alternative 2 includes 2,473,000 acres of DFAs and 15,085,000 acres of Reserve Design

Lands. For reference, Table IV.20-7 compares the Preferred Alternative to Alternative 2 for

key visual elements.

Table IV.20-7

Affected Visual Resources – Preferred Alternative Compared to Alternative 2

Preferred Alternative Alternative 2

Development Areas (acres)

DFAs 2,024,000 2,473,000

Visual Resource Elements Within Development Areas (acres unless otherwise indicated)

VRI [Class] 0 [I]

17,000 [II]

61,000 [III]

27,000 [IV]

0 [I]

39,000[II]

89,000 [III]

66,000 [IV]

VRM [Class] 0 [I]

0 [II]

0 [III]

106,000 [IV]

0 [I]

0 [II]

0 [III]

191,000 [IV]

National Scenic Byways 0 0

National Scenic and Historic Trails 1 mi. 6 mi.

California State Parks 0 0

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Visual Resource Elements Within 5 miles of Development Areas (acres unless otherwise indicated)

VRI [Class] 366,000 [I]

389,000 [II]

731,000 [III]

709,000 [IV]

686,000 [I]

691,000 [II]

1,133,000 [III]

941,000 [IV]

VRM [Class] 366,000 [I]

515,000 [II]

555,000 [III]

694,000 [IV]

686,000 [I]

1,088,000 [II]

859,000 [III]

759,000 [IV]

National Scenic Byways 13 mi. 13 mi.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-74 August 2014

Table IV.20-7

Affected Visual Resources – Preferred Alternative Compared to Alternative 2

Preferred Alternative Alternative 2

National Parks and Preserves 15,000 33,000

National Scenic and Historic Trails 350 mi. 395 mi.

Trail Management Corridors 659,000 1,586,000

California State Parks 108,000 121,000

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Reserve Design Lands (Conservation Lands) (acres)

Reserve Design Lands 14,920,000 15,085,000

Note: The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

IV.20.3.4.1 Plan-wide Impacts of Implementing the DRECP: Alternative 2

IV.20.3.4.1.1 Plan-wide Impacts and Mitigation Measures from Renewable Energy and

Transmission Development

Impact Assessment

Under Alternative 2, renewable energy related activities covered by the Plan are confined

to 2.5 million acres of DFAs, resulting in 134,000 acres of long-term disturbance (see

Volume IV, Table IV.1-1). This represents approximately 11,000 more acres of long-term

disturbance than could occur under the Preferred Alternative.

The DFAs are geographically dispersed in the Imperial Valley including areas south of

Chocolate Mountains, eastern Riverside, the Lucerne Valley, the Barstow area, the Tehach-

api area, along the U.S. 395 corridor, the Silurian Valley, and near Hidden Hills.

Transmission development and operation activities would be permitted both inside and

outside of the DFAs.

Approximately 2,473,000 acres would be within DFAs under Alternative 2, compared with

2,024,000 acres under the Preferred Alternative. This larger area of land within DFAs

(approximately 450,000 acres more) represents a higher potential for visual impacts under

Alternative 2 than under the Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-75 August 2014

Visual impacts from solar and wind development would be dispersed, with expanded

wind opportunities.

Visual impacts from geothermal energy would occur in the Imperial Borrego Valley and

Owens River Valley ecoregion subareas, as they would under the Preferred Alternative.

The following summarizes the key points in comparing the visual impacts from renewable

energy and transmission development under Alternative 2 to those of the Preferred Alter-

native (see Appendix R2, Table R2.20-13 for detailed data):

VRI Classes: There would approximately 39,000 acres of VRI Class II lands, 89,000

VRI Class III lands, and no VRI Class I lands within DFAs under Alternative 2. Per the

CMAs for visual resources, these 128,000 acres of VRI Class II and III lands within

DFAs would be managed as VRM IV and thereby sustain a potential degradation of

underlying scenic values. Approximately 12,000 acres of transmission would occur

on inventoried lands, compared with 13,000 acres under the Preferred Alternative.

A smaller amount of VRI Class II and III lands within DFAs would be managed as

VRM IV under the Preferred Alternative (78,000 acres) than under Alternative 2

(128,000 acres). This reflects a greater potential for degradation of underlying

scenic values under Alternative 2 than under the Preferred Alternative.

VRM Classes: As with the Preferred Alternative, there would be no VRM Class I, II,

or III lands in DFAs under Alternative 2 (Figure IV.20-4, Proposed BLM VRM Classifi-

cations, Alternative 2).

National Parks and Preserves: These lands would not be within the DFA footprint

under Alternative 2 or the Preferred Alternative. Although the footprint of renew-

able energy projects would not directly affect these lands, project facilities and

activities that are visible from National Parks and Preserves would diminish scenic

quality for viewers in those conservation areas, where expectations for scenic quality

are typically high.

National Scenic Byways: No segments of the Bradshaw Trail National Back Country

Byway would be within DFAs under either Alternative 2 or the Preferred Alternative.

National Scenic and Historic Trails: Approximately 6 miles of the Old Spanish

National Historic Trail alignment would be within DFAs under Alternative 2, as com-

pared with 2 miles under Preferred Alternative.

California State Parks: As with the Preferred Alternative, no California State Park

lands would be within DFAs under Alternative 2. Approximately 160 acres of trans-

mission would occur on these lands, as compared with 180 acres under the

Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-76 August 2014

State Scenic Highways: No segments of State Scenic Highways would be within

DFAs under Alternative 2 or the Preferred Alternative.

Wild and Scenic Rivers: No portion of designated or eligible Wild and Scenic Rivers

would be within DFAs under Alternative 2 or the Preferred Alternative.

Proximity of Visual Resources to DFAs. Under Alternative 2, visual resource

elements within 5 miles of proposed DFAs can be compared with those under the

Preferred Alternative, as summarized in Table IV.20-7. Alternative 2 has generally

more visual resource elements within 5 miles of DFAs than the Preferred Alternative.

One example of this is the acres of VRI Class I: 366,000 acres under the Preferred

Alternative compared with 686,000 acres under Alternative 2. For Trail Management

Corridors, there are more than twice as many acres in this proximity under Alterna-

tive 2 than there would be under the Preferred Alternative.

The visual impacts resulting from Alternative 2 are:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Preconstruction activities and equipment visible from residences, public roads, and public

preserves would result in short-term diminished scenic quality for viewers. Examples

include road upgrading, damage to or removal of native vegetation, construction of meteoro-

logical towers, drilling of temperature gradient wells, vehicles, and lighting.

During construction and decommissioning, activities and equipment visible from residences,

public roads, and public preserves would result in short-term diminished scenic quality for

viewers. Examples include dust and exhaust emissions, removal of vegetation during site

clearing, contouring and grading, presence of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, assembly of components, site light-

ing, and construction of and later removal of structures.

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

DRECP Plan Area Boundary

Ecoregion Subareas

CDCA Boundary

County Boundary

Non-BLM Land

BLM VRM Classifications

Class I

Class II

Class III

Class IV

M:\JOBS4\6287\common_gis\EIR_Figures_Spring_2014\Vol_IV\IV_20_Visual\figIV.20-4.mxd 8/18/2014

FIGURE IV.20-4

Proposed BLM Visual Resource Management Classifications, Alternative 2

0 2010

MilesI

Draft DRECP and EIR/EIS

Sources: ESRI (2014); CEC (2013); BLM (2013); CDFW (2013); USFWS (2013)

August 2014

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-78 August 2014

INTENTIONALLY LEFT BLANK

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-79 August 2014

Impact VR-2: The presence of plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

The continued presence of equipment, structures, fencing, roads and other elements

required to operate a facility would have a long-term adverse effect on the visible land-

scape. Areas of persistent surface and vegetation disturbance and the presence of struc-

tures would create visual contrast in form, line, color, and texture as compared with pre-

project conditions. Depending on viewer location, physical elements introduced by a proj-

ect could block views or create skylining. Even after project removal and site reclamation

are completed, visual contrast would remain. Restoring the natural, pre-disturbance visual

character of a desert environment is extremely difficult, can take decades, and often is

unsuccessful. Therefore, surface and vegetation disturbance would create long-term visual

impacts due to the persistence of scars in arid and semi-arid landscapes.

The structure, size, and industrial character of utility-scale renewable energy and transmis-

sion facilities during their operation and maintenance—as well as any associated glare,

reflectivity, and lighting—would visually contrast with surrounding undeveloped land and

result in long-term diminished scenic quality.

Impacts in Study Area Lands

Study Area Lands refer to three categories of lands shown on alternative maps: Assessment

Areas (FAAs), Special Analysis Areas (SAAs) and DRECP Variance Lands.

Future Assessment Areas (FAAs). Lands within FAAs are neither reserve lands nor DFAs;

they are simply areas that are deferred for future assessment. The future assessment will

determine their suitability for renewable energy development or ecological conservation. If

renewable energy development occurs on FAA lands, a BLM LUPA would not be required.

FAAs for each alternative are included and located as shown in Table IV.1-2 and Figure

II.5-1. The FAAs represent areas where renewable energy development or inclusion in the

reserve design could be implemented through an amendment to the DRECP, but additional

assessment would be needed.

Because most of the FAAs are presented as “undesignated areas” in the action alternatives,

there would be no difference between the FAAs in the Preferred Alternative except that

renewable development in an FAA would not require a BLM LUPA; so the environmental

review process would be somewhat simpler than if the location were left undesignated.

Development of the 109,000 acres of FAAs under Alternative 2 would be subject to all

visual resource CMAs identified by the Preferred Alternative and would be required to

meet the visual management objectives of the underlying VRM Class. The exception is the

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-80 August 2014

FAA south of the Imperial Sand Dunes, which would become a DFA under this alternative

and would be managed as VRM Class IV accordingly.

Special Analysis Areas (SAAs). Designating the SAAs as DFAs would result in impacts sim-

ilar to those identified for the DFAs for the Plan-wide impacts, all of which would be man-

aged to meet VRM Class IV objectives.

DRECP Variance Lands. There would be no DRECP Variance Lands under Alternative 2.

Impact Reduction Strategies and Mitigation

The implementation of the Plan would result in conservation of some desert lands as well

as the development of renewable energy generation and transmission facilities on other

lands. The impacts of the renewable energy development covered by the Plan would be

lessened in several ways. First, the Plan incorporates CMAs for each alternative, including

specific biological reserve design components and LUPA components. In addition, the

implementation of existing laws, orders, regulations, and standards would reduce the

impacts of project development.

Conservation and Management Actions

The conservation strategy (presented in Volume II, Section II.3.1.1) defines specific actions

that would reduce the impacts of this alternative. The conservation strategy includes a

definition of the reserve design and specific CMAs for the Preferred Alternative. While the

CMAs were developed for BLM lands only, this analysis assumes that all CMAs would be

applied also to nonfederal lands.

BLM-specific CMAs for VRM include measures that apply Plan-wide, measures specific to

DFAs and Plan Areas, and a detailed set of visual resource BMPs that apply to all action

alternatives. The BMPs incorporate the measures identified in Best Management Practices

for Reducing Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands.

Together, these visual resource CMAs provide a comprehensive framework of guidelines

and specifications through which visual impacts would be avoided where possible, mini-

mized, and/or mitigated to the extent practicable.

Laws and Regulations

Similar to the No Action Alternative, existing laws and regulations will reduce certain

impacts of Plan implementation. Relevant regulations are presented in the Regulatory

Setting in Volume III. The requirements of relevant laws and regulations are summarized in

Section IV.20.3.1.1.1.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-81 August 2014

Mitigation Measures

The visual impact avoidance and reduction strategies in existing guidance, such Reducing

Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands, are detailed

and comprehensive. The CMAs proposed under the DRECP (see Appendix H) provide

additional detail and direction. These represent state-of-the-art visual impact mitigation as

it applies to the Plan Area; no additional mitigation is feasible.

IV.20.3.4.1.2 Impacts from Reserve Design

There would be 15 million acres of Reserve Design Lands under Alternative 2 and under

the Preferred Alternative. This represents a generally equivalent level of conservation to

the Preferred Alternative. In general, visual resource elements would benefit from the

conservation policies and requirements applicable to these lands. Alternative 2 has

slightly more acres of BLM LUPA Conservation Designations than the Preferred

Alternative and the most acres of NLCS, SRMAs, and National Scenic and Historic Trail

corridors of all action alternatives.

The following summarizes the key points in visual impacts of the reserve design for Alter-

native 2 compared with those of the Preferred Alternative (see Appendix R2, Table R2.20-14

for detailed data):

VRI Classes: Alternative 2 would have 100% of VRI Class I lands, 79% of VRI Class II

lands, 73% of VRI Class III lands, and 73% of VRI Class IV lands in Reserve Design

Lands, compared with similar amounts (100%, 74%, 67%, and 72%, respectively)

under the Preferred Alternative.

VRM Classes: 100% of VRM Class I lands, 86% of VRM Class II lands, 87% of VRM

Class III lands, and 1% of the VRM Class IV lands would be in the Reserve Design

Lands under Alternative 2, compared with 100% of VRM Class I lands, 83% of VRM

Class II lands, 79% of VRM Class III lands, and 38% of VRM Class IV lands under the

Preferred Alternative. Alternative 2 would have a much smaller amount of VRM

Class IV lands in the reserve design than the Preferred Alternative.

National Parks and Preserves: The National Parks and Preserves would have

100% of their land areas in the reserve design under Alternative 1 and under the

Preferred Alternative.

National Scenic Byways: Under Alternative 2, approximately 51% of the Bradshaw

Trail National Back Country Byway and 15% of SR 190 would be in the Reserve

Design. This provides the same level of protection of visual and scenic values as

would occur under the Preferred Alternative.

National Scenic and Historic Trails: Under Alternative 2, approximately 4% of the

Juan Bautista de Anza National Historic Trail, 58% of the Old Spanish National His-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-82 August 2014

toric Trail, and 51% of the Pacific Crest National Scenic Trail alignments in the Plan

Area would be in the Reserve Design. This provides a similar level of protection of

visual and scenic values as would occur under the Preferred Alternative (4%, 58%,

and 40%, respectively).

California State Parks: Under Alternative 2, most California State Park lands would

be in Reserve Design Lands. This would vary by individual park or preserve; but

most parks would have more than 90% in existing conservation areas, BLM LUPA

designations, or CPAs. Exceptions are the (1) Desert Cahuilla/Freeman Project (4%),

(2) Picacho SRA (78%), and (3) Salton Sea SRA (86%). Similar but slightly smaller

amounts and percentages of California State Park lands would be in Reserve Design

Lands under the Preferred Alternative.

State Scenic Highways: Approximately 15% of SR 190 but no portion of the SR 78

and U.S. 395 alignments would be in Reserve Design Lands, compared with similar

portions under the Preferred Alternative.

Wild and Scenic Rivers: 100% of the Amargosa Wild and Scenic River, and all

eligible segments of Surprise Canyon Creek and the Mojave River, would be within

the reserve design under Alternative 2 and the Preferred Alternative.

IV.20.3.4.2 Impacts of DRECP Land Use Plan Amendment on BLM Land: Alternative 2

This section addresses two components of effects of the BLM LUPA: the streamlined

development of renewable energy and transmission on BLM land under the LUPA, and the

impacts of the amended land use plans themselves.

IV.20.3.4.2.1 Impacts from Renewable Energy and Transmission Development on BLM Land

The visual impacts of DFAs on VRI and VRM lands for Alternative 2 would be the same as

those defined in Section IV.20.3.4.1, Plan-wide Impacts of Implementing the DRECP: Alter-

native 2, for the Plan-wide analysis.

IV.20.3.4.2.2 Impacts of Changes to BLM Land Designations

The DRECP LUPA for Alternative 2 would establish VRM classes for all lands in the CDCA.

(Currently, only the Bishop RMP and the Imperial Sand Dunes RAMP have VRM Classes des-

ignated. In accordance with BLM policy, all wilderness areas and WSAs are managed as

VRM Class I). It would also (1) designate new NLCS lands, (2) designate new ACECs and

expand and reduce existing ACECs, (3) designate new SRMAs and expand and reduce exist-

ing SRMAs, (4) create buffer corridors along National Scenic and Historic Trails, and (5)

manage lands with wilderness characteristics to protect those characteristics. The BLM

LUPA would also replace the multiple-use classes.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-83 August 2014

The VRM Classes and other BLM land designations proposed under Alternative 2 would

offer protective measures that would avoid or reduce visual impacts. As with the Preferred

Alternative, CMAs for visual resources would be established and implemented. The BLM-

specific CMAs proposed under the Preferred Alternative would be the same for all action

alternatives. Together, these visual resource CMAs and the restrictions and protective mea-

sures of the land designations provide a framework of guidelines and specifications

through which visual impacts would be avoided where possible, minimized, and/or miti-

gated to the extent practicable.

Under Alternative 2, Trail Management Corridors would be established along National

Scenic and Historic Trails, at a width of generally 10 miles from the centerline of the trail,

for a total width of 20 miles (compared with a narrower 10 miles total width under the Pre-

ferred Alternative). These Trail Management Corridors would be managed as components

of the BLM’s NLCS. Where National Trails overlap other NLCS lands, the more protective

CMAs or land use allocations would apply. All Trail Management Corridors would be desig-

nated as VRM Class II, except within approved transmission corridors (VRM Class III) and

DFAs (VRM Class IV). However, state-of-the-art VRM BMPs for renewable energy would be

employed commensurate with the protection of nationally significant scenic resources and

cultural landscapes to minimize the level of intrusion and protect trail settings.

The following summarizes the key points of the impacts of changes to BLM land designations

on visual resource elements under Alternative 2 (see Appendix R2, Table R2.20-15 for

detailed, quantitative data and analysis):

SRMAs: There would be the potential for recreational activities or facilities allowed

in SRMAs to affect scenic values, particularly those of the VRI Class I and II lands

with which they coincide (approximately 251,000 acres, compared with a slightly

larger amount of 274,000 acres under the Preferred Alternative).

NLCS: The management of these lands that have nationally significant ecological,

cultural, and scientific values would offer additional protection of intactness and

scenic quality, particularly to the VRI Class I, II, III, and IV lands (5.3 million acres,

compared with a smaller amount of 3.6 million acres under the Preferred Alterna-

tive) with which they coincide.

ACECs: The special management measures given to protect the important historic,

cultural, and scenic values of these areas would generally benefit visual resources,

particularly the VRI Class II, III, and IV lands with which they coincide (approxi-

mately 115,000 acres, compared with a much larger area of 1.4 million acres under

the Preferred Alternative).

Wildlife Allocation Areas: The management of these areas must be compatible

with protection and enhancement of wildlife and plant habitat and would generally

benefit visual resources, particularly the VRI Class III and IV lands with which they

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-84 August 2014

coincide (approximately 204,000 acres, as compared with a much smaller area of

18,000 acres under the Preferred Alternative).

Lands Managed for Wilderness Characteristics: Under Alternative 2 and all other

action alternatives, these lands would be managed as VRM Class II. Other manage-

ment strategies to protect the wilderness characteristics of lands would benefit

visual resources, particularly the VRI Class II, III, and IV lands with which they

coincide (approximately 317,000 acres, compared with 299,000 acres under the

Preferred Alternative).

Trail Management Corridors: As with the Preferred Alternative, under Alternative

2 the Trail Management Corridors would be managed to meet the visual manage-

ment objectives of VRM Class II. The primary effect of the 20-mile wide corridors

under Alternative 2 would be to provide a consistent framework for protecting and

managing scenic values along National Scenic and Historic Trails within National

and California State park lands.

Alternative 2 would assign VRM classes to all BLM lands within the Plan Area. Generally, a

low correlation between the VRM classes and the VRI classes would result in greater

adverse impacts to visual quality (e.g., VRI Class II or III lands being managed as VRM

Class IV). Conversely, impacts would most likely be minimized by alternatives proposing

visual management that either closely corresponds to the VRI classes or proposes a more

restrictive (higher) class designation (e.g., VRM Class II proposed for VRI Class III lands).

Under Alternative 2, VRI Class lands within the proposed VRM Classes on BLM LUPA lands

would be as indicated in Table IV.20-8.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-85 August 2014

Table IV.20-8

VRI Classes Within Proposed VRM Classes on BLM LUPA Lands – Alternative 2

LUPA-Proposed VRM Class

Designations

Existing Visual Resource Inventory Classes

Total

VRI Class I VRI Class II VRI Class III VRI Class IV

Acres Percent Acres Percent Acres Percent Acres Percent

VRM Class I 3,842,000 100% 5,000 0% 2,000 0% 700 0% 3,849,700

VRM Class II 0 0% 1,695,000 78% 1,168,000 35% 700,000 14% 3,563,000

VRM Class III 0 0% 344,000 19% 1,239,000 56% 971,000 29% 2,554,000

VRM Class IV 0 0% 118,000 3% 353,000 9% 305,000 57% 776,000

Total 3,842,000 100% 2,162,000 100% 2,762,000 100% 1,976,700 100% 10,742,700

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. Acres above include CDCA outside the Plan Area. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-86 August 2014

Key points of the effects of VRM classification on VRI lands under Alternative 2 are

summarized here:

VRM designations: The majority of lands would be designated as VRM Class I, II, or

III. Less than 10% would be designated as VRM Class IV.

VRI Class I: As with the Preferred Alternative, all VRI Class I lands would be managed

as VRM Class I, reflecting a high level of management protection.

VRI Class II: As with the Preferred Alternative, more than 75% of VRI Class II lands

would be managed as VRM Class II or I, reflecting a moderately high level of manage-

ment protection. Approximately 22% would be managed as VRM Class III or IV, which

allows for more visual contrast and impact than the VRM Class II objectives allow.

VRI Class III: More than 90% of VRI Class III lands would be managed as VRM Class

III, II, or I, reflecting a high correlation and level of management protection. Approx-

imately 35% would be managed to meet VRM Class II objectives, which restrict

visual contrast and impact more than VRM Class III. Approximately 9% would be

managed as VRM Class IV, which allows for more visual contrast and impact than

the VRM Class III objectives allow.

VRI Class IV: Approximately 43% of VRI Class IV lands would be managed as VRM

Class III, II, or I; 57% would be managed as VRI Class IV.

Compared with the Preferred Alternative, Alternative 2 would result in a similar but

somewhat higher level of correlation between VRI values and the proposed VRM Classes,

resulting in a similar potential for retaining the integrity of the inventoried visual resource

values. Overall, visual resource protection would benefit under Alternative 2 by the desig-

nation of VRM Classes throughout the CDCA.

Under the proposed CMAs, all DFAs would be managed as VRM Class IV lands to allow for

utility-scale development. In those cases, implementation or incorporation of BMPs

would still be required to reduce the visual contrast levels of proposed facilities to the

extent practicable.

IV.20.3.4.3 Impacts of Natural Community Conservation Plan: Alternative 2

The impacts of the NCCP for Alternative 2 would be the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis.

IV.20.3.4.4 Impacts of General Conservation Plan

The impacts of the GCP for Alternative 2 would be similar to those defined in Section

IV.20.3.2.1 for the Plan-wide analysis, but they would occur on nonfederal lands only.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-87 August 2014

IV.20.3.4.5 Impacts Outside the Plan Area

IV.20.3.4.5.1 Impacts of Transmission Outside the Plan Area

The impacts of transmission outside the Plan Area would be the same under all

alternatives. These are as described for the No Action Alternative in Section IV.20.3.1.5.1.

IV.20.3.4.5.2 Impacts of BLM LUPA Decisions Outside the Plan Area

Under the proposed BLM LUPA, the changes outside the Plan Area would include the desig-

nation of NLCS lands, ACECs, National Scenic and Historic Trails Management Corridors,

VRM classes, and new land allocations to replace multiple-use classes on CDCA lands.

The VRM Classes and other BLM land designations proposed under Alternative 2 would

extend protective measures to these areas that would avoid or reduce visual impacts. CMAs

for visual resources would be established and implemented. The BLM-specific CMAs for

Alternative 2 would be the same as for all action alternatives. These visual resource CMAs

and the restrictions and protective measures of the land designations provide a framework

of guidelines and specifications through which visual impacts would be avoided where pos-

sible, minimized, and/or mitigated to the extent practicable.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements, outside the Plan Area, under Alternative 2 (see Appen-

dix R2, Table R2.20-16 for detailed, quantitative data and analysis):

Proposed NLCS: The management of these lands that have nationally significant

ecological, cultural, and scientific values would offer additional protection of intact-

ness and scenic quality.

Existing and Proposed ACECs: The special management measures given to protect

the important historic, cultural, and scenic values of these areas would generally

benefit visual resources, particularly the VRM Class II, III, and IV lands with which

they coincide (approximately 203,000 acres, compared to a similar amount of area

under the Preferred Alternative).

Trail Management Corridors: The primary effect of these 20-mile-wide corridors

would be to provide a consistent framework for protecting and managing scenic

values along National Scenic and Historic Trails within National and California State

park lands. As with the Preferred Alternative, the Trail Management Corridors

would be managed to meet the visual management objectives of VRM Class II.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-88 August 2014

IV.20.3.4.6 CEQA Significance Determination for Alternative 2

The significance determinations for short-term and long-term impacts are described in

Section IV.20.3.1.1.1 for the No Action Alternative. Section IV.20.1.2 identifies four

criteria to apply when determining if there are significant impacts from a project under

CEQA. These criteria are included as part of the more general impacts identified in this

section as VR-1 and VR-2.

The visual impacts and their associated significance determinations for Alternative 2

are as follows:

VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality. Activities and

equipment visible from residences, public roads, and public preserves would result in

short-term diminished scenic quality for viewers. This would be less than significant with

implementation of appropriate CMAs.

VR-2: The presence of plan components would create long-term visual contrast with

surrounding undeveloped land and result in long-term diminished scenic quality.

Long-term impacts to visual resources for Alternative 2 would be significant and unavoid-

able, as described in detail for the No Action Alternative (Section IV.20.3.1.6). Impacts

would be significant because of the changes in line, form, and color introduced by large-

scale development and the contrast of any such development with surrounding conditions.

Although the CMAs for Alternative 2 would reduce the impact on visual resources, they

would not reduce it to a less than significant level.

IV.20.3.4.7 Comparison of Alternative 2 with Preferred Alternative

Chapter IV.27 presents a comparison of all action alternatives and the No Action Alterna-

tive across all disciplines. This section summarizes the comparison of Alternative 2 with

the Preferred Alternative.

IV.20.3.4.7.1 Alternative 2 Compared with Preferred Alternative for Plan-wide DRECP

Although similar visual impacts would occur under both Alternative 2 and the Preferred

Alternative, the impacts would vary in key ways:

Geographic Distribution. As with the DFAs of the Preferred Alternative, the DFAs under

Alternative 2 are restricted in distribution and concentrated in areas considered less envi-

ronmentally sensitive. DFAs under Alternative 2 are geographically dispersed in the Impe-

rial Valley including south of Chocolate Mountains, eastern Riverside, the Lucerne Valley,

the Barstow area, the Tehachapi area, the U.S. 395 corridor, the Silurian Valley, and near

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-89 August 2014

Hidden Hills. A greater proportion of wind energy would be developed, solar and wind

would be dispersed, and geothermal development would occur in the Imperial Borrego

Valley ecoregion subarea. There would be less protection of Fremont Valley, Ridgecrest,

Silurian Valley, and south of Chocolate Mountains than in the alternative-specific reserve

design for the Preferred Alternative.

The severity of visual impacts depends partly on the number of potential viewers. Alterna-

tive 2 has larger DFAs than the Preferred Alternative in and near the populated West

Mojave area. As a result, greater amounts of wind and solar development would be added

to the existing visual disturbance experienced by residents in the Mojave, Lancaster, and

Palmdale areas due to extensive wind and solar development in those areas. Alternative 2

also includes DFAs similar to those of the Preferred Alternative in the areas surrounding

Victorville, Adelanto, and Lucerne Valley.

The severity of visual impacts also relates to expectations of viewers for pristine desert

vistas. The eastern and northeastern parts of the Plan Area are sensitive because they con-

tain the Mojave National Preserve, Death Valley National Monument, and several BLM Wil-

derness Areas. Alternative 2 DFAs would encourage development in the Pahrump Valley

and the Silurian Valley, both of which offer currently undeveloped approaches to Death

Valley. The large DFA in the East Riverside area (close to Joshua Tree National Park and

BLM Wilderness Areas) is the same as in the Preferred Alternative.

Extent of Potential Renewable Energy Development. Although the geographic distribu-

tion of DFAs is similar under Alternative 2 and the Preferred Alternative, the total size of

the DFAs varies. The DFAs would be approximately 450,000 acres smaller under the

Preferred Alternative (2,024,000 acres compared with 2,473,000 acres for Alternative 2).

The larger DFAs in Alternative 2 would result in renewable projects being visible to more

viewers than those of the Preferred Alternative.

Conservation. Alternative 2 has a similar amount of land in the reserve design and in CPAs

as the Preferred Alternative. The conservation strategy emphasizes compensation.

In summary, the composition and structure of Alternative 2 would provide similar oppor-

tunities for the avoidance, reduction, and minimization of visual impacts from renewable

energy development, including those from transmission corridors, compared with the Pre-

ferred Alternative. The 20-mile width of Trail Management Corridors under Alternative 2 is

twice that of the Preferred Alternative and therefore would better protect views and visitor

experience along National Scenic and Historic Trails.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-90 August 2014

IV.20.3.4.7.2 Alternative 2 Compared With Preferred Alternative for the BLM Land

Use Plan Amendment

The BLM LUPA under Alternative 2 would assign VRM Classes to all BLM lands within the

CDCA, as would the Preferred Alternative. For both alternatives, this would provide a

unifying framework and an established system for addressing visual resources.

The key difference is that Alternative 2 would have more acres of VRI Class II and III lands

(approximately 128,000 acres) in DFAs than would the Preferred Alternative (78,000 acres).

This difference in the potential area of land disturbance impacts is critical and would result

in a larger amount of land potentially subject to visual impacts under Alternative 2 than

under the Preferred Alternative. However, because Alternative 2 proposes 20-mile-wide

Trail Management Corridors compared with the smaller 10-mile-wide corridors under the

Preferred Alternative, the scenic values and viewer experience along National Scenic and

Historic Trails would have a greater level of protection under Alternative 2.

IV.20.3.4.7.3 Alternative 2 Compared with Preferred Alternative for NCCP

The impacts of the NCCP for Alternative 2 are the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis. As a result, the comparison of Alternative 2 with the

Preferred Alternative for the NCCP is the same as described above for Plan-wide DRECP.

IV.20.3.4.7.4 Alternative 2 Compared with Preferred Alternative for the GCP

The visual impacts of the GCP for Alternative 2 and the Preferred Alternative would be sim-

ilar to those defined in Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur

on nonfederal lands only.

IV.20.3.5 Alternative 3

Alternative 3 includes 1,406,000 acres of DFAs and 15,159,000 acres of Reserve Design

Lands. For reference, Table IV.20-9 compares the Preferred Alternative to Alternative 3 for

key visual elements.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-91 August 2014

Table IV.20-9

Affected Visual Resources – Preferred Alternative Compared to Alternative 3

Preferred Alternative Alternative 3

Development Areas (acres)

DFAs 2,024,000 1,406,000

Visual Resource Elements Within Development Areas (acres unless otherwise indicated)

VRI [Class] 0 [I]

17,000 [II] 61,000 [III]

27,000 [IV]

0 [I]

5,000[II] 20,000 [III]

25,000 [IV]

VRM [Class] 0 [I]

0 [II]

0 [III]

106,000 [IV]

0 [I]

0 [II]

0 [III]

50,000 [IV]

National Scenic Byways 0 0

National Scenic and Historic Trails 1 mi. 2 mi.

California State Parks 0 0

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Visual Resource Elements Within 5 miles of Development Areas (acres unless otherwise indicated)

VRI [Class] 366,000 [I]

389,000 [II] 731,000 [III]

709,000 [IV]

206,000 [I]

406,000 [II] 715,000 [III]

701,000 [IV]

VRM [Class] 366,000 [I]

515,000 [II]

555,000 [III]

694,000 [IV]

191,000 [I]

652,000 [II]

696,000 [III]

434,000 [IV]

National Scenic Byways 13 mi. 7 mi.

National Parks and Preserves 15,000 15,000

National Scenic and Historic Trails 350 mi. 295 mi.

Trail Management Corridors 659,000 525,000

California State Parks 108,000 108,000

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Reserve Design Lands (Conservation Lands) (acres)

Reserve Design Lands 14,920,000 15,159,000

Note: The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-92 August 2014

IV.20.3.5.1 Plan-wide Impacts of Implementing the DRECP: Alternative 3

IV.20.3.5.1.1 Plan-wide Impacts and Mitigation Measures from Renewable Energy and

Transmission Development

Impact Assessment

Under Alternative 3, renewable energy related activities covered by the Plan are confined

to 1.4 million acres of DFAs, resulting in 150,000 acres of long-term disturbance (see

Volume IV, Table IV.1-1). This represents approximately 5,000 more acres of long-term

disturbance than could occur under the Preferred Alternative.

The DFAs are focused in the Imperial Valley, Lucerne Valley, Barstow area, and Tehachapi

area. It has fewer DFAs in eastern Riverside and small DFAs along the U.S. 395 corridor and

near Searles Lake.

Transmission development and operation activities would be permitted both inside and

outside of the DFAs.

Approximately 1,406,00 acres would be within DFAs under Alternative 3, compared with

2,024,000 acres under the Preferred Alternative. This smaller area of land within DFAs

(approximately 600,000 acres fewer) represents a much lower potential for visual impacts

under Alternative 3 than under the Preferred Alternative.

Alternative 3 would primarily affect four ecoregion subareas, compared with five under the

Preferred Alternative.

Visual impacts from solar development would be dispersed, with emphasis in the

Imperial Borrego Valley and the West Mojave and Eastern Slopes ecoregion subareas.

Visual impacts from wind development would be primarily in the Pinto Lucerne Valley

and Eastern Slopes and the West Mojave and Eastern Slopes ecoregion subareas.

Visual impacts from geothermal energy would occur in the Imperial Borrego Valley and

Owens River Valley ecoregion subareas, the same as under the Preferred Alternative.

The following summarizes the key points in comparing the visual impacts from renewable

energy and transmission development under Alternative 3 with those of the Preferred

Alternative (see Appendix R2. Table R2.20-17 for detailed data):

VRI Classes: There would be no VRI Class I lands, 5,000 acres of VRI Class II lands,

20,000 acres of VRI Class III lands, and 7,000 acres of VRI Class IV lands within DFAs

under Alternative 3. Per the CMAs for visual resources, these 25,000 acres of VRI

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-93 August 2014

Class II and III lands within DFAs would be managed as VRM Class IV and thereby

sustain a potential degradation of underlying scenic values.

A much larger amount of VRI Class II and III lands within DFAs would be managed

as VRM Class IV under the Preferred Alternative than under Alternative 3. This

reflects a potential for degradation of underlying scenic values under Alternative 3,

but to a lesser extent than under the Preferred Alternative.

VRM Classes: As with the Preferred Alternative, there would be no VRM Class I, II,

or III lands in DFAs under Alternative 3 (Figure IV.20-5, Proposed BLM VRM Classifi-

cations, Alternative 3). Approximately 12,000 acres of transmission would occur on

VRM Classified lands compared with a slightly larger amount of 13,000 acres under

the Preferred Alternative.

National Parks and Preserves: These lands would not be within the DFA footprint

under Alternative 3 or the Preferred Alternative. Although the footprint of renew-

able energy projects would not directly affect these lands, project facilities and

activities that are visible from National Parks and Preserves would diminish scenic

quality for viewers in those conservation areas, where expectations for scenic

quality are typically high.

National Scenic Byways: No segments of the Bradshaw Trail National Back

Country Byway would be within DFAs under either Alternative 3 or the

Preferred Alternative.

National Scenic and Historic Trails: Approximately 2 miles of the Old Spanish

National Historic Trail alignment would be within DFAs under Alternative 3 com-

pared with 1 mile under the Preferred Alternative.

California State Parks: As with the Preferred Alternative, no California State Park

lands would be within DFAs under Alternative 3. Approximately 230 acres of trans-

mission would occur on these lands, compared with 180 acres under the

Preferred Alternative.

State Scenic Highways: No segments of State Scenic Highways would be within

DFAs under Alternative 1 or the Preferred Alternative.

Wild and Scenic Rivers: No portion of designated or eligible Wild and Scenic Rivers

would be within DFAs under Alternative 3 or the Preferred Alternative.

Proximity of Visual Resources to DFAs. Under Alternative 3, visual resource ele-

ments within 5 miles of proposed DFAs can be compared with those under the Pre-

ferred Alternative, as summarized in Table IV.20-9. Alternative 3 has generally fewer

visual resource elements within 5 miles of DFAs than the Preferred Alternative. One

example of this is the acres of VRI Class I: 366,000 acres under the Preferred Alter-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-94 August 2014

native compared with 306,000 acres under Alternative 3. For Trail Management

Corridors, there is a similarly sized area within this 5-mile proximity under the Pre-

ferred Alternative as under Alternative 3.

The visual impacts resulting from Alternative 3 are numbered and summarized here:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Preconstruction activities and equipment visible from residences, public roads, and public

preserves would result in short-term diminished scenic quality for viewers. Examples

include road upgrading, damage to or removal of native vegetation, construction of

meteorological towers, drilling of temperature gradient wells, vehicles, and lighting.

During construction and decommissioning, activities and equipment visible from residences,

public roads, and public preserves would result in short-term diminished scenic quality for

viewers. Examples include dust and exhaust emissions, removal of vegetation during site

clearing, contouring and grading, presence of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, assembly of components, site light-

ing, and construction of and later removal of structures.

Impact VR-2: The presence of plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

The continued presence of equipment, structures, fencing, roads, and other elements required

to operate a facility would have a long-term adverse effect on the visible landscape. Areas

of persistent surface and vegetation disturbance and the presence of structures would

create visual contrast in form, line, color, and texture as compared with pre-project condi-

tions. Depending on viewer location, physical elements introduced by a project could block

views or create skylining. Even after project removal and site reclamation are completed,

visual contrast would remain. Restoring the natural, pre-disturbance visual character of a

desert environment is extremely difficult, can take decades, and often is unsuccessful.

Therefore, surface and vegetation disturbance would create long-term visual impacts due

to the persistence of scars in arid and semi-arid landscapes.

The structure, size, and industrial character of utility-scale renewable energy and transmis-

sion facilities during their operation and maintenance—as well as any associated glare,

reflectivity, and lighting—would visually contrast with surrounding undeveloped land and

result in long-term diminished scenic quality.

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

DRECP Plan Area Boundary

Ecoregion Subareas

CDCA Boundary

County Boundary

Non-BLM Land

BLM VRM Classifications

Class I

Class II

Class III

Class IV

M:\JOBS4\6287\common_gis\EIR_Figures_Spring_2014\Vol_IV\IV_20_Visual\figIV.20-5.mxd 8/18/2014

FIGURE IV.20-5

Proposed BLM Visual Resource Management Classifications, Alternative 3

0 2010

MilesI

Draft DRECP and EIR/EIS

Sources: ESRI (2014); CEC (2013); BLM (2013); CDFW (2013); USFWS (2013)

August 2014

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-96 August 2014

INTENTIONALLY LEFT BLANK

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-97 August 2014

Impacts in Study Area Lands

Study Area Lands refer to three categories of lands shown on alternative maps: Future

Assessment Areas (FAAs), Special Analysis Areas (SAAs) and DRECP Variance Lands.

Future Assessment Areas (FAAs). Lands within FAAs are neither reserve lands

nor DFAs; they are simply areas that are deferred for future assessment. The future

assessment will determine their suitability for renewable energy development or

ecological conservation. If renewable energy development occurs on FAA lands, a

BLM LUPA would not be required. FAAs for each alternative are included and located

as shown in Table IV.1-2 and Figure II.6-1. The FAAs represent areas where

renewable energy development or inclusion to the reserve design could be

implemented through an amendment to the DRECP, but additional assessment

would be needed.

Because most of the FAAs are presented as “undesignated areas” in the action alternatives,

there would be no difference between the FAAs in the Preferred Alternative except that

renewable development in an FAA would not require a BLM LUPA, so the environmental

review process would be somewhat simpler than if the location were left undesignated.

Development of the 11,000 acres of FAAs under Alternative 3 would be subject to all visual

resource CMAs identified by the Preferred Alternative and would be required to meet the

visual management objectives of the underlying VRM Class. The exception is the FAA south

of the Imperial Sand Dunes, which would become a DFA under Alternative 3 and would be

managed as VRM Class IV accordingly.

Special Analysis Areas (SAAs). Under Alternative 3, the SAAs would be designated as con-

servation, which would be generally beneficial to visual resources. Impacts would be the

same as those explained for the Plan-wide reserve design in Section IV.20.3.2.1.2, Impacts

of the Reserve Design.

DRECP Variance Lands. There would be no DRECP Variance Lands under Alternative 3.

Impact Reduction Strategies and Mitigation

The implementation of Alternative 3 would result in conservation of some desert lands as

well as the development of renewable energy generation and transmission facilities on

other lands. The impacts of renewable energy development covered by the Plan would be

lessened in several ways. First, the Plan incorporates CMAs for each alternative, including

specific biological reserve design components and LUPA components. In addition, the

implementation of existing laws, orders, regulations, and standards would reduce the

impacts of project development.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-98 August 2014

Conservation and Management Actions

The conservation strategy for Alternative 3 (presented in Volume II, Section II.3.1.1)

defines specific actions that would reduce the impacts of this alternative. The conservation

strategy includes a definition of the reserve design and specific CMAs for the Preferred

Alternative. While the CMAs were developed for BLM lands only, this analysis assumes that

all CMAs would be applied also to nonfederal lands.

Specific visual resource CMAs have been developed and apply to the Preferred Alternative

and all action alternatives. They are summarized in Section IV.20.3.2.1.1.

Laws and Regulations

Similar to the No Action Alternative, existing laws and regulations will reduce certain

impacts of Plan implementation. Relevant regulations are presented in the Regulatory

Setting in Volume III. The requirements of relevant laws and regulations are summarized in

Section IV.20.3.1.1.1.

Mitigation Measures

The visual impact avoidance and reduction strategies in existing guidance, such Reducing

Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands, are detailed and

comprehensive. The CMAs proposed under the DRECP (see Appendix H) provide additional

detail and direction. These represent state-of-the-art visual impact mitigation as it applies

to the Plan Area; no additional mitigation is feasible.

IV.20.3.5.1.2 Impacts from Reserve Design

There would be approximately 15 million acres of Reserve Design Lands under Alterna-

tive 3 and under the Preferred Alternative. This represents a generally equivalent level of

conservation to the Preferred Alternative. In general, visual resource elements would be

beneficially affected by the conservation policies and requirements of these lands. Alterna-

tive 3 has more acres of BLM LUPA Conservation Designations than the Preferred Alterna-

tive and has the least number of acres of SRMAs of all action alternatives.

The following summarizes the key points in comparing Alternative 3 visual impacts of the

reserve design with those of the Preferred Alternative (see Appendix R2, Table R2.20-18

for detailed, quantitative data and analysis):

VRI Classes: Alternative 3 would have 100% of VRI Class I lands, 74% of VRI Class II

lands, 71% of VRI Class III lands, and 73% of VRI Class IV lands in the Reserve

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-99 August 2014

Design Lands, compared to similar amounts (95%, 80%, 72%, and 74%, respec-

tively) under the Preferred Alternative.

VRM Classes: 100% of VRM Class I lands, 85% of VRM Class II lands, 79% of VRM

Class III lands, and 8% of the VRM Class IV lands would be in the Reserve Design

Lands under Alternative 3, compared with 100% of VRM Class I lands, 83% of VRM

Class II lands, 79% of VRM Class III lands, and 38% VRM Class IV lands under the

Preferred Alternative.

National Parks and Preserves: The National Parks and Preserves would have

100% of their land areas in the reserve design under Alternative 3 and under the

Preferred Alternative.

National Scenic Byways: Under Alternative 3, approximately 46% of the Bradshaw

Trail National Back Country Byway and 11% of SR 190 would be in the Reserve

Design. This provides a lower level of protection of visual and scenic values than

would occur under the Preferred Alternative (51% and 15% respectively).

National Scenic and Historic Trails: Under Alternative 3, approximately 53% of

the Juan Bautista de Anza National Historic Trail, 58% of the Old Spanish National

Historic Trail, and 41% of the Pacific Crest National Scenic Trail alignments would

be in the Reserve Design.

Under the Preferred Alternative, approximately 4% of the Juan Bautista de Anza

National Historic Trail, 58% of the Old Spanish National Historic Trail, and 40% of

the Pacific Crest National Scenic Trail alignments would be in conservation.

California State Parks: As with the Preferred Alternative, most California State

Park lands would be in Reserve Design Lands under Alternative 3. This would vary

by individual park or preserve; but most parks would have more than 90% in exist-

ing conservation areas, BLM LUPA designations, or CPAs. Exceptions are the (1)

Desert Cahuilla/Freeman Project (4%), (2) Picacho SRA (78%), and (3) Salton Sea

SRA (86%). Similar amounts and percentages of California State Park lands would

be in Reserve Design Lands under the Preferred Alternative.

State Scenic Highways: Approximately 16% of SR 190 but no portion of the SR 78

and U.S. 395 alignments would be in Reserve Design Lands, compared to similar

portions under the Preferred Alternative.

Wild and Scenic Rivers: 100% of the Amargosa Wild and Scenic River and 100% of

the eligible segments of Surprise Canyon Creek and the Mojave River would be

within the reserve design under Alternative 3 and the Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-100 August 2014

IV.20.3.5.2 Impacts of DRECP Land Use Plan Amendment on BLM Land: Alternative 3

This section addresses two components of effects of the BLM LUPA: the streamlined

development of renewable energy and transmission on BLM land under the LUPA, and the

impacts of the amended land use plans themselves.

IV.20.3.5.2.1 Impacts from Renewable Energy and Transmission Development on BLM Land

The visual impacts of DFAs on VRI and VRM lands for Alternative 3 would be the same as

those defined in Section IV.20.3.5.1, Plan-wide Impacts of Implementing the DRECP: Alter-

native 3, for the Plan-wide analysis.

IV.20.3.5.2.2 Impacts of Changes to BLM Land Designations

The DRECP LUPA Alternative 3 would establish VRM classes for all lands in the CDCA. (Cur-

rently, only the Bishop RMP and the Imperial Sand Dunes RAMP have VRM Classes desig-

nated. In accordance with BLM policy, all wilderness areas and WSAs are managed as VRM

Class I.) It would also (1) designate new NLCS lands, (2) designate new ACECs and expand

and reduce existing ACECs, (3) designate new SRMAs and expand and reduce existing

SRMAs, (4) create buffer corridors along National Scenic and Historic Trails, and (5) man-

age lands with wilderness characteristics to protect those characteristics. The BLM LUPA

would also replace the multiple-use classes.

The VRM Classes and other BLM land designations proposed under Alternative 3 would

benefit visual resources to the extent that they offer protective measures that would avoid

or reduce visual impacts. As with the Preferred Alternative, CMAs for visual resources would

be established and implemented. The BLM-specific CMAs proposed under the Preferred

Alternative would be the same as for all action alternatives. These visual resource CMAs

and the restrictions and protective measures of the land designations provide a mutually

supportive framework of guidelines and specifications through which visual impacts would

be avoided where possible, minimized, and/or mitigated to the extent practicable.

Under Alternative 3, Trail Management Corridors would be established along National Scenic

and Historic Trails, at a width of generally 5 miles from the centerline of the trail, for a total

width of 10 miles (compared to the same total width of 10 miles under the Preferred Alter-

native). As discussed in Volume II, Section II.3.2.2.2, these Trail Management Corridors

would be managed as components of the BLM’s NLCS. Where National Trails overlap other

NLCS lands, the more protective CMAs or land use allocations would apply. All Trail Man-

agement Corridors would be designated as VRM Class II, except within approved transmis-

sion corridors (VRM Class III) and DFAs (VRM Class IV). However, state-of-the-art VRM

BMPs for renewable energy would be employed commensurate with the protection of

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-101 August 2014

nationally significant scenic resources and cultural landscapes to minimize the level of

intrusion and protect trail settings.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements under Alternative 3 (see Appendix R2, Table R2.20-19 for

detailed, quantitative data and analysis):

SRMAs: There would be the potential for recreational activities or facilities allowed

in SRMAs to affect scenic values, particularly those of the VRI Class I and II lands

with which they coincide (approximately 280,000 acres, compared to the same

amount under the Preferred Alternative).

NLCS: The management of these lands that have nationally significant ecological,

cultural, and scientific values would offer additional protection of intactness and

scenic quality, particularly to the VRI Class I, II, III, and IV lands with which they

coincide (3.5 million acres, compared to a similar amount of 3.6 million acres under

the Preferred Alternative).

ACECs: The special management measures given to protect the important historic,

cultural, and scenic values of these areas would generally benefit visual resources,

particularly the VRI Class II, III, and IV lands with which they coincide (approxi-

mately 1.7 million acres, compared with a smaller area of 1.4 million acres under the

Preferred Alternative).

Wildlife Allocation Areas: The management of these areas must be compatible

with protection and enhancement of wildlife and plant habitat and would generally

benefit visual resources, particularly the VRI Class III and IV lands with which they

coincide (approximately 13,000 acres, compared with a larger amount of 18,000

acres under the Preferred Alternative).

Lands Managed for Wilderness Characteristics: Under Alternative 3 and all other

action alternatives, these lands would be managed as VRM Class II. Other manage-

ment strategies to protect the wilderness characteristics of lands would benefit

visual resources, particularly the VRI Class II and IV lands with which they coincide

(approximately 375,000 acres, compared with 299,000 acres under the

Preferred Alternative).

Trail Management Corridors: As with the Preferred Alternative, the Trail Manage-

ment Corridors would be managed to meet the visual management objectives of

VRM Class II under Alternative 3. The primary effect of these 10-mile-wide corridors

would be to provide a higher level of protection (VRM Class II objectives) to approx-

imately 332,000 acres of VRM Class III and IV lands that would otherwise be managed

under less restrictive visual management objectives

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-102 August 2014

Alternative 3 would assign VRM classes to all BLM lands within the Plan Area. The relation-

ship between the proposed management classes and the underlying existing inventory

classes is discussed in this section.

Under Alternative 3, VRI Class lands within the proposed VRM Classes on BLM LUPA lands

would be as indicated in Table IV.20-10.

Key points of the effects of VRM classifications on VRI lands under Alternative 3 are

summarized here:

VRM designations: The majority of lands would be designated as VRM Class I, II, or

III. Less than 10% would be designated as VRM Class IV.

VRI Class I: All of VRI Class I lands would be managed as VRM Class I, reflecting a

high level of management protection.

VRI Class II: As with the Preferred Alternative, more than 75% of VRI Class II

lands would be managed as VRM Class II or I, reflecting a moderately high level of

management protection. Approximately 24% would be managed as VRM Class III

or IV, which allows for more visual contrast and impact than the VRM Class II

objectives allow.

VRI Class III: Approximately 88% of VRI Class III lands would be managed as VRM

Class III or II, reflecting a high correlation and level of management protection.

Approximately 39% would be managed to meet VRM Class II objectives, which

restrict visual contrast and impact more than VRM Class III. Approximately 12%

would be managed as VRM Class IV, which allows for more visual contrast and

impact than the VRM Class III objectives allow.

VRI Class IV: Approximately 85% of VRI Class IV lands would be managed as VRM

Class III, II, or I; 15% would be VRM Class IV.

Compared to the Preferred Alternative, Alternative 3 would result in a similar level of

correlation between VRI values and the proposed VRM Classes. An exception to this is the

management of VRI Class IV lands. A higher percentage of these areas would be managed as

VRM Class III, II, or I under Alternative 3 than under the Preferred Alternative. Overall,

visual resource protection would benefit under Alternative 3 by the designation of VRM

Classes throughout the CDCA.

Under the proposed CMAs, all DFAs would be managed as VRM Class IV lands to allow for

industrial-scale development. In those cases, implementation or incorporation of BMPs

would still be required to reduce the visual contrast levels of proposed facilities to the

extent practicable.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-103 August 2014

Table IV.20-10

VRI Classes Within Proposed VRM Classes on BLM LUPA Lands – Alternative 3

LUPA-Proposed VRM Class

Designations

Existing Visual Resource Inventory Classes

Total

VRI Class I VRI Class II VRI Class III VRI Class IV

Acres Percent Acres Percent Acres Percent Acres Percent

VRM Class I 3,842,000 100% 11,000 1% 7,000 0% 700 0% 3,860,700

VRM Class II 0 0% 1,628,000 75% 1,087,000 39% 566,000 29% 3,281,000

VRM Class III 0 0% 433,000 20% 1,348,000 49% 1,112,000 56% 2,893,000

VRM Class IV 0 0% 87,000 4% 320,000 12% 297,000 15% 704,000

Total 3,842,000 100% 2,159,000 100% 2,762,000 100% 1,975,700 100% 10,738,700

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. Acres above include CDCA Outside the Plan Area. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-104 August 2014

IV.20.3.5.3 Impacts of Natural Community Conservation Plan: Alternative 3

The impacts of the NCCP for Alternative 3 would be the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis.

IV.20.3.5.4 Impacts of General Conservation Plan: Alternative 3

The impacts of the GCP for Alternative 3 would be similar to those defined in Section

IV.20.3.2.1 for the Plan-wide analysis, but they would occur on nonfederal lands only.

IV.20.3.5.5 Impacts Outside the Plan Area

IV.20.3.5.5.1 Impacts of Transmission Outside the Plan Area

The impacts of out of Plan Area transmission would be the same under all alternatives.

These are as described for the No Action Alternative in Section IV.20.3.1.5.1.

IV.20.3.5.5.2 Impacts of BLM LUPA Decisions Outside the Plan Area

Under the proposed BLM LUPA, the changes outside the Plan Area would include the desig-

nation of NLCS lands, ACECs, National Scenic and Historic Trails Management Corridors,

VRM Classes, and new land allocations to replace multiple-use classes on CDCA lands.

The VRM Classes and other BLM land designations proposed under Alternative 3 would

extend protective measures to these areas that would avoid or reduce visual impacts. CMAs

for visual resources would be established and implemented. The BLM-specific CMAs for

Alternative 3 would be the same as for all action alternatives. Together, these visual resource

CMAs and the restrictions and protective measures of the land designations provide a

framework of guidelines and specifications through which visual impacts would be avoided

where possible, minimized, and/or mitigated to the extent practicable.

The following summarizes the key points of the impacts of changes to BLM land designations

on visual resource elements, outside the Plan Area, under Alternative 3 (see Appendix R2,

Table R2.20-20 for detailed, quantitative data and analysis):

Proposed NLCS: The management of these lands that have nationally significant

ecological, cultural, and scientific values would offer additional protection of intact-

ness and scenic quality.

Existing and Proposed ACECs: The special management measures given to protect

the important historic, cultural, and scenic values of these areas would generally

benefit visual resources, particularly the VRM Class II, III, and IV lands with which

they coincide (approximately 202,000 acres, compared to a similar area of 210,000

acres under the Preferred Alternative).

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-105 August 2014

Trail Management Corridors: The primary effect of 10-mile-wide corridors under

Alternative 3 would be to provide a consistent framework for protecting and man-

aging scenic values along National Scenic Trails within National and California State

park lands. As with the Preferred Alternative, the Trail Management Corridors would

be managed to meet the visual management objectives of VRM Class II.

IV.20.3.5.6 CEQA Significance Determination for Alternative 3

The significance determinations for short-term and long-term impacts are described in Sec-

tion IV.20.3.1.1.1 for the No Action Alternative. Section IV.20.1.2 identifies four criteria to

apply when determining if there are significant impacts from a project under CEQA. These

criteria are included as part of the more general impacts identified in this section as

VR-1 and VR-2.

The visual impacts and their associated significance determinations for Alternative 3 are

as follows:

VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality. Activities and

equipment visible from residences, public roads, and public preserves would result in

short-term diminished scenic quality for viewers. This would be less than significant with

implementation of appropriate CMAs.

VR-2: The presence of plan components would create long-term visual contrast with

surrounding undeveloped land and result in long-term diminished scenic quality.

Long-term impacts to visual resources for Alternative 3 would be significant and unavoid-

able, as described in detail for the No Action Alternative (Section IV.20.3.1.6). Impacts

would be significant because of the changes in line, form, and color introduced by large-

scale development and the contrast of any such development with surrounding conditions.

Although the CMAs relevant to Alternative 3 would reduce the impact on visual resources,

they would not reduce it to a less than significant level.

IV.20.3.5.7 Comparison of Alternative 3 with Preferred Alternative

Chapter IV.27 presents a comparison of all action alternatives and the No Action Alterna-

tive across all disciplines. This section compares Alternative 3 with the Preferred Alternative.

IV.20.3.5.7.1 Alternative 3 Compared with Preferred Alternative for Plan-wide DRECP

Although similar visual impacts would occur under both Alternative 3 and the Preferred

Alternative, the impacts would vary in key ways:

Geographic Distribution. As with the DFAs of the Preferred Alternative, the DFAs under

Alternative 3 are restricted in distribution and concentrated in areas considered less envi-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-106 August 2014

ronmentally sensitive. Similar to the Preferred Alternative, DFAs under Alternative 3 are

focused in the Imperial Valley, Lucerne Valley, Barstow area, and Tehachapi area. Alterna-

tive 3 has fewer DFAs in eastern Riverside and very small DFAs along the U.S. 395 corridor

and near Searles Lake.

The severity of visual impacts depends partly on the number of potential viewers. Alterna-

tive 3 has smaller DFAs than the Preferred Alternative in and near the populated West

Mojave area. As a result, somewhat reduced amounts of wind and solar development would

be expected by residents in the Mojave, Lancaster, and Palmdale areas. Alternative 3 also

includes DFAs similar to those of the Preferred Alternative in the areas surrounding

Victorville, Adelanto, and Lucerne Valley.

The severity of visual impacts also relates to expectations of viewers seeking pristine

desert vistas. The eastern and northeastern parts of the Plan Area are sensitive because

they contain the Mojave National Preserve, Death Valley National Monument, and several

BLM Wilderness Areas. Alternative 3 has no DFAs in these areas. The Preferred Alterna-

tive’s large DFA in the East Riverside area (close to Joshua Tree National Park and BLM Wil-

derness Areas) is substantially smaller under Alternative 3.

Extent of Potential Renewable Energy Development. Although the geographic distribu-

tion of DFAs is generally similar under Alternative 3 and the Preferred Alternative, the

size of the DFAs varies among these alternatives. The DFAs are 620,000 acres larger

under the Preferred Alternative (2,024,000 acres of DFAs versus 1,406,000 acres under

Alternative 3. Because the Preferred Alternative has larger areas of DFAs within which

development could be located, these projects could be visible from more areas of the

desert than under Alternative 3.

Conservation. Alternative 3 has slightly more acreage in the reserve design than the Pre-

ferred Alternative and more land identified in CPAs. Thus, Alternative 3 could provide

more land in conservation than the Preferred Alternative. These would be lands in which

scenic values would benefit from the management and restrictions that would apply to

those conserved areas. The conservation strategy is similar to that of the Preferred Alterna-

tive with emphasis on avoidance and compensation.

In summary, the composition and structure of Alternative 3 would provide greater oppor-

tunities for the avoidance, reduction, and minimization of visual impacts from renewable

energy development.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-107 August 2014

IV.20.3.5.7.2 Alternative 3 Compared With Preferred Alternative for the BLM Land

Use Plan Amendment

The BLM LUPA under Alternative 3 would assign VRM Classes to all BLM lands within the

CDCA, including those outside the Plan Area, as would the Preferred Alternative. For both

alternatives, this would provide a unifying framework and an established system for

addressing visual resources.

The key difference is that Alternative 3 would have a smaller amount of VRI Class II and III

lands (approximately 25,000 acres) in DFAs than would the Preferred Alternative (78,000

acres). This difference in the potential area of land disturbance impacts would result in fewer

areas potentially subject to visual impacts under Alternative 3 than under the Preferred

Alternative. Because Alternative 3 and the Preferred Alternative both propose 10-mile-wide

Trail Management Corridors, the scenic values and viewer experience along National Scenic

and Historic Trails would have a similar level of protection under each alternative.

IV.20.3.5.7.3 Alternative 3 Compared With Preferred Alternative for NCCP

The impacts of the NCCP for Alternative 3 are the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis. As a result, the comparison of Alternative 3 with the

Preferred Alternative for the NCCP is the same as described for Plan-wide DRECP.

IV.20.3.5.7.4 Alternative 3 Compared With Preferred Alternative for the GCP

The visual impacts of the GCP for Alternative 3 and the Preferred Alternative would be sim-

ilar to those defined in Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur

on nonfederal lands only.

IV.20.3.6 Alternative 4

Alternative 4 includes 1,608,000 acres of DFAs and 14,476,000 acres of Reserve Design

Lands. For reference, Table IV.20-11 compares the Preferred Alternative to Alternative 4

for key visual elements.

Table IV.20-11

Affected Visual Resources – Preferred Alternative Compared to Alternative 4

Preferred Alternative Alternative 4

Development Areas (acres)

DFAs 2,024,000 1,608,000

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-108 August 2014

Table IV.20-11

Affected Visual Resources – Preferred Alternative Compared to Alternative 4

Preferred Alternative Alternative 4

Visual Resource Elements Within Development Areas (acres unless otherwise indicated)

VRI [Class] 0 [I]

17,000 [II]

61,000 [III] 27,000 [IV]

0 [I]

200[II]

3,000 [III] 2,000 [IV]

VRM [Class] 0 [I] 0 [II]

0 [III]

106,000 [IV]

0 [I] 0 [II]

0 [III]

5,000 [IV]

National Scenic Byways 0 0

National Scenic and Historic Trails 1 mi. 1 mi.

California State Parks 0 0

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Visual Resource Elements Within 5 miles of Development Areas (acres unless otherwise indicated)

VRI [Class] 366,000 [I]

389,000 [II]

731,000 [III]

709,000 [IV]

346,000 [I]

386,000 [II]

711,000 [III]

706,000 [IV]

VRM [Class] 366,000 [I]

515,000 [II]

555,000 [III]

694,000 [IV]

330,000 [I]

396,000 [II]

808,000 [III]

585,000 [IV]

National Scenic Byways 13 mi. 13 mi.

National Parks and Preserves 15,000 16,000

National Scenic and Historic Trails 350 mi. 329 mi.

Trail Management Corridors 659,000 193,000

California State Parks 108,000 108,000

State Scenic Highways 0 0

Wild and Scenic Rivers 0 0

Reserve Design Lands (Conservation Lands) (acres)

Reserve Design Lands 14,920,000 14,476,000

Note: The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-109 August 2014

IV.20.3.6.1 Plan-wide Impacts of Implementing the DRECP: Alternative 4

IV.20.3.6.1.1 Plan-wide Impacts and Mitigation Measures from Renewable Energy and

Transmission Development

Impact Assessment

Under Alternative 4, renewable energy related activities covered by the Plan are confined

to 1.6 million acres of DFAs, resulting in 148,000 acres of long-term disturbance (see Table

IV.1-1). This represents a slightly larger amount of long-term disturbance than could occur

under the Preferred Alternative.

The DFAs are focused in the Imperial Valley, Lucerne Valley, Barstow area, and Tehachapi

area. It has fewer DFAs in eastern Riverside and very small DFAs along the U.S. 395 cor-

ridor and near Searles Lake.

Approximately 1,608,000 acres would be within DFAs under Alternative 4, as compared

with 2,024,000 acres under the Preferred Alternative. This smaller area of land within

Alternative 4 DFAs (approximately 400,000 acres less) means that development would be

more concentrated in a smaller area, so the visual impacts of renewable energy projects

would be less widespread than under the Preferred Alternative.

Alternative 4 would primarily affect four ecoregion subareas, compared with five under the

Preferred Alternative.

Visual impacts from solar development would dispersed, with emphasis in two eco-

region subareas: (1) Imperial Borrego Valley and (2) West Mojave and Eastern Slopes.

Visual impacts from wind development would be in two ecoregion subareas: (1)

Pinto Lucerne Valley and Eastern Slopes and (2) West Mojave and Eastern Slopes.

Visual impacts from geothermal energy would occur in in two ecoregion subareas:

(1) Imperial Borrego Valley and (2) Owens River Valley, the same as under the Pre-

ferred Alternative.

The following summarizes the key points in comparing the visual impacts from renewable

energy and transmission development under Alternative 4 to those of the Preferred Alter-

native (see Appendix R2, Table R2.20-21 for detailed, quantitative data and analysis):

VRI Classes: There would be approximately 200 acres of VRI Class II lands, 3,000

acres of VRI Class III lands, 2,000 acres of VRI Class IV lands, and no VRI Class I lands

within DFAs under Alternative 4. Per the CMAs for visual resources, these 3,200

acres of VRI Class II and III lands within DFAs would be managed as VRM Class IV

and thereby sustain a potential degradation of underlying scenic values. Approxi-

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-110 August 2014

mately 14,000 acres of transmission would occur on inventoried lands, compared

with 13,000 acres under the Preferred Alternative.

A much smaller amount of VRI Class II and III lands within DFAs would be

managed as VRM Class IV under Alternative 4 (3,200 acres) than under the

Preferred Alternative (78,000 acres). This reflects a potential for degradation of

underlying scenic values under Alternative 4 but to a far lesser extent than under

the Preferred Alternative.

VRM Classes: As with the Preferred Alternative, there would be no VRM Class I, II,

or III lands in DFAs under Alternative 4 (Figure IV.20-6, Proposed BLM VRM

Classifications, Alternative 4). Approximately 14,000 acres of transmission would

occur on VRM lands, compared with a smaller amount of 13,000 acres under the

Preferred Alternative.

National Parks and Preserves: These lands would not be within the DFA footprint

under Alternative 4 or the Preferred Alternative. Although the footprint of renew-

able energy projects would not directly affect these lands, project facilities and

activities that are visible from National Parks and Preserves would diminish scenic

quality for viewers in those conservation areas, where expectations for scenic

quality are typically high.

National Scenic Byways: No segments of the Bradshaw Trail National Back Country

Byway would be within DFAs under either Alternative 4 or the Preferred Alternative.

National Scenic and Historic Trails: Approximately 1 mile of the Old Spanish

National Historic Trail would be within DFAs under both Alternative 4 and the Pre-

ferred Alternative.

California State Parks: As with the Preferred Alternative, no California State Park

lands would be within DFAs under Alternative 4. Approximately 160 acres of

transmission would occur on these lands, compared with 180 acres under the

Preferred Alternative.

State Scenic Highways: No segments of State Scenic Highways would be within

DFAs under Alternative 4 or the Preferred Alternative.

Wild and Scenic Rivers: No portion of designated or eligible Wild and Scenic Rivers

would be within DFAs under Alternative 4 or the Preferred Alternative.

Under Alternative 4, approximately 690,000 of DFA lands occur within 5 miles of

Legislatively and Legally Protected Areas in the Plan Area, compared with approxi-

mately 883,000 acres of DFA lands under the Preferred Alternative.

Proximity of Visual Resources to DFAs. Under Alternative 4, visual resource ele-

ments within 5 miles of proposed DFAs can be compared with those under the

Preferred Alternative, as summarized in Table IV.20-11. Alternative 4 has similar

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-111 August 2014

amounts of visual resource elements within 5 miles of DFAs as the Preferred

Alternative. An exception is Trail Management Corridors. There is less than one-

third the acres of corridors under Alternative 4 compared with the acres under the

Preferred Alternative.

The visual impacts resulting from Alternative 4 are:

Impact VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality.

Preconstruction activities and equipment visible from residences, public roads, and public

preserves would result in short-term diminished scenic quality for viewers. Examples

include road upgrading, damage to or removal of native vegetation, construction of

meteorological towers, drilling of temperature gradient wells, vehicles, and lighting.

During construction and decommissioning, activities and equipment visible from residences,

public roads, and public preserves would result in short-term diminished scenic quality for

viewers. Examples include dust and exhaust emissions, removal of vegetation during site

clearing, contouring and grading, presence of vehicles and equipment, mobilization and

demobilization activities, material delivery and staging, assembly of components, site light-

ing, and construction of and later removal of structures.

Impact VR-2: The presence of plan components would create long-term visual contrast

with surrounding undeveloped land and result in long-term diminished scenic quality.

The continued presence of equipment, structures, fencing, roads, and other elements required

to operate a facility would have a long-term adverse effect on the visible landscape. Areas

of persistent surface and vegetation disturbance and the presence of structures would

create visual contrast in form, line, color, and texture compared to pre-project conditions.

Depending on viewer location, physical elements introduced by a project could block views

or create skylining. Even after project removal and site reclamation are completed, visual

contrast would remain. Restoring the natural, pre-disturbance visual character of a desert

environment is extremely difficult, can take decades, and often is unsuccessful. Therefore,

surface and vegetation disturbance would create long-term visual impacts due to the

persistence of scars in arid and semi-arid landscapes.

The structure, size, and industrial character of utility-scale renewable energy and transmission

facilities during their operation and maintenance—as well as any associated glare, reflectivity,

and lighting—would visually contrast with surrounding undeveloped land and result in

long-term diminished scenic quality.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-112 August 2014

Impacts in Study Area Lands

Study Area Lands refer to three categories of lands shown on alternative maps: Assessment

Areas (FAAs), Special Analysis Areas (SAAs) and DRECP Variance Lands.

Future Assessment Areas (FAAs). Alternative 4 has no FAAs identified, therefore there

would be no associated impacts to visual resources.

Special Analysis Areas (SAAs). Designating the SAAs as conservation would have no impact

to this resource. Impacts would be the same as those explained for the Plan-wide reserve

design in Section IV.20.3.2.1.2, Impacts of the Reserve Design. Portions of the SAAs are

shown as DRECP Variance Lands in Alternative 4, but the majority of these areas would be

conservation lands (near U.S. 395) and undesignated areas (near Fort Irwin).

DRECP Variance Lands. DRECP Variance Lands represent the BLM Solar PEIS Variance

Lands as screened for the DRECP and EIR/EIS based on BLM screening criteria. Covered

Activities could be permitted for NCCP purposes only through an NCCP plan amendment.

However, development of renewable energy on Variance Lands would not require a BLM

LUPA; so the environmental review process would be somewhat simpler than if the loca-

tion were left undesignated.

Under Alternative 4, Variance Lands include 588,000 acres, development of which would

conform to the visual management objectives of VRM Class II.

Impact Reduction Strategies and Mitigation

The implementation of Alternative 4 would result in conservation of some desert lands as

well as the development of renewable energy generation and transmission facilities on

other lands. The impacts of the renewable energy development covered by the Plan would

be lessened in several ways. First, the Plan incorporates CMAs for each alternative, including

specific biological reserve design components and LUPA components. In addition, the imple-

mentation of existing laws, orders, regulations, and standards would reduce the impacts of

project development.

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!( !(

!(

!(

§̈¦10

§̈¦405

§̈¦605

§̈¦210

§̈¦15

§̈¦710

§̈¦15

§̈¦10

§̈¦8

§̈¦5

§̈¦40

§̈¦5

£¤6

£¤395

£¤395

UV190

UV58

UV178

UV127

UV78

UV2

UV91

UV86

UV98

UV136

UV168

UV247

UV34

UV74

UV94

UV60

UV138

UV75

UV243

UV62

UV111

UV62

UV38

UV78

Inyo

San Bernardino

Kern

Riverside

Imperial

Tulare

San Diego

Los Angeles

Mono

Fresno

Orange

M E X I C O

O w e n s R i v e r

V a l l e y E c o r e g i o nS u b a r e a

P a n a m i n t D e a t h

V a l l e y E c o r e g i o nS u b a r e a

W e s t M o j a v e a n d

E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

M o j a v e a n d

S i l u r i a n V a l l e yE c o r e g i o n S u b a r e a

K i n g s t o n a n d

F u n e r a l M o u n t a i n sE c o r e g i o n S u b a r e a

P r o v i d e n c e a n d

B u l l i o n M o u n t a i n sE c o r e g i o n S u b a r e a

P i n t o L u c e r n e V a l l e y

a n d E a s t e r n S l o p e sE c o r e g i o n S u b a r e a

P i u t e V a l l e y a n d

S a c r a m e n t o M o u n t a i n sE c o r e g i o n S u b a r e a

C a d i z V a l l e y a n d

C h o c o l a t e M o u n t a i n sE c o r e g i o n S u b a r e a

I m p e r i a l B o r r e g o

V a l l e y E c o r e g i o nS u b a r e a

Escondido

Lancaster

Palmdale

Long

Beach

Ridgecrest

Barstow

Hesperia

Riverside

SanBernardino

Twentynine

Palms

Coachella

El Centro

San

Diego

Los

Angeles

A R I Z O N AA R I Z O N A

N E V A D AN E V A D A

DRECP Plan Area Boundary

Ecoregion Subareas

CDCA Boundary

County Boundary

Non-BLM Land

BLM VRM Classifications

Class I

Class II

Class III

Class IV

M:\JOBS4\6287\common_gis\EIR_Figures_Spring_2014\Vol_IV\IV_20_Visual\figIV.20-6.mxd 8/18/2014

FIGURE IV.20-6

Proposed BLM Visual Resource Management Classifications, Alternative 4

0 2010

MilesI

Draft DRECP and EIR/EIS

Sources: ESRI (2014); CEC (2013); BLM (2013); CDFW (2013); USFWS (2013)

August 2014

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-114 August 2014

INTENTIONALLY LEFT BLANK

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-115 August 2014

Conservation and Management Actions

The conservation strategy for Alternative 4 (presented in Volume II, Section II.3.1.1)

defines specific actions that would reduce the impacts of this alternative. The conservation

strategy includes definition of the reserve design and specific CMAs for the Preferred

Alternative. While the CMAs were developed for BLM lands only, this analysis assumes that

all CMAs would be applied also to nonfederal lands.

Specific visual resource CMAs have been developed and apply to the Preferred Alternative

and all action alternatives. They are summarized in Section IV.20.3.2.1.1. These CMAs for

VRM include measures that apply Plan-wide, measures specific to DFAs and Study Area

Lands, and a detailed set of visual resource BMPs that apply to all action alternatives. The

BMPs incorporate the measures identified in Best Management Practices for Reducing

Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands. These visual

resource CMAs provide a comprehensive framework of guidelines and specifications

through which visual impacts would be avoided where possible, minimized, and/or miti-

gated to the extent practicable.

Laws and Regulations

Similar to the No Action Alternative, existing laws and regulations will reduce certain impacts

of Plan implementation. Relevant regulations are presented in the Regulatory Setting in

Volume III. The requirements of relevant laws and regulations that would reduce the

severity of visual impacts are summarized in Section IV.20.3.1.1.1.

Mitigation Measures

The visual impact avoidance and reduction strategies in existing guidance, such Reducing

Visual Impacts of Renewable Energy Facilities on BLM-Administered Lands, are detailed and

comprehensive. The CMAs proposed under the DRECP (see Appendix H) provide additional

detail and direction. These represent state-of-the-art visual impact mitigation as it applies

to the Plan Area; no additional mitigation is feasible.

IV.20.3.6.1.2 Impacts from Reserve Design

The following summarizes the key points in comparing Alternative 4 visual impacts of the

reserve design to those of the Preferred Alternative (see Appendix R2, Table R2.20-22 for

detailed, quantitative data and analysis):

VRI Classes: Alternative 4 would have 100% of VRI Class I lands, 66% of VRI Class II

lands, 62% of VRI Class III lands, and 65% of VRI Class IV lands in the Reserve

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-116 August 2014

Design Lands, compared with slightly larger amounts (100%, 74%, 67%, and 72%

respectively), under the Preferred Alternative.

VRM Classes: 100% of VRM Class I lands, 81% of VRM Class II lands, 59% of VRM

Class III lands, and 54% of the VRM Class IV lands would be in the Reserve Design

Lands under Alternative 4, compared with 100% of VRM Class I lands, 83% of VRM

Class II lands, 79% of VRM Class III lands, and 38% of VRM Class IV lands under the

Preferred Alternative.

National Parks and Preserves: The National Parks and Preserves would have

100% of their land areas in the reserve design under Alternative 4 and under the

Preferred Alternative.

National Scenic Byways: Under Alternative 4, approximately 39% of the

Bradshaw Trail National Back Country Byway and 15% of SR 190 would be in the

Reserve Design. This provides a similar or slightly lower level of protection of

visual and scenic values than would occur under the Preferred Alternative (51%

and 15% respectively).

National Scenic and Historic Trails: Under Alternative 4, approximately 53% of

the Juan Bautista de Anza National Historic Trail, 55% of the Old Spanish National

Historic Trail, and 41% of the Pacific Crest National Scenic Trail alignments would

be in the Reserve Design. This provides a similar or higher level of protection of

visual and scenic values than would occur under the Preferred Alternative (4%,

58%, and 40%, respectively).

California State Parks: As with the Preferred Alternative, most California State

Park lands would be in Reserve Design Lands under Alternative 4. This would vary

by individual park or preserve; but most parks would have more than 95% in exist-

ing conservation areas, BLM LUPA designations, or CPAs. Exceptions are the (1)

Desert Cahuilla/Freeman Project (4%), (2) Picacho SRA (74%), and (3) Salton Sea

SRA (86%). Similar amounts and percentages of California State Park lands would

be in Reserve Design Lands under the Preferred Alternative.

State Scenic Highways: Approximately 15% of SR 190 but no portion of the SR 78

or U.S. 395 alignments would be in Reserve Design Lands, compared to similar por-

tions under the Preferred Alternative.

Wild and Scenic Rivers: 100% of the Amargosa Wild and Scenic River corridor as

well as the eligible Surprise Canyon Creek and Mojave River segments would be

within the reserve design under Alternative 4 and the Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-117 August 2014

IV.20.3.6.2 Impacts of DRECP Land Use Plan Amendment on BLM Land: Alternative 4

This section addresses two components of effects of the BLM LUPA: the streamlined

development of renewable energy and transmission on BLM land under the LUPA and the

impacts of the amended land use plans themselves.

IV.20.3.6.2.1 Impacts from Renewable Energy and Transmission Development on BLM Land

The visual impacts of DFAs on VRI and VRM lands for Alternative 4 would be the same as

those defined in Section IV.20.3.6.1, Plan-wide Impacts of Implementing the DRECP: Alter-

native 4, for the Plan-wide analysis.

IV.20.3.6.2.2 Impacts of Changes to BLM Land Designations

The DRECP LUPA Alternative 4 would establish VRM Classes for all lands in the CDCA. (Cur-

rently, only the Bishop RMP and the Imperial Sand Dunes RAMP have VRM Classes desig-

nated. In accordance with BLM policy, all wilderness areas and WSAs are managed as VRM

Class I.) It would also (1) designate new NLCS lands; (2) designate new ACECs and expand

and reduce existing ACECs; (3) designate new SRMAs and expand and reduce existing

SRMAs; and (4) create buffer corridors along National Scenic and Historic Trails. The BLM

LUPA would also replace the multiple-use classes.

The VRM Classes and other BLM land designations proposed under Alternative 4 would

offer protective measures that would avoid or reduce visual impacts. As with the

Preferred Alternative, CMAs for visual resources would be established and implemented.

The BLM-specific CMAs proposed for the Preferred Alternative would be the same as for

all action alternatives. These visual resource CMAs and the restrictions and protective

measures of the land designations provide a framework of guidelines and specifications

through which visual impacts would be avoided where possible, minimized, and/or

mitigated to the extent practicable.

Under Alternative 4, Trail Management Corridors would be established along National

Scenic and Historic Trails, at a width of generally 1 mile from the centerline of the trail, for

a total width of 2 miles (as compared to a much larger total width of 10 miles under the

Preferred Alternative). As discussed in Volume II, Volume II, Section II.3.2.2.2, these Trail

Management Corridors would be managed as components of the BLM’s NLCS. Where

National Trails overlap other NLCS lands, the more protective CMAs or land use allocations

would apply. All Trail Management Corridors would be designated as VRM Class II, except

within approved transmission corridors (VRM Class III) and DFAs (VRM Class IV). How-

ever, state-of-the-art VRM BMPs for renewable energy would be employed commensurate

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-118 August 2014

with the protection of nationally significant scenic resources and cultural landscapes to

minimize the level of intrusion and protect trail settings.

The following summarizes the key points of the impacts of changes to BLM land designa-

tions on visual resource elements under Alternative 4 (see Appendix R2, Table R2.20-23 for

detailed, quantitative data and analysis):

SRMAs: There would be the potential for recreational activities or facilities allowed

in SRMAs to affect scenic values, particularly those of the VRI Class I and II lands

with which they coincide (approximately 310,000 acres, similar to the area under

the Preferred Alternative).

NLCS: The management of these lands that have nationally significant ecological,

cultural and scientific values would offer additional protection of intactness and

scenic quality, particularly to the VRI Class I, II, III, and IV lands with which they

coincide (approximately 2.7 million acres, compared with a larger area of 3.6 million

acres under the Preferred Alternative).

ACECs: The special management measures given to protect the important historic,

cultural, and scenic values of these areas would generally benefit visual resources,

particularly the VRI Class II, III, and IV lands with which they coincide (approxi-

mately 1.6 million acres, compared with a smaller amount of 1.4 million acres under

the Preferred Alternative).

Wildlife Allocation Areas: The management of these areas must be compatible

with protection and enhancement of wildlife and plant habitat and would generally

benefit visual resources, particularly the VRI Class III and IV lands with which they

coincide (approximately 267,000 acres, compared with a smaller amount of 18,000

acres under the Preferred Alternative).

Lands Managed for Wilderness Characteristics: These lands would be managed

as VRM Class II. Other management strategies to protect the wilderness character-

istics of these lands would benefit visual resources, particularly the VRI Class II, III,

and IV lands with which they coincide (approximately 255,000 acres under

Alternative 4, compared with a much smaller area of 18,000 acres under the

Preferred Alternative).

Trail Management Corridors: The primary effect of the 2-mile-wide corridors

under Alternative 4 would be to provide a consistent framework for protecting and

managing scenic values along National Scenic Trails within National and California

State park lands. As with the Preferred Alternative, the Trail Management Corridors

would be managed to meet the visual management objectives of VRM Class II.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-119 August 2014

Alternative 4 would assign VRM classes to all BLM lands within the Plan Area. Under Alter-

native 4, VRI Class lands within the proposed VRM Classes on BLM LUPA lands would be as

indicated in Table IV.20-12.

The following summarizes the key points of the effects of VRM classifications on VRI lands

under Alternative 4:

VRM designations: The majority of lands would be designated as VRM Class I, II, or

III, and 11% would be designated as VRM Class IV.

VRI Class I: As with the Preferred Alternative, 100% of VRI Class I lands would be

managed as VRM Class I, reflecting the highest level of management and visual

resource protection.

VRI Class II: As with the Preferred Alternative, more than 70% of VRI Class II lands

would be managed as VRM Class II or I, reflecting a moderately high level of manage-

ment protection. Approximately 29% would be managed as VRM Class III or IV, which

allows for more visual contrast and impact than the VRM Class II objectives allow.

VRI Class III: Approximately 89% of VRI Class III lands would be managed as VRM

Class III, II, or I, reflecting a high correlation and level of management protection.

Approximately 25% would be managed to meet VRM Class II objectives, which

restrict visual contrast and impact more than VRM Class III does. Approximately

10% would be managed as VRM Class IV, which allows for more visual contrast and

impact than the VRM Class III objectives.

VRI Class IV: More than 58% of VRI Class IV lands would be managed as VRM Class

III, II, or I; 42% would be VRM Class IV.

Compared to the Preferred Alternative, Alternative 4 would result in a similar level of

correlation between VRI values and the proposed VRM Classes. An exception to this is the

management of VRI Class III lands. A higher percentage of these areas would be managed

as VRM Class III, II, or I under Alternative 4 than under the Preferred Alternative. The desig-

nation of VRM Classes throughout the CDCA would have the value of providing the level of

visual change allowed prior to an area being considered for actions that would introduce

change. Currently, VRM Classes are designated only for the Bishop Field Office and the

Imperial Sand Dunes RAMP.

Under the proposed CMAs, all DFAs would be managed as VRM Class IV lands, to allow for

utility-scale development. In those cases, implementation or incorporation of BMPs

would still be required to reduce the visual contrast levels of proposed facilities to the

extent practicable.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-120 August 2014

Table IV.20-12

VRI Classes Within Proposed VRM Classes on BLM LUPA Lands – Alternative 4

LUPA-Proposed VRM Class

Designations

Existing Visual Resource Inventory Classes

Total

VRI Class I VRI Class II VRI Class III VRI Class IV

Acres Percent Acres Percent Acres Percent Acres Percent

VRM Class I 3,842,000 100% 6,000 0% 3,000 0% 1,000 0% 3,852,000

VRM Class II — 0% 1,532,000 71% 696,000 25% 272,000 14% 2,500,000

VRM Class III — 0% 534,000 25% 1,775,000 64% 867,000 44% 3,176,000

VRM Class IV — 0% 87,000 4% 286,000 10% 837,000 42% 1,210,000

Total 3,842,000 100% 2,159,000 100% 2,760,000 100% 1,977,000 100% 10,738,000

Note: VRI Class I represents the highest level of inventoried visual resource values; VRM Class I represents the most restrictive visual management objectives. Acres above include CDCA outside the Plan Area. The following general rounding rules were applied to calculated values: values greater than 1,000 were rounded to nearest 1,000; values less than 1,000 and greater than 100 were rounded to the nearest 100; values of 100 or less were rounded to the nearest 10, and therefore totals may not sum due to rounding. In cases where subtotals are provided, the subtotals and the totals are individually rounded. The totals are not a sum of the rounded subtotals; therefore the subtotals may not sum to the total within the table.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-121 August 2014

IV.20.3.6.3 Impacts of Natural Community Conservation Plan: Alternative 4

The impacts of the NCCP for Alternative 4 would be the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis.

IV.20.3.6.4 Impacts of General Conservation Plan: Alternative 4

The impacts of the GCP for Alternative 4 would be similar to those defined in Section

IV.20.3.2.1 for the Plan-wide analysis, but they would occur on nonfederal lands only.

IV.20.3.6.5 Impacts Outside the Plan Area

IV.20.3.6.5.1 Impacts of Transmission Outside the Plan Area

The impacts of transmission outside the Plan Area would be the same under all

alternatives. These are as described for the No Action Alternative in Section IV.20.3.1.5.1.

IV.20.3.6.5.2 Impacts of BLM LUPA Decisions Outside the Plan Area

Under the proposed BLM LUPA, the changes outside the Plan Area would include the desig-

nation of NLCS lands, ACECs, National Scenic and Historic Trails Management Corridors,

VRM Classes, and new land allocations to replace multiple-use classes on CDCA lands.

The VRM Classes and other BLM land designations proposed under Alternative 4 would

extend protective measures to these areas that would avoid or reduce visual impacts. CMAs

for visual resources would be established and implemented. The BLM-specific CMAs for

Alternative 4 would be the same as for all action alternatives. These VRM CMAs and the

restrictions and protective measures of the land designations provide a framework of guide-

lines and specifications through which visual impacts would be avoided where possible,

minimized, and/or mitigated to the extent practicable.

The following summarizes the key points of the impacts of changes to BLM land designations

on visual resource elements, outside the Plan Area, under Alternative 4 (see Appendix R2,

Table R2.20-24 for detailed, quantitative data and analysis):

Proposed NLCS: The management of these lands that have nationally significant

ecological, cultural, and scientific values would offer additional protection of intact-

ness and scenic quality, particularly the VRM Class II, III, and IV lands with which

they coincide (approximately 162,000 acres, compared with a larger area of

215,000 acres under the Preferred Alternative).

Existing and Proposed ACECs: The special management measures given to protect

the important historic, cultural, and scenic values of these areas would generally

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-122 August 2014

benefit visual resources, particularly the VRM Class II, III, and IV lands with which

they coincide (approximately 203,000 acres, compared to a similar amount of

207,000 acres under the Preferred Alternative).

Trail Management Corridors: The primary effect of these 2-mile-wide corridors

under Alternative 4 would be to provide a consistent framework for protecting and

managing scenic values along National Scenic Trails within National and California

State park lands. As with the Preferred Alternative, the Trail Management Corridors

would be managed to meet the visual management objectives of VRM Class II.

IV.20.3.6.6 CEQA Significance Determination for Alternative 4

The significance determinations for short-term and long-term impacts are described in Sec-

tion IV.20.3.1.1.1 for the No Action Alternative. Section IV.20.1.2 identifies four criteria to

apply when determining if there are significant impacts from a project under CEQA. These

criteria are included as part of the more general impacts identified in this section as VR-1

and VR-2. The visual impacts and their associated significance determinations for Alterna-

tive 4 are as follows:

VR-1: Visibility of activities, materials, equipment, dust, and construction night

lighting would result in short-term diminished scenic quality. Activities and

equipment visible from residences, public roads, and public preserves would result in

short-term diminished scenic quality for viewers. This would be less than significant with

implementation of appropriate CMAs.

VR-2: The presence of plan components would create long-term visual contrast with

surrounding undeveloped land and result in long-term diminished scenic quality.

Long-term impacts to visual resources for Alternative 4 would be significant and unavoid-

able, as described in detail for the No Action Alternative (Section IV.20.3.1.6). Impacts

would be significant because of the changes in line, form, and color introduced by large-

scale development and the contrast of any such development with surrounding conditions.

Although the CMAs relevant to Alternative 4 would reduce the impact on visual resources,

they would not reduce it to a less than significant level.

IV.20.3.6.7 Comparison of Alternative 4 with Preferred Alternative

Chapter IV.27 presents a comparison of all action alternatives and the No Action Alterna-

tive across all disciplines. This section summarizes the comparison of Alternative 4 with

the Preferred Alternative.

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-123 August 2014

IV.20.3.6.7.1 Alternative 4 Compared with Preferred Alternative for Plan-wide DRECP

Although similar visual impacts would occur under both Alternative 4 and the Preferred

Alternative, based on the assumption that California’s renewable energy goals would be

achieved in any case, the impacts would vary in key ways:

Geographic Distribution. As with the Preferred Alternative, visual impacts of DFAs under

Alternative 4 would be concentrated in areas considered less environmentally sensitive.

DFAs under Alternative 4 would be geographically dispersed on public and private lands

with an assumption of somewhat more solar and less wind project development than the

Preferred Alternative. Solar energy development would be concentrated in one ecoregion

subarea, the Cadiz Valley and Chocolate Mountains, as opposed to two under the Preferred

Alternative; and there would be less development overall in the Imperial Borrego Valley

ecoregion subarea.

The severity of visual impacts depends partly on the number of potential viewers. Alterna-

tive 4 has DFAs similar to the Preferred Alternative in and near the populated West Mojave

area. Alternative 4 also includes DFAs similar to those of the Preferred Alternative in the

areas surrounding Victorville, Adelanto, and Lucerne Valley.

The severity of visual impacts also relates to expectations of viewers seeking pristine

desert vistas. The eastern and northeastern parts of the Plan Area are sensitive because

they contain the Mojave National Preserve, Death Valley National Monument, and several

BLM Wilderness Areas. Alternative 4 includes the Pahrump Valley DFA, but not the SAA

and FAA that are near the Mojave National Preserve. Both the Preferred Alternative and

Alternative 4 have a large DFA in the East Riverside area (close to Joshua Tree National

Park and BLM Wilderness Areas). Alternative 4 also includes DRECP Variance Lands, pri-

marily in the eastern part of the Plan Area.

Extent of Potential Renewable Energy Development. Although the geographic distribu-

tion of DFAs would be generally similar under both Alternative 4 and the Preferred Alter-

native, the scale and extent of the DFAs vary. DFAs are approximately 400,000 larger under

the Preferred Alternative (2,024,000 acres of DFAs) than under Alternative 4 (1,608,000

acres of DFAs). This smaller area within which development could occur would result in

fewer areas potentially subject to visual impacts under Alternative 4 than under the Pre-

ferred Alternative.

Conservation. Alternative 4 has a similar amount of land in the reserve design as the

Preferred Alternative, and more land identified in CPAs. Thus, Alternative 4 would

potentially provide similar amounts of land in conservation as the Preferred Alternative,

lands in which scenic values would benefit from the management and restrictions that

Draft DRECP and EIR/EIS CHAPTER IV.20 VISUAL RESOURCES

Vol. IV of VI IV.20-124 August 2014

would apply to those conserved areas. An exception is that Alternative 4 would provide

less than one-third the amount of land in Trail Management Corridors as compared with

the Preferred Alternative.

In summary, the composition and structure of Alternative 4 would provide similar oppor-

tunities for the avoidance of, and compensation for, visual impacts from renewable energy

development but would result in greater impacts from transmission corridors compared

with the Preferred Alternative.

IV.20.3.6.7.2 Alternative 4 Compared with Preferred Alternative for the BLM Land

Use Plan Amendment

The BLM LUPA under Alternative 4 would assign VRM Classes to all BLM lands within the

CDCA, including those outside the Plan Area, as would the Preferred Alternative. For both

alternatives, this would provide a unifying framework and an established system for

addressing visual resources.

Alternative 4 would have far fewer acres of VRI Class II and III lands in DFAs (approximately

3,200 acres) compared with the Preferred Alternative (78,000 acres). This would result in

a lower potential for visual impacts under Alternative 4 than under the Preferred Alternative.

A key difference is that Alternative 4 proposes 2-mile-wide Trail Management Corridors

compared with the much greater 10-mile-wide corridors under the Preferred Alternative.

In this regard, the scenic values and viewer experience along National Scenic Trails would

have a greater level of protection under the Preferred Alternative than under Alternative 4.

IV.20.3.6.7.3 Alternative 4 Compared with Preferred Alternative for NCCP

The impacts of the NCCP for Alternative 4 are the same as those defined in Section

IV.20.3.2.1 for the Plan-wide analysis. As a result, the comparison of Alternative 4 with the

Preferred Alternative for the NCCP is the same as described for Plan-wide DRECP.

IV.20.3.6.7.4 Alternative 4 Compared with Preferred Alternative for the GCP

The visual impacts of the GCP for Alternative 4 and the Preferred Alternative would be sim-

ilar to those defined in Section IV.20.3.2.1 for the Plan-wide analysis, but they would occur

on nonfederal lands only.