ITK Car Rental Inc.
Team Members:
Billy Lim (Project Manager)
Jane Doe (System Analyst)
Etc.
Table of Contents
• Milestone 1 ………………………..…..…………………..... p. 1
– Project Charter ………..……………………………….….. p. x– Stakeholder Analysis ……………...……………………... p. x– Summary List of Essential Use Cases …………………. p. x– Use Cases and Preliminary User Interfaces
• Logon …………………………………………………... p. x• Etc.
– Work Breakdown Structure ………………………………. p. x– Project Schedule/Timeline ….……………………………. p. x– Project Risk and Feasibility ………………………………. p. x– Environment ………………….……………………………. p. x
• Milestone 2 …
Milestone 1
Project Charter
• Need
• Objective
• Benefits
• System Capabilities
Stakeholder Analysis
Summary List of Use Cases
1. Log onto the System2. Remember User Signon 3. Make Vehicle Reservation4. Release Vehicle 5. Return Vehicle6. Process Customer Feedback7. Customer wants to extend rental period8. …9. Log off the System Wrong format! Instead, say:
“Adjust Rental Period”This is the right format and it is more generic (allows one to extend or cut short (with penalty perhaps) a rental)
Involves setting a cookie
1. Log onto the System
• Summary– …
• Actors
• Preconditions
• (“Sunny Day”) Descriptions
• (“Rainy Day”) Exceptions
• Postconditions
User Interface for “Log onto the System”
ITK
Logon
2. Remember User Signon
• Summary– …
• Actors
• Preconditions
• (“Sunny Day”) Descriptions
• (“Rainy Day”) Exceptions
• Postconditions
User Interface for “Remember User Signon”
ITK
If checked,cookie is set on this machine.
Work Breakdown Structure
• Refer to Figure 3-10
Project Schedule/Timeline
• Tasks with timeline
Project Risk and Feasibility
• Address all the risk and feasibilities issues – Risk to project– Feasibilities
• Organizational and Cultural • Technological • Schedule• Resource• Economic
Environment
• Tools
• Technologies