Federal Energy Regulatory Commission Item No. C- 7 Item No. C- 7 Continuing Progress Continuing Progress of LNG Terminals in of LNG Terminals in the Gulf Coast the Gulf Coast Region Region June 15, 2005

Upload: dyami

Post on 11-Jan-2016

21 views

Category:

Documents


0 download

DESCRIPTION

Item No. C- 7. Continuing Progress of LNG Terminals in the Gulf Coast Region. June 15, 2005. Item No. C- 7 Vista del Sol LNG. Vista del Sol LNG Terminal LP Docket No. CP04-395-000 Vista del Sol Pipeline LP Docket Nos. CP04-405-000, CP04-406-000 & CP04-407-000. Vista del Sol Project. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Item  No. C- 7

Federal Energy Regulatory Commission

Item No. C- 7Item No. C- 7

Continuing Progress of Continuing Progress of LNG Terminals in the LNG Terminals in the

Gulf Coast RegionGulf Coast Region

June 15, 2005

Page 2: Item  No. C- 7

Federal Energy Regulatory Commission

Item No. C- 7 Vista del Sol LNG

Vista del Sol LNG Terminal LPDocket No. CP04-395-000

Vista del Sol Pipeline LPDocket Nos. CP04-405-000, CP04-406-000 & CP04-407-000

Vista del Sol Project

Page 3: Item  No. C- 7

Item No. C- 7 - TerminalItem No. C- 7 - Terminal

Vista del Sol LNGVista del Sol LNG

Section 3 AuthorizationSection 3 Authorization• Marine TerminalMarine Terminal• Three Storage TanksThree Storage Tanks• 1.1 Bcf/day of Vaporization 1.1 Bcf/day of Vaporization

and send-out capacityand send-out capacity

Page 4: Item  No. C- 7

Item No. C- 7 - PipelineItem No. C- 7 - Pipeline

Vista del Sol PipelineVista del Sol Pipeline

Section 7 AuthorizationSection 7 Authorization• 25 miles; 36-inch Diameter25 miles; 36-inch Diameter• Up to 8 interconnects with intra and Up to 8 interconnects with intra and

interstate pipelinesinterstate pipelines• 1.4 Bcf/day Mainline Capacity1.4 Bcf/day Mainline Capacity

Page 5: Item  No. C- 7

Federal Energy Regulatory Commission

Page 6: Item  No. C- 7

Federal Energy Regulatory Commission

Corpus Christi, TX

Vista Del Sol

Ingleside LNG

Lake Charles, LA

Port Pelican

Pearl Crossing

Beacon Port

Freeport, TX

Golden Pass, TX

Port Lavaca, TX

Port Arthur

Sabine Pass, LA

Energy Bridge

Gulf Coast LNG Terminals

Freeport McMoran

Cameron

Gulf Landing

Compass Pass

Legend:

Existing Terminal

Approved Terminal

Proposed Terminal: Pre-Filing

Proposed Terminal: Filed

Working on DEIS

Working on FEIS

Planned Terminal

Galveston, TX

Pascagoula, MS

Creole Trail

Page 7: Item  No. C- 7

Federal Energy Regulatory Commission

Lake Charles, LA

Energy Bridge

Gulf Coast LNG TerminalsLegend:

Existing Terminal

Approved Terminal

Proposed Terminal: Pre-Filing

Proposed Terminal: Filed

Working on DEIS

Working on FEIS

Planned Terminal

Page 8: Item  No. C- 7

Federal Energy Regulatory Commission

Cheniere Corpus Christi

Vista del Sol

Lake Charles, LA

Port Pelican

Freeport, TX

Sabine Pass, LA

Gulf Coast LNG Terminals

Cameron

Gulf Landing

Legend:

Existing Terminal

Approved Terminal

Proposed Terminal: Pre-Filing

Proposed Terminal: Filed

Working on DEIS

Working on FEIS

Planned Terminal

Page 9: Item  No. C- 7

Federal Energy Regulatory Commission

Ingleside LNG

Pearl Crossing

Beacon Port

Golden Pass, TX

Port Lavaca, TX

Port Arthur

Gulf Coast LNG Terminals

Freeport McMoran

Compass Pass

Legend:

Existing Terminal

Approved Terminal

Proposed Terminal: Pre-Filing

Proposed Terminal: Filed

Working on DEIS

Working on FEIS

Planned Terminal

Pascagoula, MS

Creole Trail

Page 10: Item  No. C- 7

Federal Energy Regulatory Commission

Freeport, TX

Gulf Coast LNG TerminalsLegend:

Existing Terminal

Approved Terminal

Proposed Terminal: Pre-Filing

Proposed Terminal: Filed

Working on DEIS

Working on FEIS

Planned Terminal

Galveston, TX

Page 11: Item  No. C- 7

TeamTeam

Pamela Romano – OEPPamela Romano – OEP

James Martin – OEP James Martin – OEP

Frank Sparber – OMTRFrank Sparber – OMTR

Lori Tsang – OGCLori Tsang – OGC

Page 12: Item  No. C- 7

Questions?Questions?