1
It Takes a Team to Build a Dam
Dan WadeThe “Dam” Expert & Program Manager
Chris KernThe CEQA Master
Debbie Craven‐GreenThe Permitting Wiz
Cullen WilkersonProtector of the Environment
During Construction
Nicole SandkullaThe Stakeholder
![Page 2: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/2.jpg)
PALO ALTO
SAN MATEO
HAYWARD
SAN JOSE
Calaveras DamLower CrystalSprings Dam
Major Construction Needed on Two Dams to Restore Capacity
2
![Page 3: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/3.jpg)
WATER SYSTEM IMPROVEMENT PROGRAM
Daniel L. Wade, WSIP Director
![Page 4: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/4.jpg)
HETCH HETCHY REGIONAL WATER SYSTEMCROSSES 3 MAJOR EARTHQUAKE FAULTS
4
![Page 5: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/5.jpg)
• 87 Projects2 dams3 tunnels3 treatment facilitiesPipelines, pump stations, reservoirs, tanks, etc.Bioregional Habitat Restoration (BHR) Sites
• 7 Counties• $4.8 Billion• 2019 Completion
WATER SYSTEMIMPROVEMENT PROGRAM
5
![Page 6: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/6.jpg)
A (VERY) PUBLIC PROGRAM
With Many Stakeholders
Governmental/Regulatory Agencies
Special Interest Groups
Elected Officials
Impacted Communities
Oversight Bodies
Labor/Contractor
Wholesale/Retail Customers
6
![Page 7: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/7.jpg)
ENVIRONMENTALSTRATEGY• Commitment and stewardship
• Pre‐ConstructionAvoidance of ImpactsMinimization of ImpactsMitigation of Impacts
• ConstructionBMPsTrainingMonitoring / Reporting
• OperationsAdaptive Management
7
![Page 8: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/8.jpg)
• Constructed in 1890• Forms Lower Crystal Springs Reservoir• Maximum Capacity: 22.15 Billion Gallons• Current Capacity: 18.5 Billion Gallons
Lower Crystal Springs Dam
8
![Page 9: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/9.jpg)
Existing Dam Configuration
Parapet Wall
Spillway
Stilling Basin
9
![Page 10: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/10.jpg)
Dam ImprovementsRetrofittedParapet Wall
New Spillway
New Stilling Basin
10
![Page 11: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/11.jpg)
•11
LCSD ‐ New Spillway
1925 Completion
![Page 12: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/12.jpg)
•12
LCSD ‐ New Stilling Basin
1925 Completion
![Page 13: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/13.jpg)
•13
Calaveras Dam
1925 Completion
1918 Dam Failure
1918 Dam Almost Completed
![Page 14: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/14.jpg)
Left Abutment (Observation Hill)
Stilling Basin
Existing Dam (Cofferdam)
Disposal Site
Upper Spillway Chute
Lower Spillway Chute
New Dam Axis
Right Abutment
Calaveras Dam Replacement
14
![Page 15: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/15.jpg)
SCOPE OF WORK
• Replacement Dam• Spillway• Stilling Basin• Intake/Outlet Works• Borrow Areas• Disposal Sites• Haul Road• Staging Areas• Fish Passage• Habitat Restoration
15
![Page 16: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/16.jpg)
CROSS SECTION OF REPLACEMENT DAM
• Zoned Earth and Rock‐Filled Dam• 220 feet high & 1200 feet in length• 80 feet wide at crest and 1200 feet wide at base
16
![Page 17: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/17.jpg)
Calaveras Dam Replacement
17
Start of Embankment Dam Construction
![Page 18: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/18.jpg)
PROTECTION OF SPECIAL STATUS SPECIES
18
![Page 19: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/19.jpg)
Upper Alameda Creek
Lower Alameda Creek
19
![Page 20: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/20.jpg)
20
![Page 21: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/21.jpg)
Alameda Creek Diversion Dam in Operation –December 1931
21
![Page 22: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/22.jpg)
FISH PASSAGE FACILITIES AT ALAMEDA CREEKDIVERSION DAM
ACDT Inlet22
![Page 23: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/23.jpg)
CONSTRUCTION – JUNE 2016Fish Passage Facilities at Alameda
Creek Diversion Dam
23
![Page 24: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/24.jpg)
What We Learned
24
![Page 25: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/25.jpg)
Visionary Leadership
25
![Page 26: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/26.jpg)
Lead up, Down, and Sideways
26
![Page 27: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/27.jpg)
One Team Culture
27
![Page 28: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/28.jpg)
Trust the Team
28
![Page 29: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/29.jpg)
Consistency and Resiliency
29
![Page 30: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/30.jpg)
Transparency & Accountability
30
![Page 31: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/31.jpg)
Communications
31
![Page 32: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/32.jpg)
CEQA Timeline
• Project Initiation and ScopingFall 2005
• Technical Studies & Draft EIR Preparation2006 – 2009
• Public Review and Response to Comments2010 – 2011
• Final EIR Certification January 2011
32
![Page 33: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/33.jpg)
Project EIR + Program EIR• Water System Improvement Program EIR• 38 project level EIRs
33
![Page 34: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/34.jpg)
Habitats
• Study area 1,900 acres• Wetlands 34 acres• Streams 14.3 miles• Open Water (Reservoir) 1,012 acres• Grasslands 863 acres• Oak woodlands 327 acres• Scrub 79 acres• Riparian forest 38 acres
34
![Page 35: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/35.jpg)
Special‐Status Species• Callippe SilverspotButterfly
• California Red‐Legged Frog
• California Tiger Salamander
• Foothill Yellow‐Legged Frog
• Alameda Whipsnake• Bald Eagle• Berkeley Kangaroo Rat• Western Pond Turtle
• Raptors• Loggerhead Shrike• Grasshopper Sparrow• Tricolored Blackbird• American Badger• Townsend’s Big‐Eared Bat
• Pallid Bat• Western Mastiff Bat
35
![Page 36: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/36.jpg)
Naturally Occurring Asbestos
• Excavation and handling of 4 million cubic yards of NOA containing material
• Worker safety• East Bay Regional Parks employees• Park visitors• Dust control• Monitoring and Reporting• Shutdown conditions• Appeal filed by East Bay Regional Parks
36
![Page 37: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/37.jpg)
Project Changes DEIR to FEIR
• Changes to instream flow schedules for Steelhead
• Fish ladder added at Alameda Creek diversion dam
• Fish screens added at Alameda Creek diversion tunnel and Calaveras dam adits
• Adaptive management plan for Steelhead added
• Spillway grade control structures added
• Intake tower modifications• Additional instrumentation• Electrical distribution line
upgrade added• Right dam abutment
excavation expanded• Borrow area E modified• West haul road work area
modified
37
![Page 38: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/38.jpg)
Permitting CDRP & LCSD
38
![Page 39: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/39.jpg)
39
![Page 40: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/40.jpg)
SFPUC
40
![Page 41: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/41.jpg)
41
![Page 42: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/42.jpg)
42
![Page 43: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/43.jpg)
CDRP Spoils Disposal
43
![Page 44: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/44.jpg)
LCSD Fountain Thistle
44
![Page 45: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/45.jpg)
Ecosystem Level Mitigation
45
![Page 46: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/46.jpg)
Mitigation for Permitted Impacts
46
![Page 47: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/47.jpg)
47
Bioregional Habitat Restoration (BHR)
![Page 48: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/48.jpg)
48
![Page 49: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/49.jpg)
49
![Page 50: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/50.jpg)
5050
Environmental Construction Compliance
Paleontologists at work recovering a whale vertebrate
![Page 51: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/51.jpg)
What’s Wrong with this Picture?
51
![Page 52: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/52.jpg)
And this One?
52
![Page 53: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/53.jpg)
SFPUC is Committed to Compliance• Agency Mission Manage the resources—human, physical, and
natural—entrusted to its care• CEQA/NEPA mitigation measures, permit conditions, and Standard Construction Measures
• Avoid:
53
![Page 54: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/54.jpg)
Water System Improvement Program (WSIP)TYPICAL CM ORGANIZATION
PROGRAM LEVEL(SFPUC Headquarters)
REGIONAL LEVEL(Regional Office)
PROJECT LEVEL(Project Office)
WSIP Director
Deputy Director of Construction
Regional PM
QA Inspector
Cost/Schedule Engineer
Field Engineer
Program Controls Manager
QAManager
Contracts Manager
ConstructionControls Mgr
Regional CM
Contract Field Administrator
Last Revised by GBL on 10/3/07
Legend SFPUC PCM Consultant RCM Consultant BEM Consultant
PLA Administrator
Administrative Assistant
Assistant Regional PM
Public Outreach Liaison
Client/Operations Representative
CM Operations Coordinator Program CM
Shutdown Coordinator
DGM
AGM Infrastructure
BEM Manager
Environmental Construction
Compliance Mgr
Project CM
Project Engineer Test & Start-Up Engineer
Lead QA Inspector
Office Engineer
Environmental Project Manager
WSIP Construction Oversight Committee
Regional PE
Safety Manager
NOTE: This is a “typical” organizational chart for larger WSIP projects. CM positions shown may differ for some projects. Smaller WSIP projects may include a greater number of SFPUC CM staff.
Cost Estimators
Regional Environmental
Compliance Mgr
Office Clerk
Environmental Inspector
Environmental Specialist
Regional Env. Coordinator
Regional EPM
SFPUC WSIP Org ChartEnvironmental Construction Compliance Integrated in All Project Phases
54
![Page 55: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/55.jpg)
Construction Management Plan and Procedures
55
![Page 56: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/56.jpg)
Water System Improvement Program (WSIP)TYPICAL CM ORGANIZATION
PROGRAM LEVEL(SFPUC Headquarters)
REGIONAL LEVEL(Regional Office)
PROJECT LEVEL(Project Office)
WSIP Director
Deputy Director of Construction
Regional PM
QA Inspector
Cost/Schedule Engineer
Field Engineer
Program Controls Manager
QAManager
Contracts Manager
ConstructionControls Mgr
Regional CM
Contract Field Administrator
Last Revised by GBL on 10/3/07
Legend SFPUC PCM Consultant RCM Consultant BEM Consultant
PLA Administrator
Administrative Assistant
Assistant Regional PM
Public Outreach Liaison
Client/Operations Representative
CM Operations Coordinator Program CM
Shutdown Coordinator
DGM
AGM Infrastructure
BEM Manager
Environmental Construction
Compliance Mgr
Project CM
Project Engineer Test & Start-Up Engineer
Lead QA Inspector
Office Engineer
Environmental Project Manager
WSIP Construction Oversight Committee
Regional PE
Safety Manager
NOTE: This is a “typical” organizational chart for larger WSIP projects. CM positions shown may differ for some projects. Smaller WSIP projects may include a greater number of SFPUC CM staff.
Cost Estimators
Regional Environmental
Compliance Mgr
Office Clerk
Environmental Inspector
Environmental Specialist
Regional Env. Coordinator
Regional EPM
WSIP Typical Construction Management Organization
56
![Page 57: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/57.jpg)
Regular Field Meetings
57
![Page 58: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/58.jpg)
• TrainingTraining
58
![Page 59: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/59.jpg)
Compliance Protocols and Methods• Environmental Inspector manual• Checklists and tracking tables• Non‐compliance resolution process• Minor project changes process
59
![Page 60: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/60.jpg)
Managing Migratory Birds
60
![Page 61: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/61.jpg)
Handling Paleontological Discoveries• Carcharodon megalodon or Carcharocles megalodon related to modern great white shark reached lengths greater than 52 feet
61
![Page 62: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/62.jpg)
Maintaining Creek Flow Simultaneous with Dewatering
62
![Page 63: It Takes a Team to Build a Damcalifaep.org/docs/AEP_Conf_2017_It_Takes_a_Team_to_Build...1 It Takes a Team to Build a Dam Dan Wade The “Dam” Expert & Program Manager Chris Kern](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fc953e50b448c1efd1caf74/html5/thumbnails/63.jpg)
12 years of WSIP construction with• No violations• Few incidents of listed species take• Strong relationships with resource agenciesSelf‐reporting encourages trust
• Effective handling of discoveries• Meeting project schedules
Benefits of Commitment to Compliance
63