Issues/Concerns/SuccessesGeorgia Environmental
Protection Division
June 20, 2007
Amy Potter Unit Coordinator
DoD Remediation Unit
![Page 2: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/2.jpg)
Marine Corps Logistics Base
Dobbins Air Reserve BaseLockheed Martin Air Force Plant No. 6
Fort Gillem & Fort McPherson Fort Gordon
Moody Air Force Base
Fort Benning
Robins Air Force Base
Naval Submarine Base - Kings Bay
Fort Stewart
Hunter Army Airfield
www.gaepd.orgwww.gaepd.org
Military Presence Military Presence in thein the
State of GeorgiaState of Georgia
![Page 3: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/3.jpg)
Issue #1:
BRAC 2005
![Page 4: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/4.jpg)
Marine Corps Logistics Base
Dobbins Air Reserve Base
Moody Air Force Base
Fort Benning
Robins Air Force Base
Naval Submarine Base - Kings Bay
Savannah International Airport Air Guard Station
Gaining InstallationsGaining InstallationsBRAC 2005BRAC 2005
![Page 5: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/5.jpg)
Fort GillemFort McPhersonNaval Air StationPeachtree Leases
U.S. Army Reserve Center Columbus
Closing Closing InstallationsInstallationsBRAC 2005BRAC 2005
Marine CorpsInspector/Instructor Naval Supply Corps
School Athens
![Page 6: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/6.jpg)
• Of the seven closing installations, no substantive environmental restoration oversight is anticipated at five: Marine Corps Inspector/Instructor, Naval Supply Corps School Athens, Naval Air Station, Peachtree Leases and
U.S. Army Reserve Center Columbus.
What is the Impact of BRAC 2005 on Georgia’s
DSMOA Program?
![Page 7: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/7.jpg)
• Of the seven closing installations, only two require substantive environmental
restoration oversight by Georgia:Fort Gillem and Fort McPherson.
What is the Impact of BRAC 2005 on Georgia’s
DSMOA Program?
![Page 8: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/8.jpg)
Fort Gillem• Reviewed
Environmental Condition of Property
• Land Reuse Plan has been approved
•Completing Delineation in Several Areas
•Working with Army to get Acceptable Background
•Finding and closing out old USTs
![Page 9: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/9.jpg)
Fort McPherson • Completing delineation especially at pesticide mixing areas & ranges
• Finding and closing out old USTs
•Completing remediation of old USTs
•Land reuse plan has not yet been approved
•ECP has been completed and reviewed
![Page 10: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/10.jpg)
Issue/Concern #2: MNAConcern that MNA is being applied as a sole
remedy where is not effective or appropriate because:
• Timeframe to clean up is too long; or • Concentrations of contaminants are too high;
or• Microbes that destroy contaminants are not
present; or• No sampling has begun to provide lines of
evidence.
![Page 11: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/11.jpg)
MNA (continued)• MNA is being applied without considering more
active remedial strategies that will clean the site up faster or cost less money.Example: AF project: resulted in cost savings of millions that could be applied to more contaminated areas.
• Several installations have determined that MNA is ineffective, & are accelerating the process by adding nutrients or microbes to speed up the process. Example: Army project: UST site where actual reductions were less than anticipated. Added ORC to groundwater to reduce clean up time.
![Page 12: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/12.jpg)
Issue/Concern #3: FUDS
• 228 FUDS identified in GA; Approximately 5 per year are investigated
• It all comes down to $$
• Priority – Have no idea what actual dangers/contaminants are present until site is investigated.
• Limited sampling conducted.
![Page 13: Issues/Concerns/Successes Georgia Environmental Protection Division June 20, 2007 Amy Potter Unit Coordinator DoD Remediation Unit](https://reader036.vdocuments.us/reader036/viewer/2022062718/56649eac5503460f94bb2fde/html5/thumbnails/13.jpg)
Success Story @ Camp Wheeler
338 60mm mortar rounds and 10 grenade fuses found and destroyed
. . . But there is still work to do.