Isolde new vistar and Isolde beam interlocks
OP DAYS 2009
Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB
![Page 2: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/2.jpg)
25/02/2009 Emiliano Piselli 2
Outline
ISOLDEWhere? What?Isolde Beam
VistarDisplay infosVISTAR... FDF (Fixed Display Framework)
Interlocks system
Configuration GUI
Conclusions
![Page 3: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/3.jpg)
25/02/2009 Emiliano Piselli 3
ISOLDE
![Page 4: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/4.jpg)
25/02/2009 Emiliano Piselli 4
On-Line Isotope Mass Separator
Fragmentation
Fission
Spallation
1.4GeV p
ISOLDE
Cortesy E. Siesling
![Page 5: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/5.jpg)
25/02/2009 Emiliano Piselli
Cortesy E. Siesling
ISOLDE
5
On-Line Isotope Mass Separator
![Page 6: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/6.jpg)
25/02/2009 Emiliano Piselli 6
PSB layout
ISOLDE
![Page 7: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/7.jpg)
25/02/2009 Emiliano Piselli 7
ISOLDE
GPS...General Purpose Separator
HRS...High Resolution Separator
![Page 8: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/8.jpg)
25/02/2009 Emiliano Piselli 88
Isolde layout
Cortesy E. Siesling
GPS targetHRS target BTY line
from PSB
ISOLDE
![Page 9: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/9.jpg)
25/02/2009 Emiliano Piselli 9
HRS GPS Protons
Isolde layout
Physics!
ISOLDE
Cortesy E. Siesling
![Page 10: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/10.jpg)
25/02/2009 Emiliano Piselli 10
Target
ISOLDE
Cortesy E. Siesling
![Page 11: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/11.jpg)
25/02/2009 Emiliano Piselli 11
Secondary beam
accelerated
HOR
VERT
ISOLDE
Cortesy E. Siesling
![Page 12: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/12.jpg)
25/02/2009 Emiliano Piselli 1212
Converter Target Standard
Converter
Target
Target
p+p+p+
p+p+p+
ISOLDE
Cortesy E. Siesling
![Page 13: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/13.jpg)
25/02/2009 Emiliano Piselli 13
• Standard focus
• Waist of beam at target(converter targets)
nn
n
n
Fragmentation, Spallation, Fission
Fragmentation, Spallation,
Fission
Proton beam focusing
ISOLDE
Cortesy E. Siesling
![Page 14: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/14.jpg)
25/02/2009 Emiliano Piselli 14
Focusing elementsGPS focus
HRS focus
ISOLDE
Cortesy E. Siesling
![Page 15: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/15.jpg)
25/02/2009 Emiliano Piselli 15
Focus settings
• At each target-change:Focus settings of the proton beam depend on the type of target and will be applied and verified by the ISOLDE Machine Supervisor
ISOLDE
Cortesy E. Siesling
![Page 16: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/16.jpg)
25/02/2009 Emiliano Piselli 16
Liquid metal target: Cracked container welds
Converter target: Twisted W convertor rod
Wrong Beam
ISOLDE
Cortesy E. Siesling
![Page 17: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/17.jpg)
25/02/2009 Emiliano Piselli 17
GPS steering
HRS steering
Steering elements
ISOLDE
![Page 18: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/18.jpg)
25/02/2009 Emiliano Piselli 18
Steering settings
• At each target-change:Proton Scan: Final steering of the proton beam is done by the ISOLDE Machine Supervisor
ISOLDE
Cortesy E. Siesling
![Page 19: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/19.jpg)
25/02/2009 Emiliano Piselli 19
Isolde beam
ISOLDE
• Focus settings…
• Steering settings…
• Max intensities (ppp & pps)
![Page 20: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/20.jpg)
25/02/2009 Emiliano Piselli 20
Display
informations
TARGET
BEAM
CONTACT
VISTAR
![Page 21: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/21.jpg)
25/02/2009 Emiliano Piselli 21
VISTAR
![Page 22: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/22.jpg)
25/02/2009 Emiliano Piselli 22
VISTAR
![Page 23: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/23.jpg)
25/02/2009 Emiliano Piselli 23
VISTAR
![Page 24: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/24.jpg)
25/02/2009 Emiliano Piselli 24
VISTAR
![Page 25: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/25.jpg)
25/02/2009 Emiliano Piselli
VISTARFDF (Fixed Display Framework)
Library used to create a controls & monitoring java-based fixed displays.
Multiple GUI solutions are supported:•XML definition with SwiXML (also generated) for simple layouts•Pure Java JFrames (with any Java GUI Builder) for complicated cases
It integrates multiple CERN components like AscBeans (lables, tables, etc) & JDataViewer
It integrates integrates other basic components like TimeDate & “Diode”…
Main principle used to create FDs is to define them in XML.The XML files contain a description of all the components (labels, charts, etc.) and layout of each screen.FDF architecture uses japc-monitoring
and this configuration typically contains the XML file definition of the japc parameters to be monitored.
![Page 26: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/26.jpg)
25/02/2009 Emiliano Piselli 26
VISTAR
![Page 27: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/27.jpg)
25/02/2009 Emiliano Piselli 27
<Plots><Plot id="hrs_ppp" update="HISTORY" title="HRS protons per pulse"><StyleSheets><StyleSheet> chart { legendVisible : false; legendPosition : SOUTH; }dataset[name='ppp'] { stroke : stroke(2); markerSize : 5; markerType: DIAMOND; strokeColor : #000082; } axis[axis=Y] { min: 0.0; max:4400.0; }scale[axis='Y'] { title: "ppp"; } </StyleSheet> </StyleSheets><Serie parameterId="ppp" name="Protons per pulse"maximumItemCount="1000"><YValues field="value"/></Serie></Plot>
<Plot id="hrs_curr" update="HISTORY" title="HRS protons current"><StyleSheets><StyleSheet> chart { legendVisible : false; legendPosition : SOUTH; }dataset[name='prCurr'] { stroke : stroke(2); markerSize : 5;markerType : SQUARE; strokeColor : #000082; } axis[axis=Y] { min:0.00; max: 2.20; }scale[axis='Y'] { title: "uA"; } </StyleSheet> </StyleSheets><Serie parameterId="prCurrA" name="proton current in uA"maximumItemCount="1000"><YValues field="value"/></Serie></Plot></Plots>
![Page 28: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/28.jpg)
25/02/2009 Emiliano Piselli 28
Display
informations
TARGET
BEAM
CONTACT
Interlocksystem
BEAM
Interlock system
![Page 29: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/29.jpg)
25/02/2009 Emiliano Piselli 29
Interlock system
PSB layout
Beam 2 Isolde
![Page 30: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/30.jpg)
25/02/2009 Emiliano Piselli 30
Interlock system
PSB layout
Measurement devices
![Page 31: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/31.jpg)
25/02/2009 Emiliano Piselli 31
Interlock system
PSB layout
![Page 32: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/32.jpg)
25/02/2009 Emiliano Piselli 32
Interlock system
PPS device
PPS interlock:Average1’(AQN(device))≤MAX PPS
BTY.TRA325
![Page 33: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/33.jpg)
25/02/2009 Emiliano Piselli 33
Interlock system
FOCUS devices
Focus interlock:Setting(device)-2≤ AQN(device)≤Setting(device)+2
BTY.QDE321
BTY.QFO322
![Page 34: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/34.jpg)
25/02/2009 Emiliano Piselli 34
Interlock system
Pos. devices
Position interlock:Setting(device)-1 ≤ AQN(device) ≤ Setting(device)+1
BTY.DHZ323
BTY.DVT324
![Page 35: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/35.jpg)
25/02/2009 Emiliano Piselli 35
Interlock system
Watchdog devices
BTY.TRA325
![Page 36: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/36.jpg)
25/02/2009 Emiliano Piselli 36
Interlock system
PSB layout
![Page 37: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/37.jpg)
25/02/2009 Emiliano Piselli 37
Interlock system
Watchdog devices
Watchdog interlock:BT.TRA-BTY.TRA325<300E10
BTY.TRA325
BT.TRA
Need HARDWARE interlock RESET!
![Page 38: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/38.jpg)
25/02/2009 Emiliano Piselli 38
Interlock system
PPP device
Booster ring TRANSFO
![Page 39: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/39.jpg)
25/02/2009 Emiliano Piselli 39
Interlock system
275 300 805 1200
Int.
[pp
p]
t [ms]Injection Ejection
0
I(300)
PPP interlock:I(300)≤ MAX PPS
![Page 40: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/40.jpg)
25/02/2009 Emiliano Piselli 40
Interlock system
SW RESET RF Condition OK BEAM BACK
![Page 41: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/41.jpg)
25/02/2009 Emiliano Piselli 41
Interlock system
HW Interlock HW RESET BEAM BACK
![Page 42: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/42.jpg)
25/02/2009 Emiliano Piselli 42
Configuration GUI
![Page 43: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/43.jpg)
25/02/2009 Emiliano Piselli 43
Configuration GUI
![Page 44: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/44.jpg)
25/02/2009 Emiliano Piselli 44
Configuration GUI
![Page 45: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/45.jpg)
25/02/2009 Emiliano Piselli 45
DBfixed_display
Supervisor name
Supervisor phone number
Experimental contact
Target name
Genaral comment
Configuration GUI
![Page 46: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/46.jpg)
25/02/2009 Emiliano Piselli 46
DBfixed_display
Supervisor name
Supervisor phone number
Experimental contact
Target name
Genaral comment
Configuration GUI
![Page 47: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/47.jpg)
25/02/2009 Emiliano Piselli 47
Configuration GUI
![Page 48: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/48.jpg)
25/02/2009 Emiliano Piselli 48
DBfixed_display
Beam LabelBeam typeFocusMax IntensityMax proton per pulsePos. DHZPos. DVT
Max proton per pulse
Pos. DHZ
Pos. DVT
Focus
Max Intensity
DEVICE
Configuration GUI
![Page 49: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/49.jpg)
25/02/2009 Emiliano Piselli 49
Special FOCUS disable Position and focus interlock
Configuration GUI
![Page 50: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/50.jpg)
25/02/2009 Emiliano Piselli 50
...Isolde VISTAR is CO standard and fully CO supported
...Isolde VISTAR contains many informations extremelly useful for the users and PSB team.
...Isolde Interlock system is very fast...reaction time smaller than 10ms.
Conclusions
![Page 51: Isolde new vistar and Isolde beam interlocks OP DAYS 2009 Emiliano Piselli - Jose-Luis Sanchez Alvarez BE-OP-PSB](https://reader036.vdocuments.us/reader036/viewer/2022062515/56649c8a5503460f94943edc/html5/thumbnails/51.jpg)
25/02/2009 Emiliano Piselli 51
Tim Giles (EN-STI-RBP)
Jakub Wozniak & Danilo Cimino (BE-CO-AP)
BE-OP-PSB
Thanks to...
Thanks to you for your attention...