island eastern corridor - epd
TRANSCRIPT
Project Title: Harbour Area Treatment Scheme (HATS) Stage 2A工程名稱工程名稱工程名稱工程名稱:::: 淨化海港計劃淨化海港計劃淨化海港計劃淨化海港計劃 – 第二期甲第二期甲第二期甲第二期甲
Figure 1b: Location Plan圖圖圖圖 1b:::: 位置圖位置圖位置圖位置圖
Environmental Permit No.: EP-322/2008/B環境許可證編號:EP-322/2008/B
PROPOSED BARGING POINTAT NORTH POINT
SITE PORTION NP –(TEMPORARY REQUIREMENT)- AREA ~ 4000m2
- PRODUCTION SHAFT AND WORKS SITE(WITH SURFACE EXCAVATION WORKS)
ISLAND EASTERN CORRIDOR
DROP SHAFT
PRODUCTION SHAFT
NORTH POINT PTW
PTW BOUNDARYWORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
LOCATION PLAN1:4 000 000
LOCATION PLAN1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
SITE PORTION WCE -(TEMPORARY REQUIREMENT)- AREA ~ 2600m2
- PRODUCTION SHAFT AND WORKS SITE(WITH SURFACE EXCAVATION WORKS)
WAN CHAI EAST PTWDROP / RISER SHAFT
PRODUCTION SHAFTSITE PORTION WCE -(TEMPORARY REQUIREMENT)- AREA ~ 1000m2
- WORKS AREA
SITE PORTION WCE -(TEMPORARY REQUIREMENT)- AREA ~ 1000m2
- WORKS AREA
LOCATION PLAN1:4 000 000
ISLAND EASTERN CORRIDORLOCATION PLAN1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT