islamic relief worldwide bangladeshislamicrelief.org.bd/irwtender/package 01.pdf · water...
TRANSCRIPT
Name of Vendor/ Company
i) Registered Business Address
ii) Corporate Address (if different)
Name of Proprietor/MD with Contact Number
Name of Contact Person with Contact Number
Email ID
Trade License Number and validity
VAT Registration Number
Taxpayer's Identification Number
Any Other Information
Tender No.
Name of Item with Location
Name of Package
Total Quoted Amount
Total Bid Security Amount
Pay Order Number and Date
Name of Bank
Name of Branch
Any Other Information
Signature
Designation
Date
Company Seal
ISLAMIC RELIEF WORLDWIDE BANGLADESHHouse # 10, Road #10, Block-K, Baridhara, Dhaka 1212
INDIVIDUAL SUMMARY SHEET FOR ATTENDING TENDER
Tenderer's Signature, Date & Seal
Company Information
Tender Relevant Information
I/We hereby declare that the information and documents provided along with the bid submission are true and authentic.
RFQ No: 34/2018/L & CD/SUCHANA II (Package # 01) Please complete, sign and return to PR No: 166/2018, AX 2114 Islamic Relief Worldwide BangladeshDate: May 08, 2018 Tel: 9893458, 8819392, 8859128, 8859128
To
SL Name of items Specification Unit Qty Total Price Remarks
1 Shelter RepairAs per attached BOQ and Design of
Shelter RepairNo's 150
TERMS AND CONDITIONS:
1
2
3
4
5
6 Mode of Payment: Through A/C payee cheque only in favor of the name of the organization.
7
8 Terms of Payment: Advance payment is not allowed.
9
10
11
12
13
14
15
16 All quotation should be intact at the time of submission. Please write the Package number and your company name on the envelop.
17
18 Others (if any):
Shahidul IslamSenior Procurement Officer
Islamic Relief Worldwide Bangladesh
Signature of supplier (with seal & date)
Child Protection Policy: IR reserves the right to terminate this agreement without any notice if any vendor is engaging child labour or supporting any forms of
illegal practices and child exploitation.
Anti Bribery Policy: IR follows ZERO-TOLERENCE policy for any form of bribery or corruption.
Special Condition: The authority of Islamic Relief reserves the right to accept or reject any or all of the quotations and right to stop supply at any stage of
delivery without assigning any reason whatsoever
Condition of the Items: Shelter repair must be complete as per our requirement and as our given drawing, design and specifications.
Time of Delivery: Within 180 days (Tentative) from receiving the Work Order.
VAT & IT: Supplier must provide VAT challan with the bill. Otherwise, VAT will be deducted as per Govt. rules. For IT Deduction at Source (TDS) will be
applicable as per rule.
Security Deposit : 2.5% of total quotation value should submit with the price offer by a pay order from any schedule bank in favor of Islamic Relief.
Documents: All relevant documents like Trade License, VAT, Tax etc. must be up-to-date and copy attached with your quotation.
Offer Letter: You are requested to provide a forwarding letter on your organization's letterhead pad with seal and signature from the authority with this
offer along with duly filled in Summary of Tender Submission as per attached format.
Penalty amount: A. 2% of work order amount will be deducted from your total bill amount for each and every belated day or as per IRB management decision.
B. 5% of work order amount will be deducted for any deviation with the given specification in your quotation if supply does not rectify immediately or as per
IRB management decision.
Contractor/Vendor/Supplier undertakes to comply with all applicable laws and to ensure that it does not engage in any kind of criminal activity including but
not limited to bribery, fraud, corruption, terrorism and to maintain ethical business practices as well as not to commit any Prohibited Acts defined as:-
(i) to offer, promise or give any person a financial or other advantage;
(ii) to request, agree to receive or accept any financial or other advantage.
Distribution of Works : IRB has the authority to divide the works among the qualified vendors.
AML & ATF Policy: IR will terminate this agreement without any notice if any supplier is found to be in violation of Anti Money Laundering & Anti Terrorist
Funding policy.
Place and Cost of Delivery : Including carrying, loading, unloading up to the delivery spot at household level of Mirpur 10, Mirpur 11, Mirpur 12
Quotation Submission Date: The price offer/quotation must be submitted as per our attached Bill of Quantities (BOQ) to the "Procurement Department" on
or before May 22, 2018 at 02: 00 PM (Tender Box # 01)
Grand Total =
Total Amount in words : BDT.
ISLAMIC RELIEF WORLDWIDE BANGLADESHRequest for Quotation (RFQ)
Address: HOUSE # 10, ROAD # 10, BLOCK – K,
BARIDHARA, DHAKA – 1212,
Subject: Request for Price Quotation for 150 units of Shelter Repair under L & CD Program of SUCHANA II Project at Mirpur, Dhaka.
Attention:Tel/ Fax #
Please quote for your best price for supply the following:
Page 1 of 1
SL Description of works Unit Unit PriceQuantity
(Approximate)Total Price Remarks
Viti Sand Filling: cft 5340 - First necessary works for site prepare. Supply & Fixing
Viti sand & proper compaction with water all complete
as per design.
-
CC work: cft 1990 -
Supply, fitting & fixing Portland Composite Cement
(Shah Special, Supercrete, Basundhara), local sand (FM:
1.2-1.5), 1st class brick chips (19mm downgrade).
Proper mix as Ratio-1:1.5:3 with fresh water & proper
curing. Use polythene under Cement Concrete. All
complete include formwork. As per drawing. (make &
use cube form for ensure proper ratio)
-
Brick work: sft 4710 -
Supply, fitting & fixing 1st class brick for wall work,
Portland Composite Cement (Shah Special, Supercrete,
Basundhara), local sand (FM: 1.2-1.5). Proper mix as
Ratio-1:4 with fresh water. Minimum 7 days curing
(Two times in a day). All complete. As per drawing.
-
12 mm Plaster Work: sft 4845 - Supply, fitting & fixing Portland Composite Cement
(Shah Special, Supercrete, Basundhara), local sand (FM:
1.2-1.5). Proper mix as Ratio-1:4 with fresh water.
Minimum 7 days curing (Two times in a day) all
complete.
-
Neat Cement Finishing (NCF): sft 8825 -
Supply & fixing Portland Composite Cement (Shah
Special, Supercrete, Basundhara), proper mix with fresh
water. Minimum 7 days curing. All complete.
-
Paint work (Plastic): sft 2020 - Surfaces prepare (proper sanding & cleaning) then
supply & fixing 3 coat distemper paint (Barger). All
complete.
-
Paint work (Enamel): sft 990 - Surfaces prepare (proper sanding & cleaning) then
supply & fixing 3 coat enamel paint (Barger). All
complete.
-
Metal Work (Door): pcs 31 -
Supply, fitting & fixing metal door with frame, made of
20 gauge CI sheet, 1.5"X1.5"X3mm angle bar for frame,
1"X1"X3mm angle & 3/4"X 3mm flat bar & well welding
with red oxide paint. All complete as per direction of
the Engineer-in-charge..
- As per practical
size
Metal Work (Angle bar): kg 6950 - Supply, fitting & fixing (37X37X3 mm) Angle Bar of
Anwar Ispat for Purlin, Rafter & vertical support. Well
welded lapping (length minimum 1'). Vertical join will
be not considered (as per design & as per need, some
shelter has MS Angle, need to open & re fitting). All
complete.
-
Roof Work (New CGIsheet): sft 25472 -
Open existing roof and remove carefully. Supply, fitting
& fixing 0.46mm thick new CGI Sheet (brand: Arabian
Horse, Cow, Hen) for roofing with proper lapping. All
complete with necessary kits (nails, hooks, nuts, screw,
ridges etc).
-
Bamboo Work: pcs 65 - Supply, fitting & fixing well battened Bamboo for CI
Truss and CI Fence support (as per design as per need).
With necessary kits. All complete.
-
Branding Work: pcs 150 -
Supply, fitting & fixing 316 grade Stainless Steel made
engraved & 4 color printed name plate & attach each
shelter (design will be provide) all complete.
Size: 10" x 8"
Thickness: 20 gauge
Finish: Brush polished
Holes: 4 x 3mm holes
-
BDT 0.00
______________________________
5
4
3
2
BoQ FOR SHELTER REPAIR
1
In favor of my organization named...................................................................... , I the following signatory have visited the project area. Analyzed
the quantities of material, human resources, assessed the market rates and material transportation routes. Finally offering to Islamic Relief
Bangladesh as a competitive bidder for this package. I thereby also declaring our quick and effective support to complete my assignment within
the said time by following the mentioned BOQ and design/as per direction of the Engineer-in-charge.
Signature of Contractor (with seal)
Total=
6
12
11
10
9
8
7
Page 1 of 1