“On may 29, 2019. I was sworn-in as the governor of kwara state, beginning a new chapter in the history of our state.
It’s the first year of the four years given to us by the good people of kwara state to rebuild our state and make it work for all irrespective of family, tribe and religion. And we are doing exactly that!” -Abdulrahman Abdulrazaq
2
KWARA NORTH•(1) Rehabilitation Of Pategi Waterworks
•Installation Of 2 Nos 11kw Submersible Pumps With Their Respective Control Panels•Installation Of 200kva Transformer
•Relaying Of Upvc Pipe Along Galadima And Makun Road•Repair Of Service Tank, Overhead Tank And Aeration Tanks
•Repair Of Pipe Burst On The Distribution Main Lines (100mm Ac Pipe)•Drilling Of A New Borehole And Installation Of Pump
•Installation Of Aeration Pump With Panels•Flushing Of Industrial Borehole
•Repair Of Generator
KWARA NORTH SENATORIAL ZONE
KWARA NORTH(2) Rehabilitation 7 Of Lafiagi Waterworks
•Flushing Of Industrial Borehole•Installation Of 7.5kw Submersible Pump And Its Corresponding Electrical Panel
•Electrical Connections For The High Lift Pump•Installation Of The 30kw High Lift Pump With Panels
•Replacement Of The 100mm And 200mm Sluice Valve On The Distribution Line Among Others.
KWARA NORTH SENATORIAL ZONE
KWARA NORTH(3) Rehabilitation Of Kaiama Waterworks
•Flushing Of Industrial Borehole•Installation Of 7.5kw Submersible Pumps Including Construction Of Their Control Panels•Servicing Of The Existing 75kva Generating Set With Purchase Of 2nos 200amp Battery
•Welding, Repair And Repainting Of The Existing Overhead Service Tank•Replacement And Relaying Of 2” And 3” Existing Distribution Line Along The Secretariat Office (210m)
Affected By Erosion•Relaying Of The Destroyed 6” Existing Distribution Line (320m)
•Expansion And Extension Of Pipeline To Tenebo Road, 3” And 6” Respectively (950m) With The Construction Of Stand Pipes
•Laying And Connection Of Water Supply To The Resident Doctor’s Quarters With Stand Pipes Among Other Works Done.
KWARA NORTH SENATORIAL ZONE
KWARA NORTHRehabilitation Of Gwanara Waterworks
•Drilling Of Industrial Borehole•Installation Of Pumps With Construction Of Panels And Relevant Devices•Repair And Replacement Of The Existing Control Panels And Accessories
•Repositioning Of The Exposed 3” D.I Rising Main Lines•Provision Of Pipe Line Extension Across The Teeming Growing Community
•Provision Of Standpipes Across Strategic Positions In The Community•Resuscitation Of Abandoned Overhead Tank And Connection To The Distribution Lines
•Provision And Installation Of New Uk 30kva Perkins Generator•Overhauling Of The Old Generator Set Including The Purchase Of Two (2) Batteries
KWARA NORTH SENATORIAL ZONE
KWARA NORTHDrilling Of Motorized Boreholes In Baruten Local Government
1) Yashikira2 )Gure
3 )Kosuboisu4) Geasoro
5) Okuta6) Taberu
7) Ngurume8) Ilesha Baruna
9) Shiya10) Boriya
KWARA NORTH SENATORIAL ZONE
KWARA CENTRAL SENATORIAL ZONE(5) Rehabilitation of Asa Dam Waterworks
• Cleaning of the sedimentation tanks
• Redesigning of the Lateral pipes
• Purchase and installation of a new chlorinating system
• Repair of the low lift pump
• Repair of the cooling system in the panel rooms of the low lift and high liftpump sections respectively
• Tiling of the inner walls of the alum tanks and
• Improvement on the security lightings of the Waterworks.
• Installation of Borehole In Shutta Community (AsaLocal Government)
• Repair of water infrastructure at Ilorin Teaching Hospital
• Connection of Sobi Waterworks to Sobi SpecialistsHospital
KWARA NORTH SENATORIAL ZONE
Rehabilitation of Igbaja Waterworks• Installation of 11kw sewage pump at the intake
• 15kw horizontal pump at the aeration
• Servicing and re-installation of the 11kw and 15kw horizontal pumps
• Installation of 45kw horizontal high lift pump
• Servicing 30kw horizontal high lift pumps respectively
• Repair of generator
• Installation of 2Nos 60bar dosing pumps among others
KWARA SOUTH SENATORIAL ZONE
Rehabilitation of Oro-Ago Waterworks• Drilling of Industrial Borehole and its installation
• Installation of Transformer and its relevant accessories
• Installation of Submersible and Horizontal Pumps with construction of panels and relevant devices
• Construction of Shed and concrete floors for Storex tank
• Provision and installation of piping network for Storex tank
• Fencing of Borehole site, pump house and Storex tanks with wired link
• Provision of pipe line extension across the teeming growing community
• Provision of Standpipes across strategic positions in the community
• Provision and Installation of New 100KVA Perkins Generator
KWARA SOUTH SENATORIAL ZONE
Other works on going are Motorized boreholes• Repair of Busted Pipe at Ita Elepa
• Repair of Busted Pipe at Audi road, Sango Area
• Ita Koko
• Adefalu
• Aliara village
• Rehabilitation of Alanamu borehole
• Fixing of burst pipe and reticulation work in igbaja and lafiagi
• Alagbado rehabilitation of ductile pipe at Alagbado bridge
KWARA SOUTH SENATORIAL ZONE
MINISTRY OF WORKSS/No. Projects Status
1. Town Hall/Station Road Erin-Ile, Oyun LGA (Oyun LGA) On-Going
2 Museum Road, Esie in (Irepodun LGA) On-Going
3 CAC Ogere road in Babanloma town in (Ifelodun LGA) (Asphalt Overlay)
On-Going
4 Oro-Ago to Oyate (Ifelodun LGA) On-Going
5 Osi township road (Ekiti LGA) On-Going
6 Tipper Garage Junction -Amuyo-Adesoye College (Offa LGA) On-Going
7 Ipata Market Internal Road (Ilorin East LGA) On-Going
8. Adeta Primary School Road linking Kuntu Road (Ilorin West) On-Going16
MINISTRY OF WORKSS/No. Projects Status
9 Construction of Sobi Specialist Hospital-Gaa-Osibi-Medina Road (Ilorin South LGA)
On-Going
10 Alore-Banni-Adabiyat (Ilorin West) On-Going
11College Of Education Road Ilorin, Ilorin West LGA
On-Going
12 Drainage along Yebumot-Al-hikmah-Adeta roundabout (Ilorin West LGA)
Not Started
13 Ipata –Oloje Market Internal Road (Ilorin West LGA) On-Going
14 Construction of Asa Dam (Lower Road) by Railway Flyover by Hon. Magaji (Ilorin West LGA)
On-Going
15 Ero Omo-Kilanko-Olorunsogo (Ilorin South) Not Started
16 Awolowo Road-Tanke Linking Danialu Primary School (Ilorin South)
On-Going17
MINISTRY OF WORKSS/No. Projects Status
17 Sango-Akerebiata road rehabilitation (Hydraulic Structure and 1.2km Asphalt Overlay) (Ilorin East LGA)
On-Going
18 Internal Road Queen Elizabeth School On-Going
19Shao Township road (Moro LGA)
On-Going
20 Market Junction-Emir Palace Road, Gwanara (Baruten LGA) On-Going
21 Kaiama Roundabout to General Hospital (Kaiama LGA) On-Going
22 Emir’s Road, Patigi (Patigi LGA) On-Going
23 Secretariat Road Lafiagi, (Edu LGA) On-Going
24 Tswata-Bodzo Road, Tsonga (Edu LGA) On-Going18
MINISTRY OF WORKSS/No. Projects Status
25 Tsaragi-Market-Batakpan Box Culvert Road (Edu LGA) On-Going
26 Gberia Township road (Kaiama LGA) On-Going
27Ita Ogunbo-Ita Elefun
Completed
28 Oke Apomu-Ile Eletu Banni Completed
29 Ode Adana-Singini linking Ile Kutu, Okekere Completed
30 Oke Ebo Primary Sch.-Ile Alaya Completed
31 Aibinu Street-Idigba Completed
32 Koro Afoju Completed19
MINISTRY OF WORKSS/No. Projects Status
33 Baboko linking Eruda Completed
34 Erubu Street Off Area Court Street Completed
35 Oke Apomu-Sarumi Completed
36 Alanamu Akeyede - Agaka Completed
37 Area Court Centre Gboro Completed
38 Popo Giwa Completed
39 Babakini-Ode Alausa Completed
40 Babakini – Agbaji Completed
41 Ita Ogunbo-Idilamosowo – Ita Elefun Completed20
MINISTRY OF WORKSS/No. Projects Status
42 Abata Asunkere-Ajibade linking Ita Merin 70% Completed
43 Abegunde Lanronkun linking Amule School 40% Completed
44 Oke Kura (Munabau Mosque)-Agbarere 40% Completed
45 Grading of Kaiama to Chainage 56km along Kaiama-Bode Saadu road
Completed
46 Grading of Ilesha Baruba to Oyo State Boundary Ogboro Completed
47 Patching of potholes and Sectional overlay on Offa Garage, Saw-Mill, Olorunshogo, Asa-Dam, Sanni Okin, Apalara/Al-Hikmah University, Atiku, Kaduna, Osere, Kokorokan, and Isale Aluko Roads, Ilorin
Completed
21
MINISTRY OF WORKSS/No. Projects Status
48 Patching of potholes and Sectional overlay on Adeta-Kuntu-Adebata, Hajj Camp, Challenge Junction, Dss Frontage, Unity Road, Lagos, Amuda Gobir, Pipe Line, Benin, Adewole Road, Kaduna Road
Completed
49 Patching of potholes and Sectional overlay on Adeta-Kuntu-Adabata, Ogidi-Oloje, Offa Garage, Dangote, Offa Road, pipeline Road, AdetaPakata Road
Completed
50 Patching of potholes and Sectional overlay on New Yidi, Abdul Azeez Attah, Emir’s Palace, Cemetary-Osere Road, Osere-SawMill Garage, Post Office, Flower Garden, Adeta-Pakata, Isale Oja, Kaduna Road
Completed
51 Patching of potholes and Sectional overlay , mending of Drainage, Desilting and Cart Away on Stadium Underpass
Completed
52 Construction of Road to Asphalt Level at Jengbe-Oloje Estate Project Completed
53 Box Culvert Construction at Jengbe-Oloje Estate River Completed
54Box Culvert Construction at Oke-Fomo
Completed
22
MINISTRY OF WORKSS/No. Projects Status55 Eroded portion of Federal road at Otte Completed56 Grading of some portion of Kaiama-Kishi Road. Completed
57 Retaining Wall and Asphalt work project at Eieyenkorin -Ogbomosho Road Otte
Completed
58 Completion of Taiwo Road, Omu-Aran Surface Dressing to Asphalt overlay
Completed
59 Rehabilitation of Popo Road Offa Completed60 Rehabilitation of Tanke Round About -Unilorin Main Gate Completed61 Rehabilitation of Saadu Alanamu, Pakata- Isale-Oja Road. Completed
62Repair of Tipper Garage to Judges Quarters-New GRA
Completed
63Repair of Taiwo road
Completed23
MINISTRY OF WORKSS/No. Projects Status64 Repair of Unity road Completed65 Repair of ItaAdu Junction to Jagun Junction road Completed
66 Repair of Jagun Junction to Sobi Specialist to Lanre Gada - Sobi road
Completed
67 Repair of Basin Taoheed road to Judges Quarters Completed
68 Rehabilitation of Niger road, Ilorin Completed69 Rehabilitation of Post Office to Garage Offa road, Ilorin (MICHEAL
IMODU)Completed
70 Repair of bridges/Culverts Egwa Bridge, Lafiagi Edu. Idofin OdoAse Bridge, Oke Ero. Buka Adena Bridge Moro/Kaiama and Bokungi Culvert, Edu LGA
Completed
71Construction of Idofin OdoAse Bridge, Oke Ero
Completed24
MINISTRY OF WORKSS/No. Projects Status72 Construction of Tsaragi Market Drainage and Culvert. Edu LGA Completed73 Kwara Master plan Completed
74 Rehabilitation of Dada- Alawonla road Completed
75 Construction of Asadam - Egbejila- Airport road Completed76
Dualization of Kulende-UITH Road ProjectCompleted
77Kishi – Kaiama Road
Completed
25
MINISTRY OF WORKSOther Projects Include:1. Ita Ogunbo-Ita Elefun
2. Oke Apomu-Ile Eletu Banni
3. Ode Adana-Singini linking Ile Kutu,
Okekere
4. Oke Ebo Primary Sch.-Ile Alaya
5. Aibinu Street-Idigba
6. Koro Afoju
7. Baboko linking Eruda
8. Erubu Street Off Area Court Street
9. Oke Apomu-Sarumi
10. Alanamu Akeyede - Agaka 26
MINISTRY OF WORKSOther Projects Include:16. Grading of Kaiama to Chainage 56km along Kaiama-Bode Saadu road
17. Grading of Ilesha Baruba to Oyo State Boundary Ogboro
18. Rehabilitation of Moro Bailey Bridge
19. Patching of potholes and Sectional overlay on Offa Garage, Saw-Mill,
Olorunshogo, Asa-Dam, Sanni Okin, Apalara/Al-Hikmah University, Atiku,
Kaduna, Osere, Kokorokan, and Isale Aluko Roads, Ilorin
27
MINISTRY OF WORKSOther Projects Include:20. Patching of potholes and Sectional overlay on Adeta-Kuntu-Adebata, Hajj Camp, Challege Junction, Dss
Frontage, Unity Road, Lagos, Amuda Gobir, Pipe Line, Benin, Adewole Road, Kaduna Road
21. Patching of potholes and Sectional overlay on New Yidi, Abdul Azeez Attah, Emir’s Palace, Cemetary-
Osere Road, Osere-SawMill Garage, Post Office, Flower Garden, Adeta-Pakata, Isale Oja, Kaduna Road
22.Construction of Road to Asphalt Level at Jengbe-Oloje Estate Project
23. Box Culvert Construction at Jengbe-Oloje Estate River
24. Box Culvert Construction at Oke-Fomo
28
MINISTRY OF WORKSOther Projects Include:25. Eroded portion of Federal road at Otte
26. Grading of some portion of Kaiama-Kishi Road.
27 Retaining Wall and Asphalt work project at Eieyenkorin -Ogbomosho Road Otte
28. Completion of Taiwo Road, Omu-Aran Surface Dressing to Asphalt overlay
29. Rehabilitation of Popo Road Offa
30. Rehabilitation of Tanke Round About -Unilorin Main Gate
31. Rehabilitation of Saadu Alanamu, Pakata- Isale-Oja Road.
32. Repair of Tipper Garage to Judges Quarters-New GRA
33. Repair of Taiwo road
29
MINISTRY OF WORKSOther Projects Include:34. Repair of Unity road
35. Repair of ItaAdu Junction to Jagun Junction road
36. Repair of Basin Taoheed road to Judges Quarters
37. Rehabilitation of Niger road, Ilorin
38. Rehabilitation of Post Office to Garage Offa road, Ilorin (MICHEAL IMODU)
39. Construction of Coca-Cola Bridge
40. Rehabilitation of Dada- Alawonla road
30
1. Payment of over 700M, seven months salary arears owed by the pastadministration to the Colleges of Education.
2. N123,137,802 was released for the accreditation exercise for three institutionsnamely C.O.E. (Technical), Lafiagi, College of Nursing and midwifery, Ilorin andCAILS, Ilorin.
3. Scholarship of N100,000 was given to 179 students of Kwara origin in law schoolsacross the country. Total sum of N17.9M.
4. Disbursed N5,000 each to 8,304 final year students of Kwara State indigene acrossvarious Tertiary Institutions in the country. Total expended, NGN41,520,000.
5. Monthly subvention has been restored in the state- owned Colleges of Education.6. Approval of 19,560,000. for Aircraft Insurance and salaries.7. N17.562M was released for the college of law accreditation exercise by the councilof legal education. 32
8. NGN19,573,363.54 outstanding salary arears was released to IVTEC, Ajasse Ipo.
9. Approval of N40 Million to College of Health Technology Offa for accreditation.
10.N4,540,030 was released to College of nursing, Oke-Ode for repair of leakingroofs of four major buildings in the college.
11.Funds released for the purchase of DA42 propeller, ELT batteries and other ITequipment for flight operation in International Aviation College, Ilorin.
12.Ambulance was purchased in the College of health tech. Offa
13.N1,800,000 was approved to support entrepreneurship program 2019 (workshop),which was organized by MOTEST
33
Subtitle
S/NO Project Name Location/LGAs Senatorial District
1 Construction of Isolation Center at the Sobi Specialist Hospital Ilorin East Kwara Central
2 Renovation and reconstruction of leprosarium at Oke-Igbal Ifelodun Kwara South
3 Renovation of PHC Kpada Patigi Kwara North
4 Renovation of Sobi Specialist Hospital Ilorin East Kwara Central
5 Equipping of Isolation Centre with state of the art equipment Ilorin East Kwara Central
6 Equipping of Sobi Specialist Hospital with beds and beddings Ilorin East Kwara Central
7 Renovation and re-activation of the Oxygen Plant Ilorin East Kwara Central
8 Renovation of 15 units 3 bedroom staff quarters at Sobi Specialist
Hospital.
Ilorin East Kwara Central
9 Procurement of 2 Hilux truck for immunization activities Ilorin South MOH, Headquarter
10 Renovation of Eyes Center at Civil Service Hospital and
Conversion into Ultramodern Eyes Center.
Ilorin South Kwara Central
35
Subtitle
S/No. Project Name
1 Payment of Counterpart funds for Basic Health Care Provision Fund2 Payment of Counterpart fund for Accelerated Nutrition Results in Nigeria.3 Conduct of Polio Eradication Campaign 4 Conduct of Medical Outreaches in the 16 LGAs, 2500 patients were treated for various ailments. Also 138 Eye Surgeries
and 146 Other Surgeries were carried out while 250 Eye Glasses were issued to patients free of charged.
5 Launch of Malaria Free Kwara which include;
a. Procurement & distribution of Malaria Commodities (Arthermeter/ Lumefantrine, Artesunate Injections, Long Lasing
Insecticidal Nets, Net Hangers, SP for Pregnant women
b. Provision of free Malaria services to 450 Functional Public Health facilities both primary & secondary, 7 tertiary
institutions and military and police health facilities.
c. Capacity building of health professionals in Public & Private sectors on malaria case management.
d. Launch & domestication of RMNCAH-N integration with malaria services.
e. Effective coordination frame work for malaria services.36
Subtitle
S/No. Project Name6 Funding of HIV/AIDS activities;
a. Procurement & distribution of HIV test kits
b. Training of Health care workers
c. Commencement of HIV services at General Hospital Ilorin, General Hospital Okuta and Comprehensive Health centers
Ilesa Baruba.
7 Funding of Hepatitis Control Activities, 856 students were screened in COET Lafiagi, College of Education ORO and Kwara
State Polytechnic Ilorin.
8 Fund was released for free Medical screening for civil servants for which 1,397 civil servants from 16 MDAs benefited.
9 The distribution of medications for the prevention of neglected tropical diseases: Soil Transmitted Helminthes,Onchocerciasis etc, in all the 16 LGAs of the State.
10 Successful conduct of review and resupply of free family planning commodities to 16 LGAs.11 16 Surgeries were carried out free of charge on Vesico Vaginal Fistula patients at the Sobi Specialist Hospital12 Production of IEC Materials, Jiggles and Radio Programmes on Cancer Awareness 37
1. Revamping of College of Midwifery, Ilorin.
2. 4 Blocks of Classrooms in College of Health Technology, Offa
3. 1. 6km road at the College of Health Technology, Offa
4. 300-Capacity ICT Centre at the College of Health Technology, Offa
5. Items purchased for accreditation purpose in the College.
38
ENERGYS/No. Name of Project Status
1. Supply and installation of 20 Nos of All-in-one Solar street light at Ipata Market, Ilorin
Completed
2. Electricity metering of New Kwara State Secretariat complex, Ahmadu Bello Way, Ilorin.
Completed
3. Supply and Installation of All-in-one solar street light at Ipata Oloje Market Ilorin. Completed
4. Rehabilitation of High Tension Networks along Ogboro/Agbonle-Ilesha Baruba, Gwanara, Gobo Gwanara and Ningurume via Gwanara Axis in Baruten LGA
OnGoing/DL
5. Procurement and Installation of 1 No. 300KVA, 11/0.415KV transformer at Oyatedo Town, Oro-Ago Kingdom, Ifelodun LGA
Completed
6. Procurement and Installation of 1 No. 300KVA, 11/0.415KV transformer at Oganyin Town, Oro-Ago Kingdom, Ifelodun LGA
98% Completed
7. Procurement and Installation of 1 No. 300KVA, 11/0.415KV transformer at IsaleAraromi (Oyatedo II) Community, Oro-Ago Kingdom Isin LGA.
Completed
40
ENERGYS/No. Name of Project Status
8. Procurement and Installation of 1 No. 300kva, 33/0.415kv at Ajegunle Town, Ifelodun LGA.
Completed
9. Replacement of faulty transformer at Igbaja Water works Completed/DL
10. Completion of abandoned eletrification works and the project from camp to Banisula
98% Completed
11. Electrification of Suuru village along Ilesha Baruba-Gwanara High Tension Network in Baruten LGA
90% Completed
12. Completion of Iwonte Electrification project (REB) On-Going/DL
13. Completion of electrification project at Kanmonu, Alayin, Ajegunle, Kafinta and Pandoro communities in Offa LGA
95% Completed
14. Purchase and Installation of 500KVA by 33/0.415KVA Transformer at Oke-FomaCommunity in Ilorin West LGA
Completed41
ENERGYS/No. Name of Project Status
15 Procurement of 500KVA, 33/0.415KV Transformer to Kemanji Bye-Pass Community in Kiama L.G.A
Completed
16 Purchase and Installation of 300KVA , 33/0.415KVA Transformer to ShirigweriaCommunity in Kaiama LGA
Completed
17 Procurement and installation of 500KVA, 33/0.415kv transformer at Ora AyokaCommunity Off Iloffa Road, Omu-aran.
Completed
18 Procurement and installation of 300KVA, 33/0.415kv transformer at Liberty Water, along Fire Service Road, Omu-aran.
Completed
19 Procurement and installation of 300KVA, 33/0.415kv transformer at ECWA Church, Egbe Garage Road, Omu-aran.
95% Completed
20 Procurement and installation of 300kva, 33/0.415kv transformer at Alakaka road, Towards Landmark University , Omu-Aran.
95% Completed
21 Procurement and Installation of 500KVA Transformer at Ita-Amodu/Niger Junction Oke-Aluko Ilorin.
Completed42
ENERGYS/No. Name of Project Status
22 Installation of the Donated Transformer Dropped at Upper Alagbado Community Ilorin.
Completed
23 Electrification of Gaa Oke, Share District in Ifelodun LGA On-Going
24 Procurement and Installation of 2nos 500KVA Transformer at Share Water Works and Police Intelligent College in Share Township
On-Going
25 Rehabilitation of 33Kv Line TEE off at Echwada to Koro Axis With Replacement of damaged Transformer at Shiyangi and Koro Axis
On-Going
26 The Rehabilitation of 33KV Line from Patigi to kpada with replacement of damaged transformer and other equipment at key company
On-Going
27 Jani Close by Government House Roundabout, Ilorin Completed
28 Rehabilitation of 33KV Feeder to Ora-Ayetoro, Ejiu Community, Ekiti LGA On-Going
29 Procurement and Installation of 1No 500KVA, 33/0.415KV at ObanisuwaEgbejila, Il/West LGA
On-Going43
ENERGYS/No. Name of Project Status
30 Procurement and Installation of 1No 500KVA, 11/0.415KV at AdewoleCommunity, Il/West LGA
On-Going
31 Installation of 1No Donated 300KVA, 11/0.415KV at Aleniboro/AgbedeCommunity, Tanke, Oke-Odo, Il/South LGA
Completed
32 Construction of 11KV Dedicated Line from Sawmill Control Room to General Hospital, Ilorin
On-Going
33 Procurement and Installation of 1No 500KVA, 11/0.415KV at Specialist Hospital, Sobi, Ilorin
Completed
34 Connection of more than 12 border communities to National Grid Completed
44
EDUCATIONS/No. INTANGIBLES1. Printing and Production of Free Exercise Books to all Pupils/Students of all public
Primary and Secondary Schools in the State.2. Prompt approval of training for teachers
3. Settlement of outstanding arrears of N55,077,000.00 feeding allowance of exchange students.
4. Sponsorship of 2019 common entrance at the sum of N14,365,700.00
5. Sponsorship of 1000 brilliant indigent students of the State for 2020 UTME/JAMB at a cost of N5million
6. Payment of N30.5million fine imposed by WAEC for examination malpractices recorded in the April 8-May 30, 2019 exams in some public secondary schools in the State 46
EDUCATIONS/No. INTANGIBLES7. Enabling environment for teachers to participate in UNESCO programme at
Owerri, Imo State
8. Prompt and regular monthly release of the sum of N16,404,500.00 for feeding of exchange students
9. Ongoing Rehabilitation of Blocks of Classrooms in Thirty-One (31) Secondary Schools across the state at a total cost of N1,751,105,049.33
47
EDUCATIONS/No. Project Status1. Comprehensive Rehabilitation of Government High School,
IlorinOn-Going
2. Comprehensive Rehabilitation of Government (Unity) Secondary School, Kaiama
On-Going
3. Comprehensive Rehabilitation of Oro Grammar School, Oro On-Going
4. Comprehensive Rehabilitation of Offa Grammar School, Offa On-Going
5. Comprehensive Rehabilitation of Government Secondary School, Lafiagi
On-Going
6. Comprehensive Rehabilitation of Government Secondary School, Share
On-Going
7. Comprehensive Rehabilitation of Patigi Secondary School, Patigi
80% Completed48
EDUCATIONS/No. Project Status8. Rehabilitation of Blocks of Classrooms at Government
Secondary School, AlapaOn-Going
9. Rehabilitation of a Block of Classrooms at Ansarul Islam Secondary School, Laduba
On-Going
10. Rehabilitation of a Block of Classrooms at College Arabic & Islamic Studies, Ilorin
On-Going
11. Rehabilitation of Blocks of Classrooms at Community Secondary School, Baboko, Ilorin
On-Going
12. Rehabilitation of a Block of Classrooms at Senor Secondary School, Okelele, Ilorin
Completed
13. Rehabilitation of a Block of Classrooms at Govt. Day Secondary School, Omode
On-Going
14. Rehabilitation of a Block of Classrooms at Govt. Day Secondary School, Ilorin
On-Going49
EDUCATIONS/No. Project Status15. Rehabilitation of a Block of Classrooms at govt. Arabic
College, JebbaOn-Going
16. Rehabilitation of a Block of Classrooms at Government Secondary School, Molete
On-Going
17. Rehabilitation of a Block of Classrooms at Ansarul Islam Secondary School, Ikotun
On-Going
18. Rehabilitation of a Block of Classrooms at Ojoku Grammar School, Ojoku
90% Completed
19. Rehabilitation of a Block of Classrooms at Ijara Isin High School, Ijara Isin
On-Going
20. Rehabilitation of a Block of Classrooms at Victory Commercial College, Edidi
On-Going
21. Rehabilitation of a Block of Classrooms at OyelagbawoGovernment School, Ilala
On-Going50
EDUCATIONS/No. Project Status22. Rehabilitation of a Block of Classrooms at Government
Secondary School, Omun-Aran80% Completed
23. Rehabilitation of a Block of Classrooms at Osi Central School, Osi
On-Going
24. Rehabilitation of a Block of Classrooms at Senior Secondary School, Isolo Opin
70% Completed
25. Rehabilitation of a Block of Classrooms at Comprehensive High School, Ajase-Ipo
On-Going
26. Rehabilitation of a Block of Classrooms at Tsaragi Secondary School, Tsaragi
On-Going
27. Rehabilitation of a Block of Classrooms at Govt. Day Secondary School, Okuta
Completed
28. Rehabilitation of a Block of Classrooms at Government Secondary School, Ilesha Baruba
On-Going51
EDUCATIONS/No. Project Status29. Rehabilitation of a Block of Classrooms at Government
Secondary School, Yashikira
On-Going
30. Rehabilitation of a Block of Classrooms at Govt. Day
Secondary School Jamaat Nasr Islam Community Grammar
School, Odo – Owa
On-Going
31. Comprehensive Rehabilitation of Ilorin Grammar School,
Ilorin
Awarded
32 Rehabilitation of a Block of Classrooms at Baptist Grammar
School, Igbaja
On-Going
33. Rehabilitation of a Block of Classrooms at Playfair Memorial
College, Oro-Ago
On-Going
34. Rehabilitation of a Block of Classrooms at Playfair Memorial
College, Oro-Ago
Awarded
35. Rehabilitation of a Block of Classrooms at Playfair Memorial
College, Oro-Ago
On-Going 52
EDUCATIONS/No. Project Status36. Rehabilitation of structures for the proposed Police Secondary
School, BallahCompleted
37. Construction of classrooms at the new site for Government Secondary School, Ballah
Completed
38. Provision pf teaching aids and equipment for School for Special Needs, Ilorin
Completed
39. Provision of special software, computer and Internet for School for Special Needs, Ilorin
Completed
40. Prompt payment for transportation of Students on Exchange Programme
Done
41. Sponsorship of Students for Debate and Quiz Competitions Done
42. Printing of free exercise books distributed to pupils/students of public Primary and Secondary Schools in the State
Completed53
EDUCATIONS/No. Project Status
43. Employment of 10Nos. staff to School for Special Needs, Ilorin
Done
44. Absorption of 26Nos. staff of College of Education Model Primary School owed 30 months salary by the College to SUBEB
Done
45. Media tutorials/floatation of media tutorials for SS3 students in the State during CONVID-19 Pandemic
On-Going
54
MINISTRY OF ENVIRONMENTS/No. Project Location Status1. Construction of 3 Modern Integrated
Public Toilets Opposite College of Education Ilorin, Amberi, Offa Garage Park (Road)
Completed
2. Evacuation of waste from major rivers Amilegbe under bridge, Edun/ Opolmalu under bridge & Post office/Emir’s road
On-Going
3. Public sensitization on predicted flooding as predicted by NEMA
Lafiagi, Songa, PatigiBacita, Jebba, Oro-Agor , Ilorin East
Completed
4. Social Assessment Vulnerability Indicator Committee (KW-SAVI) Committee and White Paper Committee on KW-SAVI Committee to reposition Waste Management and water supply in the State
Appointed Committee On-Going
5. Desilting of silted drainages Ilorin metropolis Completed56
MINISTRY OF ENVIRONMENTS/No. Project Location Status6. Repositioning of Waste Management
Scheme Throughout the State Completed
7. Relocation of traders and motor park @ to Soludero park
Post office Underpass & Challenge
On-Going
8 Dredging and desilting of Asa River ASa River ( UBA unity – IsaleKoko)
On-Going
9 Procurement 50 containers of waste containers
For waste collection within Ilorin metropolis
10. Road maintenance ( road median ) Ilorin metropolis On-Going
11. 12,000 tree plant Seedling raising in preparation for aforestationprogramme
For 2020 forestation programme
On-Going
12. Desilting of some silted drainages Within Ilorin metropolis On-Going57
MINISTRY OF SPORTS1. Youth holiday camping for selected schools prefects across the 16 LGA in the state 180 studentsAugust, 2019 Yikpata Youth Camp, Edu LGA.
2. Release of fund for 3-day sponsorship of Nigerian youth parliamentary representing Kwara State
to attend the young African 3 Youth October, 2019 Ghana.
3. Capacity building workshop organized for Youth Officer/Leader across the 16 LGA in the State.
250 November, 2019 Kwara State Library Complex.
4. Hosting of 2015, 2016 and 2017 Presidential NYSC award recipients from Kwara State 6 CorpsMembers November, 2019 Deputy Governor’s Office, Govt House Annex, Ilorin.
5. Educational Enlightment on Sexual Harassment 1000 Participants December 10th, 2019 StellaObasanjo Multipurpose Hall.
6. Official disbursement of 2019 Government assistance to VYOs across the 16 LGA in the State 50
VYOs December 13th 2019 MSYD Conference room.
59
MINISTRY OF SPORTS7. Capacity Building on Sustainable live hood skill acquisition in vocational, agriculture and
entrepreneurship development programme for vulnerable and unemployed youth organized byFederal Ministry of Youth and Sports, Abuja. 5 Participants 1st – 14th December, 2019 Jos,Katsina and Ode Omu.
8. Training of NYSC Corps members as peer educators, counsellors and Tester/Formation of anti-HIV/AIDs CDS group 180 Corps Members November, 2019 NYSC Orientation Camp, EduLGA.
9. Hosting of 2015, 2016 and 2017 Presidential NYSC award recipients from Kwara State 6 CorpsMembers November, 2019 Deputy Governor’s Office, Govt House Annex, Ilorin.
10. Renovation of hostels, camp clinic 95% completed Yipata Youths’ Camp, Edu LGA.
11. Provision of meal subsidy Two Thousand and Five Hundred Corps Members per OrientationDuring each orientation NYSC Orientation Camp.
12. Fumigation of Camp During every Camp NYSC Orientation Camp.60
MINISTRY OF SPORTS• Renovation of the State Baseball Court Adewole, Ilorin
• Renovation of the State NYSC camp’s hostels and provision of water
• Delivery of 400 New Mattresses, 200 double trunk beds, 90 and several
consumable drugs to the NYSC camp
• Successful Revival and Hosting of Kwara Sports Festival
61
INTERVENTIONS• Complete rehabilitation/repair of the Area Court at 'Centre Igboro' and
completion of the ongoing one which had been there for over 30 years
• Reconstruction of Sango Magistrate Court gutted by fire four years ago.
• Re-roofing of the High Court complex Ilorin, the first time since it was done in the military era.
• Approval and payment of all outstanding allowances of judicial officers, law officers of the ministry of justice, and magistrates and area court judges. Some of these arears dated back to 2014.
• Approval of 400m naira for the commencement of the construction of ministry of justice’s building.
63
MINISTRY OF AGRICULTURE
65
PROJECTSPPR State Wide Vaccination Exercise in Small Ruminants (Sheep and Goats)
. Veterinary Drugs Revolving Scheme, for the provision and availability of genuine veterinary
drugs to Livestock and poultry farmers at affordable rates.
Fadama III’s Social Intervention Fund for Promotion of sugarcane, cashew and sheabutter
value chain
Rural Access and Agricultural Marketing Project (RAAMP)
Cocoa Development Project
Tree Crops Development Project
COMMUNICATION1. Resuscitation of Radio Kwara (FM and AM Channels)
2. Restoration of Subvention to state owned media houses
3. Procurement of 6 nos Motor Cycle to the Ministry and KWASAA to ease their operation.
4. Strengthening of Human Capacity of KWASAA for effective Service delivery.
5. Purchase of Printing Materials for Graphic Division for effective performance and revenue
generation to the State.
6. Staff Capacity Building through in-house training
7. Prompt release of funds for the attendance of Seminars and Workshops by Officers of the
Ministry e.g. National Council on Information, ANAN and ICAN etc. 67
COMMUNICATION8. Grant releases for Advocacy and Sensitization on Print and Electronic Media documents on
Food and Nutrition.
9. Set of Computer distribution across MDAs
10. Production of 2020 Calendar and Dairies to document Government activities and serve as
archival record.
11. Purchase of Tools for Arts & Culture to improve their activities
12. Capital Grant releases to Tourism Board
13. Release of fund for Annual Special Day Celebrations i.e World Tourism Day.
14. Participation in Cultural/ Carnival activities in the State e.g Shao Annual Mass Wedding.
15. Organized 2019 Kwara State Cultural Quiz Competition for Secondary Schools. 68
COMMUNICATION16. Release of fund to participate in 2019 International Arts and Culture Festival in Abuja and
National Festival of Arts and Culture in Benin.
17. Purchase of Spear Parts for 3DX50AM Transmitter for Kwara State Broadcasting Corporation(Radio Kwara)
18. Purchase of 30 KW uninterrupted Power Supply (UPS) to power the Elenos FM Transmitter atApata Yakuba
19. Purchase of very essential Spare Parts for the Old Harris FM Transmitter at Apata Yakuba tobring it back on air.
20. Repair of Exciter for the Elenos Transmitter that is in use at Apata Yakuba.
21. Purchase of spoilt spare parts of the AM Harris Transmitter at Budo - Efo for itsrefurbishment. 69
COMMUNICATION22. Purchase of Basic Spare Parts for AM Harris Transmitter to sustain its clarity (i.e Audio
Processor and External input/output board)
23. Installation of Studio Console for AM Transmitter at Broadcasting House (Headquarters’)
24. Purchase of New Studio Transmitter Link (STL) at Broadcasting House (Headquarters)
25. Purchase of New Uninterrupted Power Supply (UPS) at Budo-Efo Station
26. Purchase of 2 nos of Generator sets (220KW) for both AM&FM Stations to serve as back up
for the existing ones.
27. Provision of fund for the establishment of FM Radio Transmission Station in Baruten LGA70
COMMUNICATION28. Regular production of three editions per week of the Herald Newspapers.
29. Resuscitation and consistent release of Monthly Running Cost for effective operation for the
Ministry and its Agencies.
71
SOCIAL DEVELOPMENTWork Done so far...
• Conceived/assented to the Kwara State Social Investment Programme (Law)
which seeks to take care of the poorest of the poor.
• Paid N60 Million Counterpart fund to World Bank-funded Community and Social
Development Projects(CSDP) for Community projects.
• Renovated Children Reception Centre at Gaa Akanbi
• Renovated juvenile Correctional Home, Oko Erin, Ilorin
73
STATE CIVIL SERVICE• Restoration of monthly subventions to ministries, department and agencies
(MDAs)
• Purchase of 27 operational vehicles for civil servants, fire service and kwara
united
• Distribution of computers and other office tools to various ministries,
department and agencies (mdas)
• Historic stabilization of the civil service through refusal to Summarily Dismiss
Inherited Officials
75