NATIONAL CONSULTATION ON COALDECEMBER 3-4, 2009ILOILO CITY 

Save the Valley, Serve the People Alliance for the Environment – Cagayan

 Valley

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 2/27

Mga detalye ng kasalukuyan atnakaambang coal project sa rehiyon.

 Anu-ano ang proyekto ng coal sa rehiyon?Saan ito matatagpuan? 

• matatagpuan ang coal mining sa probinsya ng Isabelana nasasakupan nito ang tatlong bayan – Cauayan City,Benito Soliven, Naguilian

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 3/27

  Sino ang may-ari ng korporasyong may hawak o panukala ng proyekto? Lokal ba ito odayuhan, at ano pang negosyo ang mayroon

sila sa Pilipinas? Isali ang lahat ng investor.

• pag-aari ng gobyerno ang proyekto sa pamamagitanng pagsuporta ni dating Gov. Faustino Dy

• December 23, 1997 – DOE awarded the Coal OperatingContract (COC) No. 22 for for exploration covering 9(nine) coal blocks with an area of about 9,000 hectaresto PNOC-EC.

•  Mga Investors:

> 2 investors are based in China

> 3 are based in Japan of which one of the companyis owned by a friend of Danding Cojuangco

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 4/27

Kailan nagsimula? Kalian matatapos?

• 1975 – Iniulat ng ICEC ang pagtuklas ng karbon sa CV.

• 1979 – tinukoy ng ICEC ang Cauayan bilangpinakapotensyal na pagkunan ng karbon.

• 1980 – binuo ng Isabela Coal Consortium para sukatinang yaman ng karbon sa 15,000 hectares konsesyon naibinigayng Bureau of Energy and Development.

• Sumang-ayon ang pamahalaan na itayo ang dalawang150 MW na thermal plant.

• 1981 – 78.55 MMT ang natuklasang deposit, later ayinevaluate at natuklasang umaabot ito sa 82.8 MMT

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 5/27

Kailan nagsimula? Kailan matatapos?

• 1982 – Ipina aufit ng NPC sa Dames and Woodsat kinumpirma nito ang 82.8 MMT

• 1983 – Gumawa ng feasibility study ng NPC at

Kuljian Corp. para sa dalawang 150MW coalfired plant

• 1982-1992 – Nahalam ang proyekto dahil na rinsa transisyong pampulitika.

• Investment climate, change to BOT, BOOpolicies. 

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 6/27

Kailan nagsimula? Kailan matatapos?

• 1993 – Kinausap ng NPC ang ICEC para mag-organisa ang Coal Mine and Power PlantConsortium for Isabela Coal.

• 1994-1995 – nagpahayag ng pagsuporta angpamprobinsyang pamahalaan sa pamamagitanng mismong Governor na si Dy.

• Site visit ng iba't-ibang korporasyon at grupo na

interesado sa proyekto.• 1996 – DOE – na ang tumatayong New MineDevelopers

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 7/27

Kailan nagsimula? Kailan matatapos?

• December 23, 1997 – DOE awarded the CoalOperating Contract (COC) No. 122 forexploration covering 9 (nine) coal blocks with an

area of about 9,000 hectares to PNOC-EC.• July 20, 1999 – Reconnaissance Permit awardedto PNOC-EC covering the six blocks with anarea of 6,000 hectares

• March 29, 1999 – a Certificte of None Coverage(R 02-CNS-0231-99-07) was secured from theDENR Reg, II. to cover the infill-drilling activitiesand related exploration works.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 8/27

Kailan nagsimula? Kailan matatapos?

• May 19, 1999 – June 25, 1999 – Phase I drilling of 26 drill holes wasdone to perform the work obligation under Coal OperatingContract (COC) with the DOE to validate and confirm previousexploration data to increase the degree of confidence of thefeasibility study to a bankable level.

• June 25, 1999 – Phase I drilling completed.

•  August 1999 – BHO Engineering (Broken Hill Property Company,Inc.) prepared the project study and submitted the pre-

feasibilty study, that confirmed the presence of open pittable lignitedeposit in the COC area.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 9/27

Kailan nagsimula? Kailan matatapos?

• It also delineated 28 million metric tons of recoverableevaluation with an average strip ratio of 9.6 Bank CubicMeter (BCM) per metric ton. This reserve will satisfy the

coal requirements of 150 MW mine mouth power plantfor about 19.7 years.

• Oct. 8, 1999 – Phase II drilling started

• = 69 Drill holes

• Feb 25,2000 – Drilling completed

•  August 1, 2000 – Reconnaissance survey started

• October 2000 – target completion

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 10/27

Kailan nagsimula? Kailan matatapos?

•  August 24, 2001 – the provincial government headed byGov. Faustino Dy, Jr. entered into a memorandum of agreement with ISELCO I & II ( joint venture of a

company and ISELCO).• September 6, 2001 – Gov. Dy is considering 5companies – 2 are based in China, 3 are based in Japanof which one of the company is owned by a friend of Danding Cojuangco

• July 3, 2002 – active Information DisseminationCampaign in Benito Soliven area.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 11/27

Para saan ang gamit ng proyekto? Opakinabang dito ng probinsya/rehiyon?

• PNOC-EC's mandate to look for alternative energysources for the country that is consistent withthedirectives of the DOE.

• The Isabela Mine-Mouth Power Plantwill be base loadpower plant.

• The electricity produced will be solely for Isabela; to

address Isabela's steadily increasing demand

• The electricity tobe generated will be passing throughthe system of Isabela Electric Cooperative I & II(ISELCO)

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 12/27

Para saan ang gamit ng proyekto? Opakinabang dito ng probinsya/rehiyon?

• The implementation of the Isabela Mine-Mouth Coal-Fired PowerPlant will assure a steady power supply forIsabela.

• But in the long run, this will contribute to the stability of the Luzon Power Grid.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 13/27

Gaano kalaki o kalawak ang maapektuhanng proyekto (lupa, pamilya, panirahan,kabuhayan)? 

• Total land area affected = 15,000 hectares for mining; 5,000hectares for tree farm

Total families affected> Quinalabasa, Naguilian = 483 families> Sinippil, Cauayan = 284 families

> Cabugao = 463 families> San Pablo = 1,478 families> Sta. Victoria = 639 families> Sto. Tomas = 581 families> Villaluz, Dagupan, Magsaysay (Benito

Soliven) =22,146 families• No. of Barrios affected

> Cauayan – 12 barangays> Naguilian – 7 barangays> Benito Soliven – 5 barangays

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 14/27

Ano ang kasalukuyang estado ng mgaaplikasyon sa coal (in reference to #1)o produksyon (kung nagsimula na)?

• 2006 – pansamanatalang na –freeze angproyekto.

• 2007 – itinuloy ang pagbabahay-bahay ng mgatauhan ng PNOC-EC

• September 16, 2009 – nagpatawag ang PNOC-EC ng public consultation sa Sinippil, Cauayan

City.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 15/27

 Ano ang kasalukuyang estado ng mgaaplikasyon sa coal (in reference to #1) oproduksyon (kung nagsimula na)?

• Dumalo sina SP Atayde, SP Maddara, VM Malillin(Cauayan), mga Brgy. Captains ng Villaluz atMagsaysay (Benito Soliven), Sinippil, Cabugao,

Casalatan, Dagupan, San Pablo (Cauayan); Victor Dy, PNOC at SAC Ilagan

• stand ng mga kapitan ng Brgys. Sinippil,Cabugao, San Pablo, Magsaysay, Casalatan, at

Dagupan ay mga pro mining sila.

•  

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 16/27

 Ano ang kasalukuyang estado ng mgaaplikasyon sa coal (in reference to #1) oproduksyon (kung nagsimula na)?

• stand ng mga kapitan ng Benito Soliven ay kungano ang gusto ng mga tao ay siyang masusunod

• Sa Naguilian ay anti-mining ang kanilang standpati na ang Municipal Mayor kaya walangdumalo sa consultation.

• Posisyon ng mga tao pati na ang taong

simbahan ay kontra sa planta ng karbon.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 17/27

 Ano ang tugon ng mamamayan atiba’t-ibang ahensya sa proyekto?

• Mga magsasaka, taong simbahan atpanggitnang saray ay tutol sa anumang

klase ng environmental destructions saprobinsya ng Isabela lalo na angpagtatayo ng planta ng karbon.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 18/27

 Ano ang tugon ng mamamayan at iba’t-ibang ahensya sa proyekto?

Lokal na pamahalaan

• Harrassments of peasant leaders

- Surveillance- PNP invitation/questioning of 

peasant leaders

• Brgy. Captains were instructed by theloccal executive (LGU) to let new faces inthe area sign in the log book.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 19/27

 Ano ang tugon ng mamamayan atiba’t-ibang ahensya sa proyekto?

• Streamers with anti-coal mining slogan or calls are notallowed to be hanged.

• Some of the church people are accused of being NPA 

recruiters/sending student activists in the coal miningareas giving “misinformation” to farmers.

• Conducting Civilian Military Operation (CMO) – throughmedical /dental mission while giving information

dissemination (deception) letting people sign anattendant sheet and later used as signatories for theproject.

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 20/27

 Anu-anong hakbang ang isinagawakaugnay ng coal project?

• Concerted efforts of the SAC programs andpartner NGOs in the dissemination of information, education and training of peasant

leaders in the areas affected.• Mobile Information dissemination in the areasaffected.

• First Mobilization las October 19, 1999. March

rally in Cauayan participated by more than1,000 farmers plus support group from themiddle sector – church people, studentsand professionals

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 21/27

 Anu-anong hakbang ang isinagawakaugnay ng coal project?

• Formation of farmers organization in thebarangay level and municipal level.

• Fora/Symposia in the area and schools in theprovince and national level.

• Peasant leaders from the affected area hadexposure trip to Calaca, Batangas

• Environmental Investigative Mission conducted• Petition submitted to DENR Region II andMunicipal level particular in Naguilian

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 22/27

 Anu-anong hakbang ang isinagawakaugnay ng coal project?

• Dialogue with DENR, Bureau of Mines and LocalGovernment Unit

• Media hopping /interview during mobilizations of 

peasant leaders and Alliance heads.• Formation of Multi-Sectoral aliiance – Anti-Coal

Mining Movement of Isabela (IACMMI)•  Alliance/Networking – local, national and

Internationa level towards the formation of support group (students, professional, churchpeople)

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 23/27

 Anu-ano ang nakamit kaugnayng mga/labang ito?

• pansamantalang napatigil ang operasyonPNOC-EC sa mga lugar.

• nakapagbuo ng anti mining alliance angprobinsya

• patuloy ang pagtutol ng mga tao sa

mining kahit pansamantalang natigil angoperasyon

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 24/27

Gaano kalapad ang partisipasyon ngmamamayan sa mga hakbang na inilunsadkaugnay ng coal project? O sinu-sino ang

napalahok sa mga ito?• lahat ng sektor ay lumahok sa kampanya

pangunahin ang sektor ng mga magsasaka• nanguna din ang mga taong simbahan sa

pagtutol sa coal mining• sa mga inilunsad na rally, dialogues, piket at

petition signing ay umabot sa libo ang bawatmobilisasyon.

• Lumahok din sa kampanya ang mga kasamanginsti mula sa National (Agham, CEC, RMP, KMP,Bayan)

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 25/27

 Anu-ano ang mga naging kahinaan ng mgahakbanging inilunsad?

• karamihan sa mga apektadong baryo ay hindinakapagtayo ng antas baryo ng organisasyon ng mgamagsasaka

• Bagamat may naitayong multi-sectoral alliance, hindi rinnakonsolida.

• Hindi namentena ang propaganda laban sa coal mining

• Naiwan din ang ilang mga erya dahil sa tindi ng militaryoperations/harrassments sa lugar at kulang din nghuman machinery ang region.

• hindi nakakadalo ang provincial peasant organization samga patawag ng PNOC na konsultasyon

7/29/2019 Isabelanational Consultation on Coal

http://slidepdf.com/reader/full/isabelanational-consultation-on-coal 26/27

   Ano ang mga nakahanay na susunodna hakbang kaugnay ng kampanya

laban sa coal?• Sa kagyat, kailangang magpatawag ng

konsultasyon ang multi sectoral alliance

para i-address ang maint pa rin na isyu ngcoal sa rehiyon.

• Regional Mining Summit

• Regional Conference on Climate Change

7/29/2019 Isabelanational Consultation on Coal