is april,l, that of

44
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE: (215) 821-5151 NORMAN W. CUIITIS Vice President. Engineering 8 Construction 821-538 t May 20, 1981 Mr. B.J. Youngblood, Chief Licensing Branch No. 1 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Susquehanna Steam Electric Station SER Issue No. 21, 22, 23, 24 ER100450 File 841-2 PLA-796 Docket Nos 50-387 and 50-388 Dear Mr. Youngblood: The" NRC Material Engineering Branch is an April,l, 1981 Working meeting with the BWR-Licensing Review Group defined the necessary and sufficient action to review NTOL plants that pre-date 10 CFR 50, Appendices G and H. The enclosed data provides the basis for that review of Susquehanna and closure of SER issues 21, 22, 23, and 24. Very truly yours, N.W. Curtis Vice President-Engineering 8 Construction-Nuclear . CC: R.M. Stark .8 10.528035%

Upload: others

Post on 25-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: is April,l, that of

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE: (215) 821-5151

NORMAN W. CUIITISVice President. Engineering 8 Construction821-538 t

May 20, 1981

Mr. B.J. Youngblood, ChiefLicensing Branch No. 1

U.S. Nuclear Regulatory CommissionWashington, D.C. 20555

Susquehanna Steam Electric StationSER Issue No. 21, 22, 23, 24ER100450 File 841-2PLA-796

Docket Nos 50-387 and 50-388

Dear Mr. Youngblood:

The" NRC Material Engineering Branch is an April,l, 1981 Working meetingwith the BWR-Licensing Review Group defined the necessary and sufficientaction to review NTOL plants that pre-date 10 CFR 50, Appendices G

and H.

The enclosed data provides the basis for that review of Susquehannaand closure of SER issues 21, 22, 23, and 24.

Very truly yours,

N.W. CurtisVice President-Engineering 8 Construction-Nuclear

. CC: R.M. Stark

.8 10.528035%

Page 2: is April,l, that of

Table 1 - Sus uehanna lBeltline Plate Tou hness Data

SA-533 Grade B, Class 1 Plate - Lukens Steel Co.)

Char V-Notch Tou hness (To /Bottom)

Plate Heat 0-Slab 8

DropweightNDT

(Top/Bottom)0F

Orientation

(L or T)

C harpyTest Temp.

0F

Energy

Ft.-Lb.Lat. Expansion

Hi 1s % Shear

~wer Shell21-1

21-2

B5083-1

C0770-2

- 10

- 30

+ 10

+10

61,64,45/44,74,5 38,46,50/45,56,3/

73,82,78/92,106, 65,61,60/78,72,799

40,40,40/50,50,50

60,60,60/70,70,70

21-3 C0814-2 - 30 +10 110,108,120/86,84,91

80,81,85/63,62,6 80,80,80/60,60,60

iwer Int.gael 1

22-1

22-2

22-3

C0803-1

C0776-1

C2433-l~

- 10

- 10

-50/-50

+10

+10

+10

81,56,66/78,73,6 66,53,56/29,63,5

37.,38,54/53,56,4 44,32,33/36,44,4

4,53,43/34,31,3 44,36,44/33,31,3

40,40,40/40,40,40

40,40,40/40,40,40

40,40,40/30,30,

~. This m terial is alsurveillance progra

o in the react r vessel

Page 3: is April,l, that of

Table 2 - Sus uehanna 1

Beltline Meld Toughness Data (Shielded Metal Arc Melds)

Post Meld 1150 F for 50 Hr. T ical

Char Tou ness

Weld Seam Type Heat ¹ Lot ¹ orFlux ¹

Drop-weightNDTQF

Charpy

Temp.'F

CharpyEnergyFt.-lbs.

Lat. Expan-"sion

Nils

% Shear

tDO

tt$ UU CPCP r

5- tt$CP r

r

~rtt$

5-tD t/l

U0 5-O~ OCP

CP Ct

~ rI ~

+) =t UCP t

QP

5- tt-0

U ~t

QP CP

0C U$

~ r t/lUl CP

Vlo5 5-

VP QU O

CP ~

QlCPr

tt$ VlO

~r 5-M tD$

tD 0)e

U~ QPO Vltt$ tt$CP CP

C CP~t 5

U VlCP QPVl U0

5

CP M5- OtD tD3:r—

CPVl

tt$ ~'r5-QP 5

Qrt$ tt-E

tt$UW

r tt$CP U ~

VlVl tDCP M

O UU IMr O.0 O4 C CPN 't- t/l

$Dtt$ N NCP

CPUlM J3

O tt$ ~r~ t

rs CP

CPCM U~t $

—rCP

QP or'U ~ ttE

OCP0

E8010G(Trade Name,Atom Arc8018 NM)

40150371

629616

402K9171

411L3071

494 K2351

402C4371

412P3611

* These matersurveillanc

NA= Not Availa

B504B27AE

L320A27AG

K315A27AE*

- 80

- 70

- 70

L311A27AF* - 70

L307A27AD

C115A27A

J417B27AF

- 80

- 80

als are also in the reactor vprogram.

le

- 20

+10

- 108:.- 70- 20+ 10+ 40+ 130

- 108- 70- 30+ 10+ 40+ 130

+ 10

+10

- 20

ssel

57,58,62

51,52

5,68,13,1726,3458,5880,106128,135,140

6,68,11,1336,4051,6790,100124,126,129

87,96

82,84,92

52,65,69

5,39,13,1625,32.52,5250,6793,91,86

5,49,11,1421.2739,5461,7194,88,99

NA

NA

NA

15,1O,1O25,2550,5040,60

100,100,100

5,512,8,10

30,3050,6080,70

100,100,100

NA

Page 4: is April,l, that of

Tbl 3-~Sh 1

Beltline Plate 5 Weld RTNDT Estimates

(Peak End-of-Life, EOL, fluence = 1.4 x 101 n/cm2. (>1 Nev.) at 1/4 T wall fromvessel ID)

Ht. Wt. /o

Cn

A. Plates - beltline

Wt.P

Y1006A006"'Start

RTNDT (~ F )Reg. Guide1.99 Extrap.

RTNDT (o F)

EstimatedEOL

NDT

B5083-1

C0770-2

C0814-2

C0803-1

C0776-1

C2433-1*

0.14

0. 14

0.13

0.09

0.12

0.10

'.0100. 008

0. 011

0.009

0.010

0.009

- 20

— 20

- 10

+ 6

+18

41

37

39

21

34

24

+33

+17

+19

+11

.+40

+42 (LimitinPlate)

Ht./Lot Wt. XC.u

B. Welds - beltline

. Wt."P

Y1006A006

Start

NDT

Reg. Guide1.99 Extrap.

RTNDT (')Estimated

EQL

RTNDT (o F)

401 50371/B504B27AE

629616/L320A27AG

402 K9171/K315A27AE*

411L3071/L311A27AF*

0.03

0.04

0.03

0.03

0.013

0.015

0.015

0.016

-80

-50

-50

-50

28

28

30

-56

-22

-22

-20 (limitingfield)

494K2351/L307A27AD 0.04

402C4371/Cll5A27A 0.02

412P3611/J417827AF 0. 03

.0. 015

0.009

0.016

-50

-50

-80

28

17

30

-22

-33

-50

* These materials are also in the, reactor vessel surveillance program.

Page 5: is April,l, that of

'hl(. a,<o ilri',~ Ec Iron Co ~

I's ~ '~. i" 4i;:".ia, L';.).a rChica,",o Bridqo 1 Iron Co..;o) la~, (U.a ~

~ ~~

CD.' 9"-1 Rev. 10 1970~u.=-,ur l970 Addenda and',(e I:ore:iy certify that we have

cept ) "ra. L<.v ',i-5- „L;r. 3 Claoa lec, .'-..".er t g 101-73.

I/0...

TEST CERTIFICATE~ ~

3lpiip 1 l 3g "I'Iec t 7 Kz 5l973 D<)

I

cor..plied with all the rcqul.renento ofA~I('ode 'ect. 3 1 jvU Edition incl.

c 2433 16 l.33 039II I

(«, ', 4'«(g p

C H E t<'I I C A L

5 cu r<'mi015 23 63

A N A L Y S I S

HO

.57

a

Qr'aha'pico

I-8 y.r,p. Stec3,

I

I < I

I

PHYSICAL PROPERT<ELon~.

.. V-sot.=n +10'F.-~ 43-

I

Lateral Expansion in Inches,044 I.o36 I.o44

..033 .031 i .030

54@ Y>ccb'('",'<O

MO kS <.

rCuuCC g (.(.oVg,

Kri'.

C 2433 ~ 654- 861"666: BQ9

24":23

I

TOT. OF Pl XT

DFGP QYIGIiT TEmN~ITX4N CURVE (

R CULTS . I

-"..3'l'. Ão Ereak-IIO'F. 2 5o ieeakpgtF Break

C0 -tA'F. Break"cd F'(roak

ff.D.T. is 50'Fo

ill he ~ t t~ ( n t--.nt re r bp .c ifice t ion Shoe~ " (' +»»I»»I ~ a' '<»A

~ ~ - ~ '1-"tl.;; y a= n" t. @err.or=.cd op. VJKM~

I

I

I

t F 101-73.I

~ - ~ ' ~ (<I ~ < ( < ((Ip ~ Qg < i' 'II ~ ~ ~ ~~

~ << ~ « < ((I) ~ ( (I<~ I g<(eI<<«y

I'< (

I I

I

S

iruc t,uroAppears:leo.

~near0&0-40 . 3.-

30-30-30

I <Pl <oN

6--,/16" x l~g x 326

I

I.'0'I fGI!i)RGP MiIUIi<TL~iu.-20'F, j" -Iio'F,

vp y<Op,

HoD.X.

OF FL%TE'lR&,I(;~ITIOUS Cl,RVK

Bi~ULTSHo Break

2 lIo LIraakLXCQkdroukQreak,

is -5O'y.

r5

~ ' ~ ~ I ~

1+ I»Pt I ~ I

Page 6: is April,l, that of

Ill(g Q g p~

33039-1310'(V-1

t ~ f)

'.".«=C Loc.-.t:» on:

Bend - ."p 1-'ic'."le - Tr=~ovcrocTens ions - "c: ('c „'o".Ccz - ~anovcrocImpacts - '.""; '.:..'o tc.-.. - L n,",it 'inalTests 1/4T fr=:-. -o':1- ' rfacc".~ c'" " CI "..". "T" "-C.-.. L.l cached c; t"-".'"ed cdv>

Fino Grain PracticeV.I.P. Steel

Baoic Proccos: Elect,r3.c .'-'urncce

I.'""h".sic((1 Pron(rty R q"uk'(: ( -..,c.s.

5".c ! fication:SA-53'r. 9 CL-1 ~r. c<oure V.-ocl C silty

! ~-1 1'..'v. 10 D„3 1 "/9/70 ("..e:~: »:.".v. 6)

: 'a~co:husten1tixed at l~+ held ll? hr,/>Terapered a,t /~«< held 1/~ ."."./'::- i

Stress 3.el /evecf «t /OS 4"+ held l h=.

n"h ~in., a ~atcr qu nchcd.~ ~ J ~ ( ~ p ( ~ 3 ~ C -.'v'L ~ f ~ »('(3 ~

( ~ . ~ ( .. (~ ~ 1

k air cooled.

LB-'3"'cv. 8 DTD 10/4/71

'rotc - A.'.1 i".:.:pcrct "eo ohoi:n belcic arc ac ual.

Tc nolle;Y1cld:

l.",".::c':

Grain Slr.e:

GO/lOO,OOO PSZV.in...".; 0l font

'J ft. lbs.F10 'F,Lit. r.:1 ';"noicnX " "'>ca-.i'ra'ore .orinforr.:at»on only.

Final Plate GrainSi=». f/> or finerdeter:.".incd on p.fully 1 cat tre...'dt«ot coupon,

~ ( ( ( ~ th:n cut fr,. plate,

aSSCress relieved at / ~ 1"..'J 50 hro. 8. f r..."."e cc.l';1 o belo~ C"'3 r". t.".c.". am cooled.

oHaX. 31eatf.isa l~ate

R 1 0 (7 tl7,Nzx. Cooll33 Ra.te

.Ra CeA'»r,100 1-.

+(, ~ f ( ~ ( ' ~ ((»'~ «(I c<':r. '»~ c.',r ~ .

fg(jp gn ( )( ', ', t ((s rnpan. ~ ~ '(J ))( ~ C ~t$ ~ / I i") e+ 1(( ~ t( "rr"-:~"""' '.r"-'>"rr'd e tc»'l

-.~I- ~~@K.( 1'(

Page 7: is April,l, that of

Table 5

SA-533 Grade B, Class 1 PlateTou hness Data Base Includina U er Shelf

Vendor - Lukens Steel Co.)

Plant A La Salle 1, Combustion En ineerin )

Heat No. NDT

(F)Charpy Temp. Orient

(oF) (L or T)Energy

(Ft.-l bs.)Lateral

Expansion (mils)

4

X Shear

C5978-1 +10 -40

+10

+40

+110

+160

7.0,7.0,11.05.0,33.0,30.0

3.0,48.0,48.018.0,116.0,109.023.0,136.0,136.0

5,3,723,25,23

40,35,36

79,76,74

82,84,84

0;0,010,10,10

20,20,2080,80,8090,95,95

C5978-2 -40.+10

+40

+110

+160

22.0,24.0,24.049.0,46.0,42.062.0,60.0,41.098.0,90.0,100.0119.0,120.0,118.

17,18,19

38,36,33

46,44,34

73,67,7588,86,82

0,0,025,25,25

35,35,2580,70,8099,100,100

C5979-1 -10 -40

+10

+40

+110

+116

9..0,11.0,19.061.0,57.0,43.073.0,92.0,65.0 .

117.0,116.0,100.134 ',136.0,134.

5,7,13

. 45,41,3251,63,43

78,76,6887,86,85

0,0,030,30,2035,45,3580;80,7099,99,100

C6345-1 -40 -80

-40

+10

+40

+110

+160

8,629,15,23109,88,77

103,96,122

147,147

151,165

4 4

21,13,1676,58,5668,65,77 .

84,82

87,94

0,05,0,150,35,3545,40,60100,100

100,100

C6318-1 -20 -40

+10

+40

+110

+160

25,17,14

80,66,72

85,95,112

126,145,117

140,140,139

18,11,957,47,5064,68,75

81,89,7686,89,88

1,0,035,30,3040,40,5090,100,90100,100,100

Page 8: is April,l, that of

~ ~

~TBbl8

SA-533 Grade B, Class 1 PlateTou hness Data Base, Includin U er Shelf

Vendor - Lukens Steel Co.

Plant A La Salle 1, Combustion En ineerin )

Heat No'. NDT

('F)Charpy Temp. Orient

(oF) (L or T)Energy

(Ft.-lbs.)Lateral

Expansion (mils)I Shear

\

C6345-2

A5333-1

-40 '80-40

+10

+40

+110

+160

-40

+10

+40

+110

+160

10,12

32,16,49

93,94,67

109,125,128'27,165

153,161

21,13,11

56,67,53

82,100,84

126,120,133

155,155,145

7,9.

20,11,33

69,66,48

70,72,82

81,82

86,88

17,11,941,47,40

'6,70,60

87,81,84-92,90,89

0,010,0,2040;40,2550,60,7085;100

,100,100

5,0,020,30,20

'0,50,40

80,80,80100,100,100

B0078-1 -10 -40

+10

+40

+110

+160

10,14,25*

73,49,70

94,100,100

118,128,140

151,136,143

10,13,2154,39,53

65,68,70

82,86,8990,84,88

0,0,540,30,4060,60,6090,90,100100,100,100

C6123-2 -80

-40

+10

+40

+110

+160

11,8

28,38,10

77,60,73

113,108,122

120,149

149,151

9,722,28,956,45,53

73,71,7589,91

91,93

0,010,10,040,35,4065,60,7590,100

100,100

Page 9: is April,l, that of

Table 5

A-533 Grade B, Class 1 PlateTou hness Data Base, Includin U er Shelf

Vendor - Lukens Steel Co.

Plant A La Salle 1 — Combustion En ineerin

Heat No. NDT

('F)Charpy Temp. Orient

( F) (L or T)Energy

(Ft.-lbs.)Lateral

Expansion (mils)X Shear

C5987-1

C5987-2

-10 -40

+10

+40

+110

+160

-40

+10

+40

+110

+160

19,13,14

63,55,35

80,99,87

122,134,122

122,134,127

15.0,8.0,10.076.0,79.0,51.057.0,76.0,75.0106.0,102.0,113140.0,133.0,138

14,10,13

47,41,2659,68,61

84,86,8486,86,84

77754,59,57

42,57,5472,68,76

87,81,84

0,0,035,35,3050,70,55

100,100,100

100,100,100

0,0,035,35,30-30,35,35

80,80,80,100,100,100

C6003-2

C5996-2

-10

-10

~g

-40

+10

+40

+110

+160

-80

-40

+10

+40

+110

+160

L'-

10,7.0,8.037.0,31.0,51.065.0,49.0,50.081.0,95.0,82.0121.0,107.0,120

7.0,10.018.0,25.0,25.062.0,71.0,66.081.0,100.0,91.0124.0,130.0149.0,151.0

7,4,328,22,37

44,34,3660,67,61

82,78,87

5,814,20,19

45,50,4752,71,6483,88

89,91

0,0,020,.20,30

35,30,3060,70,60

100,99,100

0,010,10,1020,30,25

35,50,4090,90

100,100

Page 10: is April,l, that of

~ ~

<Ja 't

Tabl e 5

-533 Grade B, Class 1 Plate'ou

hness Data Base, Includin U er ShelfVendor - Lukens Steel Co.

Q3

Plant A La Salle 1 - Combustion En ineering

Heat No. NDT

(F)Charpy Temp.

(~F)Orient

(L or T)Energy

(Ft.-lbs.)Lateral

Expansion (mils)% Shear

C5979-2

C5996-1

-10

-10

-80

-40

+10

+40

+110

+160

-40

+10

+40

+110

+160

L.

8.0,11.028.0,17.0,18.064.0,63.0,49.072.0,76.0,79.0107.0,102.0134.0,141.0

12. 0,53. 0,12. 0

65. 0,60. 0,77. 0

88. 0,113. 0,78. 0

111.0,126.0,134.146.0,148.0,143.

E

5,9

20,16,14

44,44,34

47,49,5Q

77,"74'9,83

10,20,11

46,42,54

. 56,70,54

74,85,83

86,89,86

0,015,10,10

30,30,2035,35,3588,80

100,100

0,15,030,30,4040,60,4080,90,90100,100,10Q

Page 11: is April,l, that of

~ ~fabl e

SA-533 Grade B, Class 1 Pl ate'Tou hness Data Base, Includin U er Shelf

''(Vendor - Lukens Steel Co.

21

"'Plant'A'a.'Salle 1 — Combustion En ineerin

Heat No. NDT

(.'F).

Charpy Temp.

(. F)

rient(L or T)

Energy

(Ft.-lbs.)Lateral

xpansion (mils)/ Shear

'C6318-1 -40

-10

+10

+40

+61

+120

+200

7.5.32.5,31.041.5,42.031.5,60,49,6370,71.095

100.0,91.0,90.0

5.0. 27.0,28'536.0,37.026.0,44.0,34.0,4957.2,57.570.5

75.0,63.5,69.5

5,525,25

35,30,40,4059.,50

99

99,100,.100 .

Page 12: is April,l, that of

~ ~ Table 5

SA-533 Grade B Class 1 PlateTou hness Data Base Includin U er Shelf

Vendor - Lukens Steel Co.

22

Plant E Ho e Creek 2 CBIN

Heat No. NDT

('F)Charpy Temp

('F)Orient(L or T)

Energy(Ft.-lbs.)

LateralExpansion

(oils)

X Shear

C9533- 2 0/10 -50 F

-30

-20

+10

+70

+100

+130

+212

9-7

7-12

9-14, 19-40

34-26,45-47

48-64,70-76

82-62,82-71

72-68,92-86

88-81,110-9

7-4,ll 7$

28-23,

48-40,53-65,

60-57,

75-73,

7-4

5-30

36-35

57-60

63-61

72-69

87-81

10-10,

20-20,40-40,60-60,

60-60,99-99,

20-20

30-30

40-40

60-60

80-80

99-99

-'40/-5 -"70

-50

-20

+10

+70

+100

+212

6-4

10-13

14-27

30-42

70-64

76-79

.106-108

20-20

23-14

29-39

56-54

64-63

66-81

10-10

20-20

30-30

40-40

60-60

90-90

-70

-40-20

+10

+40

+70

+100

+130

5-7

12-12

36-45

35-46

48-56

79-81

90-110

114-11

16-18

30-36

29-34

47-49

74-,75

70-82

86-85'0-1020-20

30-3050'-50

70-70

80-80

99-99 .

Page 13: is April,l, that of

Tabl e

SA-533 Grade B Class 1 Plate''Tou hness Data Base, Includin U er Shelf

Vendor - Lukens Steel Co.

23

Plant C La Salle 2 - CBIN

Heat No.NDT(0 F)

Charpy Temp.(F)

Orient(LorT)

Energy(ft.-lbs.)

LateralExpansion

'I

I Shear

.'C9481-1 -30 +40

+40

74,74,81

103,61,85

61,58,6048,66,72

50,50,5040,50,50

C9481-1 -40

+10

+25

+40

+51

+70

+93

+120

+200

17. 0

23.5,22.036.0

45. 0,35. 0,42. 0

40. 5

51. 0,50. 0

71.0

93. 0

93.5,100.0,93.0

15. 0

1.0,20.531. 0

42,0,34.2,38.035.0

44.5 42.558. 5

69.5

74.0,72.0,69.0

10,1020-25

30-35,30,30-3530

40,4070

90-95

95,95,95

Page 14: is April,l, that of

Tabl e

SA-533 spade B, Class 1 Plate

Tou hness Data Base, Includin U er Shelf

Vendor - Lukens Steel Co.

Plant D Fermi 2 - Combustion En ineerin

Heat No. NDT

(F)Charpy Temp.

(F)Orient

(L or T)

Energy

(Ft.-lbs.)Later al

Expansion (mils)%%d Shear

C4574-2 -30 -80'-40

+10

+40

+110

+160

8.0,16.034.0,32.0,27.048.0,49.0,60.076.0,63.0,69 '

98.0,103.0121.0,119.0

6,13

25,24,20

36,37,43

56,47,51

72,76

85,82

0,010,10,515,15,20

30,20,2593,95

100,100

C4574-2 -20

+10

+40

+65

+102

+119

+201

+202

22. 0

32.0,35.050.0,52.564.0,55.075.0

108 ',88.0112.5

108.5

17. 5

22. 5,27. 5

35.5,41.547.0,42.560.5

75.0,66.083.5

79.0

1

5,510,10

30,30

50

100,85

100

100

Page 15: is April,l, that of

Tabl e 5

SA-533 Grade B Class 1 PlateTou hness Data Base, Includin U er Shelf

Vendor - Lukens Steel Co.

Plant B Shoreham- Combustion En ineerin

Meat No. NDT

(F)Charpy Temp.

(F)Orient(L or T

Energy

(Ft.-lbs.)Lateral

Expansion (mils)I Shear

C4882-1 -60 -80

-40

+10

+40

+110

+160

16.0,14.041.0,32.0,54.075.0,68.0,48.083.0,95.0,100.0104. 0,116. 0

130.0,131.0

15,11'8722~38

52,49,35

59,65,70

75,82

86,84

0,020,20,25

30,30,2545;50,60

,85,90

100,100'4882-2

-40 -80

-40

+10

+40

+110

+160

10.0,7.046.0,43.0,30.075. 0,50.0,66.090.0,80.0,88.0120.0,107.0

137.0,129.0

10,8

36,35,26

58,44,52

71,62,63

84,82

94,90

0,0—10,10,10

30,20,2040,35,4085,80

100,100

Page 16: is April,l, that of

26

SA-533 Grade B, Class 1 PlateTou hness Data Base,Includin U er Shelf

Vendor - Lukens Steel Co.

Plant B Shoreham - Combustion En ineerin

Heat No. NDT

(.F)Charpy Temp.

(F)Orient

(L or T)

Energy

(Ft.-lbs)Lateral

Expansion (mils)X Shear

C4882-2- -80

-50-30

+10

+39

+70

+121

+200

19.0

41.0,25.0,37.541.0,40.061.0,68.077.0,71.091.0,71.0113.0

115.5,113.5

15.5

29.0,16.5-26.030.0,29.545.0,49.554.0,54 '62 0 53'0

79. 0

82. 5,74. 0

20,10,2020,20

30,30

50,30

7P',40

95

95,95

Page 17: is April,l, that of

L~ ~ ~ ~ee- >~~~ $ A @ — svtsg u 8 a M~~ /

r . I(»~ee, u/e/A''roc,eg~w 7( ~ ~ 4 >V

Ge>Led%) E:.Lac.t'.K.i.c CoTAphgyHUcLEAAf vFsM.Ls (c l a ss 1)

p8 Ltbgf~p. 1 Mh'cg r i g 1

PRCc Guy' S 3

--.-.- 3(7-4- 22iqAD

HrrEi~r.:.CE '>"'LIFIC>lI IL»S

IGenera1. @PS 800 l.atest Revision

>'OLL ~.>n>.'.~~L>rIC>ii ~ <>.>

PRE'HEAT':::; j::::t.:::".";,:

o~ 300'1= mini>>g>

lVQ.

I

61,6

f'OS! T IO:> Tli!C8:.L.' »::.:O'L

3>t'1C" L() 8"

96? 6~

POST HEAT TREA1'htpz'yccluy'e qualified vi"1 50 hoursat: 1150'> 425'F/-50'F.

IP a s t b e 1 d > e 0 C e. r e 3 t-..

. we) dmeTTt. shall be in: coo <':..::c ~;z CB.j i zpr roved procedure.BASE METAL—

I

ASH SR-$ 33 Gr B C 1 - " 1 orSA-5'08 Class 2

A ~~8 Group No. Pl ZB SU&'.jrollp 1

I N THRP ASS ~ > ~

1" "''

~

"6 '.'c(.".'0 0 P LAWx i%~>

I

~ $ > I ~

I

1

FIL L E R %ET AL —,RSME57ec L f I cat:on SFP -5. 5Cl a~s ificayioa E8013-6Analys is h-3(except, Ni 0. 50 to i.Usual i l i ty F4T'Yzde Name Al.)oy Roofs E801SNpf

ELEC rRtcAL CftARACQE'RfSY7CS-

D.C. Reverse PolarLtySH>iLPtNG SAS-

BACKV7 &AS—

fL.VX

None

.-;,=-"L=ASco2 5')

l%( C>>l& I'>t-,s»r.n( .4 q, 4' ~D ~ >

' \

I It"

0>. ~ ''>~, ~ > C,. ~

~ L

j~ ~

~ 'C

g w~ > Q Q>I

QP

Page 18: is April,l, that of

LEASED FOR CBQ CONTRACTS

ONTRACT NO. OY DATE

/cj'eneralElectric Comaanv

PRODUCT ass ADEscRIPTIDN Shie 1ded hie ta 1 Arc and Sub IeraedArc Weldin of ASNE P12B Sub rouo 1 hlaterial

WELD PROCEDURESPECI F ICATIONLow Alloy Sfu' SAGrooves & Buildup

PROCE DURE WP S

PAGE NO.~OF~DATE — 7-6

"»~:

REFERENCE SPECIFICATIONSGeneral WPS 800 Latest RevisionGeneral WPS 820 Latest Revision

PROCEDURE QUALIFICATION

POSITION

963( W) F(Sub Arc)F,V, H (ShIA)

1261 (SW) F (Sub Arc)F,V (StlA)

THICKNESS RANGE

4 l/2" to 9.9"

2 3/4" to 8"

FILLER METAL— ASIDE

See Adjacent Colu~

ELECTRICALCHARACTERISTICS—

See Adjacent Column

SHIELDING GAS — Non e

BAGKUP GAs — None

POST HEAT TREATMENT—Procedure qualified with 50;, hrs. at1150'F +25'/-50'F.Post weld heat treatment of thewe 1 dmen t shall be in accordance witha CB&I approved procedure.BASE METAL-

ASHE SA-533 Gr B Class 1 orSA-508 Class 2

AS>1E Group No. P12B Subgroup 1

P REHEAT PZQU IRZ!'iE:ITS:

hlinipum preheat of 300'F shall beapplied uniformly to the fullth'ckness of the weld joint andadjacent base material for aminimum'distance of "T" or 6",whichever is least, where "T"is the material thickness.

hfain ain preheat temperatureuntil start of post weld heattreatment.

INTERPAS. TEhfPEPDTURE REQUI REM 'PTS

The interpass temperature shallnot exceed 500'F maximum.

FILLER Yi:-TAL:SubmercIed Arc

Specification — N.A.Classification — N.A.Analysis — A3 (except Ni 0.50 to

1.25) I

Usability - F6Trade Name — Adcom 1Nhi~l (1% NickeI'r

equalShielded h'.etal Arc

Specification — SA-316Classification — E8018-G

, Analysis — A3 (except Ni 0.50 to1.25)

.Usability — F4Trade Name — Alloy Rods E8018Nhf.

ELECTRICAL CHARACTERISTICS:

Linde 124

P/=~ ~8/2- iZ >7'a 4/e.z - E/ante// j,*y//~ g,

//cl)'/inaSW~'py/.oo I oo f oo I oo I oo I vo I u> I oo

ENGS}ENGRIENGRIWEI.D} IN P'} 0

}

NU}

NUnr ~ c. r. seqv~ 1 C' f nn nr~ ~

REG~AEG REG I REGMFG

}MFG CONST}CON5Tftnr ~ ~ ~ Qh

OY DATE

~,rs ~/c/r.'e I

Submerged ArcTandem Wire

Lead Wire - DCRP~ Trail Wire — ACSingle Wire — DCRP

Page 19: is April,l, that of

y,fP

$ » .r

, ~

»

CHl~O DRXCCZ S ZWH CO

VrELD PROCEDUpFQ ECIFICATIQ:g~ Alloy Sp~Croovas S, Bcigd">

~~o Ganaral Electric Cc~"..an~OOvCT

kelt!inc os,.~." i3 ' crcun 1? ater?,alArc

PAVt w+%<»L»«yt << < 5 5 '» « ~

~ << «<.

P4

~ ~

«»< r

Qp» ~

~ r ~ ~

RfbfRI<.~ Srtrtf>CAT:~SCanoral RPS I)00 Latest PavisicnConaral IG 5 820 Latest Feviaicn

to" OCR 0'JR E C'«AltF >CAT <CH

DOS'fT!CH 7H>CK)vfSS RARQX

1890 (Sr>)1891 (SMD)l892 (S..h)1893 (SA-12200 (S~-2f

8G?I, F

F

3/1 63/163/'3/1 5"3/1 6"

to 8to 8"to 8Po 8to 8

~ST l EAT TRINA.M$.%T-Proco"ura ~alifiod Mith 50 ):rs. atliKQ F +25 / 50PPostveld boat .".oa=:ont cf PLe Me P.-

.ent shalX he in acmr8anca vi"0 aC3Ll-approved procoduro ~

P $ T 'P f & ~ ~ «»<'P<)«'5

?IinLwvw @recoat of 30applied vskfowlv tot".ick~ess of t?;e ~olda")acont base r ateria

d s»tanco of T ceve" 's 'ear L<"e-e.-..aterr al t.".ickiness.

A ~ Ftea

rc nC

P ~ 4 gP

ha

~ a«a rgL

P L

~ ~ » P

c P»

'".til a art of p r~e." ..ea=

«lrc" «0»e.. a« s..c ll an» areasea.-..s -"e.".eat;«av Le Crcr-

d c piig o e aa c 4 0{'e ~«<»«$ ' ~ \

SASK L4%TAt

AS?iE SA-533 Cr 3 Class 1 o"SP-5LnB Class 2

k5.K Cr" ~ No. )'123 S'borough 'E

not exceed 50"'F =rm=..~.» P Q»<

ted»

~ ~~ v~ <» ~ ~

~ L» «P~ -e

a.L,a. 1

~ ~~rJ, ~

»

~ ~

PZ~ ~

Y~.P.

~ 0w

~<P~ ~

P.N'olt'.cD ?iota'. <~ cSpo<:S 'k<lo<l vi~A5Cla~aif icat'or. - E8018MAnalysis A3 (oxcopt Wi 0.50 to1.2Usa''li y - F4Trade t:r=o - A lov bc& ES018VN

Su~arced Arc

CLECTRtCAL uIARACTKR~STICg-

ae Ad)aeon Column.

Ia'iWC GAS-

BacxL I CAS — HonePL.vx-'ndc 124

@vier c~kR ~nov AL

Spkci icat " <I . <».

L".ai.rsis - h3 (except) l.. 25)Vsahili"v - F&J ra«o Vaw — C3P P<<Y'i

or et;a'i

0.50 to

('i Ã:eke )

mc-.~:CZ r.!ha.~c —.=~:5-.:CS:

QiA XAP

St MeracC P rcTan@a~ T~iro

lAad Piro C DC<>Tra'1 Hire'f- hC

Scnglo piro -DC'Pe~~

Pan& a-8<lfi'«e 7

/le'l/t

/p( p~ +8, ~~ 0

C<<» l An Qu»«CIP J ~ I ~ <«» f LL'a It,gyp« ~ g~ RIP«t gQ ~ Qg j llt»I <«( ~ » '<lip

~~ ~ % ~ <<<'< ~ <

g(t:I» <

'<» t ~ «<P < ~ < ~ ~ < ~ ~ <P gy I 4'

A l ccrc> '~>». rl? $ 3/ff~ ~ « r»P'J1 <~ ~ I J 4

p<hn j

Page 20: is April,l, that of

Tabl e

1Nt<H Electrode Trade Name — Raco

Linde 124 Flux, Submer ed Arc

30

Post Weld ll50'F for 50 hr. T ical

Plant C La una Verde 2 — CBIN

Heat No.

Flux No;

NDT

('F)Charpy Temp

S Ingl e

(~ F) ~T~p)em

SorT

Energy

(Ft. - lbs.)Lateral

Expansion (mils)/ Shear

5P7397,0156

-50 -70-50

+10

+10

+40

+212

25,21

42,27,19

64,67,55

64,70

91,84,85

103,92,94

18,15

33,25,20

53,53,52

53,54

78,68,79

59,66,59

5,5

10,15,10

30,35,4040,45

85,90,95

100,100,100

3P49660342

-80 -80

-20

+10

+10

+40

+70

+212

51,27,971,66,54

85,84,71

83,76

87,91

100,101,97

108,111,108

45,25,12

57,57,45

68,72,61

67,64

71,60

82,89,7166,84,86

5,5,530,25,2070,80,6565,55

75,80

90,95,90100,100,100

4P74650751

-60 -80-70

0

+10

+10

+40

+212

27,14

48,43,2663,57,6856,58,9087,55

67,97

118,102,112

21,12

42,36,2254,45,63

62,62,86

83,42

71,90

88,71,72

5,015,15,530,25,3530,25,4540,30

45,50

100,100,100

1P64840156

-20 -80

-60

0

+10

+30

+40

+212

5,822>16,12

17,36,30

30,38,17,34,2834,46,42

72,60,72

93,81,83

6,11

23,13,1020,27,2825,38,12,28,3029,37,45

54,47,49

65,66,69

5,510,10,1025,20,2515,15,15,15,2025,50,35

50,45,50 .

100,100,100

Page 21: is April,l, that of

Tail e 9

1NHM Electrode (Trade Name - Raco)

Linde 124 Flux 'Submer ed Arc

Post Weld 1150 F for 50 hr. T ical

Plant C La una Verde 2 -'HIN

Heat No.

Flux No.

~ NDT

('F)Charpy Temp.

('F)

Sin~leTandemWireSorT

Energy

(Ft. - lbs.), LateralExpansion (mils)

/ Shear

5P56570931

-60 -80

-60

0

+10

+10

+40

+212

39,39

19,20,32

51,55,58

69,69,66

62,C7,

77,66

88,91,85

27 37

18,22,28

50,50,63

61,65,59

60,63

'3,72'6,75,83

,510,10,1030,30,55=

0,50,400,40

0,80100,100,100

lP6484156 -20 -80

-6000

+10

+10

+30

+40

+212

5,822,16,12

17,36,30

30,38,1734,28

34,46,42

72,60,72

93,81,83

6,11

23,13,1020,27,2825,38,1228,30

29,37,4554,47,4965,66,69

,510,10,105,20,25

15,15,1515,20

5,50,3550,45,50100,100,100

Page 22: is April,l, that of

Tabl e

E8018 NM Electrode (Trade Name - Atom Arc)

Shielded Metal ArcPost Weld, 1150 F for 50 hr. T ical

32

Plant C Laauna Verde 2 RPV — CBIN

Heat No.

Lot No.

NDT

('F)Charpy Temp.

('F)Energy

(Ft.-lbs.)LateralExpansion

( ,-l )

X Shear

492L487i421 B27AE

-60 -108

-90

-30

-20

-10

0'40

+130

10,11

25,30,32

19.28,31

22,26,30

38,41,43

50,51.,57

135,137

151,160,161

5,46,6,619,23,25

23,21,27

28,32,30

36,38,4084,80

80,82,81

8,10,1020,25,25

25,25,30

30,30,30

30,40,4590,80

100,100,100

422K851313A27AD

-80 -90

-80

-40-20

+25

+40

+50

+68

14,17

14,16,20

26,26,40

65,74,127

107,108

125,125,140

153,143,156

153,143,165

15,16

15,16,20

26,24,3344,48,7674,80

84,89,82

95,81,91

85,96,91

5,510;10,1030,30,3040,50,6080,70

100,100,90

90,80,90100,100,100

64089424B27AE -60 -108

-70

-10

0

+40

+130

14,16

15,20,27

38,42,45

55,62,6256,75

118,122,130

338,9,1526,31,3138,44,4842,55

87,89,82

3.35,10,1030,30,3035,40,40

50,60'00,100,100

Page 23: is April,l, that of

~Tabl e'

E8018Nt1 Electrode Trade Name — Atom Arc E8018NN

Shielded Metal ArcPost lleld, 1150 F for 50 hr. t ical

Plant C La una Verde 2 RPV — CBIN

Heat No.

ot No.

NDT

('F)Charpy Temp.

("F)Energy

(Ft.-lbs.)Lateral

Expansion (mils)X Shear

401S 0371

B504B27AE

-60 -60

-20

-20

0

+40

+70

+212

42,45,23

61,84,77

68,67

80,85,82

95,97

111,107,109

122,114,130

35,36,20

48,66,62

51,52

63,62,6071,76

87,85,7792,92,69

5,5,530,25;2525,25

35,50,35

,40,75

80,90,80 .

100,100,100

42P 3162

'426B27AE

401P2871

H430827AE

07R458

5403827AG

-70

-50

-70

-40

-20

-20

-10

+40

+212

-90

-70

-10

+10

+40

+130

-70

-60

0

+40+72+130

11,7

33,52,32

65,62,37

52,55

60,54,6896,99

119,122,124

7,10

15,16,16

27,39,5427,50,56

75,76,107

90,100

130,140,142

9,910,11,13

59,61,7099,101106,110129,131,132

9,6

27,42,2252,48,3036,38"

44,37,5357,68 ~

93,90,68

7 ll14,15,16

25,35,46

25,42,4660,62,74

71,76

91,94,93

779,9,1151,52,5877,7885,8781,78,81

5,510,15,1020,10,2015,15

40,30,3060,60

100,100,100

3,58,8,1035,35,3540,45,4560,50,8070,80

100,100,100

5,515,10,1050,50,6080,7580,80100,100,100

Page 24: is April,l, that of

Table 9

E8018NN Electrode Trade Name — Atom Arc E 8018NN

Shielded Metal Arc

Post lleld, 1150 F for 50 hr. t ical

Plant C La una Verde 2 RPV-CBIN

Heat No.

ot No.

NDT(') Charpy Temp.

. (F)Energy

(Ft.-lbs.)Lateral

-Expansion (mils)X Shear

03L048

B525B27AF

02R486

404B27AG

-60

-70

-105

-80

-20

-10

+40

+130

-100

-90

-30

-20

-10

+40

+130

8,910,16,19

31,50,65

36,53,5861,75,?9104,108

122,123,126

12 13

16,17,19

17,30,31

41,42,4452,64,66

84,87

121,124,129

237,10,1122,37,5034,43,4544,58,59

75,77

89,83,91

3,5

6,8,715,24,23,

33,34,35

39,45,4663,68

91,96,95

3.3-10,10,10

30,30,30

40,40,40.

50,60,6080,80

100,100,100

3,58,8,1015,20,20

30,30,30

40,40,4060,60

100,100,100

L83978

414B27AD -80 -100

-80

-20

-20

-20

+40

+72

+130

10,12

14,15,2451,52,81

64,63,6967,56

120,123

128,140

148,156,168

6,710,12,183?,40,6351,47,5553,45

72 73

78,81

90,81,87

4,510,10,1235,50,4015,15,1515,10

80,80

90,90

100,100,100

Page 25: is April,l, that of

Table 9

'lNHM Electrode Trade Name - Techallo

Linde 124 Flux Submer ed Arc

Post Weld 1150 F for 50 hrs. t ical

Plant A Zimmer RPV CHIN

Heat No. NDT

('F)Charpy Temp.

('F)

Sinp e

TandemWire(S or T)

Energy

(Ft.-lbs.)Lateral

Expansion (mils)% Shears

KN2030171

'-80 -130

-80

-20

+10

+40

+212

7,634,18,22

68,70,62

75,72

94,82

94,92,86

7732,16,21

61,57,56

64,64

81,71

76,80,80

5,540,35,4080,70,7590,90

100,95

100,100,100

-130

-100

-80

-20

-10

+10

+40

+212

7,525,16

24,22,25

48,49,54

59,54,5478,67

80,79

86,89,87

6,5

24,19

21,19,25

44,42,4648,49,4665,56

'8,6887,86,85

5,510,10

25,20,3045,45,6060,45,6095,80

95,95

100,100,100

Page 26: is April,l, that of

Tabl e 9

E8018-G Held Electrode, Shielded Metal Arc

Trade Name - Atom Arc E8018 NN

Post Held 1150~F for 50 hr. t ical

Plant A Zimmer RPV CBIN

Heat No.

Lot No.

NDT

('F)Charpy Temp.

('F)Energy

(Ft.-lbs.)Lateral

Expansion (mils)%%d Shear

640967

D502B27AF

-80 -105

-80

-20

+40

+72

+130

13,14

16,22,28

58,76,86

102,106,119

119,127

130,140,150

11,13,18

18,42,56

69,74,86

86,82

90,92,80

5,5

10,12,1515,50,50

90,80,9090,90

"100,100,100

Page 27: is April,l, that of

Table 9

1NNN Electrode Trade Name - Raco

Linde 124 Flux, Submer ed ArcPost Meld 1150'F for 50 hr. T ical

37

Plant B La Salle 2 RPV, CBIN

Heat N

ux No.NOT('F)

. Charpy Temp.(F)

SingleorTandem Ener

(Ft. - lbs.)SorT

LateralExpansion (mils)

I Shear

5P73970342

-70 -70

-10

+10

+10

+40

+70

+212

22,16,36

58,68,61

76,73,7575,69

91,84

79,75,77

84,81,87

22,18,2854,50,47-60,65, 60

58,56

75,63

73,63,7469,67,75

5,5,525,20,2030,45,5035,35

80,85

90,95,95100,100,100

-70

-10

+10

+10

+40

+70

+212

20,34,27

54,50,59

65,59,69

70,75

71,78

92,101,94

100,95,96

16,32,22

47,47,5360,56,6556,61

65,68

82,65,6988,58,82"

5,5,525,20,2050,25,7545,55

75,90

95,95,100

100,100,100

Page 28: is April,l, that of

t~ Table 9

E8018-6 Weld Electrode Shielded Metal Arc

Trade Name - E8018 NM)

Post Weld 1150 F for 50 hr. t ical

38

Plant B La Salle 2 RPV~CBIR

Heat No NDT

Lot No. (~F)Charpy Temp

(OF)Energy

(Ft. — lbs.)Lateral

Expansion (mils)X Shear

401P28730B27AF

-50 -90

-70

-20

-20

-10~ 0

+10

+40

+130

7,10

15,16,16

66,76,64

63,81

27,39,54

27,50,56

75,76,107

90,100

130,140,142

7 11

14,15,16

58,61,5850,61

25,35,46

25,42,46

60,62,7471,76

91,94,93

,5

,8,105,15,155,15

5,35,350;45,450,50,800,8000,100,100

402P3162

H426B27AE

-70'70-40

-20

-20

-10

+40

+212

11,7,1433,52,32

65,62,37

52,55

60,54,53

96,99

119,122,124

9,6,827,42,22

52,48,3036,38

44,37

57.,68

93,90,68

,5,50,15,100,10,205,15

0,30,300,60

00,100,100

Page 29: is April,l, that of

Ir i e:.~S

Valve: HSIV

Table 10 Sh. No. 1

C p:~BdApplicable Code: ASME Sct. III 1971 and 1971 Summer Addenda

Valve Vendor: Atwood 5 Morrill Co.

Material Vendor: uaker Allo Castin Co.

Material .Specification - SA-216 Grade WCB

Heat No. - F9930

Chemical Composition - (wt.X) - C/.25 Hn/.76 Si/.49 P/.017 S/.014 Al/NAGrain Size (ASTM No.) — NA

CHeat Treatment — Normalize 1680-1700 F (6 hr. 5 min.) Air Cool,

Temper 1340-1370~F (12 hr. 10 min.) Air Cool,Post Weld 1325-1365~F (7 hr. 20 min.) Air Cool,

1150 F (5 hr. 45 min.) Air Cool

Charpy V - Notch Impact Toughness

Test Temperature:

Ft.-lb.Mi 1s

% Shear

Note - Welding rods used for Susquehanna 1 HSIV were ASME SFA 5.1 Type E7018.

These materials were charpy V-notch impact tested at -2(f F in both as-welded and stress relieved (135 F or 1100 F for 8 hrs.):conditions. Results of three specimen averages ranged from 54 to 240

0ft.-lb. at -20 F.

NA - Not Available7

39

Page 30: is April,l, that of

Table 10 h. No. 2

Project: Sus uehanna 1

Valve: MSIV

Component: Cover Bonnet

Applicable Code: ASME Sct. III 1971 and 1971 Summer Addenda

Valve Vendor: Atwood 5 Morril Co.

flaterial Vendor: Cann 5 Saul Steel Co.

Material Specification - SA-105 Grade IIHeat No. — 6068582

Chemical Composition (wt. %) - C/.26 Mn/;84 Si/.22 P/.015 S/.024 Al/NA

Grain Size (ASTM No.) - Fine grain practice (No grain size available)Heat Treatment - Normalize 1650 F (8hr. ) Air Cool

Charpy Y-Notch Impact Toughness

Test Temperature:

Ft.-lb.Mils

/ Shear

NA

NA - Not Available

Page 31: is April,l, that of

0Table 11 Sh. No 1

Project Clinton 1

Valve MSIV

Component BodyA

Applicable Code ASME Sect-III 1974

Valve Vendor Atsvood 5 Morrill Co. Material Vendor: quaker AlleyCasting Co.

Material Specification - ASME SA216 Grad WCB

Heat No. - F7516

Chemical Composition (ult/)- C'n Si P S Al

.25 .78 . 53 .018 .013 NAGrain Size (ASTM No.) - N/A

Heat Treatment - 1690/1710 F (6hr. 5 min.) air cool + temper 1350/1360 F

(6 hrs) air cool + post 'lleld 1200 F (6 hr, 5 min)

air cool.

Charpy V - Notch Impact Toughness

Test Temperature: +60 F

Ft-lb

Mi l s

/ Shear

30, 24, 34

37» 27» 33

40, 40, 40

NA - Not available 41

Page 32: is April,l, that of

Table ll Sh. No 2

Project Clinton 1

Val ve MS IV

Component Cover (Bonnet

Applicable Code Same

Valve Vendor Atwood 8 Morrill Co

Vendor:Cann 5 Saul Steel Co.-

Material Specification - ASME SA 105 (}T

Heat No. - 214934

Chemical Composition (wtX)- C. Mn Si.28 .76 .22

P S Al. 017 .023 NA

Grain Size (ASTM No.)-

Heat Treatment - 1600 F (12hr) quench, Water + 1175 F (12hr) furnace cool

Charpy V - Notch Impact Toughness

Test Temperature: +60 F

-Ft-lb. 62, 60, 55

Mils 48, 45, 50

X Shear 30, 30, 30

NA - Not available 42

Page 33: is April,l, that of

A1

Table 11 Sh. No 3

Project Grand Gulf 1

Val ve HS IV

Component Bod

Applicable Code ASHE Sect. III 1974

Valve Vendor Atwood 8 Horrill, Co.

Material Vendor uaker Allo Castin Co.

Material Specification - ASHE SA 216 Grade 1JCB

Heat No. - F6406

Chemical Composition.(wt %) - C/.23 Hn/.89 Si/.53 P/.019 S/.012 Al'/NA

Grain Size (ASTH No.). — NA

Heat Treatment 1680/1710 F (5 hrs. 30 min) air cool '-+ temper1350'F (Shr. 30 min) air cool + Post weld 1200 F-(6 hr.) air cool

C

Charpy V - Notch Impact Toughness

Test Temperature +60 "

Ft-lb.. 32,31,34

Mils 33 32 3]

% Shear 40 40 40

NA - Not Available

Page 34: is April,l, that of

Table 11 Sh. No. 4

project

Valve

Component

Applicable Code S

Valve Vendor Atwood 8 Morrill Co. Material Vendor . Cann 5 Saul Steel Co.

Material Specification - .SA"-105 (qT)

Heat No. 632202

Chemical Composition . (wt. /) - C/.26 Mn/.94 Si/.20 P/.023 S/.015A'l/NA'rain

Size - (ASTM No.)

Heat Treatment - 1550 F (12 hr.) quench.'in water +1175 F. 12 hr.), furnace cool.

Charpy V - Notch Impact Toughness

Test Temperature: .+60 F

Ft-lb : 66,74,65

Mils '58,64,54

g Shear . 20,20,20

NA - Not Available

Page 35: is April,l, that of

Table 11 Sh. No 5

Project Ri.verbend 1

Valve MSIV

Component Bod

Applicable Code ASME Sect III, 1974

Valve Vendor Atwood 8 Morrill Co , Material Vendor Atwood 5thrill, Ltd.

Material Specification - SA 216 Grade MCB

Heat No. - 35

Chemical Composition (wt'/)- -4.24Mn Si P S Al

.82 .46 .022 .013 NNN

Grain Size (ASTM No.) - N/A

Heat Treatment - 1650 F - 1800 F (8hrs) Air cool to 400 F +

temper 1150 /1250 F (8hrs) air cool-,+ post weld

1095 /1195 F (18 hrs) furnace cool to 800 F (100 F/N)I,

air cool

Charpy V - Notch Impact Toughness.

Test Temperature: +60

Ft-1 b . 31. 5, 37.5. 39. 5

Mils 33, 41, 40

X Shear 10, 10, 10

NA-Not Available

Page 36: is April,l, that of

Table 11 Sh. No. 6

Project b nd 1

Valve MSIV

Component Cover Bonnet

Applicable Code SAME

Valve Vendor SAME Material Vendor: Cann & Saul Steel Co.

Material Specification - ASME SA105 QT

Heat No. 216149

Chemical Composition. (wt. !) - C/.30 Mn/.88 Si/.16 P/.006 S/.014 Al/NA

Grain Size - (ASTM No.) NA

Heat Treatment — 1550~F (12 hr.) quench in water+1225~F (12 hr.)Furnace cool.

Charpy V - Notch Impact Toughness

.Test Temperature '- .+6 F

Ft-lb : 62,64,60

Mils - 56,54,52

/ Shear . 20,20,20

NA - Not Available

Page 37: is April,l, that of

Table 11 Sh. No 7

Project a una Verde 1

Valve MSIV

Component Bod

Applicable Code ASME Sect. III, 1971 with Summer 1973 addenda

Valve Vendor Rockwell International, Material Vendor .

Material'pecii'ication - ASME SA216 Grade 'IfCC

Heat No., 1750262

Chemical Composition.(wt.%) -'C/.21 Mn/1.19 Si/.43 P/.011 'S/.009 A'l/.043

Grain Size (ASTM No.) .- NA

Heat Treatment- 1700'F (10 hrs.) normalize +1225 F (7;5 hrs.) Temp..1100oF (6 hr.) Post weld

Charpy V - Notch Impact Toughness

Test Temperature : +40 "

Ft lb: 29.0,33.0,35.0

Mils: 25.0 26 0 30.0

/ Shear: 15 15 15

NA - Not Available 47

Page 38: is April,l, that of

4 o

Table ll

0Sh. No.

Project

Valve SIV

una Verde 1

Component Bonnet

Applicable Code SAME

Yal ve Vendor SAME , Material Vendor: Cann 8 Saul Steel Co.

Material Specification - ASME SA105 Nuc.

Heat No. 211971

Chemi cal Compos i tion . (wt X)-

Grain Size - (ASTM No..) - NA

Heat Treatment - 1550~F (10 hr.)* 1175'F (10'hr.)

C/.27 . Mn/1.03 Si/.22 ,P/.010 S/.014"Al/NA

Quench in water '+

Furnace cool

Charpy V — Notch Impact Toughness

Test Temperature: +40 F

I'tlb 35,45,34

Mi1s: NA

I Shear: 30i40 30

31,34,35

NA

30,30,30

45,38,48

64,57,65

15,15,15

Ft-lb: 55, 47, 43

~ Mils: 66, 64, 60

62, 64, 52 58, 62, 72 39, 44, 38 40, 45, 52

74, 72, 65 70, 68, 75 56, 60, 57 '8, 60, 60

X Shear:, 20, 15, 15 20, 20, 20 20, 20, 20 15, 15, 15 20, 20, 20

NA - Not Available

Page 39: is April,l, that of

1 ~~

+ ~

Table ll Sh. No 9

TVA X20

Valve HSIV

Component Bod

Applicable Code ASHE Sect. III, 1974 with summer 1975 addenda.=

Valve Vendor Atwood 5 Horrill Co., Haterial Vendor: quaker Alloy Casting Co.

Haterial Specification - ASHE SA216 Grade llCB

Heat No. F3547

Chemical Composition . (wt. !) - C/.23 Hn/.88 Si/.38 P/.016 S/.015 .Al/NA

Grain Size (ASTH No.) .- NA

Heat Treatment 1700/1721 F (6 hr. 20 min.) air cool + temper1345~F (6 hr. 45 min,) air cool +post weld1200/1225 F (6 hrs. 30 min) air cool

V

Charpy V - Notch Impact Toughness

Test Temperature: +60 "0

Ft lb: 66, 56, 54

Nils:

/ Shear - 40 40 40

NA - Not Available 49

Page 40: is April,l, that of

Table 11 Sh. No 10

Project TVA

Valve MS IV

Component Cover Bonnet

Applicable Code Same

Valve Vendor Same , Material Vendor Cann & SaulSteel Co.

Material Specification - ASME SA 105

Heat No. - 217630

Chemical Composition (wt/) - ~C Mn

Grain Size (ASTM No.) - 5'9

Si P S Al.19 .013 .013 NA

~ g

Heat Treatment - 1650 F (6 hrs) air cool + 1550 F (6 hr 30 min} water quench

+ Temper 1200 F (12 hr 30 min)

Charpy V- Notch Impact Toughness

Test Temperature: +60 F

Ft-lb

Mi1 s

90, 89, 77

71, 67, 59

/ Shear 50, 50, 40

NA - Not available 50

Page 41: is April,l, that of

0Table ll Sh. No.ll

Project CNV

Valve MSIV

Component Bod

Applicable Code ASME Sect III, 1971 with 573 Addenda

Valve Vendor Rockwell International , Material Vendor-"RockwellInternational

Material Specification - SA216 Grade WCC

Heat No. - 3760171

Chemical Composition (wtX)-

Grain Size (ASTH No.) - N/A

C Hn Si.17 1.09 .50

P S Al.008 .011 .060

Heat Treatment - 1700 F (8 hours) normalize

1275 F (8 hours) Temper

1100 F (8 hours) Post Weld

Charpy V - Notch Impact Toughness

,Test Temperature: + 40 F0

Ft-lb .

Mi 1 s

35.0, 38.0, 29.0

32.0, 36.0, 29.0

% Shear 20, 20, 20

NA.-..'Not available .

Page 42: is April,l, that of

Table 11 Sh. No 12

Project CNV

Val ve NSIV

Component Bonnet

Applicable Code Same

Valve Vendor Same Naterial Vendor.Cann 8 SaulSteel Co.

Material Specification - SA 105

Heat No. - 214943

Chemical Composition (wt%)- .35Nn Si P S Al

.78 .25 .014 .023 NA

Grain Size (ASTN No.) - N/A

Heat Treatment - 1550 F (10 hours) water quench

1175 F (10 hours) furnace cool

1100 F (10 hours) post weld

'harpy V - Notch Impact Toughness

Test Temperature: +40 F

Ft-lb .

Nils

/ Shear

25, 25, 29

36, 34, 34

20, 20, 20

28, 30, 34

36, 37, 35

20, 20, 20

NA-Not Available 52

Page 43: is April,l, that of

0 ~ L

'l ~

Page 44: is April,l, that of

Waa~~O

3LoX ~Ib p Oping-]