irvine ranch water district michelson water recycling plant biosolids & energy recovery project
DESCRIPTION
Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project. So Cal Alliance of POTWs Energy Management/Biosolids Committee. Steve Malloy, Principal Engineer August 12, 2014. Presentation Overview. IRWD Background - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/1.jpg)
Irvine Ranch Water DistrictMichelson Water Recycling Plant
Biosolids & Energy Recovery Project
So Cal Alliance of POTWsEnergy Management/Biosolids Committee
Steve Malloy, Principal Engineer
August 12, 2014
![Page 2: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/2.jpg)
2
1. IRWD Background
2. MWRP Biosolids & Energy Production Facilities
3. 3-D Model Renderings
4. Construction Photos
5. Project Schedule
Presentation Overview
![Page 3: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/3.jpg)
3
IRWD Services
Drinking Water 4 Water Treatment Plants, 26 Wells 1500 miles of water pipeline
Sewage Collection 1000 miles of collection pipeline
Recycled Water 2 Recycled Water Plants 500 miles of recycled water pipeline
Urban Runoff Treatment San Joaquin Marsh prototype 31 wetland treatment sites
![Page 4: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/4.jpg)
4
IRWD Serves 20% of Orange County
![Page 5: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/5.jpg)
5
Biosolids & Energy Recovery Facilities
Project
![Page 6: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/6.jpg)
6
Biosolids & Energy Recovery Project
Project Objectives:
• Beneficially reuse Biosolids and Biogases produced during the treatment process.
• Manage residuals (Biosolids) at reduced costs to IRWD’s customers.
• Construct project to meet IRWD’s future Biosolids handling needs.
• Minimize environmental impacts:Drying and pelletizing reduces export truck loads by a factor of four.
• Reduces greenhouse gas effects by beneficially using pellets locally as a fertilizer or e-fuel.
![Page 7: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/7.jpg)
7
Project Description:
• IRWD to construct facilities at MWRP for:
• Biosolids digestion, dewatering and drying
• Biogas management and energy recovery
• Odor control systems
• IRWD would no longer export solids to Orange County Sanitation District (OCSD).
• Project would also accept Biosolids trucked in from IRWD’s Los Alisos Water Recycling Plant (LAWRP).
Biosolids & Energy Recovery Project
![Page 8: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/8.jpg)
8
Biosolids Project Location
![Page 9: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/9.jpg)
9
Biosolids Facilities Site Location
MWRP
Biosolids and Energy
Recovery Facilities
![Page 10: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/10.jpg)
10
CENTRATETREATMENT
Simplified Process Schematic
![Page 11: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/11.jpg)
11
Biosolids Facilities Site Plan
![Page 12: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/12.jpg)
12
Air Permit Process Diagram
![Page 13: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/13.jpg)
13
Cool Biosolids Stuff
![Page 14: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/14.jpg)
• Operational benefits• More efficient
mixing• Good foam control• Easy grit removal
• Structural • Steel shell• Insulated exterior• Ring wall
Egg Shaped Digester Characteristics
Appr
ox 6
7 Ft
Appr
ox 3
5 Ft
Portion of DigesterBelow Grade
Approx 73 Ft
![Page 15: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/15.jpg)
15
Heat Drying System
Furnace
Mixer
ID Fan
Pellet Cooler
To Storage Silos
Cake from dewatering
Cake BinRecycle Bin
RTO
Venturi Scrubber
Condenser
FurnaceTriple Pass Drying Drum
Gas Recirculation
Pneumatic Transporter
Atmosphere
Preseparator Baghouse
![Page 16: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/16.jpg)
16
Heat Drying System
• Produces a pellet suitable for local beneficial reuse
• Nitrogen for fertilizer
• Btu content for e-fuel
• Dryers in CA:
• Encina (Carlsbad)
• Sacramento
• Corona
![Page 17: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/17.jpg)
17
Alt. 3 – Microturbines
Biogas Priorities:
1. Use in the micro-turbines to get SCE incentives.
2. When dryer and micro-turbines are off, use in boilers to heat digesters, if needed.
3. Excess biogas (very little) diverted to enclosed gas burner.
4. Use natural gas in the dryer.
![Page 18: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/18.jpg)
18
Electrical Power Summary
MWRP Recycled
Water Production
(MGD)
Recycled Water
Treatment Electrical Demand
(MW)
Biosolids Handling Electrical Demand
(MW)
Total MWRP Electrical Demand
(MW)
Micro-Turbine Power
Generated(MW)
Percent of Power Self-Generated
23 5.1 1.8 6.9 1.0 15%
28 6.1 2.4 8.5 1.5 18%
• Continuous biogas production and power generation.
• All power used on MWRP site.
Biogas Production (Digestion)
Power Generation
(Microturbines)
Power Use (Aeration Blowers)
![Page 19: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/19.jpg)
19
3-D Model Renderings
![Page 20: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/20.jpg)
20
Digestion Facilities
Egg-Shaped DigestersSludge Holding Tanks
Acid Phase Digesters
Digester Control Bldg.
FOG Foodwaste Receiving
![Page 21: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/21.jpg)
21
Centrifuges & Cake HandlingPellet & Cake Truck Loading
Heat DryerCake Bins
Cake Receiving & Storage
Biosolids Handling Building Interior
![Page 22: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/22.jpg)
22
Biosolids Handling Building
Dryer and Odor Control Discharge Stacks
Polymer Storage
Solids Receiving Pellet Loadout
![Page 23: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/23.jpg)
23
Centrate Treatment
Polymer Storage
Centrifuge Area
Dryer Area
Biosolids Handling Building
![Page 24: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/24.jpg)
24
Biogas Treatment & Microturbines
Biogas Storage
Biogas Conditioning Microturbines
![Page 25: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/25.jpg)
25
Centrifuge Room
Thickening Centrifuges
Dewatering Centrifuges
![Page 26: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/26.jpg)
26
Dryer System – Lower Level
Dryer Drum
Pellet Screen
![Page 27: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/27.jpg)
27
Dryer System – Upper Level
Dryer Drum
Solids/Off Gas Separation
Pellet Mixer
Recycle Bin
![Page 28: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/28.jpg)
28
Sub-Surface View of 3,028 Piles
![Page 29: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/29.jpg)
29
Construction Photos
![Page 30: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/30.jpg)
30
Construction Photos
Installation of Piles in Solids Handling Facility
![Page 31: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/31.jpg)
31
Construction Photos
Pile Installation – Digester Area
![Page 32: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/32.jpg)
32
Construction Photos
Installation of Piles in Methane Digester Area
![Page 33: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/33.jpg)
33
Construction Photos
Aerial View of Western Half of Biosolids Site – Solids Handling Area
Centrate Treatment
Sludge Wet
Wells
Digester Feed Pumps
Electrical Room
Dryer Area
Sludge Receiving Basement
![Page 34: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/34.jpg)
34
Rebar Installation for Wall of Solids Handling Building Basement
Construction Photos
![Page 35: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/35.jpg)
35
Aerial View of Methane Digesters and Sludge Holding Tanks
Methane Digester No. 1
Methane Digester No. 2
Methane Digester No. 3
Sludge Holding Tank No. 1
Sludge Holding Tank No. 2
Digester Sludge Pump Station
Digester Control Building Area
Acid Digesters Area
FOG Receiving Area
Construction Photos
![Page 36: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/36.jpg)
36
Construction Photos
Rebar Work for Methane Digester No. 3
![Page 37: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/37.jpg)
37
Construction Photos
Formwork and Rebar Work for Methane Digester No. 3 Wall
![Page 38: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/38.jpg)
38
Construction Photos
Finished Concrete Work of Methane Digester No. 2 Wall
![Page 39: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/39.jpg)
39
Construction Photos
Basements of Methane Digesters Nos. 1 and 2
![Page 40: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/40.jpg)
40
Construction Photos
Rebar and Concrete for Work of Sludge Holding Tank No. 2
![Page 41: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/41.jpg)
41
Project Schedule
![Page 42: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/42.jpg)
42
DATE ACTIVITY
April 29, 2013 Notice of Award
June 3, 2013 Notice to Proceed
Sept. 2013 – March 2014 Pile Driving
January 17, 2016 Anaerobic Digestion Facilities Online
March 2, 2016 Produce Class B Biosolids (Cake)
June 30, 2016 Microturbine Power Generation Online
August 29, 2016 Produce Class A Biosolids (Pellets)
October 28, 2016 Project Completion
Project Schedule
![Page 43: Irvine Ranch Water District Michelson Water Recycling Plant Biosolids & Energy Recovery Project](https://reader035.vdocuments.us/reader035/viewer/2022081421/56815000550346895dbdc8b9/html5/thumbnails/43.jpg)
43
Contact Information: