IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: Chongqing, China

Upload: phamtuong

Post on 27-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015

Venue: Chongqing, China

Page 2: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Theme

Focus 1

Focus 2

Road infrastructure safety, sustainable development & management

Road infrastructure safety, mountainous areas infrastructure safety

Transportation development and environmental protection,

low-carbon transportation

Focus 3

Public Private Partnership(PPP)

Focus 4

Management of expressway infrastructure

Focus 5

Connected-vehicles

Page 3: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Preliminary Agenda

September 20-22, 2015

Day 1: Registration

IRF Board meeting (14:00-17:00)

Day 2: Seminar on road safety, sustainability and management

Day 3: Seminar (morning), Technical tour (afternoon)

Page 4: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 5: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Chongqing comprises 38 districts, counties and autonomous counties, with the

vast territory of more than 80,000 square kilometers.

Page 6: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

2013 2014

GDP

2013 2014

Import & export value

2013 2014

Average per capita disposable income

Page 7: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

1949 1969 1989 2009 2010 2011 2012 2013 2014

Unit

(1,000km)

The total mileage of highway

Page 8: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

1949 1969 1989 2009 2010 2011 2012 2013 2014

Unit

(km)

The total mileage of expressway

Page 9: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Until 2030, the total mileage of expressway will

reach 4,000 km.

Page 10: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

The built-in expressway extends about 2,401 km, with the average cost of 20 million

USD/km. The ratio for bridge and tunnel for ordinary roads is 50%. Its highest ratio is

86%.

Page 11: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Longest tunnel group: Chongqing-Hunan Province Expressway Horn tunnel group with the length of 24.76

km. Its bridge tunnel extends 23.77 km, accounting for 96% of the road section. It is basically linked by

bridges and tunnels. Thus, the 21 km mega tunnel group-Chongqing to Hunan Province Expressway Wujiang

River Bridge was constituted by 4 mega tunnels, 1 tunnel.

Page 12: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Expressway linking Chongqing and

Hunan Province

Wuling Mountain Bridge

Page 13: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Yunwan Expresswy

Lupengxi River Mega Bridge

Page 14: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Wulong Section, Expressway

linking Chongqing and Hunan

Province

Page 15: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Jieshi Grade Separation in the

expressway linking Chongqing and

Hunan Province

Chongqing Hunan

Expressway

Liangwan Road Section, from

expressway linking Chongqing to

Yichang and Yibin

Page 16: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Pengshui Expressway

Service Area

Page 17: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Chengdu Chongqing Fuxianbishan

Mountain Toll Station

Page 18: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Chongqing is accelerating its pace in building expressway, with 650 km

mileage of expressway being built currently.

Page 19: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 20: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

In-built tunnel

In-built

bridges

Page 21: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Trunk road:mileage of 8,428 km of the

second grade and beyond, with the design

speed over 40 km/hr.

Page 22: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

1949 1969 1989 2009 2010 2011 2012 2013 2014

Unit

(km)

Sketch map of the total road(2nd grade and beyond) mileage increase over the years

Page 23: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

High speed road from Chengkou to

Wanyuan

Page 24: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Gele Road winding

around mountains

Page 25: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Zhoujiashan Bridge in

North Chongqing

Page 26: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

1949 1969 1989 2009 2010 2011 2012 2013 2014

Unit

(1,000 km)

Rural road:

All administrative villages are accessible to roads,

64% of which are paved with asphalt or cement roads

Page 27: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 28: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 29: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 30: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 31: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for
Page 32: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Life protection project:

Special life protection project with the total mileage of 15,000 km

Page 33: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Wave-like anti-collision

Page 34: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Steel reinforced concrete

Page 35: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Slowdown facilities

Page 36: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

田园新景

Chongqing

Hotpot

4. Culture of Chongqing

Page 37: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

田园新景

Chongqing

Hotpot

Page 38: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

田园新景 Night Scenery in Chaotianmen

Page 39: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

田园新景 The Three Gorges in Yangtze River

Page 40: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

田园新景 Wulong Furong Cave

Page 41: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

Dazu Rock Carvings

Page 42: IRF & CHTS 2015 China Congress and Board Meeting Time ... · IRF & CHTS 2015 China Congress and Board Meeting Time: Sept. 20-22, 2015 Venue: ... The ratio for bridge and tunnel for

THANKS TPRI and CHTS sincerely

invites you to participate in the

IRF and CHTS 2015 China

Congress & Board Meeting!