    FORM - 1 FOR AIR CONSENT

    (See Rule 13) (To be submitted in Duplicate)

    PLICATION FOR CONSENT FOR EMISSION/CONTINUATION OF EMISSION UNDER SECTION 21 OF THE AIR (PREVENTION AND CONTROL OFLLUTION ACT, 1981)

    te :

    m :

    ...........................

    ...........................

    ...........................

    e Member Secretary, P. Pollution Control Board, yawaran Parisar, E-5, ra Colony, Bhopal - 16

    We hereby apply for Consent/Renewal of consent under Section 21 of the Air (prevention and Control of Pollution) Act 1981 (No. 14 of 1981) to bring intoa new/altered "Stack for the discharge of Emission/to begin to make new discharge of emission/to continue to discharge emission" from stack in

    ustry owned by ..................................................................................... The relevant details are as below :-

    Full name of application, degsignation with address & Telephone No. :

    ......................................................................................................

    ......................................................................................................

    ......................................................................................................

    Name of full time Directors with address & Telephone No. :

    ......................................................................................................

    ................................................................................................

    Full factory address (with name of Plot/Premises) & Telephone No. :

    ......................................................................................................

    ......................................................................................................

    ......................................................................................................

    Date of commissioning of factory or proposed date of commissioning of Factory:

    Capital investment made (Rs. In Lakhs)

    Total No. of Employees :

    A) Licensed Annual Capacity of the factory :

    (B) Attach a brief of the manufacturing process along with a flow, diagram and the position of corresponding Stack on the Plot plan.

    State the number of boilers, heaters, furnaces installed in the factory along with their capacity type/quantity of fuel used and emission from thestacks .............

    ..........................................................................................................

    ..........................................................................................................

    Stack's details :

    (a) Number of Stacks : (b) Natural draft/I.D.Fan/F.D. Fan : (c) Material of construction of stack : (d) Hight of Stacks :

  • 8/12/2019 IR9

    2/2

    (i) Above ground level (Meters) : (ii) Above factory room (Meters) :

    Attach information on Air Pollution Control Equipment in respect of each of the Stacks listed in item 9 above.

    (a) Name of equipment : (b) Existing or Proposed and for which : pollution and date of installation (c) Reduction efficiency guarantteed by : the manufacturer (d) Quantity & Quality of current/expected : emission (e) Whether the industry works in general : shift or 2 shift or round the clock (e) Whether monitoring is being done or :

    proposed

    Attach information on compliance of emission with respect to the Standard.

    I/We declare that the information furnished above is correct to the best of my/our knowledge.

    I/We hereby submit that in case of change either of the point of the emission or its quality, a fresh application for consent shall be made until suchconsent is granted no emissions shall be made.

    I/We hereby agree to submit the State Board an application for renewal of consent one month in advance of the date of expiry of the consentedperiod for stack emission if to be continued thereafter.

    I/We undertake to furnish any information within one months its being called by the State Board.

    I/We enclosed herewith cash Receipt No. .................................. Bank Draft

    ..............................................dated ..................... for Rs. ..............

    upees ............................................................................................)

    avour of Madhya Pradesh Pollution Control Board, as has been payableunder Section 21 of the Act.

    urs Faithfully,

    nature of the Applicant

    nature of the Applicant companiments :

    Site plan, lay out & to be sheet. A copy of Project Report. Name of Local Body/panchayat. List of industries, villages rivers & lakes and other Salient feature and distances from site, within a radius of 5/10 Km. In case of medium/largeindustry.

    te :

    Any applicant knowingly giving incorrect information of suppressing any information pertaining there to shall liable to be punished under the Act.

    "Strikeout which is not relevant".