    PN-IPMSPN-IPMSSystems Analysis andSystems Analysis and

    Design UpdatesDesign Updates

    17 April 2010

    Caroline G. Apolinario-Lozano, [email protected]

  • 8/8/2019 IPMS-Updates20100406-Isens

    2/39

    IPMS Project UpdateIPMS Project UpdateUser Objectives:

    To integrate the three systems and databasesinto a single unified system and database.

    To make the system readily available to the17 Naval Offices securely anytime andanywhere.

    To provide the navy personnel access to theirown personnel records online.

  • 8/8/2019 IPMS-Updates20100406-Isens

    3/39

    OverallOverallContext DiagramContext Diagram

  • 8/8/2019 IPMS-Updates20100406-Isens

    4/39

    IPMSIPMS

  • 8/8/2019 IPMS-Updates20100406-Isens

    5/39

    PMIS(NPMC)

    NARIS(OTNA)

    IPMS(PNFC)

    IPMSIPMS

  • 8/8/2019 IPMS-Updates20100406-Isens

    6/39

    IPMSIPMS

  • 8/8/2019 IPMS-Updates20100406-Isens

    7/39

    Critical Findings:NPMCCritical Findings:NPMCPMIS was developed last 2003 and was deployed

    on 2005

    It was developed using Visual Basic

    Its mainstream support ended last March 31,2005;

    Microsofts extended support ended March2008

    VB is a dead technologyMicrosoft SQL Server a proprietary database

  • 8/8/2019 IPMS-Updates20100406-Isens

    8/39

    Critical Findings:NPMCCritical Findings:NPMCMicrosoft Windows 2003 operating system used.

    Its near end-of-life with the release ofWindows 2008

    Current IPMS is not designed in a cross-platformenvironment.

    Current working module is Personnel Module

    Limited access to SOI by PN Personnel

    Updating of records is the sole responsibility ofNPMC.

    Orders and DF modules development areongoing/testing period

  • 8/8/2019 IPMS-Updates20100406-Isens

    9/39

  • 8/8/2019 IPMS-Updates20100406-Isens

    10/39

    What does NPMC have?What does NPMC have?

    Officers/EP

    PMIS

  • 8/8/2019 IPMS-Updates20100406-Isens

    11/39

    Critical Findings:OTNACritical Findings:OTNA

    NARIS Naval Adjutant Records InformationSystem

    A system developed using FoxBase during thelate 80s

    Its a text based system running on MS-DOS

    OTNA maintains and updates its own database

    It is still being used to generate Statement of

    Service and Leave BalanceIssuance of SOI is OTNAs Function (ONA/N1 Cir #

    7 dated 22 April 2009) but is currentlydone at NPMC

  • 8/8/2019 IPMS-Updates20100406-Isens

    12/39

    What does OTNA have?What does OTNA have?

    Officers/EP

    NARIS

  • 8/8/2019 IPMS-Updates20100406-Isens

    13/39

    Critical Findings:PNFCCritical Findings:PNFCPNFC is using the Payroll Module of the IPMS

    developed using I4GL,ISQL

    Database: Informix

    Operating System: SCO UnixThey maintain and update their own personnel

    database that are necessary in payroll processingsuch as:

    Promotion/Demotion orders Long Pay Order

  • 8/8/2019 IPMS-Updates20100406-Isens

    14/39

    Critical Findings:PNFCCritical Findings:PNFCThey maintain and update their own personnel

    database that are necessary in payroll processingsuch as:

    Assignment orders/CHIPS Report for the units with extra collateral pay CAD Orders/Enlistment Order Retirement/discharge orders

    Reenlistment order c/o major unit For reserve officers - Tour of Active Duty

    (ETAD)

  • 8/8/2019 IPMS-Updates20100406-Isens

    15/39

    What does PNFC have?What does PNFC have?

    PNFC PNFC

  • 8/8/2019 IPMS-Updates20100406-Isens

    16/39

    STOP

    Business Process PainsBusiness Process Pains

    IPMS

    Officers/EP

    NARIS

    PMIS

    PNFC

    Officers/EP

    PNFCusers

  • 8/8/2019 IPMS-Updates20100406-Isens

    17/39

    Business Process PainsBusiness Process Pains

  • 8/8/2019 IPMS-Updates20100406-Isens

    18/39

    What is the Solution?What is the Solution?

    SYSTEMSANALYSIS

    DESIGN

    NewIPMS

  • 8/8/2019 IPMS-Updates20100406-Isens

    19/39

    Officers/EP

    NARIS

    Officers/EP

    PNFC

    PMIS

    PNFCIPMS

    Integrated PersonnelIntegrated PersonnelManagement SystemManagement System

  • 8/8/2019 IPMS-Updates20100406-Isens

    20/39

    The Need for a New IPMS.The Need for a New IPMS.Data Base

    Scalability and Flexibility High Performance

    High Availability Robust Transactional Support Web and Data Warehouse Strengths Strong Data Protection

    Open Source Freedom and 24x7 Support Lowest Total Cost of Ownership

  • 8/8/2019 IPMS-Updates20100406-Isens

    21/39

    The Need for a New IPMS.The Need for a New IPMS.Operating System

    Stability Reliability

    No Licensing Mechanism Optional Subscription

  • 8/8/2019 IPMS-Updates20100406-Isens

    22/39

    The Need for a New IPMS.The Need for a New IPMS.

    Browser-based Application Accessible via navy network and/or www No special configuration or changes are

    needed on user's PCs.

    Lower costs. Centralised data is secure and easy to

    backup. Updates can be made quickly and easily. Information is accessible to a wide audience

    anywhere. Available 24 hours a day, 7 days a week. Everybody has a browser - familiar interface

    encourages use.

  • 8/8/2019 IPMS-Updates20100406-Isens

    23/39

    Integrated PersonnelIntegrated PersonnelManagement SystemManagement System

  • 8/8/2019 IPMS-Updates20100406-Isens

    24/39

    User Diagram:User Diagram:

    USERSREPORTS:

    1.Hardcopy2.Softcopy

    3.Viewing4.Query, Etc

    IPMS

  • 8/8/2019 IPMS-Updates20100406-Isens

    25/39

    User Diagram:User Diagram:

    N1/NPMC

    Statistical Reports1.# of Capt2.# of Logistician3.# of Retiring this year

    4.Due for promotion5.Due for Specialization

    Strength Reports1.Fleet Count2.Marine Count3.NISF4.NLC5.Naval Force6.Etc

    1.SLL Report3.Automated QRS4.Other Required Executive Reports

    IPMSPersonnel Files

  • 8/8/2019 IPMS-Updates20100406-Isens

    26/39

    User DiagramUser Diagram

    PNFCUnit Admin

    CHIPs Reports1.Updated SOI2.Accurate Personnel Inventory

    3.Other required Executive Reports

    IPMSPersonnel Files

  • 8/8/2019 IPMS-Updates20100406-Isens

    27/39

    User DiagramUser Diagram

    OTNA IPMSOrders

    OTNA Reports1.Leave Record2.Statement of Service3.Orders4.Other required Executive Reports

  • 8/8/2019 IPMS-Updates20100406-Isens

    28/39

    User DiagramUser Diagram

    PNFC

    PNFC Required Data1.Number of Payees

    2.Number of Area3.Number of personnel per area4.Other required Executive Reports

    IPMSPayroll-related system

  • 8/8/2019 IPMS-Updates20100406-Isens

    29/39

    How will the new IPMS work?How will the new IPMS work?

    SOI

    IndividualUsers

    1 Family

    OTNA

    Orders

    PNFC

    Inquiry

    Report

    Report

    OtherUsers

  • 8/8/2019 IPMS-Updates20100406-Isens

    30/39

    IPMS ETL ProcessIPMS ETL Process

  • 8/8/2019 IPMS-Updates20100406-Isens

    31/39

    ETL: Extract Transform LoadETL: Extract Transform Load

  • 8/8/2019 IPMS-Updates20100406-Isens

    32/39

    Hardware Capacity PlanHardware Capacity PlanUse of RAID technology is highly recommended

    for the following reasons: Higher Data Security

    Fault Tolerance Improved Availability Increased Integrated Capacity Improved Performance

    At least Quad Core ProcessorMinimum of 4Gb Memory

    Redundant Power Supply

  • 8/8/2019 IPMS-Updates20100406-Isens

    33/39

    Hardware Capacity PlanHardware Capacity PlanRaid Level 10- Mirroring, Requires minimum of 4

    Drives Drive Bays: Standard 5 hot-swap SAS/SATA Flex-bay Storage Drive: 500Gb Serial ATA Hard Drive 7200 RPM

    16MB Buffer 2nd Hard Drive: 500Gb Serial ATA Hard Drive 7200

    RPM 16MB Buffer 3rd Hard Drive: 500Gb Serial ATA Hard Drive 7200 RPM

    16MB Buffer 4thHard Drive: 500Gb Serial ATA Hard Drive 7200 RPM

    16MB Buffer

  • 8/8/2019 IPMS-Updates20100406-Isens

    34/39

    Software Capacity PlanSoftware Capacity PlanTo meet the recommended Browser-based User

    Interface requirements of Philippine Navy-IPMS,the following is the suggested

    Database/Operating System/Front-endDevelopment Tool to be used:

    MySQL for Database

    The most widely used open sourcedatabase because of its consistent fastperformance, high reliability andease-of-use.

  • 8/8/2019 IPMS-Updates20100406-Isens

    35/39

    Software Capacity PlanSoftware Capacity PlanLinux for Operating System

    open source, multi-platform,

    multi-user operating system.PhP/Java/

    a widely-used open source general-purpose scripting language that is specially

    suited for web development. It is very useful in integrating WebPages

    with databases.

  • 8/8/2019 IPMS-Updates20100406-Isens

    36/39

    Network Capacity PlanNetwork Capacity PlanReview the current network setup

    Network equipment (routers, switches) End-user equipment (workstations)

    Local access requirements

    Remote access requirements

    Existing applications

    Determine future/planned applications aside

    from IPMS that will run in the network.Connectivity outside the organization (to

    stakeholders)

    Allocate a minimum of 2Mbps CIR to IPMS server.

  • 8/8/2019 IPMS-Updates20100406-Isens

    37/39

    Network Security PlanNetwork Security PlanImplement NIPRNet and SIPRNet

    NIPRNet. Nonsecure Internet Protocol RouterNetwork. It is used to exchange sensitivebut unclassified information between"internal" users as well as providing usersaccess to the Internet.

    SIPRNet. Secure Internet Protocol RouterNetwork. A secured network dedicated to

    computers directly accessing the IPMSserver.

    Implement a Semestral Security Audit To determine the vulnerabilityof the

    system/network.

  • 8/8/2019 IPMS-Updates20100406-Isens

    38/39

    Information Security PlanInformation Security PlanProtect the security and confidentiality of

    protected Information;

    Protect against anticipated threats or hazards to

    the security or integrity of suchinformation; and

    Protect against unauthorized access to or use ofprotected Information that could result in

    substantial harm or inconvenience to anypersonnel and the entire organization.