    IPLASMA HDE ASSEMBLY INSTRUCTIONS

  • 7/30/2019 iPlasma Instruction

    2/12

    1. Install the leveling bolt on each leg. A flat washer and nut should be used on each side.This will allow the frame to be leveled once it is installed.

  • 7/30/2019 iPlasma Instruction

    3/12

    2. Stand up the legs and bolt on the J channel and the angle as shown. Note that the angle isbelow the J channel. The angle and channel have slots in them for adjustability. Center thebolts on the slots as you assemble and it will make it much easier to adjust the table in futureinstructions. A level can be used on each leg in both directions to be sure they are plum.Before tightening the bolts between the J channel and angle. Use a tape measure to measurediagonally across the frame to check for squareness. Once the same dimension is measured

    achieved, the frame is square, and the remaining bolts can be tightened to lock it in place.

  • 7/30/2019 iPlasma Instruction

    4/12

    3. On the 4X8 model, the center legs can now be installed. You will need to adjust the levelingbolt to match the corner legs.

  • 7/30/2019 iPlasma Instruction

    5/12

    4. A U channel is also required on the 4X8 frame. It is installed between the center legs andprevents the side channels from twisting. It also helps support a water bed.

  • 7/30/2019 iPlasma Instruction

    6/12

    5. Remove the end caps of the side tubes to access the nuts in the tubes. Install the tubes asshown. If the holes dont line up, you will need to loosen the frame bolts to allow for anadjustment in the slots. If the frame was assembled with the bolts in the center of the slots, thisshould not be necessary.

  • 7/30/2019 iPlasma Instruction

    7/12

    6. Install the carriages on the rails. The single wheels with the eccentric adjustment will need tobe removed and reinstalled. Using a 9/16 wrench, adjust the eccentric to take up all of theclearance between the bearings and tubing. Test to be sure the carriages run smoothly. If not,the adjustment should be loosened.

  • 7/30/2019 iPlasma Instruction

    8/12

    7. Install the gantry on the side carriages. Slide the carriages against the frame to keep themsquare. Center the gantry between the carriages and tighten the (4) bolts to hold it in place.Roll the gantry down to the opposite side of the table. If the gantry binds, the rails are not parallel.To correct this issue, loosen the bolts on the frame on the opposite end of where you installed thegantry. Roll the gantry to the loosened end of the frame, and retighten the bolts on the frame.The gantry will move the frame to the correct dimension.

  • 7/30/2019 iPlasma Instruction

    9/12

    8. Install the Z axis carriage using the same procedure as the side carriages. Install the Z axis.You will need to remove the front plate of the Z to have access to the mounting bolts.

  • 7/30/2019 iPlasma Instruction

    10/12

    9. Install the cable tracks using the supplied hardware. (optional)

  • 7/30/2019 iPlasma Instruction

    11/12

    10. Install 1/8 x 3.5 hot rolled steel slats (as shown) or water bed. Note: The 4x4 frame is asquare so the rails can be installed on either side. The table shown is set up to slide the materialon from the side. If you want to slide the material on from the front, the slats should be set up torun at 90 degrees from the picture shown.

  • 7/30/2019 iPlasma Instruction

    12/12

    Motor Tuning:

    X andY

    Steps per inch nylon gear1273.24Steps per inch steel gear 1018.59

    Velocity 500Acceleration 35

    ZSteps per inch 10000

    Velocity 100Acceleration 35