IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001 AND CC-IAAP-002 OPERABLE UNIT NINE INTRODUCTION This Proposed Plan identifies the Preferred Remedial Alternatives for the closure of Construction Debris Site 001 (CC-IAAP-001) and Construction Debris Site 002 (CC-IAAP-002). These facilities are part of Operable Unit Nine (9) (OU-9) at the Iowa Army Ammunition Plant (IAAAP) in Middletown, Iowa (Figure 1). Figure 1. Site Location This work is being conducted under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the IAAAP Federal Facility Agreement (FFA). This document is issued by the U.S. Army (Army), the owner of the IAAAP facility, and the U.S. Environmental Protection Agency (EPA). The Army is the lead agency and the EPA is the primary regulatory agency. The State of Iowa is not a signatory to the IAAAP FFA. Dates to Remember A) Public Comment Period - January 13, 2015 through February 11, 2015 B) Public Meeting – February 9, 2015 The Army and EPA will accept written comments on the Proposed Plan during a 30-day public comment period. The Army will hold a public meeting to explain the Proposed Plan and the remedial alternatives in the Focused Feasibility Study. Oral and written comments will also be accepted at the meeting. The meeting will be held at the Burlington Public Library on February 9, 2015 from 4:30 to 6:00 pm to explain this proposed action and to answer questions and accept comments. Detailed information regarding this proposed action is available in the Administrative Record File, which is located online at www.iaaap.adminrecord.com. A hard copy is located at the IAAAP Library. The Burlington Public Library has computers available to the public for those interested in viewing the electronic version of the Administrative Record. The library is located at: 210 Court Street Burlington, IA 52601 319-753-1647 The Army and EPA are issuing this Proposed Plan as part of the public participation responsibilities under Section 300.430(f)(2) of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and Section 117(a) of CERCLA. This Proposed Plan summarizes information that is presented in detail in the Focused Feasibility Study (PIKA International, Inc., 2014 [PIKA]) report and in the IAAAP Administrative Record File (see above). January 2015 1

Upload: others

Post on 05-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

IOWA ARMY AMMUNITION PLANT

FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES

CC-IAAP-001 AND CC-IAAP-002

OPERABLE UNIT NINE

INTRODUCTION

This Proposed Plan identifies the Preferred Remedial Alternatives for the closure of Construction Debris Site 001 (CC-IAAP-001) and Construction Debris Site 002 (CC-IAAP-002). These facilities are part of Operable Unit Nine (9) (OU-9) at the Iowa Army Ammunition Plant (IAAAP) in Middletown, Iowa (Figure 1).

Figure 1. Site Location

This work is being conducted under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the IAAAP Federal Facility Agreement (FFA). This document is issued by the U.S. Army (Army), the owner of the IAAAP facility, and the U.S. Environmental Protection Agency (EPA). The Army is the lead agency and the EPA is the primary regulatory agency. The State of Iowa is not a signatory to the IAAAP FFA.

Dates to Remember A) Public Comment Period - January 13, 2015 through February 11, 2015 B) Public Meeting – February 9, 2015 The Army and EPA will accept written comments on the Proposed Plan during a 30-day public comment period. The Army will hold a public meeting to explain the Proposed Plan and the remedial alternatives in the Focused Feasibility Study. Oral and written comments will also be accepted at the meeting. The meeting will be held at the Burlington Public Library on February 9, 2015 from 4:30 to 6:00 pm to explain this proposed action and to answer questions and accept comments. Detailed information regarding this proposed action is available in the Administrative Record File, which is located online at www.iaaap.adminrecord.com. A hard copy is located at the IAAAP Library. The Burlington Public Library has computers available to the public for those interested in viewing the electronic version of the Administrative Record. The library is located at: 210 Court Street Burlington, IA 52601 319-753-1647

The Army and EPA are issuing this Proposed Plan as part of the public participation responsibilities under Section 300.430(f)(2) of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and Section 117(a) of CERCLA.

This Proposed Plan summarizes information that is presented in detail in the Focused Feasibility Study (PIKA International, Inc., 2014 [PIKA]) report and in the IAAAP Administrative Record File (see above).

January 2015 1

Page 2: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

The Administrative Record is a compilation of the information that was considered in making the proposal presented in this Proposed Plan, and presents a comprehensive description of the site investigation and proposed remediation activities.

The Army, in conjunction with the EPA, will select the final remedy for the site after reviewing and discussing all available data, including information submitted during the 30-day public review period. This review period provides the public with an opportunity to provide comments on the alternatives and remedial action selected for Site CC-IAAP-001 and Site CC-IAAP-002. After public comments are addressed, the Proposed Plan will be finalized. The public is encouraged to review and comment on this proposed plan.

IAAAP HISTORY

The IAAAP is located in the southeastern part of Iowa, near the town of Middletown, Des Moines County, approximately 10 miles west of the Mississippi River. Figure 1 shows the location of the IAAAP in southeastern Iowa and Figure 2 shows the location of the two sites with respect to Line 2 and each other within the IAAAP. The IAAAP is a secured facility covering approximately 19,000 acres in a rural setting. Approximately 7,750 acres are currently leased for agricultural use, 7,500 acres are forested land, and the remaining area is used for administrative and industrial operations. The principal mission of IAAAP has been load, assemble, and pack (LAP) operations dealing with a variety of conventional ammunition and fuzing systems.

IAAAP was initially developed in 1941 for the production of supplies for World War II and operated from September 1941 until August 1945. Production was resumed in 1949 and has continued to the present. Additionally, nitrogen fertilizer was produced at Line 8 from 1946 to 1950. From 1947 through mid-1975, the former Atomic Energy Commission (AEC) occupied facilities on the site, which then reverted to Army control in 1975 (Ecology and Environment, Inc., 1987 in JAYCOR, 1996). Currently, IAAAP is a government facility, owned by the United States Army and operated by a private contractor, American Ordnance, LLC (AO).

Figure 2. Construction Debris Site Locations

SITE BACKGROUND

CC-IAAP-001 was discovered in October 2007 at the intersection of roads H and A during work on a water line along Road H (Figure 3). The 1.34 acre site was used to discard construction and demolition debris. Visible debris includes scattered bricks, corrugated metal, metal parts, wire, and metal banding.

Figure 3. CC-IAAP-001

January 2015 2

Page 3: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

The site is bounded by a curving railroad spur that crosses Road H at the south end of the site and Road I at the northeast end of the site. The site slopes from north to south with steep embankments along Road H and the railroad spur. An unnamed drainage way bisects the site and flows from Road I, parallel to Road H, then to the railroad spur at the south end of the site. The drainage exits the site through a culvert under the railroad spur approximately 50 feet west of Road H. The discharge from the intermittent drainage ditch eventually flows into Brush Creek.

CC-IAAP-002 was discovered by recreational users in March 2009 along a tributary to Brush Creek in a forested area south of Line 2 (Figure 4). The 0.625 acre site was used to discard construction and demolition materials including sheets of metal, bricks, corrugated transite roofing/siding, wire, buckets, and wood. The debris was placed along the banks of an intermittent, unnamed drainage which discharges to Brush Creek. The end of the debris lies approximately 100-200 feet from the confluence with Brush Creek.

Figure 4. CC-IAAP-002

A Remedial Investigation (RI) was conducted at the two construction debris sites by PIKA in 2013 to identify the areas of potential contamination. Samples were collected from soil, surface water, sediments, and groundwater. Target analytes included explosives, metals, hexavalent chromium, semi-volatile organic compounds (SVOCs),

polynuclear aromatic hydrocarbons (PAHs), volatile organic compounds (VOCs), pesticides, herbicides, polychlorinated biphenyls (PCBs), and asbestos (a component of the transite roofing/siding). In addition, visual and instrument aided radiological observations and geological and analog geophysical investigations were also conducted at both sites to identify and delineate areas of potential contamination or debris.

The RI delineated the nature and extent of contamination of four media at CC-IAAP-001 and CC-IAAP-002: soil, sediment, surface water, and groundwater. The four media investigated at CC-IAAP-001were soil, sediment, surface water, and groundwater. Seven metals (arsenic, barium, cadmium, total chromium, hexavalent chromium, lead, and selenium) and one pesticide (endrin aldehyde) exceeded their respective project action limit (PALs) or background concentrations.

• Soil - metals (arsenic, barium, cadmium, total chromium, lead, and selenium) and one pesticide (endrin aldehyde) exceeded their respective PALs or background concentrations.

• Sediment - metals (arsenic, barium, total chromium, and selenium) exceeded their respective PALs.

• Surface Water metals (total and dissolved arsenic; total and dissolved barium; total hexavalent chromium, and total selenium) exceeded their respective PALs.

• Groundwater - metals (total and dissolved arsenic, total chromium, total hexavalent chromium, and total lead) exceeded their respective PALs.

At CC-IAAP-002, seven metals (arsenic, barium, cadmium, total chromium, hexavalent chromium, lead, and selenium) and 13 SVOCs (acenaphthene, acenaphthylene, benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-cd)pyrene, phenanthrene, and pyrene) exceeded their respective PALs or background concentrations.

• Soils, metals (arsenic, barium, total chromium, lead, and selenium) exceeded their respective PALs or background concentrations.

• Sediment - metals (arsenic, barium, total chromium, lead, and selenium) and thirteen SVOCs

January 2015 3

Page 4: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

(acenaphthene, acenaphthylene, benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, chrysene, dibenzo(a,h)anthracene, fluoranthene, indeno(1,2,3-cd)pyrene, phenanthrene, and pyrene) exceeded their respective PALs or background concentrations.

• Groundwater - metals (total and dissolved arsenic, total chromium, and total hexavalent chromium) exceeded their respective PALs.

Figures showing the distribution of contaminants that exceeded their respective PALs or background concentrations are included in Attachment 1. Figures showing the distribution of contaminants that exceeded their respective PALs or background concentrations are included in Attachment 1. Attachment 2 includes two tables which list the RI PAL and Background Exceedances at each site. Table A2-1 lists the exceedances for Site CC-IAAP-001 and Table A2-2 lists the exceedances for Site CC-IAAP-002.

All soil, sediment, and water samples from both sites were scanned for radiation using a multi-spectrum detector (i.e. alpha/beta/gamma). The radiation measurements indicated all radiation levels were within normal background levels. Soil borings and geophysical data confirmed that no construction debris was buried at either site. The concentrations of all detected metals, pesticides, and SVOCs were further evaluated during the human health and ecological risk assessments. None of the detected concentrations exceeded acceptable risk levels.

SCOPE AND ROLE OF RESPONSE ACTIONS

No response action is proposed for CC-IAAP-001 because no human health or ecological risks were identified. The evaluation of risk is discussed in the next section. The proposed response action at CC-IAAP-002 is to remove the asbestos containing material (ACM) debris piles.

SUMMARY OF SITE RISKS

Baseline Human Health Risk Assessments (BHHRAs) and Screening-Level Ecological Risk Assessments (SLERAs) were conducted for the two sites (CC-IAAP-001 and CC-IAAP-002). No unacceptable human health or ecological risks were identified at either site. The BHHRA was consistent

with the framework for risk assessment described in Risk Assessment Guidance for Superfund (RAGS) (EPA, 1989) and the SLERA was completed in accordance with the Superfund Guidance “Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments” (EPA, 1997).

The current and foreseeable future (industrial/recreational) land uses at both sites include:

• Current and future hunter exposure to soil, surface water and sediment;

• Future construction worker exposure to soil and soil derived dust; and

• Future commercial/industrial worker exposure to soil and groundwater hypothetically used as drinking water.

The BHHRA evaluated potential exposures to surface soil, subsurface soil, groundwater, and surface water for current and future hunters, future outdoor workers, and future construction workers. This evaluation was performed using conservative exposure assumptions, which represent very cautious estimates of potential site exposure.

The potentially complete exposure pathways evaluated in the BHHRA included direct contact (incidental ingestion and dermal contact) with soil, surface water, and sediment, inhalation of contaminants of potential concern (COPCs) in dust released from soil, and potable use of groundwater (ingestion with groundwater used as tap water in a commercial setting). Health risks for each of the current and future land use exposure scenarios were quantified using algorithms specified in USEPA guidance.

The BHHRA characterized cancer and non-cancer risks associated with the COPC, media and potential receptors identified above. The results of the BHHRA indicate, for current and potential future land uses, that potential exposure to soil, surface water, and sediment at the Site would be associated with cancer risks that do not exceed USEPA’s cancer risk range of 1x10-6 to 1x10-4 (for all receptors except for the Commercial/Industrial Worker, which falls within the acceptable range), and non-cancer hazard index (HI) values that are lower than EPA’s threshold value of 1.

January 2015 4

Page 5: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

In addition, the results of the BHHRA indicate that combined exposures to soil, surface water, sediment, and groundwater used as drinking water would not result in risks that exceed the upper bound of the USEPA Remedial Goal range or an HI of 1. Therefore, no response actions to mitigate cancer and non-cancer risks are required for these media.

The SLERAs were performed using USEPA Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments. The SLERA evaluated the potential for chemical constituents of concern detected in surface soil, surface water, and sediment to adversely affect ecological receptors. The SLERA identified complete exposure pathways and conducted a conservative assessment of all contaminants of potential ecological concern. Analytes with a Hazard Quotient (HQ) > 1 were considered Contaminants of potential ecological concern (COPECs) and were retained for further evaluation. The analysis of uncertainties found that the estimations of exposure and potential toxicity used in calculating the HQs are based on conservative assumptions of bioavailability, uptake, and toxicological threshold, resulting in HQs that overestimate the potential for risk to exposed individuals,

The results of the SLERA indicate that given the uncertainties described above, the concentrations present an acceptable risk to ecological receptors and no further evaluation of risk is required.

Although no human health or ecological risks were identified at either site, the transite roofing/siding material in debris piles located within CC-IAAP-002 are known to contain chrysotile asbestos (a CERCLA hazardous substance). With continued exposure to the elements the ACM debris will degrade and pose a future threat of exposure to friable asbestos. NFA will be recommended after the ACM is removed and subsequent site sampling verifies the site as not having unacceptable risk levels.

REMEDIAL ACTION OBJECTIVES

Remedial Action Objectives (RAOs) describe what the proposed cleanup alternative is expected to accomplish and serves as the basis for development and evaluation of the selected remedial alternatives.

No RAOs are necessary for CC-IAAP-001 because no unacceptable risk was identified. No further action (NFA) is recommended.

The Army and EPA concluded that remedial action is necessary to protect public health, welfare, and the environment from future exposure to friable asbestos from the ACM debris piles at CC-IAAP-002.

Site-specific Remedial Action Objectives (RAOs) for soil, sediment and surface water are as follows:

• Prevent direct media contact with human and ecological receptors;

• Prevent migration of friable asbestos through wind, surface water runoff, and erosion pathways; and

• Remove all ACM debris from CC-IAAP-002 to prevent exposure and allow for unlimited use and unrestricted exposureAfter removal of the ACM debris, NFA is recommended.

SUMMARY OF REMEDIAL ALTERNATIVES

In the Feasibility Study (FS), four alternatives were developed to address the ACM debris piles at CC-IAAP-002.

Alternative 1 - No Action

The No Action alternative is required by the National Oil and Hazardous Substances Pollution Contingency Plan for baseline comparison purposes (40 CFR 300.430[e][6]). Under this alternative, the site would remain in its present condition with periodic inspections to document any changes in site conditions that might affect the condition of the ACM debris piles. Although the No Action alternative is not recommended as a choice, it does provide value for comparing the other alternatives.

Alternative 2 – Security Fencing with Land Use Controls and Long-Term Monitoring

This alternative involves the placement of a barbed wire fence around the debris piles. This option would involve long-term maintenance of the fence and periodic vegetation removal. Security fencing would limit access to the site and signs would be posted to warn of potential hazards.

January 2015 5

Page 6: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

Alternative 3 – Encapsulation/ Capping with Land Use Controls and Long-Term Monitoring

This alternative involves the placement of a two foot thick “cap” of clean fill material over the ACM debris piles with a suitable overlap around the edges. Following placement, the material will be graded to ensure uniform application and compacted for stability. Suitable erosion control measures and revegetation will be implemented to ensure integrity of the cap material from potential run-off events within the unnamed drainage. Long-term monitoring will be required to ensure the integrity of the cap and the stability and effectiveness of the erosion control measures.

Alternative 4 – Removal and Disposal of ACM Debris Piles

This alternative involves the removal of the ACM debris piles and disposing of the material at an approved off-site facility. After the material is removed, the site would be restored and revegetated. No additional action would be required.

EVALUATION OF ALTERNATIVES

In accordance with CERCLA regulations, the Army and EPA used the nine CERCLA Evaluation Criteria listed in Table 1 to determine the best alternative for addressing the ACM debris piles at CC-IAAP-002.

Table 1 CERCLA Evaluation Criteria For Remedial

Alternatives

Threshold Criteria:

1) Overall Protection of Human Health and the Environment: Does the alternative protect human health and the environment from exposure to risks above acceptable threshold levels?

All retained alternatives must achieve the overall protection of human health and the environment. This evaluation criterion provides an overall assessment of each alternative’s ability to protect human health and the environment, focusing on how each alternative addresses site risks from each exposure pathway through treatment,

engineering controls, or institutional controls.

2) Compliance with Applicable or Relevant and Appropriate Requirements (ARARs): Does the alternative comply with all required laws, statutes, and regulations?

The remedial alternatives are evaluated to determine whether they attain the ARARs that were presented in the FS. The ARARs are included in Attachment 3. To be selected for implementation, an alternative must meet all project ARARs.

For an alternative to be selected, it must meet the two Threshold Criteria

Balancing Criteria:

3) Long-Term Effectiveness and Permanence: Is the alternative effective and permanent for the contamination at the site?

This criterion evaluates the risk from hazardous materials remaining at the conclusion of remedial activities. The evaluation takes into account the volume, toxicity, mobility, and propensity of the residuals to bioaccumulate. This evaluation also includes assessment of the uncertainties associated with an alternative for providing long-term protection from the hazardous wastes and residuals, the potential need to maintain or replace technical components of the alternative, and the potential exposure pathways and risks posed should the remedial action need replacement.

4) Reduction of Toxicity, Mobility, or Volume of Contaminants through Treatment: Does the alternative reduce the toxicity, mobility, and volume of the contaminants?

This criterion evaluates the anticipated performance of the alternative to include the extent to which total mass, volume, and/or mobility of contaminants are reduced; the toxicity of residuals resulting from the remedy; and to what extent the effects of treatment are irreversible.

5) Short-Term Effectiveness: What is the risk to the community, workers, and the environment during implementation of the response action?

This criterion measures the effects of the various alternatives on human health and the environment during implementation of the remedial action, as well as the effectiveness of the proposed measures to protect the community, workers, and the environment

6) Implementability: How difficult is it to implement the alternative?

Implementability refers to administrative and technical feasibility of applying a proposed alternative. Administrative factors that were investigated during the

January 2015 6

Page 7: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

evaluation included construction permits, dust permits, and potential impacts on operations being conducted in areas adjoining the site. This evaluation was completed using input from IAAAP representatives, American Ordnance, LLC. representatives and discussion with project personnel.

7) Cost: What are the relative costs associated with the alternative?

Cost estimates are developed for the purpose of comparing the remedial alternatives during the remedy selection process

Modifying Criteria

8) State / Support Agency Acceptance: Do the regulatory agencies involved accept the remedy?

This Proposed Plan solicits input and acceptance from the regulatory agencies involved with the remedial action.

9) Community Acceptance: Does the community accept the remedy as viable option?

Community acceptance is evaluated based on issues and concerns the public, or representatives of the public, may have regarding each of the alternatives. Questions concerning the selected alternatives will be addressed during this phase of the project.

Modifying criteria will be evaluated in the Record of Decision. At this time, IAAAP is aware of no objections to the preferred remedy, but community acceptance will be re-evaluated following agency and public comments on the Proposed Plan.

The evaluation of each alternative for CC-IAAP-002 using the nine CERCLA criteria is summarized below. Threshold Criteria:

Overall Protection of Human Health and the Environment

Because no action would be performed, Alternative 1 would not prevent the degradation of the ACM and potential future exposure to friable asbestos. Alternative 2 would deter access to the material but would not reduce potential degradation, mobility, or volume of debris. Alternatives 3 and 4 offer the best overall protection of human health and the environment by eliminating ACM degradation, mobility, and possible exposure to friable asbestos.

Compliance with Applicable or Relevant and Appropriate Requirements

Under Alternative 1, since no action would be taken, the ARARs would not be met. Alternative 2 would not reduce the potential for degradation of the ACM or mobility of friable asbestos and, therefore, the ARARs would not be met. Compliance with the project ARARs (Attachment 3) is expected if either Alternative 3 or 4 are applied.

Long-Term Effectiveness and Performance

Alternative 1 would not limit site access and would not reduce or eliminate potential exposure, degradation, mobility, or volume of the ACM debris. In addition, it includes no long-term management (LTM) measures. Alternative 2 would limit site access and provide for LTM. However, Alternative 2 will not reduce potential degradation, mobility, or volume of the ACM debris. Therefore, all potential future risks from friable asbestos exposure would remain under Alternatives 1 and 2. Application of Alternative 3 or 4 will address the potential exposure to friable asbestos by encapsulating or removing and disposal of the ACM debris. With Alternative 3, the encapsulation of the ACM debris piles provides a physical barrier that provides temporary reduction to the future exposure as long as the integrity of the cap, the erosion control features, and the land use controls are maintained. The regular maintenance of the erosion control measures and effective application of land use controls will determine the long-term effectiveness and performance of this Alternative. Alternative 4 provides the best long-term effect and performance of a remedial action.

Reduction of Toxicity, Mobility, or Volume

Alternatives 1 and 2 provide no significant reduction in toxicity, mobility, volume, or future potential exposure to the ACM debris piles. Alternative 3 does not reduce the volume of the ACM debris piles. However, the encapsulation or capping of the ACM debris pile provides a physical barrier that limits exposure. Alternative 4 provides maximum reduction in mobility and volume of the hazardous material by removing the ACM debris piles to an off-site facility.

Short-Term Effectiveness and Performance

Any disturbance of the debris would increase the risk of exposure to friable asbestos and limit short-

January 2015 7

Page 8: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

term effectiveness. The implementation of Alternatives 1 and 2 would not disturb the ACM; therefore, there is limited short term risk to workers. However, the risk of exposure remains for hunters and trespassers if the ACM is disturbed. Alternative 1 could be implemented immediately and Alternative 2 could be implemented in several weeks.

Alternatives 3 and 4 would take longer to implement (approximately two months for each alternative). Appropriate measures would be used during construction to limit workers exposure to friable asbestos generated during capping or removal activities. Risk to the operations at other active IAAAP sites, the surrounding community, or the adjoining ecosystem is not anticipated for either Alternative 3 or 4. All efforts will be taken to minimize the potential for these short-term risks through the use of dust control technologies, appropriate training, and use of personal protection equipment, when applicable.

Implementability

Alternative 1, since it requires no action, is the most implementable since no action would be taken. Alternatives 2, 3, and 4 have varying levels of implementability. Alternative 2 would not require an access road or heavy equipment and would be relatively simple to implement. For Alternatives 3 and 4, conventional, commercially available heavy machinery and equipment would be used. As is typical with most mechanical equipment, certain wear and tear and maintenance is expected and might affect the implementability during the course of the remediation.

Alternative 2 is the easiest to implement, while Alternative 3 and 4 have similar implementability due to the need to mobilize equipment and vehicles on site. For Alternatives 2 and 3, LTM and effective land use controls are required. Compared to Alternative 4, Alterative 2 and 3 would be more difficult to implement. The need to implement LTM for Alternative 2 or 3 has a negative impact on implementability. In contrast, no additional LTM will be required after completion of the removal action making Alternative 4 the most implementable remedy. Alternatives 2 and 3 do not achieve the remediation goal of site closure, whereas Alternative 4 does.

Cost

There are no projected costs associated with Alternative 1. The costs for implementation of Alternatives 2, 3, and 4 vary based on the level of effort and overall time estimated for each alternative to achieve the remediation goals. The estimated costs for each alternative are provided in Table 2.

Table 2

Estimated Costs for Remedial Action Alternatives

ALTERNATIVE ESTIMATED COST

Alternative 1 – No Action No Cost

Alternative 2 – Security Fencing with Land Use Controls/ One Year of Long-Term Monitoring

$119,577.24

Alternative 3 – Encapsulation or Capping with Land Use Controls/One Year of Long-Term Monitoring

$ 269,238.66

Alternative 4 – Removal and Disposal of ACM Debris Piles

$ 462,336.23

RECOMMENDED ALTERNATIVE

The Preferred Remedial Alternative for Site CC-IAAP-002 is the removal and disposal of the ACM debris piles due to the potential of future exposure to friable asbestos. Alternative 3 prevents exposure to potential friable asbestos by installing a barrier. However, this alternative also requires the use of effective long-term monitoring which will result in additional costs and effort following the implementation of the alternative. This alternative also leaves the potential for future exposure in the event of degradation of the cap or erosion control measures. Alternative 3 does not achieve site closure. Alternative 4 provides the best solution to eliminate the risk for future exposure and the costs incurred during remedial action could be offset by eliminating the need for incurring costs for long-term monitoring or future costs for maintenance that

January 2015 8

Page 9: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

January 2015 9

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

 

may be required for Alternative 3. Following the detailed evaluation of Alternatives 3 and 4, Alternative 4 is the recommended remedial alternative for Site CC-IAAP-002.

The Army and EPA support the Preferred Remedial Alternative stated above and believe it provides the best remedial alternative with respect to the evaluation criteria. The Army and EPA expect the Preferred Remedial Alternative to satisfy the following statutory requirements of CERCLA Section 121(b): 1) be protective of human health and the environment; 2) comply with Applicable or Relevant and Appropriate Requirements; 3) be cost effective and 4) utilize permanent solutions and alternative treatment technologies to the maximum extent practicable. The Preferred Alternative can change in response to public comment or new information.

COMMUNITY PARTICIPATION

Detailed information regarding this proposed action is available in the Administrative Record File, which is located online at www.iaaap.adminrecord.com. A hard copy is located at the IAAAP Library. The Burlington Public Library has computers available to the public for those interested in viewing the electronic version of the Administrative Record. Announcements of the availability of this Proposed Plan were published in The Hawk Eye newspaper on January 9 and January 12, 2015, in accordance with CERCLA. The Army is seeking comments on the action recommended in this Proposed Plan.

A public comment period running from January 13, 2015 through February 11, 2015 is open during which comments will be accepted and considered prior to a final decision on the construction debris sites.

In addition, a public meeting will be held at the Burlington Public Library, 210 Court Street Burlington, Iowa, on February 9, 2015 from 4:30 to 6:00 pm to explain this proposed action and to answer questions and accept comments. A comment form has been included at the end of this document to submit input on the Proposed Plan.

For additional information, please contact:

Mr. Jesse Kahler Email: [email protected] Phone: (319) 753-7339

Page 10: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

ACRONYM AND ABBREVIATIONS ACM Asbestos Containing Material AEC Atomic Energy Commission ARAR Applicable or Relevant and Appropriate Requirements BHHRA Baseline Human Health Risk Assessment CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations COPCs Contaminants of potential concern COPCs Contaminants of potential ecological concern EPA United States Environmental Protection Agency FFA Federal Facility Agreement FS Feasibility Study HI Hazard Index HQ Hazard Quotient IAAP Iowa Army Ammunition Plant (used in site identifiers) IAAAP Iowa Army Ammunition Plant LAP Load, Assemble, and Pack LTM Long-Term Management LUCs Land Use Controls NCP National Oil and Hazardous Substances Pollution Contingency Plan PAH Polynuclear Aromatic Hydrocarbons PAL Project Action Limit PCBs Polychlorinated Biphenyls PIKA PIKA International, Inc. RAGS Risk Assessment Guidance for Superfund RAOs Remedial Action Objectives RI Remedial Investigation SLERA Screening-Level Ecological Risk Assessment SVOC Semi-Volatile Organic Compound VOC Volatile Organic Compound

January 2015 10

Page 11: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

GLOSSARY OF TERMS1.

Administrative Record File – A compilation of documents that serve as the basis for the decision in selecting a response action to be taken at a site.

Applicable or Relevant and Appropriate Requirements (ARARs) – The federal and state environmental laws that a selected remedy will meet. These requirements may vary among sites and alternatives.

Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) – The federal law that addresses problems resulting from releases of hazardous substances to the environment.

Feasibility Study (FS) – This CERCLA document develops and evaluates options for remedial action. The FS emphasizes data analysis and is generally performed concurrently in an interactive fashion with the Remedial Investigation (RI), using data gathered during the RI.

Land Use Controls (LUCs) – Physical, legal, or administrative mechanisms that restrict the use of, or limit access to, contaminated property to reduce risk to human health and the environment. Physical mechanisms encompass a variety of engineered remedies to contain or reduce contamination and physical barriers to limit access to property, such as fences or signs. The legal mechanisms are imposed to ensure the continued effectiveness of land use restrictions imposed as part of a remedial decision. Legal mechanisms include restrictive covenants, negative easements, equitable servitudes, and deed notices. Administrative mechanisms include notices, adopted local land use plans and ordinances, construction permitting, or other existing land use management systems that may be used to ensure compliance with use restrictions.

Operable Unit – A portion of a site separately considered for remedial or corrective action.

Long-term Maintenance – Measures required to maintain remedial systems to ensure the effectiveness of the response action.

1 This glossary provides a description of how the terms listed are used in this Proposed Plan.

Proposed Plan – CERCLA document that summarizes evidence to support the selection of a preferred remedial alternative at a CERCLA site. This document is intended for public distribution to solicit comments on the proposed action(s).

Record of Decision (ROD) – The CERCLA decision document that presents the cleanup remedy selected by the Army and EPA.

Remedial Action Objectives (RAOs) – Site-specific goals to protect human health and the environment.

Remedial Investigation (RI) – A process under CERCLA to determine the nature and extent of the problem presented by a contaminant release. The RI includes sampling, monitoring, and gathering of sufficient information to determine the necessity for remedial action.

Remediation Goals (RGs) – Contaminant concentrations used to identify the soil requiring excavation, treatment, and disposal to meet the RAOs and provide protection for human health and the environment.

January 2015 11

Page 12: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

USE THIS SPACE TO WRITE YOUR COMMENTS

Your input to the Proposed Plan process is important to the Army. The comments that the Army receives are vital to select the cleanup remedy for the site. Changes to the Preferred Remedial Alternative can be made based on comments made by the public. Please use the space below to submit your comments on the Proposed Plan. If you need more space for your comments, attach additional pages. After you have completed the form, mail to the following address: Iowa Army Ammunition Plant, Attn: Mr. Jesse Kahler, 7571 DMC Hwy 79, Middletown, Iowa, 52638-5000. Comments must be postmarked by February 6, 2015.

If you have any questions about the comment period, please contact Jesse Kahler at (319) 753-7339.

January 2015 12

Page 13: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

ATTACHMENT 1

CONTAMINANT DISTRIBUTION FIGURES

January 2015 13

Page 14: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 1

LEGEND

LOCATION MAP

Remedial Investigation Surface Soil and Sediment

PAL and Background Exceedances for CC-IAAP-001

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

SS-1

SS-2

SB-1

SB-3

SB-2

SB-5

SB-4

ST2

ST1

ST3ST4

0 40 8020Feet

1 inch = 38 feet

*Duplicate result reported if higher thanthe primary sample result.

A-1FIGURE

LEAD 28 mg/kg

SELENIUM 1.9 mg/kg

CC-IAAP-01-SF01-SS-00A

ARSENIC 8.2 mg/kg

LEAD * 22 mg/kg

SELENIUM * 2.7 mg/kg

CC-IAAP-01-SB01-SS-00A / -00B

ARSENIC 4.6 mg/kg

BARIUM 73 mg/kg

CHROMIUM 12 mg/kg

SELENIUM 3 mg/kg

CC-IAAP-01-ST03-SS-00A

ARSENIC 10 mg/kg

CHROMIUM 21 mg/kg

LEAD 26 mg/kg

SELENIUM 3.1 mg/kg

CC-IAAP-01-SB02-SS-00A

ARSENIC 8.4 mg/kg

BARIUM 160 mg/kg

CHROMIUM 17 mg/kg

SELENIUM 2.3 mg/kg

CC-IAAP-01-ST02-SS-00A

ARSENIC * 5.8 mg/kg

BARIUM * 140 mg/kg

CHROMIUM * 14 mg/kg

SELENIUM 3.8 mg/kg

CC-IAAP-01-ST01-SS-00A / -00B

ARSENIC 9.5 mg/kg

CHROMIUM 20 mg/kg

ENDERIN ALDEHYDE 0.017N mg/kg

LEAD 22 mg/kg

CC-IAAP-01-SF02-SS-00A

ARSENIC 11 mg/kg

CHROMIUM 25 mg/kg

LEAD 26 mg/kg

SELENIUM 2 mg/kg

CC-IAAP-01-SB03-SS-00A

ARSENIC 9.7 mg/kg

SELENIUM 2.5 mg/kg

CC-IAAP-01-SB05-SS-00ASite Boundary

Surface Soil (SS)

Soil Borings (SB)

Sediment (ST) ARSENIC 7.3 mg/kg

BARIUM 92 mg/kg

CHROMIUM 13 mg/kg

SELENIUM 2.6 mg/kg

CC-IAAP-01-ST04-SS-00A

ARSENIC 11 mg/kg

CHROMIUM 21 mg/kg

ENDERIN ALDEHYDE 0.017N mg/kg

LEAD 24 mg/kg

SELENIUM 3.4 mg/kg

CC-IAAP-01-SB04-SS-00A

"N" denotes tentatively identified values.

Direction of Surface Water Flow

SELENIUM 2.9 mg/kg

Page 15: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 1

LEGEND

LOCATION MAP

Remedial Investigation Subsurface Soil PAL and Background Exceedances

for CC-IAAP-001

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

SB-1

SB-3

SB-2

SB-5

SB-4

0 40 8020Feet

1 inch = 38 feet

A-2FIGURE

Color Key2 ft bgs6 ft bgs

10 ft bgs

CHROMIUM 23 mg/kg

SELENIUM 1.8 mg/kg

ARSENIC 7.8 mg/kg

CHROMIUM 21 mg/kg

LEAD 18 mg/kg

SELENIUM 2.7 mg/kg

SELENIUM 2.5 mg/kg

CC-IAAP-01-SB03-SS-02A

CC-IAAP-01-SB03-SS-06A

CC-IAAP-01-SB03-SS-10A

BARIUM 350 mg/kg

CADMIUM 1.3 mg/kg

CHROMIUM 22 mg/kg

SELENIUM 4.3 mg/kg

ARSENIC 11 mg/kg

SELENIUM 2.3 mg/kg

ARSENIC 7.9 mg/kg

SELENIUM 3.3 mg/kg

CC-IAAP-01-SB05-SS-02A

CC-IAAP-01-SB05-SS-06A

CC-IAAP-01-SB05-SS-10A

ARSENIC 9.4 mg/kg

CHROMIUM 24 mg/kg

SELENIUM 3 mg/kg

ARSENIC 12 mg/kg

CHROMIUM 20 mg/kg

SELENIUM 3.3 mg/kg

ARSENIC 9.5 mg/kg

SELENIUM 2.8 mg/kg

CC-IAAP-01-SB04-SS-02A / -02B

CC-IAAP-01-SB04-SS-06A

CC-IAAP-01-SB04-SS-10A

ARSENIC 21 mg/kg

CHROMIUM 25 mg/kg

LEAD 27 mg/kg

SELENIUM 4 mg/kg

ARSENIC 9.1 mg/kg

SELENIUM 3 mg/kg

ARSENIC 15 mg/kg

CADMIUM 0.81 mg/kg

SELENIUM 2.3 mg/kg

CC-IAAP-01-SB01-SS-02A

CC-IAAP-01-SB01-SS-06A

CC-IAAP-01-SB01-SS-10A

ARSENIC 14 mg/kg

SELENIUM 2.6 mg/kg

ARSENIC 10 mg/kg

CHROMIUM 20 mg/kg

SELENIUM 2.5 mg/kg

ARSENIC 8.3 mg/kg

SELENIUM 2.2 mg/kg

CC-IAAP-01-SB02-SS-02A

CC-IAAP-01-SB02-SS-06A

CC-IAAP-01-SB02-SS-10A

Site Boundary

Soil Borings (SB)

Direction of Surface Water Flow

Page 16: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 1

LEGEND

LOCATION MAP

Remedial InvestigationSurface Water and Groundwater PAL

and Background Exceedancesfor CC-IAAP-001

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

GW1

GW2

GW3

GW-4

ST2

ST1

ST3

0 40 8020Feet

1 inch = 38 feet

Notes:(T) = Total(D) = Dissolved

A-3FIGURE

ARSENIC (D) 1.5 J ug/l

ARSENIC (T) 13 ug/l

CHROMIUM (T) 16 ug/l

LEAD (T) 16 ug/l

CC-IAAP-01-SB01-GW-14A

ARSENIC (D) 4.1 J ug/l

ARSENIC (T) 8.9 J ug/l

CHROMIUM (T) 3.3 J ug/l

CHROMIUM (HEXAVALENT) (T) 11 J ug/l

CC-IAAP-01-SB02-GW-17A

ARSENIC (T) 2.1 J ug/l

CHROMIUM (T) 15 ug/l

CC-IAAP-01-SB04-GW-33A

Not Sampled

ARSENIC (D) 1.5 J ug/l

BARIUM (D) 130 ug/l

ARSENIC (T) 1.2 J ug/l

BARIUM (T) 130 ug/l

CC-IAAP-01-ST03-SW-00A

ARSENIC (T) 2 J ug/l

BARIUM (T) 130 ug/l

SELENIUM (T) 1.8 J ug/l

CHROMIUM (HEXAVALENT) (T) 16 J ug/l

CC-IAAP-01-ST02-SW-00A

ARSENIC (T) 1.4 J ug/l

BARIUM (T) 130 ug/l

CC-IAAP-01-ST01-SW-00A / -00B

Site Boundary

SF (Surface Water)

GW (Groundwater) Direction of Surface Water Flow

Page 17: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

SS-1

SS-2

SB-4

SB-2

SB-3

SB-1

ST1

ST2

ST3

Brush Creek

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 2

1 inch = 33 feet

0 30 6015 ft

LOCATION MAP

Remedial Investigation Surface Soil and Sediment PAL and

Background Exceedances for CC-IAAP-002

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

LEGEND

*Duplicate result reported if higherthan the primary sample result.

A-4

ARSENIC * 14 mg/kg

BARIUM * 380 J mg/kg

CHROMIUM * 14 mg/kg

LEAD * 150 J mg/kg

SELENIUM * 3.5 mg/kg

ACENAPHTHENE * 0.027 J mg/kg

ACENAPHTHYLENE * 0.077 J mg/kg

BENZO(A)ANTHRACENE * 0.4 J mg/kg

BENZO(A)PYRENE * 0.57 J mg/kg

BENZO(B)FLUORANTHENE * 1 J mg/kg

BENZO(G,H,I)PERYLENE * 0.48 J mg/kg

BENZO(K)FLUORANTHENE * 0.34 J mg/kg

CHRYSENE * 0.81 J mg/kg

DIBENZO(A,H)ANTHRACENE * 0.093 J mg/kg

FLUORANTHENE * 2.5 J mg/kg

INDENO(1,2,3-CD)PYRENE * 0.54 J mg/kg

PHENANTHRENE * 2.1 J mg/kg

PYRENE * 1.8 J mg/kg

CC-IAAP-02-ST01-SS-00A / -00B

ARSENIC 7.9 mg/kg

LEAD 18 mg/kg

SELENIUM 3.1 mg/kg

CC-IAAP-02-SB03-SS-00A

ARSENIC 7.6 mg/kg

LEAD 25 mg/kg

SELENIUM 2.5 J mg/kg

CC-IAAP-02-SF02-SS-00A

ARSENIC 7.7 mg/kg

SELENIUM 1.7 J mg/kg

CC-IAAP-02-SB02-SS-00A

LEAD 46 mg/kg

SELENIUM 1.9 J mg/kg

CC-IAAP-02-SF01-SS-00A

LEAD 23 mg/kg

CC-IAAP-02-SB04-SS-00A

LEAD 19 mg/kg

SELENIUM 3.6 mg/kg

CC-IAAP-02-SB01-SS-00A

ARSENIC 7.9 mg/kg

BARIUM 120 J mg/kg

CHROMIUM 14 mg/kg

SELENIUM 2.2 J mg/kg

CC-IAAP-02-ST02-SS-00A

ARSENIC 9.4 mg/kg

BARIUM 170 mg/kg

CHROMIUM 16 mg/kg

SELENIUM 4.4 mg/kg

CC-IAAP-02-ST03-SS-00A

Surface Soil (SS)

Soil Borings (SB)

Creek

Site boundary

ST (Sediment)

Direction of Surface Water Flow

FIGURE

Page 18: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

SB-4

SB-2

SB-3

SB-1

Brush Creek

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 2

1 inch = 33 feet

0 30 6015 ft

LOCATION MAP

Remedial InvestigationSubsurface Soil PAL and

Background Exceedancesfor CC-IAAP-02

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

LEGEND

*No surface water present onsite

Color key2 ft bgs6 ft bgs10 ft bgs

Soil Borings (SB)

Creek

Site boundary

Direction of Surface Water Flow

ARSENIC 9.3 mg/kg

CHROMIUM 27 mg/kg

SELENIUM 3.3 mg/kg

ARSENIC 8 mg/kg

SELENIUM 2.1 J mg/kg

ARSENIC 12 mg/kg

SELENIUM 1.5 J mg/kg

CC-IAAP-02-SB02-SS-02A

CC-IAAP-02-SB02-SS-06A

CC-IAAP-02-SB02-SS-10A

CHROMIUM 24 mg/kg

SELENIUM 2.4 J mg/kg

ARSENIC 21 mg/kg

SELENIUM 4.5 mg/kg

ARSENIC 13 mg/kg

SELENIUM 1.7 J mg/kg

CC-IAAP-02-SB03-SS-02A

CC-IAAP-02-SB03-SS-06A

CC-IAAP-02-SB03-SS-10AARSENIC 7.6 mg/kg

ARSENIC 16 mg/kg

ARSENIC 12 mg/kg

BARIUM 390 mg/kg

CC-IAAP-02-SB04-SS-02A

CC-IAAP-02-SB04-SS-06A

CC-IAAP-02-SB04-SS-10A

ARSENIC 8.8 mg/kg

CHROMIUM 25 mg/kg

SELENIUM 4.3 mg/kg

ARSENIC 19 J mg/kg

LEAD 22 J mg/kg

SELENIUM 3.3 mg/kg

ARSENIC 7.5 mg/kg

SELENIUM 1.9 J mg/kg

CC-IAAP-02-SB01-SS-02A

CC-IAAP-02-SB01-SS-06A / -06B

CC-IAAP-02-SB01-SS-10A

A-5FIGURE

Page 19: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

GW-1

GW-2

GW-3

Brush Creek

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 2

1 inch = 33 feet

0 30 6015 ft

LOCATION MAP

Remedial Investigation Groundwater PAL and

Background Exceedances for CC-IAAP-002

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

LEGEND

**No surface water present onsite

(T) = Total(D) = Dissolved*Duplicate result reported if higherthan the primary sample result

Notes:

ARSENIC (T) 3.7 J ug/l

CHROMIUM (HEXAVALENT) * (T) 11 J ug/l

CC-IAAP-02-SB01-GW-13A / -13B

ARSENIC (D) 1.2 J ug/l

ARSENIC (T) 18 ug/l

CHROMIUM (T) 39 ug/l

CC-IAAP-02-SB02-GW-13A

ARSENIC (T) 3.2 J ug/l

CHROMIUM (T) 13 ug/l

CC-IAAP-02-SB03-GW-11A

Site boundary

A-6FIGURE

Groundwater (GW)

CreekDirection of Surface Water Flow

Page 20: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

ACM 4

ACM 3

ACM 2

ACM 1

Brush Creek

Iowa Army Ammunition PlantMiddletown, Iowa

Construction Debris Site 2

1 inch = 30 feet

0 25 5012.5 ft

LOCATION MAP

Remedial Investigation Asbestos Sample Results

for CC-IAAP-002

TITLE

IowaIowa

Data Sources: ESRI

NOTES & SOURCES

IAAAP Location

LEGEND

*No surface water present onsite

A-7FIGURE

ACM Debris Samples

Debris Pile

Creek

Site boundary

CHRYSOTILE 15 %

CC-IAAP-02-WP04-DB-00A

CHRYSOTILE 15 %

CC-IAAP-02-WP03-DB-00A

CHRYSOTILE 15 %

CC-IAAP-02-WP01-DB-00A

CHRYSOTILE 15 %

CC-IAAP-02-WP02-DB-00A / -00B

Direction of Surface Water Flow

Page 21: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

ATTACHMENT 2

SUMMARY OF THE RI PAL AND BACKGROUND EXCEEDANCES

January 2015 21

Page 22: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-1Remedial Investigation PAL and Background Exceedances for CC-IAAP-001

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 22

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-01-SB01-SS-00A 01-SB-1 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 8.2 mg/kg 6.4 2.4 HH PAL 7.327CC-IAAP-01-SB01-SS-00B 01-SB-1 FD 0 0.5 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 6.2 mg/kg 5.8 2.4 HH PAL 7.327CC-IAAP-01-SB01-SS-00A 01-SB-1 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 17 mg/kg 12 5.6 HH PAL 19.34CC-IAAP-01-SB01-SS-00B 01-SB-1 FD 0 0.5 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 13 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB01-SS-00A 01-SB-1 NS 0 0.5 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 19 mg/kg 1.9 11 ECO PAL 17.7CC-IAAP-01-SB01-SS-00B 01-SB-1 FD 0 0.5 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 22 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB01-SS-00A 01-SB-1 NS 0 0.5 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 1.9 mg/kg 3.2 0.52 ECO PAL 0.335CC-IAAP-01-SB01-SS-00B 01-SB-1 FD 0 0.5 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 2.7 mg/kg 2.9 0.52 ECO PAL 0.335CC-IAAP-01-SB01-SS-00A 01-SB-1 NS 0 0.5 SO 6/11/2013 SW7471 T 7439-97-6 MERCURY 0.057 mg/kg 0.053 0.1 ECO PAL 0.055CC-IAAP-01-SB01-SS-00B 01-SB-1 FD 0 0.5 SO 6/11/2013 SW7471 T 7439-97-6 MERCURY 0.079 mg/kg 0.049 0.1 ECO PAL 0.055CC-IAAP-01-SB01-SS-02A 01-SB-1 NS 2 2 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 21 mg/kg 5.9 2.4 HH PAL 7.327CC-IAAP-01-SB01-SS-02A 01-SB-1 NS 2 2 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 25 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB01-SS-02A 01-SB-1 NS 2 2 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 27 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-01-SB01-SS-02A 01-SB-1 NS 2 2 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 4 mg/kg 3 0.52 ECO PAL 0.335CC-IAAP-01-SB01-SS-02A 01-SB-1 NS 2 2 SO 6/11/2013 SW7471 T 7439-97-6 MERCURY 0.065 mg/kg 0.047 0.1 ECO PAL 0.055CC-IAAP-01-SB01-SS-06A 01-SB-1 NS 6 6 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 9.1 mg/kg 5.7 2.4 HH PAL 7.327CC-IAAP-01-SB01-SS-06A 01-SB-1 NS 6 6 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 18 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB01-SS-06A 01-SB-1 NS 6 6 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 3 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB01-SS-10A 01-SB-1 NS 10 10 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 15 mg/kg 5.1 2.4 HH PAL 7.327CC-IAAP-01-SB01-SS-10A 01-SB-1 NS 10 10 SO 6/11/2013 SW6020 T 7440-43-9 CADMIUM 0.81 mg/kg 0.31 0.36 ECO PAL 0.728CC-IAAP-01-SB01-SS-10A 01-SB-1 NS 10 10 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 13 mg/kg 9.7 5.6 HH PAL 19.34CC-IAAP-01-SB01-SS-10A 01-SB-1 NS 10 10 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 2.3 mg/kg 2.6 0.52 ECO PAL 0.335CC-IAAP-01-SB01-SS-10A 01-SB-1 NS 10 10 SO 6/11/2013 SW7471 T 7439-97-6 MERCURY 0.082 mg/kg 0.046 0.1 ECO PAL 0.055CC-IAAP-01-SB02-SS-00A 01-SB-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 10 mg/kg 5.6 2.4 HH PAL 7.327CC-IAAP-01-SB02-SS-00A 01-SB-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-43-9 CADMIUM 0.43 mg/kg 0.33 0.36 ECO PAL 0.728CC-IAAP-01-SB02-SS-00A 01-SB-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 21 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB02-SS-00A 01-SB-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 26 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB02-SS-00A 01-SB-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 3.1 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB02-SS-02A 01-SB-2 NS 2 2 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 14 mg/kg 5.5 2.4 HH PAL 7.327CC-IAAP-01-SB02-SS-02A 01-SB-2 NS 2 2 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 18 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-01-SB02-SS-02A 01-SB-2 NS 2 2 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 13 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB02-SS-02A 01-SB-2 NS 2 2 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2.6 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB02-SS-06A 01-SB-2 NS 6 6 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 10 mg/kg 5.5 2.4 HH PAL 7.327CC-IAAP-01-SB02-SS-06A 01-SB-2 NS 6 6 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 20 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-01-SB02-SS-06A 01-SB-2 NS 6 6 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 12 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB02-SS-06A 01-SB-2 NS 6 6 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2.5 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB02-SS-10A 01-SB-2 NS 10 10 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 8.3 mg/kg 5.4 2.4 HH PAL 7.327CC-IAAP-01-SB02-SS-10A 01-SB-2 NS 10 10 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 15 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-01-SB02-SS-10A 01-SB-2 NS 10 10 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 16 mg/kg 1.6 11 ECO PAL 17.7CC-IAAP-01-SB02-SS-10A 01-SB-2 NS 10 10 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2.2 mg/kg 2.7 0.52 ECO PAL 0.335CC-IAAP-01-SB03-SS-00A 01-SB-3 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 11 mg/kg 6.3 2.4 HH PAL 7.327CC-IAAP-01-SB03-SS-00A 01-SB-3 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-39-3 BARIUM 210 mg/kg 13 330 ECO PAL 201CC-IAAP-01-SB03-SS-00A 01-SB-3 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 25 mg/kg 12 5.6 HH PAL 19.34

Page 23: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-1Remedial Investigation PAL and Background Exceedances for CC-IAAP-001

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 23

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-01-SB03-SS-00A 01-SB-3 NS 0 0.5 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 26 mg/kg 1.9 11 ECO PAL 17.7CC-IAAP-01-SB03-SS-00A 01-SB-3 NS 0 0.5 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2 mg/kg 3.1 0.52 ECO PAL 0.335CC-IAAP-01-SB03-SS-02A 01-SB-3 NS 2 2 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 6.5 mg/kg 5.8 2.4 HH PAL 7.327CC-IAAP-01-SB03-SS-02A 01-SB-3 NS 2 2 SO 6/13/2013 SW6020 T 7440-39-3 BARIUM 230 mg/kg 12 330 ECO PAL 201CC-IAAP-01-SB03-SS-02A 01-SB-3 NS 2 2 SO 6/13/2013 SW6020 T 7440-43-9 CADMIUM 0.61 mg/kg 0.35 0.36 ECO PAL 0.728CC-IAAP-01-SB03-SS-02A 01-SB-3 NS 2 2 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 23 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB03-SS-02A 01-SB-3 NS 2 2 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 15 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB03-SS-02A 01-SB-3 NS 2 2 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 1.8 mg/kg 2.9 0.52 ECO PAL 0.335CC-IAAP-01-SB03-SS-06A 01-SB-3 NS 6 6 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 7.8 mg/kg 5.9 2.4 HH PAL 7.327CC-IAAP-01-SB03-SS-06A 01-SB-3 NS 6 6 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 21 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB03-SS-06A 01-SB-3 NS 6 6 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 18 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-01-SB03-SS-06A 01-SB-3 NS 6 6 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2.7 mg/kg 3 0.52 ECO PAL 0.335CC-IAAP-01-SB03-SS-10A 01-SB-3 NS 10 10 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 2.8 mg/kg 5.6 2.4 HH PAL 7.327CC-IAAP-01-SB03-SS-10A 01-SB-3 NS 10 10 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 16 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB03-SS-10A 01-SB-3 NS 10 10 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2.5 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB04-SS-00A 01-SB-4 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 11 mg/kg 5.9 2.4 HH PAL 7.327CC-IAAP-01-SB04-SS-00A 01-SB-4 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 21 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB04-SS-00A 01-SB-4 NS 0 0.5 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 24 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-01-SB04-SS-00A 01-SB-4 NS 0 0.5 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 3.4 mg/kg 2.9 0.52 ECO PAL 0.335CC-IAAP-01-SB04-SS-00A 01-SB-4 NS 0 0.5 SO 6/11/2013 SW8081 7421-93-4 ENDRIN ALDEHYDE 0.017 mg/kg N 0.0021 0.0105 ECO PALCC-IAAP-01-SB04-SS-02A 01-SB-4 NS 2 2 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 9.4 mg/kg 5.6 2.4 HH PAL 7.327CC-IAAP-01-SB04-SS-02B 01-SB-4 FD 2 2 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 9.3 mg/kg 5.3 2.4 HH PAL 7.327CC-IAAP-01-SB04-SS-02A 01-SB-4 NS 2 2 SO 6/11/2013 SW6020 T 7440-39-3 BARIUM 250 mg/kg 11 330 ECO PAL 201CC-IAAP-01-SB04-SS-02A 01-SB-4 NS 2 2 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 24 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB04-SS-02B 01-SB-4 FD 2 2 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 18 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-01-SB04-SS-02A 01-SB-4 NS 2 2 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 13 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB04-SS-02A 01-SB-4 NS 2 2 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 3 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB04-SS-02B 01-SB-4 FD 2 2 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 3 mg/kg 2.6 0.52 ECO PAL 0.335CC-IAAP-01-SB04-SS-06A 01-SB-4 NS 6 6 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 12 mg/kg 5.1 2.4 HH PAL 7.327CC-IAAP-01-SB04-SS-06A 01-SB-4 NS 6 6 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 20 mg/kg 9.7 5.6 HH PAL 19.34CC-IAAP-01-SB04-SS-06A 01-SB-4 NS 6 6 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 12 mg/kg 1.5 11 ECO PAL 17.7CC-IAAP-01-SB04-SS-06A 01-SB-4 NS 6 6 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 3.3 mg/kg 2.6 0.52 ECO PAL 0.335CC-IAAP-01-SB04-SS-10A 01-SB-4 NS 10 10 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 9.5 mg/kg 5.1 2.4 HH PAL 7.327CC-IAAP-01-SB04-SS-10A 01-SB-4 NS 10 10 SO 6/11/2013 SW6020 T 7440-43-9 CADMIUM 0.56 mg/kg 0.31 0.36 ECO PAL 0.728CC-IAAP-01-SB04-SS-10A 01-SB-4 NS 10 10 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 17 mg/kg 9.8 5.6 HH PAL 19.34CC-IAAP-01-SB04-SS-10A 01-SB-4 NS 10 10 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 13 mg/kg 1.5 11 ECO PAL 17.7CC-IAAP-01-SB04-SS-10A 01-SB-4 NS 10 10 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 2.8 mg/kg 2.6 0.52 ECO PAL 0.335CC-IAAP-01-SB05-SS-00A 01-SB-5 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 9.7 mg/kg 5.5 2.4 HH PAL 7.327CC-IAAP-01-SB05-SS-00A 01-SB-5 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-43-9 CADMIUM 0.39 mg/kg 0.33 0.36 ECO PAL 0.728CC-IAAP-01-SB05-SS-00A 01-SB-5 NS 0 0.5 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 17 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB05-SS-00A 01-SB-5 NS 0 0.5 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 17 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB05-SS-00A 01-SB-5 NS 0 0.5 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 2.5 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB05-SS-02A 01-SB-5 NS 2 2 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 6.4 mg/kg 5.4 2.4 HH PAL 7.327

Page 24: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-1Remedial Investigation PAL and Background Exceedances for CC-IAAP-001

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 24

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-01-SB05-SS-02A 01-SB-5 NS 2 2 SO 6/11/2013 SW6020 T 7440-39-3 BARIUM 350 mg/kg 11 330 ECO PAL 201CC-IAAP-01-SB05-SS-02A 01-SB-5 NS 2 2 SO 6/11/2013 SW6020 T 7440-43-9 CADMIUM 1.3 mg/kg 0.32 0.36 ECO PAL 0.728CC-IAAP-01-SB05-SS-02A 01-SB-5 NS 2 2 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 22 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-01-SB05-SS-02A 01-SB-5 NS 2 2 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 16 mg/kg 1.6 11 ECO PAL 17.7CC-IAAP-01-SB05-SS-02A 01-SB-5 NS 2 2 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 4.3 mg/kg 2.7 0.52 ECO PAL 0.335CC-IAAP-01-SB05-SS-06A 01-SB-5 NS 6 6 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 11 mg/kg 5.7 2.4 HH PAL 7.327CC-IAAP-01-SB05-SS-06A 01-SB-5 NS 6 6 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 18 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SB05-SS-06A 01-SB-5 NS 6 6 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 15 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-01-SB05-SS-06A 01-SB-5 NS 6 6 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 2.3 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-01-SB05-SS-10A 01-SB-5 NS 10 10 SO 6/11/2013 SW6020 T 7440-38-2 ARSENIC 7.9 mg/kg 5 2.4 HH PAL 7.327CC-IAAP-01-SB05-SS-10A 01-SB-5 NS 10 10 SO 6/11/2013 SW6020 T 7440-47-3 CHROMIUM 16 mg/kg 9.5 5.6 HH PAL 19.34CC-IAAP-01-SB05-SS-10A 01-SB-5 NS 10 10 SO 6/11/2013 SW6020 T 7439-92-1 LEAD 13 mg/kg 1.5 11 ECO PAL 17.7CC-IAAP-01-SB05-SS-10A 01-SB-5 NS 10 10 SO 6/11/2013 SW6020 T 7782-49-2 SELENIUM 3.3 mg/kg 2.5 0.52 ECO PAL 0.335CC-IAAP-01-SF01-SS-00A 01-SS-1 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 7.2 mg/kg 5.2 2.4 HH PAL 7.327CC-IAAP-01-SF01-SS-00A 01-SS-1 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 13 mg/kg 9.9 5.6 HH PAL 19.34CC-IAAP-01-SF01-SS-00A 01-SS-1 NS 0 0.5 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 28 mg/kg 1.6 11 ECO PAL 17.7CC-IAAP-01-SF01-SS-00A 01-SS-1 NS 0 0.5 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 1.9 mg/kg 2.6 0.52 ECO PAL 0.335CC-IAAP-01-SF02-SS-00A 01-SS-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-38-2 ARSENIC 9.5 mg/kg 6 2.4 HH PAL 7.327CC-IAAP-01-SF02-SS-00A 01-SS-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 20 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-01-SF02-SS-00A 01-SS-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7439-92-1 LEAD 22 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-01-SF02-SS-00A 01-SS-2 NS 0 0.5 SO 6/13/2013 SW6020 T 7782-49-2 SELENIUM 2.9 mg/kg 3 0.52 ECO PAL 0.335CC-IAAP-01-SF02-SS-00A 01-SS-2 NS 0 0.5 SO 6/13/2013 SW8081 7421-93-4 ENDRIN ALDEHYDE 0.017 mg/kg N 0.0022 0.0105 ECO PALCC-IAAP-01-ST01-SS-00A 01-ST1 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-38-2 ARSENIC 4.6 mg/kg 7.1 0.59 ECO PALCC-IAAP-01-ST01-SS-00B 01-ST1 FD 0 0.5 SE 6/12/2013 SW6020 T 7440-38-2 ARSENIC 5.8 mg/kg 7.7 0.59 ECO PALCC-IAAP-01-ST01-SW-00A 01-ST1 NS 0 0 WS 6/10/2013 SW6020 T 7440-38-2 ARSENIC 1.4 ug/l J 10 0.045 HH PALCC-IAAP-01-ST01-SS-00A 01-ST1 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-39-3 BARIUM 130 mg/kg 14 23.7 ECO PALCC-IAAP-01-ST01-SS-00B 01-ST1 FD 0 0.5 SE 6/12/2013 SW6020 T 7440-39-3 BARIUM 140 mg/kg 15 23.7 ECO PALCC-IAAP-01-ST01-SW-00A 01-ST1 NS 0 0 WS 6/10/2013 SW6020 T 7440-39-3 BARIUM 130 ug/l 2 110 ECO PALCC-IAAP-01-ST01-SW-00B 01-ST1 FD 0 0 WS 6/10/2013 SW6020 T 7440-39-3 BARIUM 130 ug/l 2 110 ECO PALCC-IAAP-01-ST01-SS-00A 01-ST1 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-47-3 CHROMIUM 12 mg/kg 14 5.6 HH PALCC-IAAP-01-ST01-SS-00B 01-ST1 FD 0 0.5 SE 6/12/2013 SW6020 T 7440-47-3 CHROMIUM 14 mg/kg 15 5.6 HH PALCC-IAAP-01-ST01-SS-00A 01-ST1 NS 0 0.5 SE 6/12/2013 SW6020 T 7782-49-2 SELENIUM 3.8 mg/kg 3.6 0.93 ECO PALCC-IAAP-01-ST01-SS-00B 01-ST1 FD 0 0.5 SE 6/12/2013 SW6020 T 7782-49-2 SELENIUM 1.7 mg/kg 3.9 0.93 ECO PALCC-IAAP-01-ST02-SS-00A 01-ST2 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-38-2 ARSENIC 8.4 mg/kg 6.1 0.59 ECO PALCC-IAAP-01-ST02-SW-00A 01-ST2 NS 0 0 WS 6/12/2013 SW6020 T 7440-38-2 ARSENIC 2 ug/l J 10 0.045 HH PALCC-IAAP-01-ST02-SS-00A 01-ST2 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-39-3 BARIUM 160 mg/kg 12 23.7 ECO PALCC-IAAP-01-ST02-SW-00A 01-ST2 NS 0 0 WS 6/12/2013 SW6020 T 7440-39-3 BARIUM 130 ug/l 2 110 ECO PALCC-IAAP-01-ST02-SS-00A 01-ST2 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-47-3 CHROMIUM 17 mg/kg 12 5.6 HH PALCC-IAAP-01-ST02-SS-00A 01-ST2 NS 0 0.5 SE 6/12/2013 SW6020 T 7782-49-2 SELENIUM 2.3 mg/kg 3.1 0.93 ECO PALCC-IAAP-01-ST02-SW-00A 01-ST2 NS 0 0 WS 6/12/2013 SW6020 T 7782-49-2 SELENIUM 1.8 ug/l J 5 0.66 ECO PALCC-IAAP-01-ST02-SW-00A 01-ST2 NS 0 0 WS 6/12/2013 SW7196A T 18540-29-9 CHROMIUM (HEXAVALENT) 16 ug/l J 10 0.031 HH PALCC-IAAP-01-ST03-SW-00A 01-ST3 NS 0 0 WS 6/11/2013 SW6020 D 7440-38-2 ARSENIC 1.5 ug/l J 10 0.045 HH PALCC-IAAP-01-ST03-SW-00A 01-ST3 NS 0 0 WS 6/11/2013 SW6020 D 7440-39-3 BARIUM 130 ug/l 2 110 ECO PAL

Page 25: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-1Remedial Investigation PAL and Background Exceedances for CC-IAAP-001

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 25

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-01-ST03-SS-00A 01-ST3 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-38-2 ARSENIC 4.6 mg/kg 6.7 0.59 ECO PALCC-IAAP-01-ST03-SW-00A 01-ST3 NS 0 0 WS 6/11/2013 SW6020 T 7440-38-2 ARSENIC 1.2 ug/l J 10 0.045 HH PALCC-IAAP-01-ST03-SS-00A 01-ST3 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-39-3 BARIUM 73 mg/kg 13 23.7 ECO PALCC-IAAP-01-ST03-SW-00A 01-ST3 NS 0 0 WS 6/11/2013 SW6020 T 7440-39-3 BARIUM 130 ug/l 2 110 ECO PALCC-IAAP-01-ST03-SS-00A 01-ST3 NS 0 0.5 SE 6/12/2013 SW6020 T 7440-47-3 CHROMIUM 12 mg/kg 13 5.6 HH PALCC-IAAP-01-ST03-SS-00A 01-ST3 NS 0 0.5 SE 6/12/2013 SW6020 T 7782-49-2 SELENIUM 3 mg/kg 3.4 0.93 ECO PALCC-IAAP-01-ST04-SS-00A 01-ST4 NS 0 0.5 SE 6/19/2013 SW6020 T 7440-38-2 ARSENIC 7.3 mg/kg 5.8 0.59 ECO PALCC-IAAP-01-ST04-SS-00A 01-ST4 NS 0 0.5 SE 6/19/2013 SW6020 T 7440-39-3 BARIUM 92 mg/kg 12 23.7 ECO PALCC-IAAP-01-ST04-SS-00A 01-ST4 NS 0 0.5 SE 6/19/2013 SW6020 T 7440-47-3 CHROMIUM 13 mg/kg 11 5.6 HH PALCC-IAAP-01-ST04-SS-00A 01-ST4 NS 0 0.5 SE 6/19/2013 SW6020 T 7782-49-2 SELENIUM 2.6 mg/kg 2.9 0.93 ECO PALCC-IAAP-01-SB01-GW-14A 01-GW1 NS 14 14 WG 6/13/2013 SW6020 D 7440-38-2 ARSENIC 1.5 ug/l J 10 0.045 HH PALCC-IAAP-01-SB01-GW-14A 01-GW1 NS 14 14 WG 6/13/2013 SW6020 T 7440-38-2 ARSENIC 13 ug/l 10 0.045 HH PALCC-IAAP-01-SB01-GW-14A 01-GW1 NS 14 14 WG 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 16 ug/l 10 0.031 HH PALCC-IAAP-01-SB01-GW-14A 01-GW1 NS 14 14 WG 6/13/2013 SW6020 T 7439-92-1 LEAD 16 ug/l 3 15 HH PALCC-IAAP-01-SB02-GW-17A 01-GW2 NS 17 17 WG 6/13/2013 SW6020 D 7440-38-2 ARSENIC 4.1 ug/l J 10 0.045 HH PALCC-IAAP-01-SB02-GW-17A 01-GW2 NS 17 17 WG 6/13/2013 SW6020 T 7440-38-2 ARSENIC 8.9 ug/l J 10 0.045 HH PALCC-IAAP-01-SB02-GW-17A 01-GW2 NS 17 17 WG 6/13/2013 SW6020 T 7440-47-3 CHROMIUM 3.3 ug/l J 10 0.031 HH PALCC-IAAP-01-SB02-GW-17A 01-GW2 NS 17 17 WG 6/13/2013 SW7196A T 18540-29-9 CHROMIUM (HEXAVALENT) 11 ug/l J 20 0.031 HH PALCC-IAAP-01-SB04-GW-33A 01-GW4 NS 33 33 WG 6/19/2013 SW6020 T 7440-38-2 ARSENIC 2.1 ug/l J 10 0.045 HH PALCC-IAAP-01-SB04-GW-33A 01-GW4 NS 33 33 WG 6/19/2013 SW6020 T 7440-47-3 CHROMIUM 15 ug/l 10 0.031 HH PAL

Acronyms

Bkg - Background NS - Normal sampleCAS ID - Chemical Abstracts Service Identification N - Tentatively IdentifiedD - Dissolved PAL - Project action limitECO - Ecological SE - SedimentExds - Exceeds SO - SoilFD - Field duplicate sample T - TotalHH - Human health TEM - Transmission electron microscopyJ - Estimated ug/l - Microgram per literLOQ - Level of quantitation WG - Groundwatermg/kg - Milligram per kilogram WS - Surface watermg/l - Milligrams per liter

Page 26: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-2Remedial Investigation PAL and Background Exceedances for CC-IAAP-002

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 26

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-02-SB01-SS-00A 02-SB-1 NS 0 0.5 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 6.9 mg/kg 5.7 2.4 HH PAL 7.327CC-IAAP-02-SB01-SS-00A 02-SB-1 NS 0 0.5 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 16 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SB01-SS-00A 02-SB-1 NS 0 0.5 SO 6/14/2013 SW6020 7439-92-1 LEAD 19 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-02-SB01-SS-00A 02-SB-1 NS 0 0.5 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 3.6 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-02-SB01-SS-02A 02-SB-1 NS 2 2 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 8.8 mg/kg 5.7 2.4 HH PAL 7.327CC-IAAP-02-SB01-SS-02A 02-SB-1 NS 2 2 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 25 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SB01-SS-02A 02-SB-1 NS 2 2 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 4.3 mg/kg 2.9 0.52 ECO PAL 0.335CC-IAAP-02-SB01-SS-06A 02-SB-1 NS 6 6 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 19 mg/kg J 5.6 2.4 HH PAL 7.327CC-IAAP-02-SB01-SS-06A 02-SB-1 NS 6 6 SO 6/14/2013 SW6020 7440-39-3 BARIUM 310 mg/kg J 11 330 ECO PAL 201CC-IAAP-02-SB01-SS-06A 02-SB-1 NS 6 6 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 16 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SB01-SS-06A 02-SB-1 NS 6 6 SO 6/14/2013 SW6020 7439-92-1 LEAD 22 mg/kg J 1.7 11 ECO PAL 17.7CC-IAAP-02-SB01-SS-06A 02-SB-1 NS 6 6 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 3.3 mg/kg 2.8 0.52 ECO PAL 0.335CC-IAAP-02-SB01-SS-06B 02-SB-1 FD 6 6 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 3.2 mg/kg J 5 2.4 HH PAL 7.327CC-IAAP-02-SB01-SS-06B 02-SB-1 FD 6 6 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 12 mg/kg 9.5 5.6 HH PAL 19.34CC-IAAP-02-SB01-SS-06B 02-SB-1 FD 6 6 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 2.2 mg/kg J 2.5 0.52 ECO PAL 0.335CC-IAAP-02-SB01-SS-10A 02-SB-1 NS 10 10 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 7.5 mg/kg 5.5 2.4 HH PAL 7.327CC-IAAP-02-SB01-SS-10A 02-SB-1 NS 10 10 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 11 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-02-SB01-SS-10A 02-SB-1 NS 10 10 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 1.9 mg/kg J 2.7 0.52 ECO PAL 0.335CC-IAAP-02-SB02-SS-00A 02-SB-2 NS 0 0.5 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 7.7 mg/kg 5.1 2.4 HH PAL 7.327CC-IAAP-02-SB02-SS-00A 02-SB-2 NS 0 0.5 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 19 mg/kg 9.7 5.6 HH PAL 19.34CC-IAAP-02-SB02-SS-00A 02-SB-2 NS 0 0.5 SO 6/14/2013 SW6020 7439-92-1 LEAD 14 mg/kg 1.5 11 ECO PAL 17.7CC-IAAP-02-SB02-SS-00A 02-SB-2 NS 0 0.5 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 1.7 mg/kg J 2.6 0.52 ECO PAL 0.335CC-IAAP-02-SB02-SS-02A 02-SB-2 NS 2 2 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 9.3 mg/kg 5.8 2.4 HH PAL 7.327CC-IAAP-02-SB02-SS-02A 02-SB-2 NS 2 2 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 27 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SB02-SS-02A 02-SB-2 NS 2 2 SO 6/14/2013 SW6020 7439-92-1 LEAD 14 mg/kg 1.7 11 ECO PAL 17.7CC-IAAP-02-SB02-SS-02A 02-SB-2 NS 2 2 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 3.3 mg/kg 2.9 0.52 ECO PAL 0.335CC-IAAP-02-SB02-SS-06A 02-SB-2 NS 6 6 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 8 mg/kg 5.5 2.4 HH PAL 7.327CC-IAAP-02-SB02-SS-06A 02-SB-2 NS 6 6 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 17 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-02-SB02-SS-06A 02-SB-2 NS 6 6 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 2.1 mg/kg J 2.8 0.52 ECO PAL 0.335CC-IAAP-02-SB02-SS-10A 02-SB-2 NS 10 10 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 12 mg/kg 5 2.4 HH PAL 7.327CC-IAAP-02-SB02-SS-10A 02-SB-2 NS 10 10 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 14 mg/kg 9.4 5.6 HH PAL 19.34CC-IAAP-02-SB02-SS-10A 02-SB-2 NS 10 10 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 1.5 mg/kg J 2.5 0.52 ECO PAL 0.335CC-IAAP-02-SB03-SS-00A 02-SB-3 NS 0 0.5 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 7.9 mg/kg 6.1 2.4 HH PAL 7.327CC-IAAP-02-SB03-SS-00A 02-SB-3 NS 0 0.5 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 16 mg/kg 12 5.6 HH PAL 19.34CC-IAAP-02-SB03-SS-00A 02-SB-3 NS 0 0.5 SO 6/14/2013 SW6020 7439-92-1 LEAD 18 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-02-SB03-SS-00A 02-SB-3 NS 0 0.5 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 3.1 mg/kg 3 0.52 ECO PAL 0.335CC-IAAP-02-SB03-SS-02A 02-SB-3 NS 2 2 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 6.8 mg/kg 5.4 2.4 HH PAL 7.327CC-IAAP-02-SB03-SS-02A 02-SB-3 NS 2 2 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 24 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-02-SB03-SS-02A 02-SB-3 NS 2 2 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 2.4 mg/kg J 2.7 0.52 ECO PAL 0.335CC-IAAP-02-SB03-SS-06A 02-SB-3 NS 6 6 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 21 mg/kg 4.6 2.4 HH PAL 7.327CC-IAAP-02-SB03-SS-06A 02-SB-3 NS 6 6 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 17 mg/kg 8.8 5.6 HH PAL 19.34CC-IAAP-02-SB03-SS-06A 02-SB-3 NS 6 6 SO 6/14/2013 SW6020 7439-92-1 LEAD 12 mg/kg 1.4 11 ECO PAL 17.7CC-IAAP-02-SB03-SS-06A 02-SB-3 NS 6 6 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 4.5 mg/kg 2.3 0.52 ECO PAL 0.335CC-IAAP-02-SB03-SS-10A 02-SB-3 NS 10 10 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 13 mg/kg 4.9 2.4 HH PAL 7.327CC-IAAP-02-SB03-SS-10A 02-SB-3 NS 10 10 SO 6/14/2013 SW6020 7440-43-9 CADMIUM 0.64 mg/kg 0.3 0.36 ECO PAL 0.728CC-IAAP-02-SB03-SS-10A 02-SB-3 NS 10 10 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 19 mg/kg 9.4 5.6 HH PAL 19.34CC-IAAP-02-SB03-SS-10A 02-SB-3 NS 10 10 SO 6/14/2013 SW6020 7439-92-1 LEAD 15 mg/kg 1.5 11 ECO PAL 17.7

Page 27: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-2Remedial Investigation PAL and Background Exceedances for CC-IAAP-002

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 27

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-02-SB03-SS-10A 02-SB-3 NS 10 10 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 1.7 mg/kg J 2.5 0.52 ECO PAL 0.335CC-IAAP-02-SB04-SS-00A 02-SB-4 NS 4 4 SO 6/17/2013 SW6020 7440-38-2 ARSENIC 7.2 mg/kg 6 2.4 HH PAL 7.327CC-IAAP-02-SB04-SS-00A 02-SB-4 NS 4 4 SO 6/17/2013 SW6020 7440-43-9 CADMIUM 0.37 mg/kg 0.36 0.36 ECO PAL 0.728CC-IAAP-02-SB04-SS-00A 02-SB-4 NS 4 4 SO 6/17/2013 SW6020 7440-47-3 CHROMIUM 12 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SB04-SS-00A 02-SB-4 NS 4 4 SO 6/17/2013 SW6020 7439-92-1 LEAD 23 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-02-SB04-SS-02A 02-SB-4 NS 2 2 SO 6/18/2013 SW6020 7440-38-2 ARSENIC 7.6 mg/kg 5.9 2.4 HH PAL 7.327CC-IAAP-02-SB04-SS-02A 02-SB-4 NS 2 2 SO 6/18/2013 SW6020 7440-47-3 CHROMIUM 17 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SB04-SS-02A 02-SB-4 NS 2 2 SO 6/18/2013 SW6020 7439-92-1 LEAD 17 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-02-SB04-SS-06A 02-SB-4 NS 6 6 SO 6/18/2013 SW6020 7440-38-2 ARSENIC 16 mg/kg 4.9 2.4 HH PAL 7.327CC-IAAP-02-SB04-SS-06A 02-SB-4 NS 6 6 SO 6/18/2013 SW6020 7440-47-3 CHROMIUM 15 mg/kg 9.4 5.6 HH PAL 19.34CC-IAAP-02-SB04-SS-06A 02-SB-4 NS 6 6 SO 6/18/2013 SW6020 7439-92-1 LEAD 13 mg/kg 1.5 11 ECO PAL 17.7CC-IAAP-02-SB04-SS-10A 02-SB-4 NS 10 10 SO 6/18/2013 SW6020 7440-38-2 ARSENIC 12 mg/kg 5.4 2.4 HH PAL 7.327CC-IAAP-02-SB04-SS-10A 02-SB-4 NS 10 10 SO 6/18/2013 SW6020 7440-39-3 BARIUM 390 mg/kg 11 330 ECO PAL 201CC-IAAP-02-SB04-SS-10A 02-SB-4 NS 10 10 SO 6/18/2013 SW6020 7440-43-9 CADMIUM 0.57 mg/kg 0.33 0.36 ECO PAL 0.728CC-IAAP-02-SB04-SS-10A 02-SB-4 NS 10 10 SO 6/18/2013 SW6020 7440-47-3 CHROMIUM 13 mg/kg 10 5.6 HH PAL 19.34CC-IAAP-02-SF01-SS-00A 02-SS-1 NS 0 0.5 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 6.7 mg/kg 6 2.4 HH PAL 7.327CC-IAAP-02-SF01-SS-00A 02-SS-1 NS 0 0.5 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 14 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SF01-SS-00A 02-SS-1 NS 0 0.5 SO 6/14/2013 SW6020 7439-92-1 LEAD 46 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-02-SF01-SS-00A 02-SS-1 NS 0 0.5 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 1.9 mg/kg J 3 0.52 ECO PAL 0.335CC-IAAP-02-SF02-SS-00A 02-SS-2 NS 0 0.5 SO 6/14/2013 SW6020 7440-38-2 ARSENIC 7.6 mg/kg 6 2.4 HH PAL 7.327CC-IAAP-02-SF02-SS-00A 02-SS-2 NS 0 0.5 SO 6/14/2013 SW6020 7440-47-3 CHROMIUM 15 mg/kg 11 5.6 HH PAL 19.34CC-IAAP-02-SF02-SS-00A 02-SS-2 NS 0 0.5 SO 6/14/2013 SW6020 7439-92-1 LEAD 25 mg/kg 1.8 11 ECO PAL 17.7CC-IAAP-02-SF02-SS-00A 02-SS-2 NS 0 0.5 SO 6/14/2013 SW6020 7782-49-2 SELENIUM 2.5 mg/kg J 3 0.52 ECO PAL 0.335CC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW6020 7440-38-2 ARSENIC 8.4 mg/kg 6.1 0.59 ECO PALCC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW6020 7440-39-3 BARIUM 130 mg/kg J 12 23.7 ECO PALCC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW6020 7440-47-3 CHROMIUM 12 mg/kg 12 5.6 HH PALCC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW6020 7439-92-1 LEAD 91 mg/kg J 1.8 35.8 ECO PALCC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW6020 7782-49-2 SELENIUM 2.4 mg/kg J 3 0.93 ECO PALCC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW8270C SIM 208-96-8 ACENAPHTHYLENE 0.014 mg/kg J 0.0085 0.00587 ECO PALCC-IAAP-02-ST01-SS-00A 02-ST1 NS 0 0.5 SE 6/14/2013 SW8270C SIM 129-00-0 PYRENE 0.2 mg/kg J 0.0085 0.195 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW6020 7440-38-2 ARSENIC 14 mg/kg 6 0.59 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW6020 7440-39-3 BARIUM 380 mg/kg J 12 23.7 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW6020 7440-47-3 CHROMIUM 14 mg/kg 11 5.6 HH PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW6020 7439-92-1 LEAD 150 mg/kg J 1.8 35.8 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW6020 7782-49-2 SELENIUM 3.5 mg/kg 3 0.93 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 83-32-9 ACENAPHTHENE 0.027 mg/kg J 0.0087 0.00671 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 208-96-8 ACENAPHTHYLENE 0.077 mg/kg J 0.0087 0.00587 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 56-55-3 BENZO(A)ANTHRACENE 0.4 mg/kg J 0.0087 0.108 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 50-32-8 BENZO(A)PYRENE 0.57 mg/kg J 0.087 0.15 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 205-99-2 BENZO(B)FLUORANTHENE 1 mg/kg J 0.087 0.24 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 191-24-2 BENZO(G,H,I)PERYLENE 0.48 mg/kg J 0.087 0.17 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 207-08-9 BENZO(K)FLUORANTHENE 0.34 mg/kg J 0.0087 0.24 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 218-01-9 CHRYSENE 0.81 mg/kg J 0.087 0.166 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 53-70-3 DIBENZO(A,H)ANTHRACENE 0.093 mg/kg J 0.087 0.033 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 206-44-0 FLUORANTHENE 2.5 mg/kg J 0.087 0.423 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 193-39-5 INDENO(1,2,3-CD)PYRENE 0.54 mg/kg J 0.087 0.2 ECO PALCC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 85-01-8 PHENANTHRENE 2.1 mg/kg J 0.087 0.204 ECO PAL

Page 28: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

Table A2-2Remedial Investigation PAL and Background Exceedances for CC-IAAP-002

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 28

Sample Number Sample Location

Sample Type

Start Depth (feet)

End Depth (feet)

Matrix Sample Date Method

Fraction (water

samples)CAS ID Chemical Name Result Units Qualifier LOD PAL PAL

Reference Bkg

CC-IAAP-02-ST01-SS-00B 02-ST1 FD 0 0.5 SE 6/14/2013 SW8270C SIM 129-00-0 PYRENE 1.8 mg/kg J 0.087 0.195 ECO PALCC-IAAP-02-ST02-SS-00A 02-ST2 NS 0 0.5 SE 6/14/2013 SW6020 7440-38-2 ARSENIC 7.9 mg/kg 5.8 0.59 ECO PALCC-IAAP-02-ST02-SS-00A 02-ST2 NS 0 0.5 SE 6/14/2013 SW6020 7440-39-3 BARIUM 120 mg/kg J 12 23.7 ECO PALCC-IAAP-02-ST02-SS-00A 02-ST2 NS 0 0.5 SE 6/14/2013 SW6020 7440-47-3 CHROMIUM 14 mg/kg 11 5.6 HH PALCC-IAAP-02-ST02-SS-00A 02-ST2 NS 0 0.5 SE 6/14/2013 SW6020 7782-49-2 SELENIUM 2.2 mg/kg J 2.9 0.93 ECO PALCC-IAAP-02-ST03-SS-00A 02-ST3 NS 0 0.5 SE 6/14/2013 SW6020 7440-38-2 ARSENIC 9.4 mg/kg 6.4 0.59 ECO PALCC-IAAP-02-ST03-SS-00A 02-ST3 NS 0 0.5 SE 6/14/2013 SW6020 7440-39-3 BARIUM 170 mg/kg 13 23.7 ECO PALCC-IAAP-02-ST03-SS-00A 02-ST3 NS 0 0.5 SE 6/14/2013 SW6020 7440-47-3 CHROMIUM 16 mg/kg 12 5.6 HH PALCC-IAAP-02-ST03-SS-00A 02-ST3 NS 0 0.5 SE 6/14/2013 SW6020 7782-49-2 SELENIUM 4.4 mg/kg 3.2 0.93 ECO PAL

CC-IAAP-02-SB01-GW-13A 02-GW-1 NS 13 13 WG 6/16/2013 SW6020 T 7440-38-2 ARSENIC 3.7 ug/l J 10 0.045 HH PALCC-IAAP-02-SB01-GW-13B 02-GW-1 FD 13 13 WG 6/16/2013 SW6020 T 7440-38-2 ARSENIC 2.5 ug/l J 10 0.045 HH PALCC-IAAP-02-SB01-GW-13B 02-GW-1 FD 13 13 WG 6/16/2013 SW7196A T 18540-29-9 CHROMIUM (HEXAVALENT) 11 ug/l J 40 0.031 HH PALCC-IAAP-02-SB02-GW-13A 02-GW-2 NS 13 13 WG 6/16/2013 SW6020 D 7440-38-2 ARSENIC 1.2 ug/l J 10 0.045 HH PALCC-IAAP-02-SB02-GW-13A 02-GW-2 NS 13 13 WG 6/16/2013 SW6020 T 7440-38-2 ARSENIC 18 ug/l 10 0.045 HH PALCC-IAAP-02-SB02-GW-13A 02-GW-2 NS 13 13 WG 6/16/2013 SW6020 T 7440-47-3 CHROMIUM 39 ug/l 10 0.031 HH PALCC-IAAP-02-SB03-GW-11A 02-GW-3 NS 11 11 WG 6/18/2013 SW6020 T 7440-38-2 ARSENIC 3.2 ug/l J 10 0.045 HH PALCC-IAAP-02-SB03-GW-11A 02-GW-3 NS 11 11 WG 6/18/2013 SW6020 T 7440-47-3 CHROMIUM 13 ug/l 10 0.031 HH PAL

Acronyms

Bkg - Background NS - Normal sampleCAS ID - Chemical Abstracts Service Identification PAL - Project action limitD - Dissolved SE - SedimentECO - Ecological SIM - Single ion modeExds - Exceeds SN - DebrisFD - Field duplicate sample SO - SoilHH - Human health T - TotalJ - Estimated ug/l - Microgram per literLOQ - Level of quantitation UJ - Not detected/reported quantitation limit is estimatedmg/kg - Milligram per kilogram WG - Groundwatermg/l - Milligrams per liter Y - Yes

Page 29: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINAL OU-9 CONSTRUCTION DEBRIS SITES PROPOSED PLAN

ATTACHMENT 3

APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS

January 2015 29

Page 30: iaaaprestoration.comiaaaprestoration.com/.../9003-PP-PPforContructionDebrisSites-JAN2… · IOWA ARMY AMMUNITION PLANT FINAL PROPOSED PLAN FOR CONSTRUCTION DEBRIS SITES CC-IAAP-001

FINALPROPOSED PLAN

OU-9 CONSTRUCTION DEBRIS SITES

January 2015 30

No Type Scope Citation Description Overview Applicable to Alternatives?

Relevant or Appropriate to Alternatives?

1 Action Federal

40 CFR (Protection of Environment)Part 262. Subpart A (substantive provisions), B (substantive provisions), and C (substantive provisions).Part 268. Subpart A (substantive provisions), D (substantive provisions), and E (substantive provisions).

Federal RCRA Hazardous Waste Management and Land Disposal Restrictions (LDRs)

Establishes federal rules for identifying, generating, transporting, treating, storing, and disposing of hazardous waste 4 None

3 Action StateIowa Code 455B.307A (also incorporates Iowa

Administrative Code 567-100.5 (1) through (3). 1Solid Waste Disposal

Substantive provisions of the Iowa Code 455B.307A Subpart (1) through (3) that list the prohibitions that apply to discarding solid waste will be complied with. The Iowa Administrative Code 567-100.5 lists the rules that apply to the disruption and excavation of sanitary landfills or closed dumps and disposal of solid waste generated during remedial actions. All solid waste disturbed or generated as part of the implemented remedial action will be properly disposed of at an appropriate off-site facility (landfill).

4 None

1 These are work safety provisions that will be followed pursuant to State Law, but they are not ARARs under CERCLA.

ARAR - Applicable or relevant and appropriate requirementCFR - Code of Federal RegulationsRCRA - Resource Conservation and Recovery Act

Table A3-1: Identification of Applicable or Relevant and Appropriate Requirements