ASX and Media Release: 24 February 2014 ASX code: RXM
Investor Presentation February 2014 Rex Minerals Limited (“Rex”) is pleased to release its latest investor presentation. This presentation will be used for investor road shows.
Mark Parry (Managing Director) or Amber Rivamonte (Company Secretary) Phone: +61 (0)8 8299 7100 E-mail: [email protected]
Media enquiries to:Simon Jemison C/. Collins Street Media Phone: 0408-004-848 or 03-9224-5319 Email: [email protected]
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Disclaim
er
Investor PresentationMark Parry – Managing Director & CEOFebruary 2014
Delivering Australia’s Largest Undeveloped Copper ProjectF
or p
erso
nal u
se o
nly
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Disclaim
er
The presentation (in this projected form and as verbally presented) (“Presentation”) is provided on the basis that none of the Company nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any representation or warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing contained in the Presentation is, or may be relied upon as a promise, representation or warranty, whether as to the past or the future. The Company herby excludes all warranties that can be excluded by law.
The Presentation contains prospective financial material which is predictive in nature and may be affected by inaccurate assumptions or by known or unknown risks and uncertainties and may differ materially from results ultimately achieved.
The Presentation contains “forward-looking statements”. All statements other than those of historical facts included in the Presentation are forward-looking statements. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, copper and other metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. The Company does not undertake any obligation to release publicly any revisions to any “forward-looking statement”.
The Presentation contains general background information about the Company and its activities current as at the date of this presentation. The information in this Presentation is in summary form only and does not contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with the Company’s other periodic and continuous disclosure announcements lodged with the ASX, which are available at www.asx.com.au and other publicly available information on the Company available at www.rexminerals.com.au.
The Presentation does not constitute an offer, invitation or recommendation to subscribe for or purchase any security and does not form the basis of any contract or commitment. The Presentation, the entitlement offer and the contracts formed on acceptance of the relevant applications are governed by the laws applicable in Victoria, Australia. Each person who applies for new shares submits to the jurisdiction of the courts of Victoria, Australia.
All persons should consider seeking appropriate professional advice in reviewing the Presentation and the Company.
2
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
Hillside O
verviewFebruary 2014
3
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Hillside O
verview
Key Attributes‒ 100% ownership of project, no off-take encumbrances or royalties
‒ 2Mt of contained copper resources reported in accordance with the 2012 JORC (future additions likely)
‒ 12 year open pit Ore Reserve reported in accordance with the 2012 JORC
‒ >75 ktpa Cu or >110 ktp CuEq (first 10 years*)
‒ Close to existing major infrastructure (power, water, port)
‒ Simple, conventional metallurgy
‒ Clean, highly marketable concentrates expected for both copper/gold and iron products
‒ State government very keen for project to go ahead (jobs)
‒ Right team in place at the right time to build Hillside* Refer to Appendix 1
4
For
per
sona
l use
onl
y
Hillside O
verview
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Output Key Features Advantage110+ ktpa CuEq Integrated modular plant Economies of scale
3 revenue streams
Copper (Cu) >75,000 tpa
• Open Pit• Shallow orebody• Moderate Strip• Conventional floatation to
Quality Cu-Au concentrate.• Slurry pipeline to existing
port (only 12kms).
• Good recovery• Low impurities• Easily saleable
concentrate
Gold (Au)>60,000 ozpa
Iron Ore>1.2 Mtpa
Conventional recovery from tailings of Cu/Au circuit.Slurry pipeline to existing port.
Refined product with >67%Fe and low impurities.Low cost delivered to port (~A$40/t)
Increased ProductionNew average production profile over first 10 years
February 2014
5
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
Rex C
orporate Overview
February 2014
6
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Rex C
orporate Overview
Managing DirectorMr Mark Parry
Chief Financial Officer
Ms Rachel Rees
Financial and Accounting Team
ICT Team
Chief GeologistMr Patrick Say
Geology and Drilling Team
Project ManagerMr John Burgess
Project Commercial &Financial Manager
Mr Mark Terry
Environmental & Stakeholder MgmtMs Erica Dearlove
Regulatory and Community Liason
Team
Government & Regulatory Relations
Mr Marc Twining
Company SecretaryMs Amber Rivamonte
Mining ManagerMr James Nagel
Mining Engineering Team
Rex Minerals Executive Management Team – Building Capability
Blue denotes most hires as Rex builds capability
7
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Rex C
orporate Overview
February 2014
Major Shareholders %
Acorn 8.35
Directors & Management 5.7
Grand South Development 6.24
Northcape 4.16
Greenstone Property 4.32
JP Morgan Chase 3.74
Capital Structure and Ownership
*as at 31 December 2013**as at 31 January 2014
Capital Structure
Cash* $20.9m
Debt* NIL
Shares 188.9m
Options (unlisted) 4.6m
Market Capitalisation (undiluted)** $85m
Market Capitalisation (diluted)** $87m
8
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
The Resource
February 2014
9
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
The Resource
Measured, Indicated and Inferred Mineral Resources‒ Defined by magnetic anomaly‒ 584DD holes & 246RC holes for over 250,000m drilled‒ Resource audited by P. Stoker (AMC)‒ Stuart Masters Resource Validation Study
Hillside JORC Mineral Resource
10
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
The Resource
HILLSIDE ORE RESERVE
Reserve Category Tonnes(Mt)
Grade Contained MetalCopper
(%)
Gold(g/t)
Iron(%)
Copper(kt)
Gold(koz)
Iron Ore(kt)
Proved 65 0.47 0.15 15.4 304.6 312.5 10,180.3
Probable 115 0.55 0.12 13.9 632.5 443.7 15,637.4
Total 180 0.52 0.13 14.4 936.0 752.3 25,743.5
Resource Reserve Conversion
‒ Exploration success has been followed by excellent conversion of Mineral Resources to Ore Reserves
‒ 2Mt contained copper classified as a Mineral Resource
‒ Of this, 64% classified as Measured and Indicated Resources
‒ Of this, 72% converted to Proved and Probable Ore Reserves
Hillside Ore Reserve Summary – June 2013
Hillside Ore Reserve
11
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
The Resource
Based on company ASX announcements between June 2013 and December 2013
12 Year Ore Reserve
12
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
Mining
February 2014
13
For
per
sona
l use
onl
y
Large Scale Open Pit Planned‒ Proven, robust mining methods
‒ Excellent understanding of conditions
‒ Developing operable value focussed sequence
‒ BFS incorporates 12 year OP Ore Reserve shell
‒ Underground is a value accretive add on, not part of BFS or current Ore Reserves
‒ Optimisation opportunities
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Mining
S
N
14
For
per
sona
l use
onl
y
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Tota
l M
ater
ial M
ined
OP - Capital WS OP - Operating WS OP - Ore Original Schedule
Mining Schedule Substantially Improved Since PFS
Peak mining rate reduced by ~25%
More consistent mining rate
February 2014M
ining
15
For
per
sona
l use
onl
y
0.00%
0.20%
0.40%
0.60%
0.80%
1.00%
1.20%
-
3,000
6,000
9,000
12,000
15,000
18,000 20
14
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
CuEq
%
Tota
l Ore
Mill
ed
Mill Feed - ExPit Mill Feed - Stockpile Mill Feed - Grade
Production Schedule based on 12 year reserve Production schedule provides generally superior feed grade to PFS at front end of plan.
Resource and underground options (not part of BFS) support mine life beyond 2029.
February 2014M
ining
16
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Mining
Underground‒ Significant amount of design work done (detailed PFS level)
‒ Confidence achieved in plans to continue mining beyond current Ore Reserve pit shell
‒ Planning to confirm with BFS level, detailed designs after open pit operations have commenced
17
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
ProcessingFebruary 2014
18
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Processing
Testwork Programs‒ Pilot plant testing undertaken to de-risk the process design from both
a technical and economic perspective (using 9tn representative sample)
‒ Sufficient quantities of concentrate and tailings were produced for marketing and equipment selection and mineralogical purposes
‒ Final flowsheet has been optimised – value engineering completed (rationalised grind size & ball mills, drives, float circuit, thickener circuit, reagents, filters)
‒ Improvements in Cu in concentrate (26% increase vs. PF’s) and power usage (12% reduction) and increased grind size.
‒ Conventional process, high level of confidence, design complete (design signed off mid Feb 14)
‒ Testwork completed – Tunra, CSIRO, pipe line, thickeners, filters, column
‒ Tailings dam design finalised
‒ No outstanding issues remain in mineral processing
19
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
Approvals
February 2014
20
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Federal Government Approvals
‒ Complete – no further action required.
State Government Approvals (ML/MPL)
‒ Mining licence documents submitted (April 2013).
‒ Public consultation period complete, detailed responses and response document have been provided to the regulator.
‒ Recommendation for approval now awaiting final review by DMITRE (the regulator) and a ministerial decision (most likely post election in April 2014)
Section 49
‒ DAC have recommended for Ministerial approval.
Approvals
Mining Approvals on Track
21
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
FundingFebruary 2014
22
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Funding
‒ Funding requirements in the order of approximately US $850million
‒ Financing strategy starts with securing senior construction/term debt
‒ Debt plans include formation of a club (on an N – 1 basis), which may include ECA support from EPC partner’s home country
‒ The process for the balance of funds required will be run in parallel with the debt process, seeking to leverage work done by debt providers and will include consideration of offtake linked financing, joint ventures at the project level, mezzanine finance, etc.
Funding Strategy
23
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Funding
Hillside Project – Indicative Timeline
Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec 2015Q1
2015Q2
Regulatory Approvals
EPCECI
EPC Final negotiations & contract approvals
BFS Finalisation
Debt FundingECA plus banks selectionBank credit processApproval
JV/Offtake Funding
Construction Commence
24
For
per
sona
l use
onl
y
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
1 > Hillside Overview1 > Hillside Overview
2 > Rex Corporate Overview2 > Rex Corporate Overview
3 > The Resource3 > The Resource
4 > Mining4 > Mining
5 > Processing5 > Processing
6 > Approvals6 > Approvals
7 > Funding & Timeline7 > Funding & Timeline
8 > Growth Potential8 > Growth Potential
Grow
th PotentialFebruary 2014
25
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Grow
th Potential
Project upside (opportunities for enhancement to the BFS)‒ Treatment of oxide ore
‒ Land acquisition to shorten waste haul (not required for decision until approximately year 4)
‒ Capturing hematite to add to magnetite concentrate (potential for up to 200kt pa for an additional estimated $17m capex)
‒ Underground mine life extension
‒ Resource growth potential at Hillside (both north and south) to prolong underground operations
‒ Combination mining methods to reduce the cost of moving waste and average mining costs
‒ Potential pelletising of concentrate at existing Australian operation
26
For
per
sona
l use
onl
y
February 2014
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
Grow
th Potential
HILLSIDE PROJECT POTENTIAL
Regional Upside‒ Satellite targets to leverage
Hillside investment‒ 5 priority targets identified‒ Rapid soil testing (pXRF),
ground EM/IP and drill testing
27
For
per
sona
l use
onl
y
Appendix 1
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
February 2014
29
For
per
sona
l use
onl
y
Appendix 1 continued
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
February 2014
30
For
per
sona
l use
onl
y
Appendix 1 continued
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
February 2014
31
For
per
sona
l use
onl
y
Appendix 1 continued
AUSTRALIA’S NEXT GREAT COPPER PROJECT. HILLSIDE: SOUTH AUSTRALIA
February 2014
32
For
per
sona
l use
onl
y