INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDEX
INNOVATION
Construction of the “Mountain Resources” ......................................... 00education and display center in Makhachkala
Construction of an IT-park of complete ............................................... 00“idea-series” cycle type
Development of high-effi ciency ............................................................. 00solar cells and modules production
INDUSTRY AND TRANSPORT
Development of fl oat glass production............................................... 00
Development of nitric and sulfuric acid, ............................................. 00and high analysis fertilizer productiononsite the “Dagfos” OJSC – II stage
Construction of an intra-zone ................................................................. 00telephone communications central usingNGN technologies and optical fi ber links
Re-equipment of narrow-neck ................................................................ 00glass container production facilitiesof the “DagestanStekloTara”, Ltd.
Construction of the “Anzhi-Steklo” ......................................................... 00glass container manufacturing plant
Construction of a plant producing ........................................................ 00continuous basalt fi ber and materials on its basis
Construction of a solid domestic waste disposal ............................ 00and recycling plant
Development of LCD television sets..................................................... 00and digital set-top boxes serial production
Development of commercial vehicle production ............................ 00
Development of combined low and medium .................................... 00pressure gas control units serial production
Development of shipreparing and shipbuilding .............................. 00and metal construction units production
Development of complete-cycle textile manufacture ................... 00
Development of metal goods production .......................................... 00
Development of serial production ........................................................ 00of automotive components
Development of GRP pipes production ............................................... 00“Tchistaya liniya”
Construction of a plant producing ........................................................ 00ship pumping equipment for various purposes
Development of road, building machinery ......................................... 00and municipal and aerodrome engineering assembly
Construction of a farm machinery ......................................................... 00manufacturing plant for winegrowing and gardening
Development of E.DP-45 diesel engines production .................... 00
Construction of a round and shaped steel tubes ............................. 00producing plant
Development of in-car electronics manufacturing ......................... 00(audio sets, starters, alternators)
Construction of the “Viaduk” customs .................................................. 00and logistics centre
Reconstruction of the Makhachkala ..................................................... 00commercial sea port (facilities of the second stage)
Construction of the KamAZ vehicles trade ......................................... 00and service centers in the districtsof the Republic of Dagestan
Investment sites ........................................................................................... 00
FUEL AND ENERGY COMPLEX
Construction and exploitation ................................................................ 00of an oil refi ning and storage complex
Construction of the Gotsatlinskaya ....................................................... 00Hydro Power Plant on the Avarskoye Koysu river
Construction of a high-effi ciency ........................................................... 00biological power complex at developedgeothermal fi elds of the Northern Dagestan
AGROINDUSTRIAL COMPLEX
Priority agriculture development program ........................................ 00of the Republic of Dagestan for 2011–2014 with implementation of Americanequipment and technologies
Reconstruction and re-equipment ......................................................... 00of existing industrial livestock complexesand construction of the new complexes
Development of fruit and vegetable .................................................... 00processing production
Construction of a complex logistics centre........................................ 00
Development of fresh raw material ...................................................... 00processing, juice packagingand canned food production
Construction of a modern table grape................................................. 00and fruit storage complex
Development of champagne ................................................................... 00and still wine production withan annual capacity of 2 million dL
Construction of a juice and infant ......................................................... 00food manufacturing plant withan annual capacity of 350 dL
Construction of cold storages ................................................................. 00for grape and fruit storing
INNOVATION
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDEX
Construction and development .............................................................. 00of the “Agrodagitalia” agriculture technology park
Construction of the “Fresh Vegetables” ............................................... 00greenhouse complex
Reconstruction and re-equipment ......................................................... 00of a greenhouse complex in Makhachkala
Construction of a greenhouse complex............................................... 00for vegetables growing)
Construction of a feed milling plant, poultry .................................... 00processing premises
Construction of a complex industrial fi sh farm ................................ 00
Development of complex broiler ........................................................... 00meat and hen eggs production
Construction of factories producing ..................................................... 00competitive liqueur wine
Reconstruction of the winery .................................................................. 00and construction of facilities for juice and wine bottling
Industrial livestock complex construction, ......................................... 00meat and milk production andprocessing development
Industrial livestock complex construction ......................................... 00
Construction of greenhouse complexes .............................................. 00
Development of tomato paste, ............................................................... 00juice, nectar, fruit puree production
Construction of complexes producing ................................................. 00high-effi ciency organic fertilizersand self-regulating energy savingsystems with agroindustrial waste management
Reconstruction and re-equipment ......................................................... 00of the virgin raw materials processing, juice packaging and canned food production
Construction and reconstruction............................................................ 00of a livestock complex and milk processingplant with a daily capacity of 30 tons
Reconstruction of a canning factory ..................................................... 00
Construction of agricultural facilities .................................................. 00for agricultural produce processingand production sales
CONSTRUCTION
Construction of the «Kaspiysk» Industrial .......................................... 00and Construction Complex
Construction of a plant producing gypsum ......................................... 00and gypsum-containing construction materialsin the industrial area of the Kafyr-Kumukh village
Development of fl oor tile ......................................................................... 00and ceramic granite production
Construction of an agglomerate tile producing plant ................... 00
Development of prefabricated units, .................................................. 00concrete pipes and concrete circles production
Construction of a autoclaved aerated .................................................. 00concrete blocks production plant withan annual capacity of 100 000 m3
Development of limestone quarrying .................................................. 00and natural chalk production
Development of the production ............................................................. 00of elements and constructionsfor pre-engineered housing and non-housingproperties in the Republic of Dagestan
TOURISM
Construction of the “Lazurniy bereg” .................................................... 00satellite town
Reconstruction of the “Talgi” therapeutic resort .............................. 00
Construction of a hippodrome in Makhachkala ............................... 00
Construction of a tourist complex ......................................................... 00in the Matlas area Constructionof the “Dzhami” resort
Construction of the “Darvag-chai” ......................................................... 00recreation complex
Construction of the “Chindirchero” ........................................................ 00year-round recreational complex
Investment sites ........................................................................................... 00
NATIONAL CRAFTS
Development of the Kubachi ................................................................... 00jewellery manufacturing
Construction of a Dagestan center ........................................................ 00of traditional carpet weaving
Development of the jewellery cluster .................................................. 00in the Republic of Dagestan. Constructionof a jewellery factory in Makhachkala
3
PROJECT DESCRIPTION:
The project stipulates the creation of an IT-park of complete
“idea-series” cycle type allowing each tested and approved idea
to be implemented and forwarded to series production.
PROJECT INITIATOR:
“NPK Russkaya radioelektronika” (“Russian radioelectronics”
LOCATION:
Makhachkala, Republic of Dagestan.
MATURITY LEVEL:
construction is completed.
The “Mechanics” (“Mekhanika”) IT-park construction project is
prepared.
prepared.
A business plan is prepared.
CONTACT DETAILS:
Republic of Dagestan, Russia
PROJECT FINANCING SOURCES
PROJECT TERMS:
PROJECTCOST: 2 150,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2 years
5 years
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of an IT-park of complete “idea-series” cycle type
INNOVATION
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the “Mountain Resources” education
and display center in Makhachkala
INNOVATION
PROJECT DESCRIPTION:
innovation activity cluster which allows to create innovation
products using the resources of several research institutes, and
the creation of a pharmacological cluster producing extracted
medicinal products of medicinal plants and biologically active
additives in compliance with world GMP standards. The project
stipulates a botanical garden construction as well.
PROJECT INITIATOR:
“Innovatsionno-tekhnologichesky tsentr “Gornye Resursy”
(“Mountain Resources” Innovation and Technical Centre”), Ltd.
LOCATION:
75 Yagarskogo St., Makhachkala, Republic of Dagestan.
MATURITY LEVEL:
stage is completed.
stage of design works.
has the status of a priority project of the Republic of Dagestan.
documents preparation.
CONTACT DETAILS:
Republic of Dagestan, Russia
PROJECTCOST:
2 800,0 mln RUB
PROJECT FINANCING SOURCES
PROJECT TERMS:
Ownfunds
Raisedfunds
Implementation period Pay-back period
22 % 78 %
5 years6 years
INDUSTRY
AND TRANSPORT
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INNOVATION
PROJECT DESCRIPTION:
The project stipulates the organization of the volume production of
PROJECT INITIATOR:
“Dagkermny”, Ltd.
LOCATION:
3 Stroitelnaya St., Derbent, Republic of Dagestan.
MATURITY LEVEL:
A business plan is prepared.
Production sites are prepared.
A solar modules assembly line using commercial elements is
launched.
CONTACT DETAILS:
Republic of Dagestan, Russia
Republic of Dagestan, Russia
PROJECT FINANCING SOURCES
PROJECT TERMS:
PROJECTCOST:
720,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
2 years
4 years
3
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
updated.
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
6 215,476 mln RUB
Ownfunds
Raisedfunds
20 % 80 %
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
with a daily capacity of 600 tons (219 thousand tons per year).
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
are concluded.
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
10 512,0 mln RUB
Ownfunds
Raisedfunds
30 % 70 %
2021
2020
2019
2017
2016
2013
2012
5
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
plant in action.
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
454,341 mln RUB
Ownfunds
Raisedfunds
26,4 % 73,6 %
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
pared.
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 993,85 mln RUB
Ownfunds
Raisedfunds
70 % 30 %
2021
2020
2019
2017
2016
2013
2012
7
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
launched.
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
3 138,7 mln RUB
Ownfunds
Raisedfunds
20 % 80 %
2021
2020
2019
2017
2016
2013
2012
launched.
6
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
GENERAL CONTRACTOR:
LOCATION:
MATURITY LEVEL:
strucyion site.
sand preparation.
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
6 603,0 mln RUB
Ownfunds
Raisedfunds
30 % 70 %
2021
2020
2019
2017
2016
2013
2012
9
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
2 138,3 mln RUB
Ownfunds
Raisedfunds
48 % 52 %
8
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
3 792,0 mln RUB
Ownfunds
Raisedfunds
10 %
90 %
2021
2020
2019
2017
2016
2013
2012
11
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
Production facilities with all necessary infrastructure are
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
738,0 mln RUB
Ownfunds
Raisedfunds
(discontinued)
23 % 77 %
10
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
13 800,0 mln RUB
Ownfunds
Raisedfunds
15 %
85 %
2021
2020
2019
2017
2016
2013
2012
13
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
17 400,0 mln RUB
Ownfunds
Raisedfunds
(discontinued)
50 % 50 %
12
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
stallation.
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
4 900,0 mln RUB
Ownfunds
Raisedfunds
20 % 80 %
2021
2020
2019
2017
2016
2013
2012
15
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 200,0 mln RUB
Ownfunds
Raisedfunds
(discontinued)
15 %
85 %
14
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
440,0 mln RUB
Ownfunds
Raisedfunds
15 %
85 %
2021
2020
2019
2017
2016
2013
2012
17
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
700,0 mln RUB
Ownfunds
Raisedfunds
(discontinued)
21 % 79 %
16
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
850,0 mln RUB
Ownfunds
Raisedfunds
24 % 76 %
2021
2020
2019
2017
2016
2013
2012
19
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
867,0 mln RUB
Ownfunds
Raisedfunds
(discontinued)
20 % 80 %
18
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
800,0 mln RUB
Ownfunds
Raisedfunds
15 %
85 %
2021
2020
2019
2017
2016
2013
2012
21
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
The project stipulates the construction of a round and shaped
thousand tons.
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
700,0 mln RUB
Ownfunds
Raisedfunds
80 % 20 %
20
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
Production facilities with all necessary infrastructure are
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 288,8 mln RUB
Ownfunds
Raisedfunds
22 % 78 %
2021
2020
2019
2017
2016
2013
2012
23
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
230,7 mln RUB
Ownfunds
Raisedfunds
(discontinued)
30 % 70 %
22
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
550,0 mln RUB
Ownfunds
Raisedfunds
20 % 80 %
2021
2020
2019
2017
2016
2013
2012
25
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
2021
2020
2019
2017
2016
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
605,87 mln RUB
Ownfunds
Raisedfunds
29 % 71 %
24
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
7 205,6 mln RUB
Ownfunds
Raisedfunds
25 % 75 %
2021
2020
2019
2017
2016
2013
2012
INVESTMENT SITES OF THE REPUBLIC OF DAGESTAN
INDUSTRY AND TRANSPORT
ENGINEERING AND TRANSPORT INFRASTRUCTURE:
construction and reconstruction).
FINANCING SOURCES:
1)
2)
3)
6)
LOCATION:
AREA
DECLARED:
INVESTMENT
SITES
FUEL AND ENERGY
COMPLEX
3
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
in progress.
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
50 % 50 %
5 years
7 years
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the Gotsatlinskaya Hydro Power Plant
on the Avarskoye Koysu river
FUEL AND ENERGY COMPLEX
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
FUEL AND ENERGY COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of a cost effective oil
-
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
-
CONTACT DETAILS:
PROJECTCOST:
Total
First stage
PROJECT FINANCING SOURCES:
PROJECT TERMS:
9 %
91 %
1,5 years2 years
AGROINDUSTRIAL
COMPLEX
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
FUEL AND ENERGY COMPLEX
PROJECT DESCRIPTION:
PROJECT INITIATOR:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
21,7 % 78,3 %
2 years
4,7 years
3
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Reconstruction and re-equipment of existing industrial livestock
complexes and construction of the new complexes
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates industrial livestock complexes construc-
tion on the territory of the Kizlyarsky, Tarumovsky and Babayur-
tovsky districts of the Republic of Dagestan for 10 thousand
milk cattle in total, reconstruction and modernization of a milk
processing plant in the city of Kizlyar with a capacity increase
up to 200 tons/day and the meat processing plant capacity in-
crease to 5 tons/day.
PROJECT INITIATOR:
“Kizlyaragrokompleks” Open Joint Stock Company
LOCATION:
Kizlyarsky, Tarumovsky, Babayurtovsky districts,
Republic of Dagestan
MATURITY LEVEL:
put into operation.
Chernyaevka village, with a cattle of 1,2 thousand heads, in
the Nekrasovka village, with a cattle of 600 heads, in the
Zadoevka village with a cattle of 500 heads.
(Germany) for equipment supply and installation of a modern
megafarm (the “BouMatic” company (USA) production) has
been reached.
village (Kizlyarsky district) is chosen for the construction of
the second order of the livestock complex.
for livestock complexes construction in the Kizlyarsky,
Tarumovsky and Babayurtovsky districts.
“Vnesheconombank” State Corporation.
the Republic of Dagestan No. 492 of 30 December 2010, the
project has the status of a priority project of the Republic of
Dagestan.
MATURITY LEVEL:
-
provided to develop plan.
tons per shift is purchased.
CONTACT DETAILS:
53 Kommunisticheskaya St., 368830, Kizlyar,
Republic of Dagestan, Russia
Tukueva Maryam Magomedovna, Director General
Tel.: +7 (87239) 2 30 04
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
4 285,6 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
4 years
7 years
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Priority agriculture development program of the Republic of Dagestan
for 2011–2014 with implementation of American equipment
and technologies
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of a sugar mill with a
capacity of 200 thousand tons per year and the development of
agricultural produce processing. According to the project it is
planned to construct a beet storage with a capacity of 1 million
tons, a feed production plant with a capacity of 1 million tons of
cattle, small cattle and chicken feed per year. In case of rotation,
the land is to be used for wheat cultivation (200 thousand tons)
of the land will be used to grow fodder corn – 200 thousand
production). It is also planned to cultivate cabbage, carrot, onion,
garlic, sweet pepper, potato. Besides, the project also includes
the construction of cold storages allowing to save as much as
600 thousand tons of vegetables and the construction of
canning plant for vegetable processing and storages if needed.
According to the project it is planned to cultivate tomato and to
construct (a 36–38o brix) tomato paste production plant with
an annual capacity of 10–12 thousand tons.
PROJECT INITIATOR:
“Dagagrokompleks”, Ltd.
LOCATION:
Stepnaya village, Kizlyarsky district; A.-Nevskoe and Tarumovka
villages, Tarumovsky district, Republic of Dagestan
MATURITY LEVEL:
-
16,8 thousand hectares.
-
public of Dagestan and the “Amity Technology” LLC, a company
begun with a purpose of vegetables cultivation.
the Republic of Dagestan No. 168 of 1 June 2011, the project
has the status of a priority project of the Republic of Dagestan.
the loan of the “Dagagrokompleks”, Ltd. in 2012.
Russia is to be held in the 2012 second quarter to discuss the
CONTACT DETAILS:
66 Toturbieva St., 368000, Khasavyurt,
Republic of Dagestan, Russia
Umalatov Isak Gyusenovitch, Director General
Tel./fax: +7 (8723) 10 28 60
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
19 600,0 mln RUB
9 087,0 mln RUB
Ownfunds
Total
Raisedfunds
Implementation period Pay-back period
23 % 77 %
2030
2028
2026
2024
2022
2020
2018
2016
2014
2012
3 years
5 years
5
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a complex logistics centre
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the organization of storage, package,
processing of fruits and vegetables, meat processing, rice
cultivation and processing, transport logistics.
The construction of the center will be implemented as follows:
1) a complex for fruits and vegetables reception, handling,
prepackaging and packaging, storage and processing;
2) a complex for cattle and small cattle receiption, slaughter,
dressing, processing, waste processing with tankage and
industrial grease production;
3) a transport and logistics complex;
4) a rice processing plant with rice grit and feed additives
production lines.
PROJECT INITIATOR:
“AGRIKO Severny Kavkaz” (“AGRIKO North Caucasus”), Ltd.
LOCATION:
Karabudahkentsky district and the city of Kizlyar,
Republic of Dagestan
MATURITY LEVEL:
project has the status of a priority project of the Republic of
Dagestan.
the “AGRIKO Severny Kavkaz” (“AGRIKO North Caucasus”), Ltd.
and the Sberbank of Russia at the X International Economic
the rice-processing plant in the city of Kizlyar, and on 29 Jan-
uary 2012 the “AGRIKO Severny Kavkaz” (“AGRIKO North Cau-
casus”), Ltd. was declared a winner.
-
ernment No. 338 of 4 May 2011.
CONTACT DETAILS:
16a Shamilya St., 367000, Makhachkala,
Republic of Dagestan, Russia
22 Dakhadaeva St., 368530, Karabudahkent, Karabudahkentsky
district, Republic of Dagestan, Russia
Aliev Andgi Kamilyevitch, Director General
Tel./fax: +7 (964) 018 06 60
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
11 025,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
30 % 70 %
5 years
10 years
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of fruit and vegetable processing production
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the reconstruction and re-equipment of
the Kikuninsky canning plant, the development of agricultural
produce processing, juice, nectars and baby food production. The
overall annual capacity of the plant is 2,0 mln standard units.
PROJECT INITIATOR:
“Kikuninsky Konservny Zavod” (“Kikuninsky Canning Plant”), Ltd.
LOCATION:
Kikuni village, Gergebilsky district, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
Construction documents are prepared.
A land plot (6,7 hectares) is available.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 168 of 1 June 2011, the project
has the status of a priority project of the Republic of Dagestan.
the loan of the “Kikuninsky Konservny Zavod” (“Kikuninsky
Canning Plant”), Ltd. in 2012.
CONTACT DETAILS:
368241, Kikuni village, Gergebilsky district,
Republic of Dagestan, Russia
Magomedov Magomed Ismailovitch, Director General
Tel./fax: +7 (8722) 51 70 86
Tel./fax: +7 (8722) 51 70 47
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
651,65 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
22 % 78 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
3 years
5,4 years
7
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a modern table grape and fruit storage complex
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of cold storages for
grape and other fruits and vegetables with a capacity of 15
thousand tons.
PROJECT INITIATOR:
“Rodina”, Ltd.
LOCATION:
Nechayevka village, Kizilyurtovsky district, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
Construction documents are prepared.
A 18-hectare plot of land is available (rented for 49 years).
A loan agreement with the Commerzbank (Germany) on the
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 168 of 1 June 2011, the project
has the status of a priority project of the Republic of Dagestan.
CONTACT DETAILS:
35, 86 G. Tsadasy St., 368100, Kizilyrt,
Republic of Dagestan, Russia
Gadzhimuradov Saidakhmed Saidovitch, Director General
Tel.: +7 (985) 251 88 84
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
980,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012 2 years3,3 years
6
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of fresh raw material processing,
juice packaging and canned food production
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the reconstruction of the facilities of the
“Tchirkatinsky canning plant “G” in the Gumbetovsky district of
the Republic of Dagestan for increasing production capacity
and the quality of products (juice and nectar).
PROJECT INITIATOR:
“Tchirkatinsky canning plant “G”, Ltd.
LOCATION:
Tchirkata village, Gumbetovsky district, Republic of Dagestan
MATURITY LEVEL:
A business plan is being prepared.
A project feasibility study is prepared.
A 4,7-hectare plot of land is available.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 252 of 22 July 2011, the project
has the status of a priority project of the Republic of Dagestan.
It is planned to continue the project implementation with the
borrowed funds of the “Rosselhozbank” OJSC, in accordance
The project is supported by the state in obtaining pledged
assets (a pledge fund).
CONTACT DETAILS:
368600, Tchirkata village, Gumbetovsky district,
Republic of Dagestan, Russia
Idrisov Kalsyn Ruslanovitch, Managing Director
Tel.: +7 (8722) 69 06 00
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
215,975 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
30 % 70 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012 2 years
4,5 years
9
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a juice and infant food manufacturing plant
with an annual capacity of 350 dL
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the development of infant food and fruit
juice production with an annual processing capacity of 350 dL.
PROJECT INITIATORS:
“Kayakentsky District” (“Kayakentsky Rayon”) State Unitary
Enterprise, Committee for Wine and Vine and Alcohol Market
Regulation of the Republic of Dagestan
LOCATION:
Kayakent village, Kayakentsky district, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
A land plot of 7,6 hectares is available.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 252 of 22 July 2011, the project
has the status of a priority project of the Republic of Dagestan.
CONTACT DETAILS:
Makhachkalinskaya St., 368504, Kayakent village, Kayakentsky
district, Republic of Dagestan, Russia
Tel.: +7 (8722) 67 86 43
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
756,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
3 years
6 years
8
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of champagne and still wine production
with an annual capacity of 2 million dL
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the purchase and installation of new ad-
vanced equipment for champagne production with an annual
capacity of 2 mln dal onsite the “Caspy” State Unitary Enter-
prise.
PROJECT INITIATOR:
“Kizlyar Cognac Plant” State Unitary Enterprise, Committee for
Wine and Vine and Alcohol Market Regulation of the Republic
of Dagestan.
LOCATION:
Manaskent village, Karabudakhkentsky district,
Republic of Dagestan
MATURITY LEVEL:
(Kayakentsky district) is available.
the Republic of Dagestan No. 252 of 22 July 2011, the
project has the status of a priority project of the Republic of
Dagestan.
was adopted on 11 November 2011.
CONTACT DETAILS:
60 Ordzhonikidze St., 368830, Kizlyar,
Republic of Dagestan, Russia
Tel.: +7 (8722) 67 86 43
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 1 500,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2030
2028
2026
2024
2022
2020
2018
2016
2014
2012
3 years
5 years
11
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction and development of the “Agrodagitalia”
agriculture technology park
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of facilities for eco-
generation European technologies with advanced products
processing, as well as organic waste, crop processing waste
products converting into diesel oil, energy and other technical
products.
PROJECT INITIATOR:
“Agro-Invest”, Ltd.
LOCATION:
Sulak (Sulak valley), Babayurtovsky district,
Republic of Dagestan
MATURITY LEVEL:
construction phase is completed.
Regulations No. 19-r of 20 January 2012 stipulated the
conclusion of a contract of sale of a land plot (1130,6 and
509,5 hectares) in the Babayurtovsky district, for 49 years.
“Agro-Invest”, Ltd. investment company signed a memoran-
dum of cooperation.
construction.
village is purchased.
of the Republic of Dagestan.
CONTACT DETAILS:
9/2 Novovagankovsky pereulok, 123242, Moscow, Russia
Zinchenko Sergey Anatolyevitch, Director General
Tel.: +7 (795) 737 58 21
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
14 100,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
22 % 78 %
5 years
10 years
10
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of cold storages for grape and fruit storing
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of cold storages for
grape and other fruits and vegetables storing with a capacity of
35 thousand tons.
PROJECT INITIATORS:
“Kizlyar Cognac Plant” State Unitary Enterprise, Committee for
Wine and Vine and Alcohol Market Regulation of the Republic
of Dagestan
LOCATION:
Pervomayskoye village, Kayakentsky district, Druzhba village,
Kayakentsky district, Khazar village, Derbentsky district,
Manaskent village, Karabudakhkentsky district, Republic of
Dagestan
MATURITY LEVEL:
Kayakentsky district (Pervomayskoye village), 1,6 hectares in
the Derbentsky district (Khazar village), 1,7 hectares in the
Kayakentsky district (Druzhba village), 4 hectares in the
Karabudakhkentsky district (Manaskent village).
the Republic of Dagestan No. 252 of 22 July 2011, the
project has the status of a priority project of the Republic of
Dagestan.
was adopted on 11 November 2011.
CONTACT DETAILS:
60 Ordzhonikidze St., 368830, Kizlyar,
Republic of Dagestan, Russia
Tel.: +7 (8722) 67 86 43
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 2 911,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2030
2028
2026
2024
2022
2020
2018
2016
2014
2012 2 years
5,1 years
13
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Reconstruction and re-equipment of a greenhouse complex
in Makhachkala
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the reconstruction, re-equipment and
modernization of the existing greenhouse complex of the “Tep-
lichnoye” CJSC, as well as the construction of up-to-date green-
houses 12 hectares in area onsite the functioning greenhouse
complex of the“Teplichnoye” CJSC.
PROJECT INITIATOR:
“Teplichoye” Closed Joint Stock Company
LOCATION:
Work-study unit area, Akushinskogo Prospekt (Avenue),
Makhachkala, Republic of Dagestan
MATURITY LEVEL:
CONTACT DETAILS:
Work-study unit area, Akushinskogo Prospekt (Avenue),
367014, Makhachkala, Republic of Dagestan, Russia
Dzhamalutdinov Ismail Abilitdinovitch, Director General
Tel.: +7 (8722) 60 46 27
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 467,2 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
3 years
7,2 years
12
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the “Fresh Vegetables” greenhouse complex
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of an up-to-date green-
house complex with a 12-hectare production area, advanced
of vegetables growing, with a capacity of 5-6 thousand
tons/year.
PROJECT INITIATOR:
«Niva» production-agricultural cooperative
LOCATION:
Novokuli village, Novolaksky district, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
A plot of land 12 hectares in area is available (sublease).
Greenhouses construction is started in the Novokuli village.
The principal investor of the project is the “Creditinvest”
Commercial Bank”, Ltd.
CONTACT DETAILS:
1, Ploshchad Geroev, 368124, Kizilyrt,
Republic of Dagestan, Russia
368939, Tsilitl village, Gumbetovsky district,
Republic of Dagestan, Russia
Musaev Umar Abdullaevitch, Director General
Tel.: +7 (8722) 94 00 012
Tel.: +7 (928) 054 87 19
Tel.: +7 (928) 511 10 70
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
540,0 mln RUB
Implementation period Pay-back period
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012 2 years
4,5 years
“Creditinvest” Commercial Bank”, Ltd.
Raisedfunds
25 %
Ownfunds
5 % 70 %
15
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a feed milling plant, poultry processing premises
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of a feed milling plant
in the Khasavyurtovsky district, with a capacity of 92 thousand
tons/year, poultry killing and processing premises with a capac-
ity of 6 thousand chicken per hour with a refrigerated ware-
house for 400 tons.
PROJECT INITIATOR:
LOCATION:
Totyrbiykala village, Khasavyurtovsky district,
Republic of Dagestan
MATURITY LEVEL:
A business plan is developed.
A 6-hectare plot of land is available (rented for 49 years).
CONTACT DETAILS:
368040, Endirey village, Khasavyurtovsky district,
Republic of Dagestan, Russia
Mustafaev Soltanali Otarkhanovitch, Director General
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
255,740 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
2017
2016
2015
2014
20131 year
2,1 years
14
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a greenhouse complex for vegetables growing
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of up-to-date green-
houses for vegetables (tomato, cucumber, salad) cultivating in
Karabudakhkentsky district.
PROJECT INITIATOR:
“Untas”, Ltd.
LOCATION:
Paraul village, Karabudakhkentsky district, Republic of Dagestan
MATURITY LEVEL: CONTACT DETAILS:
17a Gagarina St., 367010, Makhachkala,
Republic of Dagestan, Russia
“Untas”, Ltd.
A person to contact: Aseev Nabiyulla Khabibullaevitch
Tel.: +7 (988) 428 10 10
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 817,986 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
23 % 77 %
2030
2028
2026
2024
2022
2020
2018
2016
2014
2012 2 years
3,7 years
17
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of complex broiler meat and hen eggs production
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project includes a cost-effective production development
program specifying the use of high producing crosses, modern
technologies of poultry keeping and feeding, poultry meat ad-
vanced processing and waste management. The construction of
3 poultry yards for 95 thousand heads each, a chickery for 105
thousand heads, egg storage and necessary infrastructure ob-
jects; feed production plant modernization.
PROJECT INITIATOR:
LOCATION:
Shamakhalyangiyurt village, Kumtorkalinsky district,
Republic of Dagestan
MATURITY LEVEL:
CONTACT DETAILS:
204, 71 Yagarskogo St., 367003, Makhachkala,
Republic of Dagestan, Russia
Saybudinov Magomed Esenbulatovitch, Director
Tel.: +7 (8722) 62 90 40
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 065,357 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
3 years
5,7 years
16
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
an annual capacity of 500 tons and caviar culturing with a ca-
pacity of 25 tons per year.
PROJECT INITIATORS:
LOCATION:
Rechnoye village, Kizlyarsky district, Republic of Dagestan
MATURITY LEVEL:
-
tion are received from the “State Projects Expertise” Govern-
ment Agency of the Republic of Dagestan.
-
ment installation is in progress.
CONTACT DETAILS:
59 Lermontova St., 368827, Yuzhny village, Kizlyarsky district,
Republic of Dagestan, Russia
A person to contact:
Magomedov Davud Akhmebnabievitch
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 600,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
30 % 70 %
2030
2028
2026
2024
2022
2020
2018
2016
2014
2012 2 years
7 years
19
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Reconstruction of the winery and construction of facilities
for juice and wine bottling
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
According to the project it is planned to develop the produc-
tion of wine base, wine and juice. The project includes the re-
equipment of existing facilities, professional training.
PROJECT INITIATOR:
“Marus” Agricultural Production Co-operative
LOCATION:
Leninkent village, Makhachkala, Republic of Dagestan
MATURITY LEVEL:
-
tion
CONTACT DETAILS:
1v Vinogradnaya St., Leninkent village, Makhachkala,
Republic of Dagestan, Russia
A person to contact:
Radzhabov Aliaskhab Abdulaevitch
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
399,335 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
4,9 years6,5 years
18
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of factories producing competitive liqueur wine
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the development of the grape liqueur
wine production using grape from the vineyards of the Sary-
Kum barchan, with a capacity of 370 million dL per year.
PROJECT INITIATORS:
“Kizlyar Cognac Plant” State Unitary Enterprise,
Committee for Wine and Vine and Alcohol Market Regulation of
the Republic of Dagestan
LOCATION:
Korkmaskala village, Kumtorkalinsky district,
Republic of Dagestan
MATURITY LEVEL:
A project feasibility study is completed.
A 700-hectare plot of land is available.
CONTACT DETAILS:
60 Ordzhonikidze St., 368830, Kizlyar,
Republic of Dagestan, Russia
Tel.: +7 (8722) 67 86 43
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 350,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
4 years
8,5 years
21
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Industrial livestock complex construction
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction and reconstruction of an
industrial livestock complex for 400 heads of cattle (brood cows)
including 200 milk-cows, with high meat and milk productivity
and the launch of meat and milk processing line. The planned
annual capacity is 500 tons of meat, and 145 tons of milk.
PROJECT INITIATOR:
“Kaspy” Agricultural Production Co-operative
LOCATION:
Karabudakhkentsky district, Republic of Dagestan
MATURITY LEVEL:
CONTACT DETAILS:
25 Petra Pervogo St., 367002, Makhachkala,
Republic of Dagestan, Russia
Askhabov Abakar, Board Chairman
Tel.: +7 (988) 217 86 54
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
258,2 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
25 % 75 %
2 years
5,6 years
20
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Industrial livestock complex construction, meat and milk production
and processing development
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of an industrial live-
stock complex for 2 thousand heads of cattle including 1 thou-
sand milk-cows, and the launch of meat and milk processing
line. The planned annual capacity is 850 tons of meat, and
5,52 thousand tons of milk.
PROJECT INITIATOR:
LOCATION:
Leninkent village, Makhachkala, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
A land plot (247 hectares) is available (rented for 49 years).
CONTACT DETAILS:
25 Petra Pervogo St., 367002, Makhachkala,
Republic of Dagestan, Russia
Abakarov Abdulnasir Rabadanovitch, Director General
Tel.: +7 (988) 217 86 54
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 030,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
25 % 75 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012 2 years
5,5 years
23
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of tomato paste, juice, nectar, fruit puree production
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the development of tomato paste, high-
quality fruit puree, natural juice production. The own resource
base is to be exploited.
PROJECT INITIATOR:
«Ros-Yugprodukt», Ltd.
LOCATION:
Stalskoye village, Kizilyurtovsky district, Republic of Dagestan
MATURITY LEVEL:
49 years) are available.
CONTACT DETAILS:
135, Dostoevskogo St., 368222, Buynaksk,
Republic of Dagestan, Russia
Gunashev Saypudin Gadzhievitch, General Director
Tel.: +7 (928) 674 59 88
Tel.: +7 (985) 974 50 61
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
851,9 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
3 years
5,4 years
22
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of greenhouse complexes
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
According to the project, it is planned to construct and launch
early vegetable production.
PROJECT INITIATOR:
“Tayfun” farm household
LOCATION:
Kayakentsky district, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
A 5-hectare plot of land is available.
CONTACT DETAILS:
368554, Kayakentsky district,
Republic of Dagestan, Russia
Zayirbekov Abdula Magomedovitch, Director General
Tel.: +7 (906) 449 68 54
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
225,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
3 years
5,4 years
25
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Reconstruction and re-equipment of the virgin raw materials processing,
juice packaging and canned food production
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the production growth and product ex-
pansion (juice, nectar, infant food, canned fruits and vegeta-
bles). As the projected capacity is reached the annual produc-
tion volume will be equal to 21 million litres.
PROJECT INITIATOR:
«Gergebil canning factory» OJSC
LOCATION:
Gergebil village, Gergebilsky district, Republic of Dagestan
MATURITY LEVEL:
assets (a pledge fund).
CONTACT DETAILS:
368250, Gergebil village, Gergebilsky district,
Republic of Dagestan, Russia
Makhmudov Imanshapi Alievitch, Director General
Tel.: +7 (988) 295 91 11
E-mail: [email protected]
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
702,9 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
19 % 81 %
3 years4,6 years
24
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
and self-regulating energy saving systems with agroindustrial waste
management
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the implementation of complexes pro-
energy saving systems with agroindustrial waste management.
PROJECT INITIATOR:
“Vympel 2002", Ltd.
LOCATION:
Khasavyurtovsky district, Republic of Dagestan
MATURITY LEVEL: CONTACT DETAILS:
Botashev Vazir Gadzhievitch, Director General
Tel.: +7 (928) 156 22 22
Tel.: +7 (909) 479 10 38
E-mail: [email protected]
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
560,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
15 %
85 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012 2 years
5 years
27
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Reconstruction of a canning factory
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project is aimed at advanced and high-quality canned food
production.
equipment purchase and current assets gaining.
The goal is to be achieved by means of advanced production of
competitive canned food.
PROJECT INITIATOR:
“Yuzhno-Dagestansky Agropromyshlenny Soyuz”
(“South Dagestan Agroindustrial Union”), Ltd.
LOCATION:
Stalsky rayon village, Makhachkala, Republic of Dagestan
MATURITY LEVEL:
A 11,5-hectare plot of land in the Stalsky rayon village is
owned.
CONTACT DETAILS:
Stalsky rayon village, Republic of Dagestan, Russia
Y. K. Balakerimov, Director General
Tel.: +7 (922) 412 91 54
A person to contact:
Regedin Abdulmuslimov
Tel.: +7 (963) 404 28 38
E-mail: [email protected]
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
313, 4 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2,8 years
26
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction and reconstruction of a livestock complex
and milk processing plant with a daily capacity of 30 tons
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction and reconstruction of a
livestock complex, milk processing line with a daily capacity of
30 tons.
PROJECT INITIATOR:
“Darada-Murada” CJSC
LOCATION:
Kumtorkalinsky district, Republic of Dagestan
MATURITY LEVEL:
Regulations No. 19-r of 20 January 2012 stipulated the
conclusion of a contract of sale of a land plot (total area
2274,4827 hectares) in the Kumtorkalinsky district, for 49
years, with the “Darada-Murada” CJSC.
CONTACT DETAILS:
367003, Murada village, Gergevilsky district,
Republic of Dagestan, Russia
Nazhmudinov Magomed Osmanovitch, Director General
Tel.: +7 (928) 510 09 00
Tel.: +7 (938) 201 34 46
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 350,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
19 % 81 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
6 years
8 years
CONSTRUCTION
26
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of agricultural facilities for agricultural
produce processing and production sales
AGROINDUSTRIAL COMPLEX
PROJECT DESCRIPTION:
The project stipulates the construction of an industrial live-
stock complex, a vegetable storage, gardens and vineyards
planting.
PROJECT INITIATOR:
“Agroholding Makhachkala”, Ltd.
LOCATION:
Shamkhal-Termen village, Makhachkala, Republic of Dagestan
MATURITY LEVEL:
CONTACT DETAILS:
1 Popovicha St., 367009, Makhachkala,
Republic of Dagestan, Russia
Asryan Yasha Rubenovitch, Director General
Tel.: +7 (928) 500 50 54
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
7 600,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
15 % 85 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
3 years
5 years
3
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a plant producing gypsum and gypsum-containing
construction materials in the industrial area of the Kafyr-Kumukh
village
CONSTRUCTION
PROJECT DESCRIPTION:
The project is aimed at the construction of a modern competi-
tive plant producing gypsum and gypsum-containing construc-
tion materials.
The project stipulates:
1) a gypsum deposit development;
2) the construction of a plant producing gypsum jointing, dry
mix mortars, gypsum partition blocks and plaster slabs.
Investment Fund .............................................................................. 27%
Budget of the Republic .................................................................... 3%
Own funds ............................................................................................ 7%
Raised funds ...................................................................................... 63%
PROJECT INITIATOR:
“Daggips”, Ltd.
LOCATION:
Kafyr-Kumukh village, Buynaksky district, Republic of Dagestan.
MATURITY LEVEL:
A business plan is prepared.
A 3,1-hectare land plot is available.
Production licenses are obtained for deposits.
Production equipment is purchased partially.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 168 of 1 June 2010, the project
has the status of a priority project of the Republic of
Dagestan.
CONTACT DETAILS:
Railway dock, 368201, Kafyr-Kumukh village,
Buynaksky district, Republic of Dagestan, Russia
Tel.: +7 (928) 579 42 47
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 682,1 mln RUB
Implementation period Pay-back period
2 years
6 years
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the «Kaspiysk» Industrial and Construction Complex
CONSTRUCTION
PROJECT DESCRIPTION:
The principal target of the project is the development of the
following production units:
1) a brick factory;
2) a concrete products manufacturing plant;
3) a dry pack mortar producing plant;
4) a gas-concrete blocks and slabs producing plant.
PROJECT INITIATOR:
"Construction Materials Plant", Ltd.
LOCATION:
Karabudakhkentsky district, Republic of Dagestan.
MATURITY LEVEL:
A business plan is prepared.
A land plot (30 hectares) is available in the
Karabudakhkentsky district.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 492 of 30 December 2010, the
project has the status of a priority project of the Republic of
Dagestan.
In compliance with the Regulation No. 255-r of 12 October
allowed.
In compliance with the Regulation of the RF Government
No. 299-r of 3 March 2012 government loan guarantee is
granted for the loans of the "Construction Materials Plant", Ltd.
A general agreement No. 110400/0024-34 of 30 November
2011 between the "Construction Materials Plant", Ltd. and
“Rosselhozbank” OJSC on 11 lines of credit is concluded.
production lines are purchased.
CONTACT DETAILS:
163g Kazbekova St., 367009, Makhachkala,
Republic of Dagestan, Russia
Nartgishiev Khabib Nartgishievitch, Director General
Tel.: +7 (8722) 51 56 50, +7 (8722) 51 58 01
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 4 110,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
3 years
5,2 years
5
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of an agglomerate tile producing plant
CONSTRUCTION
PROJECT DESCRIPTION:
The project stipulates the construction of a plant producing
high-quality agglomerate tile, with the use of the Italian
equipment manufactured by the “BRETON” company.
PROJECT INITIATOR:
"Dagaglomerat" Open Joint Stock Company.
LOCATION:
Kizilyurt, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
Interim agreements with the “BRETON” company (Italy) on
equipment supply are concluded.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 168 of 1 June 2010, the project
has the status of a priority project of the Republic of Dagestan.
CONTACT DETAILS:
25 Levanevskogo St., 368025, Makhachkala, Republic of
Dagestan, Russia
Lachuyev Shirvani Ismailovitch, Director General
Tel./fax: +7 (8722) 68 26 52
2017
2016
2015
2014
2013
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
514,1 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
1 year
2,5 years
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
CONSTRUCTION
PROJECT DESCRIPTION:
The project suggests a series of measures for the development
Dagestan. It is planned to construct a loor tile and ceramic
granite production plant with an annual capacity of 2,112
million sq m. The whole production process is to be
automated: from raw materials reclamation to production
packaging. Ceramic tile will be produced with the use of Italian
qualities and the best quality-price ratio.
PROJECT INITIATOR:
"Marabi", Ltd.
LOCATION:
Tyube village, Kumtorkalinsky district, Republic of Dagestan
MATURITY LEVEL:
negotiated with a creditor.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 168 of 1 June 2011, the project
has the status of a priority project of the Republic of Dagestan.
Construction documents of the plant have state appraisal
results.
The meeting of the Operations Committee of the Sberbank of
Russia is to be held in the 2012 second quarter to discuss
CONTACT DETAILS:
56 Batyraya St., 367000, Makhachkala,
Republic of Dagestan, Russia
Sadykov Zeynutdin Sadykovitch, Director General
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 028,1 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
30 % 70 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012 2 years
5,6 years
7
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a autoclaved aerated concrete blocks production plant
with an annual capacity of 100 000 m3
CONSTRUCTION
PROJECT DESCRIPTION:
The project is aimed at the development of aerated concrete
and gas silicate building blocks production in the Republic of
Dagestan.
PROJECT INITIATOR:
"Akhmad and Z", Ltd.
LOCATION:
Tyube village, Kumtorkalinsky district, Republic of Dagestan.
MATURITY LEVEL:
A feasibility study is completed.
A 10-hectare land plot (investment industrial and production
site) is reserved in the Kumtorkalinsky district of the Republic
of Dagestan.
CONTACT DETAILS:
367000, Republic of Dagestan, Russia
Bayramov Fidel
Tel.: +7 (928) 869 44 17
Tel.: +7 (928) 805 66 77
Tel.: +7 (960) 411 55 29
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
440,0 mln RUB
Raisedfunds
Implementation period Pay-back period
100 %
2 years
5 years
6
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of prefabricated units, concrete pipes and concrete circles
production
CONSTRUCTION
PROJECT DESCRIPTION:
According to the project it is planned to purchase and install
equipment for producing prefabricated units, concrete pipes
and concrete circles for sewage and construction works.
PROJECT INITIATOR:
“Stroydetal” Concrete Production Plant OJSC.
LOCATION:
Makhachkala, Republic of Dagestan.
MATURITY LEVEL:
production workstation for prefabricated units and concrete
pipes production” is prepared.
company for concrete pipes and prefabricated units produc-
tion (320 million Rissian roubles) is received.
CONTACT DETAILS:
367012, 67, Abubakarova St., Makhachkala,
Republic of Dagestan, Russia
Agency for Investment and External Economic Relations
of the Republic of Dagestan
Tel.: +7 (8722) 56 76 80/81
Fax: +7 (8722) 67 03 40
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
571,4 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2017
2016
2015
2014
2013 1,5 years
3 years
9
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of the production of elements and constructions for
pre-engineered housing and non-housing properties in the Republic
of Dagestan
CONSTRUCTION
PROJECT DESCRIPTION:
The project stipulates the construction of a building construc-
tions producing plant with an annual capacity of 460 thousand
sq m. Produced constructions are to be used in pre-engineered
housing and non-housing properties building.
PROJECT INITIATOR:
“Termoblok” Closed Joint Stock Company.
LOCATION:
Makhachkala, Republic of Dagestan.
MATURITY LEVEL:
CONTACT DETAILS:
368025, 25 Levanevskogo St., Makhachkala,
Republic of Dagestan, Russia
Lachuev Shirvani Ismailovitch, Director General
Tel.: +7 (8722) 68 26 52
2020
2018
2016
2014
2012
PROJECTCOST:
130,0 mln RUB
Implementation period Pay-back period
1 year
2 years
PROJECT FINANCING SOURCES:
PROJECT TERMS:
Ownfunds
Raisedfunds
10 %
90 %
8
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of limestone quarrying and natural chalk production
CONSTRUCTION
PROJECT DESCRIPTION:
The project stipulates the development of limestone quarrying
in the Tabasaransky district of the Republic of Dagestan and
natural chalk production development.
PROJECT INITIATOR:
“Zolotoy Barkhan” ("Golden Barchan"), Ltd.
LOCATION:
Tabasaransky district, Republic of Dagestan.
MATURITY LEVEL: CONTACT DETAILS:
368000, Tabasaransky district, Republic of Dagestan, Russia
Khisriev Abdulbasir Kadirovitch
Tel.: +7 (928) 594 59 84
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 125,3 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
33 % 67 %
2021
2020
2019
2018
2017
2016
2015
2014
2013
2012
1 year
5,1 years
TOURISM
3
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Reconstruction of the “Talgi” therapeutic resort
TOURISM
PROJECT DESCRIPTION:
The project stipulates infrastructure reconstruction and new
new equipment purchase including advanced medical equip
PROJECT INITIATORS:
LOCATION:
MATURITY LEVEL:
has the status of a priority project of the Republic of Dagestan.
CONTACT DETAILS:
A person to contact:
www.talgi.ru
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
584,167 mln RUB
Ownfunds
Raisedfunds
Implementation period
20 % 80 %
3 years
6 years
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the “Lazurniy bereg” satellite town
TOURISM
PROJECT DESCRIPTION:
The project stipulates the creation of two functional areas on
the territory of the Primorsky district:
1) construction of residential quarters with the blocks of
middle class and luxury) including buildings for public and
cultural purposes;
tourist centers and mass service objects.
Housing estates will be linked with large parks.
hectares).
PROJECT INITIATORS:
LOCATION:
Republic of Dagestan.
MATURITY LEVEL:
Unitary Enterprise.
has the status of a priority project of the Republic of Dagestan.
CONTACT DETAILS:
A person to contact: Z. N. Magomedova
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
150 000,0 mln RUB
23 400,0 mln RUB
Ownfunds
Total cost
First stage
Raisedfunds
Implementation period
27 % 73 %
7 years
13,2 years
5
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a tourist complex in the Matlas area
TOURISM
PROJECT DESCRIPTION:
and entertainment centers as a part of the tourist cluster of the
Republic of Adygeya. The construction of sport facilities and
development is planned.
PROJECT INITIATORS:
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
Agency for Tourism of the Republic of Dagestan
PROJECT FINANCING SOURCES:
PROJECT TERMS:
Ownfunds
Raisedfunds
Implementation period
35 % 65 %
2 years
5 years
PROJECTCOST:
38,0 billion RUB
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a hippodrome in Makhachkala
TOURISM
PROJECT DESCRIPTION:
According to the project it is planned to construct a
hippodrome in the city of Makhachkala. It is to include various
persons;
PROJECT INITIATORS:
Stock Company
LOCATION:
MATURITY LEVEL:
CONTACT DETAILS:
A person to contact:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
411,6 mln RUB
Ownfunds
Raisedfunds
Implementation period
10 %
90 %
2 years
4,4 years
7
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the "Darvag-chai" recreation complex
TOURISM
PROJECT DESCRIPTION:
The project stipulates the construction of a therapeutic resort
PROJECT INITIATORS:
LOCATION:
MATURITY LEVEL:
construction company.
CONTACT DETAILS:
Authorised Company Representative in the Russian Federation
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 200,0 mln RUB
Ownfunds
Raisedfunds
Implementation period
15 %
85 %
3,5 years
9,8 years
6
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the “Dzhami” resort
TOURISM
PROJECT DESCRIPTION:
The project stipulates a resort expanding on the Caspian Sea
PROJECT INITIATORS:
LOCATION:
MATURITY LEVEL:
Turali village.
CONTACT DETAILS:
A person to contact:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1 063,0 mln RUB
Ownfunds
Raisedfunds
Implementation period
33 % 67 %
3 years
6 years
INVESTMENT
SITES
8
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of the "Chindirchero" year-round recreational complex
TOURISM
PROJECT DESCRIPTION:
The project stipulates the construction of an engineering and
long. The complex will be equipped with lifts of various types
PROJECT INITIATORS:
LOCATION:
MATURITY LEVEL:
Program.
CONTACT DETAILS:
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 4 076,0 mln RUB
Ownfunds
Raisedfunds
Implementation period
27 % 73 %
7 years
10,5 years
7
INVESTMENT SITES OF THE REPUBLIC OF DAGESTAN
“Novokayakent”
TOURISM
ENGINEERING AND TRANSPORT INFRASTRUCTURE:
Program it is planned to create engineering infrastructure
FINANCING SOURCES:
THE FOLLOWING WORKS ARE COMPLETED:
soon;
cilities construction is in progress.
LOCATION:
AREA
DECLARED:463 000 sq m
“Port-Petrovsk”
ENGINEERING AND TRANSPORT INFRASTRUCTURE:
ed Program it is planned to create engineering infrastructure
FINANCING SOURCES:
THE FOLLOWING WORKS ARE COMPLETED:
LOCATION:
AREA
DECLARED:2 000 000 sq m
10
INVESTMENT SITES OF THE REPUBLIC OF DAGESTAN
“Chindirchero”
TOURISM
ENGINEERING AND TRANSPORT INFRASTRUCTURE:
ed Program it is planned to create engineering infrastructure for
FINANCING SOURCES:
THE FOLLOWING WORKS ARE COMPLETED:
cal generator are purchased and installed.
LOCATION:
AREA
DECLARED:1 200 000 sq m
“Darvagchai”
ENGINEERING AND TRANSPORT INFRASTRUCTURE:
ed Program it is planned to create engineering infrastructure
FINANCING SOURCES:
THE FOLLOWING WORKS ARE COMPLETED:
LOCATION:
AREA
DECLARED:600 000 sq m
NATIONAL
CRAFTS
3
PROJECT DESCRIPTION:
According to the project it is planned to construct a Dagestan
center of traditional carpet weaving. The center will render a
wide spectrum of services for traditional carpet weaving devel-
opment in the region, and will produce carpets and natural
dyes for the carpet weaving manufacturing. The complex is to
include carpet weaving facilities producing 370 sq m of carpet
production monthly, and natural dyes production and yarn
dying facilities.
PROJECT INITIATOR:
“Lyahlinskaya Carpet Mill” (“Lyahlinskaya kovrovaya fabrika”)
State Unitary Enterprise
LOCATION:
61 Nasrutdinova St., Makhachkala, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
CONTACT DETAILS:
61 Nasrutdinova St., Makhachkala,
Republic of Dagestan, Russia
Gidaev Gadzhikhasan Imimaevitch
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 54,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
27 % 73 %
2021
2020
2019
2018
2017
2016
2015
2013
2012 2 years
4,2 years
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Construction of a Dagestan center of traditional carpet weaving
NATIONAL CRAFTS
2
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of the Kubachi jewellery manufacturing
NATIONAL CRAFTS
PROJECT DESCRIPTION:
The project stipulates the re-equipment of jewellery produc-
tion to increase the capacity and spectrum of manufactured
products.
PROJECT INITIATOR:
“Kubachi Art Factory” (“Kubachinsky Khudozhestvenny Kombi-
nat”) State Unitary Enterprise
LOCATION:
Kubachi village, Dakhadaevsky district, Republic of Dagestan
MATURITY LEVEL:
A project feasibility study is prepared.
A business plan is prepared.
The project is to be implemented onsite the “Kubachi Art Fac-
tory” (“Kubachinsky Khudozhestvenny Kombinat”) State Uni-
tary Enterprise.
In compliance with the Executive Order of the Government of
the Republic of Dagestan No. 252 of 22 July 2011, the project
has the status of a priority project of the Republic of Dagestan.
CONTACT DETAILS:
368572, Kubachi village, Dakhadaevsky district,
Republic of Dagestan, Russia
Akhmedov Magomed Yusupovitch, Director General
Gidaev Zaur Imimaevitch, Chief Accountant
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST: 250,0 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
10 %
90 %
2021
2020
2019
2018
2017
2016
2015
2013
2012 2 years
5 years
4
INVESTMENT PROJECTS OF THE REPUBLIC OF DAGESTAN
Development of the jewellery cluster in the Republic of Dagestan.
Construction of a jewellery factory in Makhachkala
NATIONAL CRAFTS
PROJECT DESCRIPTION:
According to the project, the construction of a jewellery facto-
ry, advanced equipment installation, jewellery production and
its realization in the Russian market are suggested. The factory
will perform the complete gold and silver jewellery production
apparel, silverware, accessories, decorative cold arms, chains
and bracelets.
PROJECT INITIATOR:
“Makhachkala Art Factory”
(“Makhachkalinsky Khudozhestvenny Kombinat”), Ltd.
LOCATION:
Makhachkala, Republic of Dagestan
MATURITY LEVEL:
A business plan is prepared.
A 1-hectare land plot is available.
CONTACT DETAILS:
16 A. Sultana St., 367000, Makhachkala,
Republic of Dagestan, Russia
Kadiev Alikadi Dzharullayevitch, Director General
PROJECT FINANCING SOURCES:
PROJECT TERMS:
PROJECTCOST:
1017,2 mln RUB
Ownfunds
Raisedfunds
Implementation period Pay-back period
20 % 80 %
2021
2020
2019
2018
2017
2016
2015
2013
2012 2 years
5,5 years