INVESTMENT PROJECTS IN THE
AGRO-INDUSTRIAL COMPLEX OF
THE EAST KAZAKHSTAN REGION
CONTENT
Brief description
Meat production and packing factory
The feeding areas construction
Growing and processing of the crop production
The livestock’s wool and pelt processing
Dairy Farms Construction
Milk processing
Poultry Factory Construction
Reconstruction of irrigated areas
Greenhouses
Maral breeding and beekeeping
Fish farming
Timber processing
The country tourism and improvement of the persons health
Transport and logistic centre
Bridge construction
Dear participants of the Business Forum!
I invite you to take part in the investing activity of
agricultural complex of East Kazakhstan region which is
highly potential and full of big opportunities.
Today, our region is one of the unique areas of the
Republic of Kazakhstan. It is the place where agriculture
and heavy industry are cooperating perfectly. Both
agricultural and heavy industry greatly impact on supplying
of provisions and economy not only in this region, but in the
whole country.
The main part of the agrarian sector of our region is
an agricultural industry which is wide-spread into six soil-climatic zones of seven
available.
The total area of the region is 28,3 mln. ha, where 22,7 mln. ha for farm
landing and 10.4 mln. ha for agricultural purposes land and 1,4 mln. ha from total
area for plowing.
The soil cover is represented by all types of black earth, chestnut and gray
soils. The average grade of estimated productivity is ploughed fields-39, hayfields-
40 and pastures-21. In the northern parts of the region the average grade of
estimated productivity is about 70.
The variety of soil-climatic zones, large areas of farmland and market
requirement to agriculture products predetermined the diversification of
agriculture in the region.
Today, we may admit that nearly all agricultural fields are developed here:
dairy and meat industry, sheep, horse, pigs, reindeer antlers breeding, poultry,
beekeeping and fish farming.
Crop production is represented by corn, sunflower seeds, potatoes,
vegetables, melons and fodder crops.
I am confident that this business forum will be the launching for the
exchange of important business information and will contribute to investing into
the further development of economy of the agrarian sector in this region.
We are waiting for You and Your partners in the Eastern Kazakhstan!
Akim of the East Kazakhstan region
D. Akhmetov
Meat production and
packing factory
Construction of meat production complex, with the of sheep development
Applicant: LLC "Eurasia Agro Holding"
The purpose and concept of the project are: Production
and sales of meat products in the region and outside.
Period of realization: 2016-2018 years
Place of realization: EKR, Ayagoz rayon, Mamyrsu village
Current state: There are a business plan, project documentation and
feasibility study of the project. By resolution of akimat there
allocated 52 hectares of land for the construction of meat
production complex and feedlots.
Total cost of project: 7 100 million tenge
Government support: 1. Summarizing deficient infrastructure on the program
"Business Road Map-2020";
2. To subsidize the interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. To subsidize for the construction to meat production
complex;
4. To subsidize for feed production (seeds, fuels and
lubricants, herbicides, fertilizers);
5. To subsidize for meat production.
Expected Result: Breeding every year about 50 thousand heads of small cattle
on an area of 600 thousand hectares of pasture, production
and exports per year in other regions of Kazakhstan and
abroad such as China, Russia, the United Arab Emirates about
10 thousand tons of mutton, 12 thousand tons of beef.
Workplaces: Considering the growth number of livestock up to 500
persons
Construction of meat production complex and organization of feedlot for
3,000 head of cattle
Applicant: LLC«Yelim-ai Kokpekty rayon»
The purpose and concept of the project are: Production
and sales of meat products in the region and outside.
Period of realization: 2015-2016 years
Place of realization:
EKR, Kokpekty rayon , Kokzhaiyk
Current state: Here realized 1 and 2 stages of the project (breeding
reproducer for 2000 heads and food supply). There are a
project documentation and business plan.
Total cost of project: 810 million tenge
Required investments:
700 million tenge
Government support: 1. Investment subsidies for the construction meat
production complex and feedlots, as well as the introduction
of irrigation systems;
2.Subsidies for meat production;
3. Subsidies for feed production (fuel and lubricants, seeds,
herbicides, fertilizers);
4. Subsidies for irrigation water delivery.
Expected Result: 4 million tons of beef production every year.
Workplaces 45 persons
Construction of plant for deep processing of meat and the creation of an
irrigation system in the area of 700 hectares
Applicant: LLC «Shalabai»
The purpose and concept of the project are: Expansion of
production modernization, creation of a stable food supply
for the cattle breeding and production of competitive meat
products.
Period of realization: 2016-2020 years
Place of realization:
EKR, Zharma rayon, Shalabai village.
Current state: For irrigating 700 hectares of arable land on the river Kyzyl-
Su is built reservoir capacity of 650-700tys.m3. project
documentation for the construction of plant for meat
processing is developed.
Total cost of project: 5 500 million tenge
Required investments: 5 500 million tenge
Government support: 1. Subsidies of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
2. Subsidies to implement irrigation system;
3. Subsidies for feed production (seeds, fuels and lubricants,
herbicides, fertilizers), and the delivery of water;
4. Subsidies for meat production.
Expected Result: Production of 200 tons per year of premium beef and canned
meat products
Workplaces 30 persons
Construction of a meat processing plant, followed by a deep processing
(processing of meat of cattle and small cattle, production of canned meat and
sausages on the standard "Halal")
Applicant: LLC «Agro-Portal»
The purpose and concept of the project are: deep
processing of meat of cattle and small cattle, production of
canned meat and sausages on the standard "Halal". Exports
of meat to Iran, UAE, Europe.
Period of realization: 2016-2017 years
Place of realization:
EKR, Semey city
Current state: Decorated 48.0 hectares of land for the construction of the
meat industry. Project documentation is developed
Total cost of project: 4 550 million tenge
Required investments: 4 550 million tenge
Government support: 1. Subsidies of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
2. Subsidies for the construction of meat production complex;
3. Subsidies for feed production (seeds, fuels and lubricants,
herbicides, fertilizers), and the delivery of water;
4. Subsidies for meat production.
2.
Expected Result: Production of 30 thousand tones of beef and 40 thousand
tones of lamb and 7 tones of canned meat and sausages per
year.
Workplaces 250 persons
Construction of a mini factory for slaughtering cattle and meat production
Applicant: LLC «Plemfactory Kalbatau»
The purpose and concept of the project are: ensuring food
security in the region with meat products
Period of realization: 2016-2018 years
Place of realization: EKR, Ayagoz city
Current state: By akimat was allocated 1.44 hectares of land. There
construction of the factory is going.
Total cost of project: 140 million tenge
Required investments: 140 million tenge
Government support: 1. Summarizing deficient infrastructure on the program
"Business Road Map-2020";
2. Subsidize of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies for the construction of a meat
processing company;
Expected Result: Bringing production up to 1000 tons of sausages a year.
Workplaces 30 persons
Building of factory for processing of meat products
Applicant: LLC «Sakhnovskoye»
The purpose and concept of the project are: Production
and sales of meat products in the region and outside.
Period of realization: 2016-2018 years
Place of realization: EKR, Borodulikha rayon, Sakhnovka village.
Current state 10 hectares of land for the construction of factory and feedlot
for 2,500 head of cattle and 5 hectares for construction of
pedigree reproducer.
Total cost of project: 1 000 million tenge
Required investments: 880 million tenge
Government support: 1. Investment subsidies for the construction of breeding
reproducer;
2. Subsidies for feed production (fuel and lubricants, seeds,
herbicides, fertilizers);
3. Subsidies for meat production.
Expected result: Production of 5000 tonnes of beef per year.
Workplaces 40 persons
Reconstruction and modernization of existing pig farm
Applicant: LLC «Malorosinka»
The purpose and concept of the project are: Increased
production of pork to implement it in the district and region
Period of realization: 2016 2017 years
Place of realization: EKR, Zyryanovsk rayon, Parygino village
Current state There is a base of pig 24 700 sq.m, a granary of 8000 cubic
meters, as well as the entire infrastructure. Business plan,
project documentation are available. Compiled intention
agreement with the French company I-Tek for the supply of
equipment.
Total cost of project: 500 million tenge
Required investments: 500 million tenge
Government support: Subsidies for the production of pork.
Expected Result: Annual production of up to 360 tons of pork.
Workplaces 150 persons
Construction of feeding
areas
Creation of breeding reproducer and feedlots, the development of fodder
production
Applicant: «Algabas» farm
The purpose and concept of the project are: growing and
selling of breeding cattle
Period of realization: 2016 2018 years
Place of realization: EKR, Urdzhar
Current state Effective feedlot for 1,500 head of cattle, also built and
prepared documents for the introduction of the feedlot for
1500 animals. Land is available.
Total cost of project: 870 million tenge
Required investments: 520 million tenge
Government support: 1. Summarizing deficient infrastructure on the program
"Business Road Map-2020";
2.Subsidies for feed production;
3. Subsidies for breeding work.
Expected Result:
Реализация ежегодно до 375 тонн мяса говядины.
Workplaces 75 persons
Extension of milk and meat production with subsequent downstream
processing
Applicant: LLC «Semey city-Agroinvest»
The purpose and concept of the project are: expansion of
milk-meat products production, and its subsequent
downstream processing for implementation in the region.
Period of realization: 2016 2020 years
Place of realization: EKR, Borodulikha rayon
Current state Business plan are ready
Total cost of project: 7 650 million tenge
Required investments: 3 825 million tenge
Government support: 1. Subsidizing of fee rates on loans and leasing of
technological equipment and agricultural machinery;
2. Investment subsidies for construction of feedlots, milk
processing companies, milk farms, milk collection centers;
3. Subsidies for feed production (seeds, fuels and lubricants,
herbicides, fertilizers);
4. Subsidies for production of meat and milk.
Expected Result: production of 500 tons milk production, 1000 tones of meat
products per year.
Workplaces 30 persons
Growing and processing of
the crop production
Construction of oil processing of oilseeds crops
Applicant: LLC «EastAroKholding»
The purpose and concept of the project are: production
and sale of its oil in the region
Period of realization: 2016 2020 years
Place of realization: EKR, Ust-Kamenogorsk city
Current state There is an engineering infrastructure, where develop design
documentation.
Total cost of project: 900 million tenge
Required investments: 600 million tenge
Government support Subsidized of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
Expected Result: Production annual 16,900 tons of butter, 15 600 tonnes of
meal, 12,800 tons of meal.
Workplaces 47 persons
Growing and processing of artichoke to produce granular concentrated feed,
bioethanol and monosugars
Applicant: LCC «Zelenstroi KZ»
The purpose and concept of the project are: creation of a
modern agricultural holding for breeding and deep
processing of complex technical and forage crops
Period of realization: 2016 2018 years
Place of realization: EKR, Ust-Kamenogorsk
Current state There are 1600 hectares of land. Also all the necessary
engineering and transport communications are available.
Business plan.
Total cost of project: 400 million tenge
Required investments: 320 million tenge
Government support subsidies for feed production (seeds, fuels and lubricants,
herbicides, fertilizers).
Expected Result: The annual production of up to 37,000 granulated
concentrated feed, bioethanol and monosugars.
Workplaces: 220 persons
Building of factory for processing of agricultural crops
Applicant: LCC «LongXin»
The purpose and concept of the project are: Getting high-
quality, export-oriented and competitive agricultural products
for the domestic and foreign market
Period of realization: 2016 2020 years
Place of realization: EKR, Beskaragai rayon, Malaya Vladimirovka village
Current state: The issue of allocation of 14,700 hectares of land is
considering.. Business plan are ready. The infrastructure is
absent.
Total cost of project: 5 400 million tenge
Required investments: 5 400 million tenge
Government support 1. Summarizing of the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidizing of fee rates on loans and leasing of
technological equipment and agricultural machinery;
3. Subsidies for crop production (seeds, fuels and lubricants,
herbicides, fertilizers).
Expected Result:
Production and processing annual 2 000 tonnes of agricultural
products.
Workplaces: 150 persons
Construction corn-treacle factory
Applicant: «Bota» farm
The purpose and concept of the project are: processing of
corn starch release and other products for sale on the territory
of the region and outside.
Period of realization: 2016 2018 years
Place of realization EKR, Zaisan
Current state:
There are 1500 hectares of land. Develop a business plan,
feasibility study for the project.
Total cost of project: 2 500 million tenge
Required investments: 1 800 million tenge
Government support 1. Subsidized of interest rates on loans, and leasing of
technological equipment and agricultural machinery;
2. Subsidies for crop production (seeds, fuels and lubricants,
herbicides, fertilizers).
Expected Result:
Production per day 70 tons of starch.
Workplaces: 60 persons
Potato farming development
Applicant: «Kulyndy» farm
The purpose and concept of the project are: the
cultivation, storage and sale of potatoes in the region.
Period of realization: 2016 2018 years
Place of realization:
EKR, Ulan, Novo-Azovoe
Current state: There is a land area of 180 hectares. Develop a business plan,
feasibility study for the project. Required laying of the
pipeline length of 2.5 km, reconstruction of two silos at the
vegetable store total capacity of 7000 tons.
Total cost of project: 262 million tenge
Required investments: 250 million tenge
Government support Subsidies to support crop production (fuel and lubricants,
seeds, herbicides, fertilizers).
Expected Result: The cultivation and sale of annual up to 4200 tonnes.
Workplaces: 25 persons
Processing of wool and
pelt
Manufacture of felt products
Applicant: LLP "Rose felting Plant"
The purpose and concept of the Project: the expansion and
modernization of production
Implementation period: 2016
Place of realization: EKR, Semey city
Current state LLP "Rose felting Works" carries on business since 1991.
Produces boots (women, men, children, rubber), felts
(technical, aviation, for yurta, heating, boots made of felt, in
the range).
Total cost of project: 24 million tenge
Required investments: 24 million tenge
Government support: Subsidizing of fee rates on loans and leasing of technological
equipment and agricultural machinery
Expected result: Expanding the range of shoes made of felt.
Construction of dairy
farms
Construction of the milk farm for 600 heads
Applicant: LCC «Experimental farm of oilseeds»
The purpose and concept of the project are: increase
production of its own milk
Period of realization: 2015- 2017 years
Place of realization: EKR, Glubokoe, Solnechnoe
Current state: The construction of the milking of unit, maintained interior
finishing work. Before the year is over installation of
equipment.
Total cost of project: 2 312,8 million tenge
Required investments::
:
500,9 million tenge
Government support 1. Summary of the missing infrastructure on the program
"Business Road Map-2020";
2. Subsidized interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investsubsidies for the construction of the milk farm;
4. Grants for fodder production (seeds, fuels and lubricants,
herbicides, fertilizers).
Expected Result:
increase in milk production at 4320 tonnes per year
Workplaces: 20 persons
Construction of the dairy farm for 600 heads
Applicant: CH "Bagration2"
The purpose and concept of the project: increase
production of its own milk for further processing
Period of realization:: 2013-2015
Place of realization East Kazakhstan region, Ulan
district, Bagrationovsk rural district, Privolnoe
village
Current status:
Construction completed on 80%, are finishing work.
Total project cost:
497.0 million tenge
Required investments:
65.5 mln
State support:
1. Wrap the missing infrastructure on the program
"Business Road Map-2020";
2. Subsidized interest rates on loans, and leasing of
technological equipment and agricultural
machinery;
3. Investment subsidies the construction of the
dairy farm;
4. Grants for fodder production (seeds, fuels and
lubricants, herbicides, fertilizers).
Expected results Increase in the annual volume of milk production to
5 million tons
Creating jobs
20 persons
Milk processing
Opening milk processing plant
Applicant: SP "Ak Kainar"
The purpose and concept of the project: the
production and sale of milk and dairy products in
the area.
Period of realization: 2016
Project location: East Kazakhstan region, Kurchum
district, Kurchum village
Current status: There is a land plot of 1, 2 hectares. Repair of the
building of shop comes to the end. Replacement of
the sewerage is made. The project documentation is
developed.
Total project cost: 110 million tenge.
Required investments: 70 million tenge for the purchase of equipment.
Government support: Subsidies for the purchase of milk for the production
of its advanced processing
Expected Result: Processing of up to 5 000 ton of milk.
Job Creation: 10 persons
Expansion of the range of manufacture of dairy products, the installation of a
biogas plant
Applicant: a / v "E.Zaytenov"
The purpose and concept of the project: the
expansion of the range and volume of production
and sales of dairy products to the population field
Period of realization:: 2016-2018 years
Location of the project
East Kazakhstan region ,Borodulikha district,
Ivanovka village
Current status:
There are 14,982 hectares of farmland. All the
necessary material and technical base and
infrastructure are available. Project documentation
for the project is missing.
Total project cost:
130 million tenge
Required investments:
130 million tenge in the expansion and
modernization of plants for the production of cheese.
Government support:
1. Subsidizing of fee rates on loans and leasing of
technological equipment and agricultural machinery;
2. Subsidies for feed production
3. Subsidies for milk production
Expected Result:
Reaching of 60 tons of cheese production per year.
Work places:
10 persons
Reconstruction and modernization of the existing dairy
Applicant: TOO "Sunrise Milk"
The purpose and concept of the project: the
expansion of the range and volume of production
and sales of dairy products to the population field
Period of realization: 2016-2017 years
Location of the project
East Kazakhstan region , Glubokoe district,
Uvarovo village
Current status: There is a valid minishop capacity of 15 tons per
shift. Project documentation for the project is
missing.
Total project cost
150 million tenge
Required investments:
100 million tenge for the reconstruction of the
existing dairy, installation and commissioning of
equipment for packaging dairy products, the
acquisition of a special transport arrangement outlets
in regional and district centers.
Government support:
1. Subsidized interest rates on loans, and leasing of
technological equipment and agricultural machinery;
2. Subsidies for fodder production;
3. Subsidies for milk production.
Expected Result
Increase the output of dairy products up to 20 tons
per shift.
Creating jobs
4 persons
Construction of poultry
factory
Construction of poultry farm productivity
30 thousand tons of poultry meat a year
Applicant: Akimat of Urdzharsky district
The purpose and concept of the project: production
and exports out of the region and the countries of chilled
and frozen broiler meat
Period of realization: 2016-2018 years
Project location: East Kazakhstan region, Urjar district;
Current status: Akimat of the Urdzhar district for the construction of
the poultry farm will be granted 225 hectares of land
for the development of their own forage production
transferred to the long-term lease 40,808 hectares of
land, of which 4653 hectares of irrigated land.
Developed a business plan, feasibility study for the
project.
Total project cost:
23 500 mln. tenge
Required investments
23 500 mln. tenge
Government support:
1. Summary of the missing infrastructure on the program
"Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies to build poultry complex, the
introduction of irrigation systems;
4. Subsidies for fodder production (seeds, fuels and
lubricants, herbicides, fertilizers) and the delivery of
irrigation water;
5. The subsidies for the production of poultry meat, as
well as to carry out breeding.
Expected Result: Annual production of 30 thousand tons of chilled and
frozen broiler meat.
Job Creation: 879 persons
Construction of poultry farm capacity of 100 million.
Eggs per year
Applicant: Xinjiang Commerce and Industry
Corporation "San Bao"
The purpose and concept of the project: the
production and export of eggs in the Xinjiang Uygur
Autonomous Region of China
Period of realization:: 2016-2018 years
Location of the project East Kazakhstan region,
Ulan district, Bozanbay village
Current status: Signed an agreement on attraction of foreign
investments for the construction of poultry farms in
the East Kazakhstan region, dated 30 October 2015
with the Xinjiang Commerce and Industry
Corporation "San Bao" on mutual cooperation
The total cost of the project:
6,750 million. tenge
Required investments:
6 750 million. tenge
Government support:
1. Summary of the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Subsidies for fodder production (seeds, fuels and
lubricants, herbicides, fertilizers);
4. Subsidies for the production of edible eggs.
Expected Result annual production of up to 100 million of eggs
Creating jobs: 160 persons
Reconstruction of the poultry farms of egg direction
Applicant: LLP "Poultry Farm Families"
The purpose and concept of the project:
Production and sale of commercial eggs in Semey
city
Period of realization: 2016
Project location: East Kazakhstan region, Semey
city city, Small Aktyuba village
Current status: Industrial buildings, as well as all the shop poultry
farms, feed mills sealed, sealed and ready to run at
any time. Production has been suspended due to the
lack of working capital.
Total project cost:
502 million. tenge
Required investments:
150 million for working capital
Government support:
1. Subsidies for acquisition of daily young growth,
acquisition of breeding incubatory eggs, and also
reduction in cost of cost of production of food egg.
Expected Result:
Production in the year to 24.6 million. Eggs (stage 1),
which will satisfy the needs of families in the city
60%. Subsequently, it is planned to increase egg
production to 100 million pieces.
Job Creation:
48 persons
Reconstruction of
irrigated areas
Developing of 1300 hectares of irrigated land
in Zaisan district
Applicant : Akimat of Zaisan district
The purpose and concept of the project: Developing of 1300 hectares of unused land
irrigated for cultivation and sale of agricultural
products.
Period of realization: 2016
Project location: East Kazakhstan region, Zaisan district, territory and
Karabulak Aynabulakskiy rural districts.
Current status: 1000 hectares in the Karabulak rural district: the
section is in 10 km from the village of Karabulak.
Point site class of the earth 32 points. A watering
source Uydeninskiy irrigating system, the trunk
LMH2-32 channel requiring repair of intercompany
channels.
300 hectares in the Aynabulak rural district: the
section is in 3, 5 km from the village of Aynabulak.
Point site class of the earth 32 points. Watering
source Zhemeneyskiy irrigating system of the
Zhemeney river.
Total project cost: 618.5 million. tenge (approximately)
Required investments: 618.5 million. tenge (approximately)
Government support:
1. Summary of the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies for implementation of
irrigation systems;
4. Subsidies for crop production (seeds, fuels and
lubricants, herbicides, fertilizers), as well as the
delivery of irrigation water.
Expected Result:
Manufacture and sale of crop production, including
forage production management
Organization of 4157 square hectare agro- platform
"Zhanbyr"
Applicant: Akimat of the Beskaragay rayon.
The purpose and concept of the project: Developing of 4157 hectares of irrigated unused land
for cultivation and realization of agricultural products.
Period of realization: 2016-2017 years
Project location: East Kazakhstan region,
Beskaragay district, former state territory
"Krivinsky" and "Semiyarsky."
Current status: The feasibility study of the project verifying by
government.
Total project cost:
3 653.8 million. tenge (approximately)
Required investments:
3 653.8 million. tenge (approximately)
Government support:
1. Summarizing of the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidizing of fee rates on loans and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies for implementation of
irrigation systems;
4. Subsidies for crop production (seeds, fuels and
lubricants, herbicides, fertilizers), as well as the
delivery of irrigation water.
Expected Result:
Producing and selling of crop production, including
forage production.
Work places:
17 persons
Developing of 3197 hectares of irrigated landin Tarbagatai area
Applicant: Akimat of the Tarbagatay district
The purpose and concept of the project: Developing of 3197
hectares of unused land irrigated for cultivation and sale of
agricultural products.
Implementation period: 2016-2017 years
Project location: East Kazakhstan region, Tarbagatay district,
territory and Kokzhyrinsky Zhetyaralsky rural district.
Current status: 1500 hectare Zhetyaralsky rural district. The plot is at the end of
irrigation reservoir Kandysu. Irrigated through the main
channels Begetay, Kazakbay, Karash, Bolat (length about 17-25
km). Average land bonitet 20-26 points. The composition of the
soil medium loamy;
1697 hectare Kokzhyrinsky rural district. The plot is at the
end of irrigation main canal Karymsakov Bazar area. Irrigated
through internal channels Karymsakov, koybgar, Satpayev
(length 22 km). Average land bonitet 18-20 points. The
composition of the soil medium loamy;
Total project cost:
1 506.7 million. tenge (approximately)
Required investments:
1 506 7 million. tenge (approximately)
Government support:
1. Summary of the missing infrastructure on the program
"Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies for implementation of irrigation
systems;
4. Subsidies for crop production (seeds, fuels and lubricants,
herbicides, fertilizers), as well as the delivery of irrigation
water.
Expected Result:
Manufacture and sale of crop production, including forage
production management.
Developing of 4653 hectares of irrigated land
Urjar in the area to create a food base for the production of poultry farms each year
to 30 thousand tons of poultry meat
Applicant: Akimat of the Urdzhar district
The purpose and concept of the project: the
creation of fodder Urdzhar poultry farms to produce
annually up to 30 thousand tons of poultry meat.
Period of realization:: 2016-2018 years
Project location: East Kazakhstan region, Urjar area
Current status: Akimat of the Urdzhar area prepared for transfer to
long-term lease of land in 4653 hectares of unused
irrigated lands
Total project cost:
2 640.0 million. tenge
Required investments:
2 640.0 million. tenge
Government support:
1. Summary of the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies for implementation of
irrigation systems;
4. Subsidies for crop production (seeds, fuels and
lubricants, herbicides, fertilizers), as well as the
delivery of irrigation water.
Expected Result:
Provide your own food supply poultry farms
Construction of the dairy farm on 400 goals
Applicant: LLP "Batwa"
The purpose and concept of the project: organization of production of milk and dairy
products for the subsequent implementation of it in
the region and beyond
Period of realization:: 2016-2018 years
Project location: East Kazakhstan region, Urjar area
of land Sarterek
Current status On the territory of the district akimat Sarterek area
granted 200 hectares of land for the construction of
dairy farms
Total project cost:
340 mln
Required investments 340 mln, of which 270 million tenge for the
construction of the dairy farm
Government support:
1. Summary of the missing infrastructure on the
program "Business Road Map-2020";
2. Investment subsidies for implementation of
irrigation systems, the construction of the dairy farm;
3. Subsidies for feed production (fuel and lubricants
work, seeds, fertilizers, herbicides);
4. Subsidies for water delivery.
Expected Result: Organization of the dairy farm on 400 goals.
Job Creation: 50 persons
Construction of irrigation networks on irrigated land to 6000 hectares
Applicant: LLP "Batwa"
The purpose and Concept of the Project:
Expansion of irrigated land due to development of
rainfed lands fallow, introduction of new advanced
water saving technology for crops growing
Period of realization:: 2016-2018 years
Project location: East Kazakhstan region, Urjar area
of land Sarterek
Current status 6,000 hectares of irrigation networks to carry out.
Total project cost:
3000 mln
Required investments 3000 mln, 5000 million tenge to conduct irrigation
networks.
Government support:
1 Subsidies for water delivery.
Expected Result: Entering into circulation 6000 hectares of new
irrigated land..
Job Creation: 180 persons
Greenhouses
Construction of a hothouse complex
Applicant: LLP "Alzhan AGROTRADE"
The purpose and concept of the project: Growing
vegetable crops using advanced technologies.
Period of realization: 2016-2017 years
Project location: East Kazakhstan region,
Ust-Kamenogorsk city
Current status: There is a 2.2 hectare plot of land in the area of New
Sogra. The necessary infrastructure is lacking. PSD
does not. There is a business plan.
The total cost of the project: 1 350 mln. tenge
Required investments: 1 350 mln. tenge
State support:
1. Wrap the missing infrastructure on the program
"Business Road Map-2020";
2. Subsidize interest rates on loans, and leasing of
technological equipment and agricultural machinery;
3. Investment subsidies for the construction and
expansion of the greenhouse complex.
Output expected: Annual production of vegetables
and 550 tons of cucumbers and 450 tons of tomatoes.
Job Creation:
40 persons
Building a greenhouse with a mini processing plant litter and manure
Applicant: "Ust-Kamenogrosky innovative
technology"
The purpose and concept of the project:
Cultivation of agricultural products using advanced
technology.
Period of realization: 2016-2017 years
Project location: East Kazakhstan region, Ulan
district, Kasim Kaysenova village
Current status: The issue of land allocation is decided. In a selected
area has all the necessary infrastructure. Project
documentation for the project is missing.
The total cost of the project:
1 400 mln. Tenge
Required investments:
1 400 million. Tenge
State support:
1. Subsidizing interest rates on loans, and leasing of
technological equipment and agricultural machinery;
2. Investment subsidies for the construction and
expansion of the greenhouse complex
Output expected:
Annual production and sales of the region up to 1000
tons.
Job Creation:
100 persons
Maral breeding and
beekeeping
Construction of plant for packing the honey
Applicant: CH "Apiary"
The purpose and concept of the project: Increasing production and sales volumes in the
region and the Republic of honey products.
Period of realization: 2016
Project location: East Kazakhstan region, Ust-
Kamenogorsk city, Menovnoe village
Current Status: The construction of the plant and are maintained
interior finishing work. It is considering the issue of
the supply of equipment to suppliers.
Total project cost:
360 million tenge
Required investments:
140 million tenge for the purchase of equipment.
Government support:
Subsidizing interest rates on loans, and leasing of
technological equipment and agricultural machinery.
Expected Result:
The annual production of up to 1,000 ton of honey
products.
Job Creation:
15 persons
Building of innovative complex with deer corral,
antlers processing shop and wellness center
Applicant: CH "Caton-Karagayskiy deer park"
The purpose and concept of the project: Creating
a wellness center for 100 persons and deer complex
200 persons.
Period of realization: 2016-2018
Project location: East Kazakhstan region
Katonkaragay rayon, Katon-Karagay village
Current status: There is a 33 hectare plot of land. The infrastructure
is absent.
A business plan and feasibility study for the project
are ready. There is an agreement with suppliers for
the supplying of necessary materials.
The total cost of the project:
580 million tenge
Required investments: 450 mln for the construction and purchasing of
equipment for deer complex.
Government support:
1. Summarizing of the missing infrastructure on the
program "Business Road Map-2020";
2. Subsidizing of fee rates on loans and leasing of
technological equipment and agricultural machinery.
Expected result:
Processing of 200 tons antlers per year.
Work places:
12 persons
Fish farming
Complex for industrial fish farming
Applicant: LLP «Ostfish»
The purpose and concept of the project: Creation
of a significant production of fish products and
giving it to the market of Kazakhstan and beyond
Period of realization: 2015-2021 years
Project location: East Kazakhstan region, Ulan
district, Saratovka village
Current status: Allocate land of 5.6 hectares. Fully completed
construction of the complex. Completed interior
finishing work. Communication is available.
The total cost of the project:
1 881.6 million tenge
Required investments:
132 mln settlement on the road.
State support:
1. preference in accordance with the Law "On
investments";
2. Subsidizing the cost of maintaining broodstock of
valuable fish species;
The expected result in the production of 45 tons of
meat a year sturgeon, 4 tons of caviar.
Creating jobs
25 persons
Creating an integrated management of intensive cultivation of valuable species
(sturgeon, salmon, whitefish), walleye, cancer, animal feed and the production of
vermicompost in the integrated system and the development of tourism (sports and
recreational fishing)
Applicant: LLP "Kuzmich"
The purpose and concept of the project: Creation of
full-fishery commodity production and the development
of sports and recreational fishing
Period of realization: 2014-2018 years
Project location: East Kazakhstan region, Kokpekty rayon district,
Kulynzhon village
Current status: The project is ready for implementation. Investigations.
Business plan. Constructed and put into operation, the
incubation and fish processing plant, built winter
greenhouses, summed utilities including water treatment
RAS is connected to the 10kW solar power, secured land
at Bukhtarma reservoir for the development of fisheries
and tourism.
Total project cost:
170 million tenge
Required investments:
120 million tenge for working capital and construction of
tourist facilities
Government support:
1. Summary of the missing infrastructure on the program
"Business Road Map-2020";
2. The preferences in accordance with the Law "On
investments";
3. Subsidizing the cost of maintaining broodstock of
valuable fish species
Expected Result:
Growing in the year 20 tons of commercial fish
production of 100 million hatchling year.
Job creation:
33 persons
Improvement of spawning and nursery farm
Applicant: LLP "Bukhtarma spawning and nursery
farm"
The purpose and concept of the project: Updating
of fish stocks in the waters of the region and the
Republic.
Period of realization:: 2016-2018 years
Project location: East Kazakhstan region, Kurchum
district, Kurchum village
Current status: The business plan is available. The current
production base there. Infrastructure available.
Total project cost:
150 mln. Tenge
Required investments:
150 mln for the purchase of machinery and
equipment.
Government support:
Subsidizing the cost of maintaining broodstock of
valuable fish species.
Expected Result: 32.4 million. Pieces of fish fry.
Job Creation: 50 persons
Timber processing
Plant for the production of fuel pellets waste timber capacity of 20 000 tons in year
Applicant: LLP "Nurbilding"
The purpose and concept of the project: Construction of a
plant production of fuel briquettes from waste wood
processing capacity of 20 000 tons in year.
Implementation period: 2016-2017 years
Project location: Place of Ust-Kamenogorsk
Current status: The business plan, feasibility study. There is a plot pl.5,5
hectares of land in the "Zone of business development on
the Mashinostroiteley street Ust-Kamenogorsk
city. "All necessary engineering and transport
communications are available.
Total cost project:
270 million. тenge.
Required investments:
270 million. тenge.
The State Support:
1.Summarizing missinginfrastructure
the program "Business Road Map-2020";
2.Preferences in accordance with the Law "On
Investments ";
3.Different measures of financial and nonfinancial
state support and business development services
business support for the "Road Map of Business-2020 ";
Job Creation 47 persons
Construction of plant for production of wood MDF thickness of 2.3 to 13 mm
further downstream processing
Applicant: LLP "FAVORITE"
The purpose and concept of the project: Production of
MDF 50 thousand m3.
There are all the necessary technical conditions
construction.
Estimated profit - up to 40 million. Dollars. Per annum
Implementation period: 2016-2017 years
Location of the project Ziryanovsk
Current Status There are all the necessary technical conditions
construction.
Total project cost: 9 450,0 mln. Tenge.
Required investments: 9 450.0 mln. Tenge.
The State Support:
1.Summarizing missing infrastructure
the program "Business Road Map-2020";
2.Preferences in accordance with the Law "On
Investments ";
3.Different measures of financial and nonfinancial
state support and business development
business support services for program "Business Road
Map-2020";
Expected Result: Production of wood pellets capacity of 70 thousand tons
per year.
Estimated profit - from 40 euros tons of pellets and
briquettes
Creating jobs: 250 persons
Building of department
for the production of wood pellets (pellets) and wood briquettes.
Alternative sources of heat to replace coal and oil
Applicant: PC "KAZAKHSTAN"
The purpose and concept of the project: Production of
wood pellets capacity of 70 thousand tons per year.
Implementation period: 2016-2017 years
Project location: Zyryanovsk rayon city
Current status: We have all the necessary technical conditions
construction.
Total cost project 3 780.0 mln. Тenge
Required investments 3 780.0 mln. Тenge
The State Support:
1.Summarizing missing infrastructure
the program "Business Road Map-2020";
2.Preferences in accordance with the Law "On
Investments ";
3.Different measures of financial and nonfinancial
state support and business development services business
support for the "Road Map of Business-2020 ";
Expected result: Estimated profit - from 40 euros per ton of pellets and
briquettes
Job creation 255 persons
Construction of the plant for the production of chip-cement slabs, Production
of wooden building constructions for housing
Applicant: LLP "Altai RIV"
The purpose and concept of the project: Production of
particle-cement boards board (permanent formwork for
social housing and industrial facilities), production of
wooden building designs for house building "House of
the package."
Implementation period: 2016-2017 years
Place of Ust-Kamenogorsk
Current status We have all the necessary technical conditions
construction. 1 MW Electricity, water 20 thousand cu. /
year.
Network and communications are to connect to the
within 50 meters of land area portion.
The total cost of the project 2 250.0 million. Tenge
Required investments 2 250.0 million. Tenge
The State Support 1. Summarizing missing infrastructure the program
"Business Road Map-2020";
2. Preferences in accordance with the Law "On
Investments ";
3. Different measures of financial and nonfinancial state
support and business development business support
services for program "Business Road Map-2020";
Creating jobs 355 persons
: -
:
Organization of the production of wood products
Applicant: SP "Tsykunov AA"
The purpose and concept of the project: Procurement of
raw materials for the wood production and the further
processing.
Implementation period: 2016-2017 years
Project location: Ridder city
Current status: - At the design stage
Total project cost: 750.0 million. Tenge
Required investments: 720.0 million. Tenge
The State Support 1. Summing missing infrastructure the program "Business
Road Map-2020";
2. Preferences in accordance with the Law "On Investments
";
3. Different measures of financial and nonfinancial state
support and business development services business
support for the "Road Map of Business-2020 "; Expected
result: The final product (the number of ton per year):
- Cutting board - 10,000 m3; - Dry timber - 1350 m3; -
Laminated veneer lumber for housing - 1200m3; - glulam
for manufacturing euro windows - 1200m3; - Round logs
for log cabins - 10000m3; - wooden doors
Creating jobs 60 persons
: -
Reconstruction of the sawmill for placement of OSB production line
Applicant: LLP "Ridder MLC"
The purpose and concept of the project: Reconstruction of a
sawmill line placement production boards OSB.
The source of the raw material is wood, including semi-
subsistence, softwood and hardwood timber. Crushing
machine and press - China.
Implementation period: 2016-2017 years
Place of Ridder city
Current status At the design stage.
total cost project: 300.0 million. Tenge
Required investments 300.0 million. Tenge
The State Support 1. Summarizing missing infrastructure program "Business
Road Map-2020";
2. Preferences in accordance with the Law "On Investments ";
3. Different measures of financial and nonfinancial state
support and business development services business support
for the "Road Map Business-2020 ";
Expected result The company is planning for the project to achieve the
volume of production and sales of 36-40 m3 in year.
Creating jobs 60 persons
: -
:
The project of deep processing of waste deciduous and coniferous forests second,
third grade, sawdust and straw
Applicant: SP "Grigoryev N."
The purpose and concept of the project: Starting line
(capacity 1000 kg / h) for Production of biofuel briquettes
high quality charcoal class A, including the preparation of
raw materials to the processing and Organization and
storage of primary end product.
Implementation period: 2016-2017 years
Project location: Ridder city
Current status: At the design stage.
The total cost of the project: 60.0 mln. Tenge
Required investments: 60.0 mln. Tenge
The State Support:
1. Summarizing missing infrastructure the program
"Business Road Map-2020";
2. Preferences in accordance with the Law "On Investments
";
3. Different measures of financial and nonfinancial state
support and business development services business
support for the "Road Map of Business-2020 ";
Expected result: The final product (the number of ton per year): -
Biofuel briquettes - 3,000 tons; - charcoal
Class A - 1 000 ton
Creating jobs 100 persons
: -
Organization of mini-factory for the production of plywood (veneer)
Applicant: Andrievsky, AL
The purpose and concept of the project: Production of 10
sqm veneer month.
Implementation period: 2016-2017 years
Project location: the Shemonaikha city
Current status: - Prepared Spaces the plant, prepared a
business plan is being work on the collection of documents,
preparing collateral mass.
Total cost project: 25.0 mln. Tenge
Required investments: 20.0 mln. Tenge
The State Support:
1. Summarizing missing infrastructure the program
"Business Road Map-2020";
2. Preferences in accordance with the Law "On Investments
";
3. Different measures of financial and nonfinancial state
support and business development services business
support for the "Road Map of Business-2020 ";
Expected Result:
Production of 10 thousand of veneer per month.
Creating jobs 25 persons
The country tourism
and improvement of the
persons health
Creating a tourist base for 125 places
Applicant: LLP "Topkayyn"
The purpose and concept of the project: the
development of agricultural tourism
Period of realization: 2016-2019 years
Project location: Katon district, Topkayyn village
Current status: There are 10 hectares of land bought out. There is a
business plan, feasibility study, project
documentation project. The construction of 7 guest
houses.
Total project cost:
810 million tenge
Required investments:.
750 million tenge for the purchase of fixed and
current assets
Expected Result:
adoption annually until 1500 campers
Job Creation:
30 persons
Construction of ethno-ecological agricultural tourism and recreation сentre
Applicant: SP "Kanapyanov"
The purpose and concept of the project: the
development of agricultural tourism
Period of realization: 2016-2017 years
Project location: East Kazakhstan region, Ulan
district, Kobayashi Utepov village
Current status: Available land of 580 hectares. The project is under
development
Total project cost: 370 million tenge
Required investments: 300 million tenge for the construction of the base, a
cafe, stables
Expected Result: restoration of the destroyed ethno-village of Kush-
Birlik with a single capacity of 60 persons
Job Creation: 11 persons
Production of cleaned water
Applicant: LLP "Shygys Su Bio»
The purpose and concept of the project meet the
needs of the population with quality drinking water
Period of realization: 2016-2017 years
Project location : East Kazakhstan region, Ust-Kamenogorsk city
Current status: The issue of allocation of land under development.
There is a business plan
Total project cost: 100 million tenge
Required investments: 100 million tenge for the purchase of technological
equipment.
Expected Result: Cleansing the year 2400 tons of tap water.
Job Creation: 12 persons
Transport and logistic
centres
The opening of the service center for the sale of tractors and agricultural equipment
Applicant: LLP "Irtysh TK"
The purpose and concept of the project: the
opening of a service center for the sale of tractors and
agricultural equipment.
Period of realization: 2016-2018 years.
Location of the project: East Kazakhstan region,
Zaisan district, Zaisan city
Current state: The issue of allocation of land under development. It
developed a business plan and feasibility study for
the project.
Total project cost: 80 million tenge.
Required investments: 80 million tenge for the construction of the service
center, and working capital
Expected Result: Sales and service of each year until 3000 tractors.
Job creation: 25 persons
The organization of agriculture transport and logistics center "Northern"
Applicant: SP "Aubakirov NT"
The purpose and concept of the project: Organization of transport and logistics center of
transit and trade.
Period of realization:: 2015-2017 years
Project location: East Kazakhstan region, Semey
city city
Total project cost: 750 million tenge
Required investments: 350 million tenge for the construction of warehouses
and storage facilities.
Expected Result: The increase in supply turnover
Job creation: 30 persons
The organization of agriculture transport and logistics center
Applicant: SP "Khamitov AA"
The purpose and concept of the project:
Organization of transport and logistics center of
transit and trade.
Period of realization: 2015-2016 years
Location of the project East Kazakhstan region,
Shemonaikha city
Current status: Under construction Growers. Built checkpoint,
carried out all the finishing work.
Total project cost: 1160 mln
Required investments: 750 million tenge
Expected Result The increase in turnover.
Creating jobs 30 persons
-
Construction of bridges
Construction and operation of a bridge across the reservoir Bukhtarma
Applicant: Akimat of East Kazakhstan region, in the
face of "Department of passenger transport and
highways East Kazakhstan region"
Period of realization: 2017-2019 years
Project location: East Kazakhstan region, Kurchum
district
The purpose and concept of
the project:
to promote industrial and innovative development of
East Kazakhstan region of the Republic of
Kazakhstan by improving the transport infrastructure
in the region
• provide residents and businesses of the East
Kazakhstan region year-round opportunity to cross
to the opposite shore of the reservoir Bukhtarma
without threat to life and health
• give impetus to economic development of the
surrounding areas Bukhtarma lake: Zharma,
Kokpekty rayon, Kurchum and Katon-Karagay
• increases the investment appeal of industrial and
agricultural enterprises in the region through the
development of transport infrastructure
It creates a favorable environment for the
development of transport and logistics industry,
international transit traffic, the growth of domestic
and foreign trade
Current state:
Feasibility study of the project is developed, there is
a conclusion of the state, environmental, industry
expertise, is currently in the Ministry of National
Economy of Kazakhstan for the passage of economic
expertise.
Total project cost 23,578 million tenge
Required investments 23,578 million tenge
Expected Result:
The provision of safe crossings, reducing deaths,
improving the organization of traffic at any time of
the year and the increase in traffic. Total cargo ferry
Kyzyl Tu in 2014 for the navigation period totaled
45,465 units; according to the forecasts for the first
year of operation of freight traffic was 372 thousand.
Units per year;
• will be given a boost to the economy surrounding
Bukhtarma reservoir area: Zaisan, Kokpekty rayon,
Kurchum and Katon-Karagai;
• increase the investment attractiveness of industrial
and agricultural enterprises in the region through the
development of transport infrastructure;
• increase the competitiveness of domestic
manufacturing enterprises by reducing transportation
costs, a significant share in the cost structure;
• The project will boost the performance of domestic
and international tourism by increasing access of
tourists to the recreational areas adjacent to
Bukhtarma reservoir.
Job creation: 47 persons