![Page 1: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/1.jpg)
SOUTH AFRICA INVESTMENTCONFERENCE
2019
INVESTMENT PIPELINE
![Page 2: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/2.jpg)
Disclaimer for the Investment Pipeline
This document contains information related to investments (or potential investments) compiled by Invest SA and the Industrial Development Corporation of South Africa Limited (“IDC”), as the Secretariat for the South African Investment Conference (“SAIC”). No representation or warranty, express or implied, is made by Invest SA, IDC and the Secretariat for the South Africa Investment Conference as to the accuracy or completeness of any of the information contained herein or any other written or oral communication transmitted or made available to a prospective investor. Nothing contained in this booklet is, or shall be relied upon as, a promise or representation, whether as to the past or the future performance of the investments listed herein.
![Page 3: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/3.jpg)
Selection process and criteria for listed investment opportunities/projects1.
• The project should be in at least the bankable feasibility stage of development
• The project sponsors provided a qualitative assessment of the technical, marketing, financial and regulatory readiness of the project. Projects with significant issues were excluded
Project Readiness
• Greater than 50 million investment requirement
Approval Sponsors
• Only those projects approved for publication by the project sponsors are included in the investment pipeline
1
2
3
Investment Size
![Page 4: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/4.jpg)
Explanation of Project Development Stages2.
3. Project spread by sector
ImplementationScoping Pre- ImplementationPre- feasibility Bankable Feasibility
• Desk top study/ screening to determine if there is a potential business case
• Investigate different options.• Narrow down best option. Determine a business case
• Refine the selected option to improve the business case and finalise financial structure
• Setting up of construction site, employment of personnel and training
• Construction of plant and infrastructure commissioning
![Page 5: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/5.jpg)
Published investment pipeline4.
The salmon farming initiative will enter a Pilot Phase producing 400 tonnes per
annum, ramping up to 2,000 tonnes per annum. South Africa imports an
estimated 5,000 tonnes of salmon per annum.
Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)
Funding Gap (Rm)
#
The development of a biofuel manufacturing facility based on Waste
Vegetable Oil and animal fats
South Africa
South Africa
Eastern Cape
Eastern Cape
210 80Bankable Feasibility
Pre-implementation
AquacultureResource Based
Industries
1
Renewable Energy
Green Economy
Land based cultivation of abalone with an initial capacity of 400 tons
South Africa Eastern Cape
1 376 1 376
Resource Based
Industries
Agro-processing Bankable Feasibility
South Africa Eastern Cape
318 127
50 30Establishment of accommodation, catering, Spa, and other entertainment
and leisure facilities near Nkanya Estuary in Elliotdale
Sandstone quarrying with the following product lines: Hand Chipped
sandstone blocks, small bricks, cladding tiles, tombstones, pebbles/
off-cuts/bags
This project consists of Agri processing hub, Industrial Park,
Logistics center and Fresh Produce Market. The development will work
in conjunction with the various surrounding housing mega projects
and strives towards upliftment and development of the West Rand and
Soweto communities.
Pre-implementation
Pre-implementation
Bankable Feasibility
Services
Resource Based
Industries
Tourism
South Africa
South Africa
Free State 37 35
Gauteng 20 000 1 300Resource Based
Industries
Mining and Mineral
Beneficiation
2
3
4
5
6 Agro-processing
![Page 6: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/6.jpg)
Hammarsdale Waste Beneficiation Centre (HWBC) for municipal solid
waste and recyclables including plastic, glass and paper. 4 linked projects
HWBC – Operational Funding Requirement (R2.1m)
HWBC – Woodworking Enterprise Development Facility (4.6m)HWBC – Facility Retrofitting
Construction Requirement (R0.5m)HWBC Phase II expansion funding
(R78m)
Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)
Funding Gap (Rm)
#
South Africa Kwa-Zulu Natal 85,2 85,2Pre-implementationWaste Economy Green Economy
7
The first majority owned community mega project in SA to develop a
new city in a depressed mining rural area consisting of 5400 new housing
units, infrastructure, and commercial mixed use development. The project
is adjacent to the iconic Sun City, Pilansberg Nature Reserve, opposite
Wesizwe Platinum mine, and within a radius of 20 km to other platinum
mines. Thirty km radius to the new SEZ and Pilansberg International Airport.
South Africa North WestServices Property Development
3 200 2 000
South Africa North West 60 56AdvancedManufacturing
8
White Goods9 The company has identified an opportunity in the PCB assebly market,
specifically for supplying to the PC, smart metre and LED market segments.
Leema industries is relying on the opportunity presented by local content requirements for electronics procured
by the South African government. The intention is to start with PCB assembly
and then scale up to full manufacturing.
Pre-implementation
Pre-implementation
Implementation South Africa North West 180 180High tech sheep farming aimed at producing 1620 lambs a year . The
sheep are kept in a fully enclosed and secured environment ensuring that
there is no theft nor predator loss and the hygienic standards ensure that
the farm is registered as a quarantine environment which reduces the risk
of disease. Facilities will include 2 x 45m square hydroponic green barley
fodder systems,each producing 2000kg of sprouted barley fodder per day.
10 Agro-processingResource Based
Industries
![Page 7: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/7.jpg)
ALOE VIEW ESTATES is an integrated community development comprising
of 1340 affordable Full Title housing units, 3030 Sectional Title housing
units, 6864 Social Housing rental units, 156 000 m2 of retail stands, 173 000 m2
of Commercial Stands, 25 000 m2 of Hotel stands, 20 000 m2 of Filling station
stands, with provision for Schools, Community Centres and Public
Transport facilities.
Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)
Funding Gap (Rm)
#
South Africa North West 4200 50Pre-implementationProperty Development
Services 11
Chicken Abattoir with a capacity of 6000-8000bph
Ratan Poultry farm is situated in the North-West Province. The farm
currently has broiler production facilities with a production capacity of
300 000 chickens per cycle (2.25 million / yr.) and is currently contracted to
Kroon’s Poultry North West of Pretoria. The design and layout of the abattoir is
done for a slaughter capacity of 6000 birds per hour, or 240 000 chickens per week, based on a single shift of 8 hours
per day..
South Africa North WestResource Based
Industrie
Agro-processing
2 500 2 000
South Africa North West 2 400 850Services
12
Property Development
13 MATLOSANA N12 DEVELOPMENT “ THE SMART CITY DEVELOPMENT”
The Matlosana N12 Development spans some 1 100Ha on both sides
of the N12 Treasure Route Corridor, situated between the mining towns of Klerksdorp and Stilfontein, in the City
of Matlosana, DRKK district, North West Province of South Africa. It is a fully
integrated mixed-use development i.e. Commercial, Residential, Institutional
and Industrial developments.
Bankable Feasibility
Pre-implementation
Germany and South Africa
Western Cape 2 300 600Through a strategic partnership with the German co-investor, the
company is looking at establishing a ground-breaking 26ha spiral pipe
manufacturing facility which will be the first facility of its kind in Africa – as
well as majority black-owned.
14 Metal IndustriesManufacturing Pre-implementation
![Page 8: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/8.jpg)
Greenfield project (500 hectares) for the cultivation, processing and
packaging of macadamia nuts.
Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)
Funding Gap (Rm)
#
South Africa Western Cape 300 250ImplementationAgro-processing
Resource Based
Industries
15
The Cape Health Technology Park (CHTP) aims to be a world-class
innovation facility which will culminate in the co-location of innovative
firms, government, academia, health innovation programmes and business
& innovation support organizations, all of which will incorporate the principals
of a high-performing Knowledge Based Bio-Economy (KBBE) cluster in a
purpose-built facility.
For the purposes of this document, the Health Technology industries are:
South Africa Western CapeAdvanced Manufacturing
Health Technology
650 650
South Africa Western Cape 155 155Resource Based
Industries
17
Agro-processing
18 Land Extent: 144,336m2Est. Bulk Area: 70,649m2
The ACSA site is a 16ha parcel of land which is strategically located
approximately 2km east of Cape Town International Airport.
The proposed development is envisioned as a Western Cape Halal
Hub that has the potential to act as a regional distribution centre for time-
sensitive, high value goods that require air freight.
The site attributes lend itself to the consolidation of activities rather
than large scale production, and thus is envisioned as a Halal Distribution
Hub. The site has General Industrial 1 zoning.
The project is seeking a developer to lead implementation.
Bankable Feasibility
Bankable Feasibility
GreenTastic is a commercial producer of Fresh Produce using smart farming
technologies (NFT) Hydroponic System which has been developed in Israel for
more than 20 years.
South Africa Western Cape 200 100ImplementationAgro-processing
Resource Based
Industries
16
1. Medical Devices2. Digi-Health3. Bio-Tech4. Pharmaceutical5. Indigenous medicine
![Page 9: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/9.jpg)
Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)
Funding Gap (Rm)
#
Land Extent: 176,879m2Est. Bulk Area: 61,177m2
An attractive opportunity exists to develop a specialist Halal Industrial
Park of approximately 18 hectares in the Klapmuts area near Stellenbosch.
One of the site’s most significant attributes is its location directly
adjacent to the N1 national freeway, accessing a strategic major transport
corridor.
The project is seeking a developer to lead implementation.
The ACSA site is a 16ha parcel of land which is strategically located
approximately 2km east of Cape Town International Airport.
The proposed development is envisioned as a Western Cape Halal
Hub that has the potential to act as a regional distribution centre for time-
sensitive, high value goods that require air freight.
The site attributes lend itself to the consolidation of activities rather than
large scale production, and thus is envisioned as a Halal Distribution Hub.
The site has General Industrial 1 zoning.
The project is seeking a developer to lead implementation.
South Africa Western Cape 146 146Bankable FeasibilityAgro-processing
Resource Based Industries
19
Land Extent: 615,880m2Est. Bulk Area: 286,413m2
An attractive investment opportunity exists to develop a specialist Halal
Industrial Park on 67 hectares of land in the Lynedoch area near Stellenbosch.
The land is owned by Stellenbosch Municipality and a long lease is available.
The development is envisioned as a Western Cape Halal Industrial Park
that has the potential to act as a manufacturing hub. The Lynedoch site
is a 67ha parcel of land strategically located within the Boland area, the
agricultural heartland of the Western Cape.
The project is seeking a developer to lead implementation.
South Africa Western Cape 598 598Pre-feasibilityOil and GasServices 20
![Page 10: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/10.jpg)
Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)
Funding Gap (Rm)
#
The project aims to develop a Strategic Dry Port in Cato Ridge as a Back of the
Port facility that seeks to decongest the Durban port and CBD thereby
creating additional capacity for the port. The facility will be a consolidated
logistic hub with associated value-added services. This includes the
development of the following four (4) catalytic core projects:
a. Truck Stop and Staging b. Inland Port / Intermodal Terminal c. Logistics and Industrial Parks d. Tanks Farm and Pipeline
South Africa Kwa-Zulu Natal 20 000 20 000Pre-feasibilityOil and GasServices 21
South Africa Mpumalanga 2 000 700Services Property Development
24 Construction of a fresh produce market
4000 ha of Moringa and 4000 ha of sisal to produce a 50 MW biogas
renewable energy project. The project combines renewable energy with local
economic development and significant employment opportunities.
South Africa Limpopo 2 500 1 500Pre-implementationWaste EconomyGreen Economy
22
The project comprises of 3.0mt of open cast resource and 4.0mt of
under ground resource. The chrome wash plant has a feed capacity of 28
000 tonnes per month producing approximately 17 000 tonnes of 42-44%
chrome.The reserve contains 1.6g/t of PGM
South Africa LimpopoResource Based
Industries
Mining and Mineral
Beneficiation
350 30023 Pre-implementation
Pre-implementation
![Page 11: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging](https://reader036.vdocuments.us/reader036/viewer/2022063012/5fca513457976349045979ef/html5/thumbnails/11.jpg)
Mr Yunus HoosenHead: InvestSAE: [email protected]: +27 (0) 12 394 1032
Mr. Percy NgobeliDeputy Director: Investment Lead ManagementE: [email protected]: +27 (0) 12 394 5792