Page 1: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

SOUTH AFRICA INVESTMENTCONFERENCE

2019

INVESTMENT PIPELINE

Page 2: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Disclaimer for the Investment Pipeline

This document contains information related to investments (or potential investments) compiled by Invest SA and the Industrial Development Corporation of South Africa Limited (“IDC”), as the Secretariat for the South African Investment Conference (“SAIC”). No representation or warranty, express or implied, is made by Invest SA, IDC and the Secretariat for the South Africa Investment Conference as to the accuracy or completeness of any of the information contained herein or any other written or oral communication transmitted or made available to a prospective investor. Nothing contained in this booklet is, or shall be relied upon as, a promise or representation, whether as to the past or the future performance of the investments listed herein.

Page 3: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Selection process and criteria for listed investment opportunities/projects1.

• The project should be in at least the bankable feasibility stage of development

• The project sponsors provided a qualitative assessment of the technical, marketing, financial and regulatory readiness of the project. Projects with significant issues were excluded

Project Readiness

• Greater than 50 million investment requirement

Approval Sponsors

• Only those projects approved for publication by the project sponsors are included in the investment pipeline

1

2

3

Investment Size

Page 4: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Explanation of Project Development Stages2.

3. Project spread by sector

ImplementationScoping Pre- ImplementationPre- feasibility Bankable Feasibility

• Desk top study/ screening to determine if there is a potential business case

• Investigate different options.• Narrow down best option. Determine a business case

• Refine the selected option to improve the business case and finalise financial structure

• Setting up of construction site, employment of personnel and training

• Construction of plant and infrastructure commissioning

Page 5: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Published investment pipeline4.

The salmon farming initiative will enter a Pilot Phase producing 400 tonnes per

annum, ramping up to 2,000 tonnes per annum. South Africa imports an

estimated 5,000 tonnes of salmon per annum.

Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)

Funding Gap (Rm)

#

The development of a biofuel manufacturing facility based on Waste

Vegetable Oil and animal fats

South Africa

South Africa

Eastern Cape

Eastern Cape

210 80Bankable Feasibility

Pre-implementation

AquacultureResource Based

Industries

1

Renewable Energy

Green Economy

Land based cultivation of abalone with an initial capacity of 400 tons

South Africa Eastern Cape

1 376 1 376

Resource Based

Industries

Agro-processing Bankable Feasibility

South Africa Eastern Cape

318 127

50 30Establishment of accommodation, catering, Spa, and other entertainment

and leisure facilities near Nkanya Estuary in Elliotdale

Sandstone quarrying with the following product lines: Hand Chipped

sandstone blocks, small bricks, cladding tiles, tombstones, pebbles/

off-cuts/bags

This project consists of Agri processing hub, Industrial Park,

Logistics center and Fresh Produce Market. The development will work

in conjunction with the various surrounding housing mega projects

and strives towards upliftment and development of the West Rand and

Soweto communities.

Pre-implementation

Pre-implementation

Bankable Feasibility

Services

Resource Based

Industries

Tourism

South Africa

South Africa

Free State 37 35

Gauteng 20 000 1 300Resource Based

Industries

Mining and Mineral

Beneficiation

2

3

4

5

6 Agro-processing

Page 6: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Hammarsdale Waste Beneficiation Centre (HWBC) for municipal solid

waste and recyclables including plastic, glass and paper. 4 linked projects

HWBC – Operational Funding Requirement (R2.1m)

HWBC – Woodworking Enterprise Development Facility (4.6m)HWBC – Facility Retrofitting

Construction Requirement (R0.5m)HWBC Phase II expansion funding

(R78m)

Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)

Funding Gap (Rm)

#

South Africa Kwa-Zulu Natal 85,2 85,2Pre-implementationWaste Economy Green Economy

7

The first majority owned community mega project in SA to develop a

new city in a depressed mining rural area consisting of 5400 new housing

units, infrastructure, and commercial mixed use development. The project

is adjacent to the iconic Sun City, Pilansberg Nature Reserve, opposite

Wesizwe Platinum mine, and within a radius of 20 km to other platinum

mines. Thirty km radius to the new SEZ and Pilansberg International Airport.

South Africa North WestServices Property Development

3 200 2 000

South Africa North West 60 56AdvancedManufacturing

8

White Goods9 The company has identified an opportunity in the PCB assebly market,

specifically for supplying to the PC, smart metre and LED market segments.

Leema industries is relying on the opportunity presented by local content requirements for electronics procured

by the South African government. The intention is to start with PCB assembly

and then scale up to full manufacturing.

Pre-implementation

Pre-implementation

Implementation South Africa North West 180 180High tech sheep farming aimed at producing 1620 lambs a year . The

sheep are kept in a fully enclosed and secured environment ensuring that

there is no theft nor predator loss and the hygienic standards ensure that

the farm is registered as a quarantine environment which reduces the risk

of disease. Facilities will include 2 x 45m square hydroponic green barley

fodder systems,each producing 2000kg of sprouted barley fodder per day.

10 Agro-processingResource Based

Industries

Page 7: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

ALOE VIEW ESTATES is an integrated community development comprising

of 1340 affordable Full Title housing units, 3030 Sectional Title housing

units, 6864 Social Housing rental units, 156 000 m2 of retail stands, 173 000 m2

of Commercial Stands, 25 000 m2 of Hotel stands, 20 000 m2 of Filling station

stands, with provision for Schools, Community Centres and Public

Transport facilities.

Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)

Funding Gap (Rm)

#

South Africa North West 4200 50Pre-implementationProperty Development

Services 11

Chicken Abattoir with a capacity of 6000-8000bph

Ratan Poultry farm is situated in the North-West Province. The farm

currently has broiler production facilities with a production capacity of

300 000 chickens per cycle (2.25 million / yr.) and is currently contracted to

Kroon’s Poultry North West of Pretoria. The design and layout of the abattoir is

done for a slaughter capacity of 6000 birds per hour, or 240 000 chickens per week, based on a single shift of 8 hours

per day..

South Africa North WestResource Based

Industrie

Agro-processing

2 500 2 000

South Africa North West 2 400 850Services

12

Property Development

13 MATLOSANA N12 DEVELOPMENT “ THE SMART CITY DEVELOPMENT”

The Matlosana N12 Development spans some 1 100Ha on both sides

of the N12 Treasure Route Corridor, situated between the mining towns of Klerksdorp and Stilfontein, in the City

of Matlosana, DRKK district, North West Province of South Africa. It is a fully

integrated mixed-use development i.e. Commercial, Residential, Institutional

and Industrial developments.

Bankable Feasibility

Pre-implementation

Germany and South Africa

Western Cape 2 300 600Through a strategic partnership with the German co-investor, the

company is looking at establishing a ground-breaking 26ha spiral pipe

manufacturing facility which will be the first facility of its kind in Africa – as

well as majority black-owned.

14 Metal IndustriesManufacturing Pre-implementation

Page 8: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Greenfield project (500 hectares) for the cultivation, processing and

packaging of macadamia nuts.

Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)

Funding Gap (Rm)

#

South Africa Western Cape 300 250ImplementationAgro-processing

Resource Based

Industries

15

The Cape Health Technology Park (CHTP) aims to be a world-class

innovation facility which will culminate in the co-location of innovative

firms, government, academia, health innovation programmes and business

& innovation support organizations, all of which will incorporate the principals

of a high-performing Knowledge Based Bio-Economy (KBBE) cluster in a

purpose-built facility.

For the purposes of this document, the Health Technology industries are:

South Africa Western CapeAdvanced Manufacturing

Health Technology

650 650

South Africa Western Cape 155 155Resource Based

Industries

17

Agro-processing

18 Land Extent: 144,336m2Est. Bulk Area: 70,649m2

The ACSA site is a 16ha parcel of land which is strategically located

approximately 2km east of Cape Town International Airport.

The proposed development is envisioned as a Western Cape Halal

Hub that has the potential to act as a regional distribution centre for time-

sensitive, high value goods that require air freight.

The site attributes lend itself to the consolidation of activities rather

than large scale production, and thus is envisioned as a Halal Distribution

Hub. The site has General Industrial 1 zoning.

The project is seeking a developer to lead implementation.

Bankable Feasibility

Bankable Feasibility

GreenTastic is a commercial producer of Fresh Produce using smart farming

technologies (NFT) Hydroponic System which has been developed in Israel for

more than 20 years.

South Africa Western Cape 200 100ImplementationAgro-processing

Resource Based

Industries

16

1. Medical Devices2. Digi-Health3. Bio-Tech4. Pharmaceutical5. Indigenous medicine

Page 9: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)

Funding Gap (Rm)

#

Land Extent: 176,879m2Est. Bulk Area: 61,177m2

An attractive opportunity exists to develop a specialist Halal Industrial

Park of approximately 18 hectares in the Klapmuts area near Stellenbosch.

One of the site’s most significant attributes is its location directly

adjacent to the N1 national freeway, accessing a strategic major transport

corridor.

The project is seeking a developer to lead implementation.

The ACSA site is a 16ha parcel of land which is strategically located

approximately 2km east of Cape Town International Airport.

The proposed development is envisioned as a Western Cape Halal

Hub that has the potential to act as a regional distribution centre for time-

sensitive, high value goods that require air freight.

The site attributes lend itself to the consolidation of activities rather than

large scale production, and thus is envisioned as a Halal Distribution Hub.

The site has General Industrial 1 zoning.

The project is seeking a developer to lead implementation.

South Africa Western Cape 146 146Bankable FeasibilityAgro-processing

Resource Based Industries

19

Land Extent: 615,880m2Est. Bulk Area: 286,413m2

An attractive investment opportunity exists to develop a specialist Halal

Industrial Park on 67 hectares of land in the Lynedoch area near Stellenbosch.

The land is owned by Stellenbosch Municipality and a long lease is available.

The development is envisioned as a Western Cape Halal Industrial Park

that has the potential to act as a manufacturing hub. The Lynedoch site

is a 67ha parcel of land strategically located within the Boland area, the

agricultural heartland of the Western Cape.

The project is seeking a developer to lead implementation.

South Africa Western Cape 598 598Pre-feasibilityOil and GasServices 20

Page 10: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Sector Sub-sector Project Status Project Description Country of Origin Province Investment Value (R millions)

Funding Gap (Rm)

#

The project aims to develop a Strategic Dry Port in Cato Ridge as a Back of the

Port facility that seeks to decongest the Durban port and CBD thereby

creating additional capacity for the port. The facility will be a consolidated

logistic hub with associated value-added services. This includes the

development of the following four (4) catalytic core projects:

a. Truck Stop and Staging b. Inland Port / Intermodal Terminal c. Logistics and Industrial Parks d. Tanks Farm and Pipeline

South Africa Kwa-Zulu Natal 20 000 20 000Pre-feasibilityOil and GasServices 21

South Africa Mpumalanga 2 000 700Services Property Development

24 Construction of a fresh produce market

4000 ha of Moringa and 4000 ha of sisal to produce a 50 MW biogas

renewable energy project. The project combines renewable energy with local

economic development and significant employment opportunities.

South Africa Limpopo 2 500 1 500Pre-implementationWaste EconomyGreen Economy

22

The project comprises of 3.0mt of open cast resource and 4.0mt of

under ground resource. The chrome wash plant has a feed capacity of 28

000 tonnes per month producing approximately 17 000 tonnes of 42-44%

chrome.The reserve contains 1.6g/t of PGM

South Africa LimpopoResource Based

Industries

Mining and Mineral

Beneficiation

350 30023 Pre-implementation

Pre-implementation

Page 11: INVESTMENT PIPELINE€¦ · logistic hub with associated value-added services. This includes the development of the following four (4) catalytic core projects: a. Truck Stop and Staging

Mr Yunus HoosenHead: InvestSAE: [email protected]: +27 (0) 12 394 1032

Mr. Percy NgobeliDeputy Director: Investment Lead ManagementE: [email protected]: +27 (0) 12 394 5792

www.investsa.gov.za